19.08.2013 Views

Euro 6,000,000,000 Euro Medium Term Note Programme Due from ...

Euro 6,000,000,000 Euro Medium Term Note Programme Due from ...

Euro 6,000,000,000 Euro Medium Term Note Programme Due from ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

included the Calculation Period, unless such number would be 31 and D1 greater than<br />

29, in which case D2 will be 30<br />

(vii)if "30/360-FBF" or "Actual 30A/360" (American Bond Basis) is specified in the<br />

relevant Final <strong>Term</strong>s, in respect of each Calculation Period, the fraction whose<br />

denominator is 360 and whose numerator is the number of days calculated as for<br />

30E/360-FBF, subject to the following exception:<br />

where the last day of the Calculation Period is the 31st and the first day is neither the<br />

30th nor the 31st, the last month of the Calculation Period shall be deemed to be a<br />

month of thirty-one (31) days,<br />

using the same abbreviations as for 30E/360-FBF, the fraction is:<br />

If dd2 = 31 and dd1 ≠ (30,31)<br />

then:<br />

1<br />

× [(yy2 - yy1) × 360 + (mm2 - mm1) × 30 + (dd2 - dd1)]<br />

360<br />

or<br />

1<br />

× [(yy2 - yy1) × 360 + (mm2 - mm1) × 30 + Min (dd2 , 30) - Min (dd1 , 30)]<br />

360<br />

(viii) if "30E/360" or "<strong>Euro</strong>bond Basis" is specified in the relevant Final <strong>Term</strong>s, the<br />

number of days in the Calculation Period divided by 360 calculated on a formula basis<br />

as follows:<br />

1<br />

Day Count Fraction = x [[360 x ( Y2 - Y1)] + [30 x (M2 - M1)] + (D2 - D1)]<br />

360<br />

where:<br />

Y1 is the year, expressed as a number, in which the first day of the Calculation Period<br />

falls;<br />

Y2 is the year, expressed as a number, in which the day immediately following the last<br />

day included in the Calculation Period falls;<br />

M1 is the calendar month, expressed as a number, in which the first day of the<br />

Calculation Period falls;<br />

M2 is the calendar month, expressed as a number, in which the day immediately<br />

following the last day included in the Calculation Period falls;<br />

D1 is the first calendar day, expressed as a number, of the Calculation Period, unless<br />

such number would be 31, in which case D1 will be 30; and<br />

D2 is the calendar day, expressed as a number, immediately following the last day<br />

included in the Calculation Period, unless such number would be 31, in which case D2<br />

will be 30<br />

(ix) if "30E/360-FBF" is specified in the relevant Final <strong>Term</strong>s, in respect of each<br />

Calculation Period, the fraction whose denominator is 360 and whose numerator is the<br />

number of days elapsed during such period, calculated on the basis of a year<br />

comprising twelve (12) months of thirty (30) days, subject to the following the<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!