07.08.2013 Views

eMPower 3.2 Administrator Manual - Ektron

eMPower 3.2 Administrator Manual - Ektron

eMPower 3.2 Administrator Manual - Ektron

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Setting up the Order of Approval<br />

Concepts<br />

The order in which a content block gets approved can be set up in one of<br />

the three ways:<br />

• Assigning one publisher per content group<br />

• Assigning two or more publishers per content group<br />

• Assigning no publishers to a content group<br />

If you assign one publisher to a content group, the content block will be<br />

assigned to that person when the author submits the content block for<br />

approval. When this is done, the person assigned publishing permissions<br />

will have the chance to review the content of the content block and decide<br />

to either decline the changes or publish the content block. If the publisher<br />

declines the content block it will be put back into revision control and a notification<br />

will be sent to the author. If the content block is published, it will go<br />

live on the Web site, i.e. it will be viewable to the public.<br />

If you assign two or more publishers you must consider the order in which<br />

User Groups should review the content block. This order is established in a<br />

list format, where the Users high on the list will review the content block<br />

before the Users low on the list. The order of this list is determined by using<br />

the <strong>eMPower</strong> <strong>Administrator</strong> Console.<br />

NOTE: The approval list is always processed in a top down manner. As a result, a<br />

User Group’s order in the list is an important consideration in terms of who<br />

gets to review a submitted content block. This consideration is especially<br />

evident when a User of a group listed in the approval process submits a<br />

content block to be published. For example, if that User is part of a group<br />

listed in the middle of the list, only the reviewers below the middle will get to<br />

review that User’s content block. The review process always flows down<br />

the list, never up. If you want to change this situation you will have to create<br />

a new content block group that has a different review order and have the<br />

author create and submit the content block to this new group.<br />

Assigning no publishers to a content group allows you to make a content<br />

block live without going through a review process.<br />

In all three cases, the “Save and Submit” button, supplied as part of the<br />

approval process must be clicked to either start the review process or publish<br />

the content block. If there are one or more publishers identified, pressing<br />

this button will start and increment the approval process. If there is no<br />

publisher assigned, clicking this button will make the content block go live.<br />

<strong>eMPower</strong> <strong>Administrator</strong> <strong>Manual</strong>, Version 3.5 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!