3D model of the new cogeneration center<br />
Cogeneration center technical data:<br />
• 2 x GE Fr6B DLN + 2 x NEM HRSG (eq. c/ PC & FA);<br />
• nominal heat output: 82 MWe (2X41 MW e );<br />
• steam generation capacity: 260 ton\h (@ 450 C, 66 barg);<br />
• electricity production: 670 GWh\year (forecast);<br />
• steam production: 1.6 megaton Tsar/year (forecast);<br />
• natural gas consumption: 232 Mm 3 (n)/year (forecast);<br />
• equivalent electrical effi ciency (REE): 75%.<br />
Under normal operation, the new Cogeneration Plant will<br />
produce the equivalent of about 70% of the electricity<br />
consumed in the municipality of <strong>Matosinhos</strong> with an equivalent<br />
(REE) electrical effi ciency of 75% (this value compares with<br />
the electrical effi ciency of a combined cycle power plant,<br />
which is currently 60%) which shows a primary energy savings<br />
exceeding 15%, and a reduction of CO 2 emissions at national<br />
level of 400,000 ton/year.<br />
Based upon these effi ciency values, the new power of the<br />
refi nery of <strong>Matosinhos</strong> is classifi ed, according to the Community<br />
Directive 2004/8/EC, as “high effi ciency” cogeneration.<br />
Interconnection of new combined heat<br />
and power plant with the external energy<br />
infrastructure<br />
The construction of New Combined Heat and Power meant<br />
new interconnections of the Industrial Plant to high pressure<br />
natural gas network and high voltage electricity distribution.<br />
ACTIVITIES, ACTIONS AND PROJECTS 05 06 07 08 09 10 11<br />
The construction of the new pipeline and the GRMS (Gas<br />
Regulation and Metering Station) was of the responsibility<br />
of REN Gasodutos, having the electrical interconnection<br />
pipeline between the New Switch Station (built under the<br />
new combined Heat and Power Supply) and the Electrical<br />
Substation of Santa Cruz do Bispo powered by EDP distribution,<br />
been of the responsibility of PORTCOGERAÇÃO and the second<br />
section between this Substation and Substation of Custóias<br />
operated by REN, stayed been supported by EDP Distribution<br />
through previously established compensation agreements with<br />
PORTCOGERAÇÃO.<br />
Electrical interconnection between the Industrial Complex and REN<br />
Technical data of the Electrical Interconnection<br />
• fi rst section: two subway lines, the cutting, at 60kV from the<br />
Switch Station of <strong>Matosinhos</strong> refi nery to Santa Cruz do Bispo<br />
substation, extension: 3,751 m.<br />
• second section: two mixed lines, at 60kV, consisting fi rstly<br />
of underground line from Santa Cruz do Bispo substation to<br />
support no. 1, with an extension of 2,926 m, and an aerial<br />
part from support no 1. to support no. 4, with an extension of<br />
648 m, and by a fi nal underground part, from support no. 4 to<br />
Custóias substation in a length of 112 m.<br />