Inspect the parts<br />

1. With a clean rag, wipe off<br />

all the surfaces. If any part is<br />

worn, it should be replaced. Signs<br />

of wear on the pivot and link<br />

axles are discoloration or a high<br />

degree of polish.<br />

Some dark deposits may be<br />

left as the bushings and axle ‘seat<br />

in’ to each other. When this hap-<br />

Fig. 40<br />

pens, some of the bearing material<br />

is sort of plated onto the axle.<br />

Its normal, and actually makes the pivot run smoother.<br />

The bushings are harder to inspect; some discoloration<br />

is normal as the bushings and axle ‘seat in’ to each other.<br />

If wear looks uneven or non-concentric, its best to replace<br />

them.<br />

Note: When in doubt, throw out old parts. Its relatively<br />

cheap to replace the parts, and time consuming to perform<br />

a rebuild. You do the customer a favor by only tearing their<br />

bike apart once.<br />

Prepare the parts for reassembly<br />

1. Clean the bonding surfaces of the main pivot bushings<br />

and frame. These surfaces include the outside of the<br />

tubular main pivot bushing, the seating surfaces of the main<br />

pivot ‘top hat’ bushings that go into the swingarm, and the<br />

parts of the frame and swingarm that the bushings contact.<br />

These surfaces should be cleaned with Loktite Kleen ‘n<br />

Prime.<br />

Be careful not to get Kleen n Prime on the paint or<br />

bushing material. It will remove paint, and also remove the<br />

lubrication in the bushings.<br />

2. To clean the rocker pivot bushings and upper swingarm<br />

pivot bushings, simply wipe clean of dust or other<br />

debris.<br />

3. Do not lubricate any bushings.<br />

4. Clean the pivot axle bolts, shock mount bolts, and<br />

rocker bridge bolts with Kleen n Prime.<br />

Install the main pivot bushings<br />

1. Check the fit of the bushings in the frame and swingarm<br />

by dry-assembling them (practice installation, but without<br />

Loktite). Normally the bushings are a light press fit,<br />

meaning they are snug but easily go into place with hand<br />

pressure. If the parts fit correctly, go to Step 2. If they seem<br />

very loose, go to Step 3.<br />

2. If the parts fit correctly, apply Loktite 290 to all<br />

contact surfaces between the bushings and the frame or<br />

swingarm, and install the bushings.<br />

3. If the parts seem very loose, Loktite RC680 is<br />

required. 290 is a thread locker, and it works best where<br />

parts are in tight contact. RC 680 is a filler, so it has the<br />

ability to fill larger gaps and securely bond parts that do not<br />

fit tightly together.<br />

4. After installing the bushings, wipe off any excess<br />

Loktite, particularly removing any Loktite that contacts the<br />

bearing surface.<br />

2002 <strong>Trek</strong> Technical Manual<br />

Install the main pivot axle.<br />

1. Carefully align the swingarm with the main pivot<br />

of the frame. The fit is tight. Avoid contact between the<br />

bushings and any residual Loktite. Avoid scarring of the<br />

pivot surfaces as you slide the parts together.<br />

2. Align the swingarm and install the main pivot axle<br />

(the long one) from the right side of the bike. Slide it all<br />

the way through the frame and swingarm eyes.<br />

3. Apply Loktite 290 to the threads of the pivot bolt,<br />

and install the bolt from the left side of the bike. Tighten to<br />

61-75 lb in (6.9-8.5Nm).<br />

Install the rocker bushings<br />

1. The bushings in the rocker pivot lug and the upper<br />

swingarm are all installed dry. Simply press them into<br />

place, being careful to keep them aligned during insertion.<br />

Install the rocker and pivot axle.<br />

1. Apply Loktite 290 to the threads of the rocker bridge<br />

bolts.<br />

2. Loosely assembly the back of the rocker, but do not<br />

attach the small cylindrical spacer yet. Leave the bolts 4-5<br />

turns unthreaded.<br />

3. Slide the rocker around the seat tube. Install the<br />

cylindrical spacer and remaining rocker bridge bolts.<br />

4. Insert the rocker axle from the right side of the<br />

bike.<br />

5. Apply Loktite 290 to the threads of the rocker pivot<br />

bolt, and install the bolt from the left side of the bike.<br />

Tighten to 50-75 lb in (5.7-8.5 Nm).<br />

6. Tighten the rocker bridge bolts to 50-85 lb in<br />

(5.7-9.6 Nm).<br />

Install the rocker and pivot axle.<br />

1. This axle goes through the swingarm, and rocker.<br />

Apply Loktite 290 to the threads of the pivot bolt, and<br />

install the axle from the right side of the bike. Tighten the<br />

axle bolt to 50-85 lb in (5.7-9.6 Nm).<br />

Install the shock mount bolt.<br />

1. Make sure the shock orientation is how you would<br />

like it. Insert the upper shock mount bolt from the right<br />

side of the bike.<br />

2. Insert the lower shock mount bolt from the right<br />

side of the bike.<br />

2. Apply Loktite 290 to the threads of the bolts. Install<br />

the nuts and tighten to 133-164 lb in (15-18.5 Nm).<br />

Allow to Dry<br />

Loktite normally requires 24 hours to completely set.<br />

During this time, the bike should not be ridden. Do not<br />

compress the suspension or in other ways disturb the<br />

Loktite until is has fully set.<br />

121