The excess pore-pressure distribution along the 12<br />

meters <strong>of</strong> s<strong>of</strong>t clay layers after the construction <strong>of</strong> the 4.0<br />

meter fill material is visualized <strong>in</strong> Figure 4. The development<br />

<strong>of</strong> the settlements and the excess pore pressures<br />

obta<strong>in</strong>ed from the numerical model is shown <strong>in</strong> figure<br />

5 for all four conditions. As expected, the <strong>in</strong>stallation <strong>of</strong><br />

the PVD significantly decreased the consolidation time,<br />

whereas consider<strong>in</strong>g the smear effects has the opposite<br />

effect and, therefore, <strong>in</strong> order to arrive at realistic predictions,<br />

this effect has to be taken <strong>in</strong>to account.<br />

The settlement plate was <strong>in</strong>stalled and measurements<br />

started after the <strong>in</strong>stallation <strong>of</strong> the 1.0 meter sand<br />

Excess Pore Pressure (KPa)<br />

-10<br />

-20<br />

-30<br />

-40<br />

-50<br />

-60<br />

-70<br />

-80<br />

I. IKHYA & H. F. SCHWEIGER: NUMERICAL MODELING OF FLOATING PREFABRICATED VERTICAL DRAINS IN LAYERED SOIL<br />

blanket and the <strong>dra<strong>in</strong>s</strong>, so no settlement read<strong>in</strong>gs were<br />

taken for this stage <strong>of</strong> the construction. The settlements<br />

obta<strong>in</strong>ed from the numerical prediction and measured<br />

<strong>in</strong> the field are compared <strong>in</strong> figure 6. It can be seen that<br />

a good agreement between the field measurement and<br />

the numerical prediction could be achieved, for both<br />

full and partial penetration (L/H=0.7) <strong>of</strong> the PVD when<br />

tak<strong>in</strong>g the smear effect <strong>in</strong>to account. It is clear that the<br />

length <strong>of</strong> the dra<strong>in</strong> can be reduced by up to 30% without<br />

significantly affect<strong>in</strong>g the consolidation process for<br />

double dra<strong>in</strong>age—two soil-layer conditions when the<br />

second layer is stiffer and has a higher permeability than<br />

the first layer.<br />

Figure 4. Excess pore-pressure distribution after the placement <strong>of</strong> 4.0 meter fill material.<br />

Axisymmetric Model <strong>of</strong> Cirebon Power Plant Embankment<br />

1 10 100 1000 10000<br />

0<br />

Time (days)<br />

Without PVD<br />

Only PVD<br />

PVD+Smear<br />

Float<strong>in</strong>g PVD (L/H=0.7)<br />

Figure 5. Excess pore-pressure and consolidation curves for all conditions.<br />

Vertical Displacement (m)<br />

1 10 100 1000 10000<br />

0<br />

-0.1<br />

-0.2<br />

-0.3<br />

-0.4<br />

-0.5<br />

-0.6<br />

-0.7<br />

-0.8<br />

Axisymmetric Model <strong>of</strong> Cirebon Power Plant Embankment<br />

Time (days)<br />

Without PVD<br />

Only PVD<br />

PVD+Smear<br />

Float<strong>in</strong>g PVD (L/H=0.7)<br />

ACTA GEOTECHNICA SLOVENICA, 2012/2 29.