2013-14 - TNAU Agritech Portal
2013-14 - TNAU Agritech Portal
2013-14 - TNAU Agritech Portal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
32<br />
double lane and 1,000 km of Major District Roads will be<br />
widened from single lane to intermediate lane during<br />
<strong>2013</strong>-20<strong>14</strong>, under the Comprehensive Road<br />
Infrastructure Development Programme (CRIDP).<br />
Besides, 3,500 km of roads will also be further<br />
strengthened. An amount of Rs.2,032 crores has been<br />
allocated for the CRIDP in the Budget Estimates<br />
<strong>2013</strong>-20<strong>14</strong>.<br />
77. In 2012-<strong>2013</strong>, this Government sanctioned 121<br />
bridges at a cost of Rs.235 crores and rebuilding of 433.72 km<br />
of roads at a cost of Rs.211.60 crores with NABARD<br />
assistance. During <strong>2013</strong>-20<strong>14</strong>, Rs.191.60 crores has been<br />
earmarked to undertake various road works and Rs.233 crores<br />
for bridge works with NABARD assistance. The Performance<br />
Based Maintenance Contract (PBMC) model, being tried<br />
on pilot basis in Pollachi sub division, will be upscaled<br />
to other areas.<br />
78. Faster mobility demands more by-pass roads and<br />
city ring-roads. At present, construction of 28 by-pass roads<br />
and 3 ring roads at a cost of Rs.436.08 crores are in progress.<br />
Work on four laning the East Coast Road from Chennai<br />
up to Mamallapuram will commence during <strong>2013</strong>-20<strong>14</strong>.<br />
79. Based on the recommendations of the<br />
Chennai City Traffic and Transportation Study (CTTS),<br />
four grade separators in Chennai City will be taken up<br />
for execution during <strong>2013</strong>-20<strong>14</strong> at a cost of Rs.271.68<br />
crores. Similarly, work will be taken up for the<br />
construction of two flyovers at Kaalavasal and