01<br />

02<br />

03<br />

3D model of the new cogeneration center<br />

Cogeneration center technical data:<br />

• 2 x GE Fr6B DLN + 2 x NEM HRSG (eq. c/ PC & FA);<br />

• nominal heat output: 82 MWe (2X41 MW e );<br />

• steam generation capacity: 260 ton\h (@ 450 C, 66 barg);<br />

• electricity production: 670 GWh\year (forecast);<br />

• steam production: 1.6 megaton Tsar/year (forecast);<br />

• natural gas consumption: 232 Mm 3 (n)/year (forecast);<br />

• equivalent electrical effi ciency (REE): 75%.<br />

Under normal operation, the new Cogeneration Plant will<br />

produce the equivalent of about 70% of the electricity<br />

consumed in the municipality of <strong>Matosinhos</strong> with an equivalent<br />

(REE) electrical effi ciency of 75% (this value compares with<br />

the electrical effi ciency of a combined cycle power plant,<br />

which is currently 60%) which shows a primary energy savings<br />

exceeding 15%, and a reduction of CO 2 emissions at national<br />

level of 400,000 ton/year.<br />

Based upon these effi ciency values, the new power of the<br />

refi nery of <strong>Matosinhos</strong> is classifi ed, according to the Community<br />

Directive 2004/8/EC, as “high effi ciency” cogeneration.<br />

Interconnection of new combined heat<br />

and power plant with the external energy<br />

infrastructure<br />

The construction of New Combined Heat and Power meant<br />

new interconnections of the Industrial Plant to high pressure<br />

natural gas network and high voltage electricity distribution.<br />

ACTIVITIES, ACTIONS AND PROJECTS 05 06 07 08 09 10 11<br />

The construction of the new pipeline and the GRMS (Gas<br />

Regulation and Metering Station) was of the responsibility<br />

of REN Gasodutos, having the electrical interconnection<br />

pipeline between the New Switch Station (built under the<br />

new combined Heat and Power Supply) and the Electrical<br />

Substation of Santa Cruz do Bispo powered by EDP distribution,<br />

been of the responsibility of PORTCOGERAÇÃO and the second<br />

section between this Substation and Substation of Custóias<br />

operated by REN, stayed been supported by EDP Distribution<br />

through previously established compensation agreements with<br />

PORTCOGERAÇÃO.<br />

Electrical interconnection between the Industrial Complex and REN<br />

Technical data of the Electrical Interconnection<br />

• fi rst section: two subway lines, the cutting, at 60kV from the<br />

Switch Station of <strong>Matosinhos</strong> refi nery to Santa Cruz do Bispo<br />

substation, extension: 3,751 m.<br />

• second section: two mixed lines, at 60kV, consisting fi rstly<br />

of underground line from Santa Cruz do Bispo substation to<br />

support no. 1, with an extension of 2,926 m, and an aerial<br />

part from support no 1. to support no. 4, with an extension of<br />

648 m, and by a fi nal underground part, from support no. 4 to<br />

Custóias substation in a length of 112 m.<br />

MATOSINHOS REFINERY / DATA BOOK ON HEALTH, SAFETY AND ENVIRONMENT <strong>2011</strong><br />

19<br />

04

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!