<strong>Solar</strong> School Shelters<br />

Baker School<br />

Battery Backup PV System<br />

Okaloosa County, <strong>Florida</strong><br />

Table of Content: <strong>Permit</strong>ting/Planning Notes:<br />

A-00 Cover Sheet<br />

A-01 Symbols & System Description<br />

A-02 Equipment Location<br />

A-03 System Riser Diagram<br />

E-01 Module Wiring Layout<br />

E-02 Inverter/Charger Wiring Detail<br />

E-03 Inverter/AC Wiring Detail<br />

E-04 Battery Wiring Detail<br />

E-05 Electrical Calculation<br />

E-06 Labels & Markings<br />

E-07-08 Monitoring System<br />

N-01 Installation Notes<br />

M-01 <strong>Solar</strong> Equipment Enclosure Location vs Array Detail<br />

M-02 <strong>Solar</strong> Equipment Enclosure - School Wall Connections Detail<br />

P-01 PVWatts<br />

DS-01:04 Data Sheet<br />

Aerial View:<br />

A01 of 07 through A07 of 07 Enclosure Detail<br />

S-1 Foundation Plan, Framing plan and Structural Notes<br />

S-2 Section and Attachment Detail<br />

S-3 Clamp Placement Layout<br />

Map:<br />

Site View:<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Cover Sheet<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 1 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

A-00


Symbols: Abbreviations:<br />

Section..............<br />

Elevation ...........<br />

Detail ................<br />

Detail ................<br />

(Enlarged Plan)<br />

Keyed Notes ..........<br />

Ground Terminal .....<br />

Grounding Point/rod....<br />

<strong>Solar</strong> Panel ......... or<br />

Combiner Box ..........<br />

DC Disconnect ..........<br />

Main Distribution<br />

Panel ......................<br />

Fuse ......................<br />

Overcurrent Breaker ..<br />

Inverter ....................<br />

Transformer .............<br />

Automatic ...............<br />

Transfer Switch<br />

X<br />

X-XX<br />

X<br />

X-XX<br />

X<br />

X-XX<br />

X<br />

X-XX<br />

1<br />

CB<br />

DCD<br />

MDP<br />

ATS<br />

Sheet where<br />

section is located<br />

Detail ID Letter<br />

Sheet where<br />

section is located<br />

Detail ID Letter<br />

Sheet where<br />

section is located<br />

Detail ID Letter<br />

Area to be enlarged<br />

Sheet where<br />

section is located<br />

Keyed note designation<br />

on applicable sheet<br />

00 Module with Source<br />

Circuit number<br />

AC Alternating Current<br />

APPROX Approximate<br />

AWG American Wire Gauge<br />

CB Combiner Box<br />

DC Direct Current<br />

DCD Direct Current Disconnect<br />

DISC Disconnect<br />

(E) Existing<br />

EL Elevation<br />

EQ Equal<br />

JB Junction Box<br />

MCB Main Combiner Box<br />

MFR Manufacturer<br />

MIN Minimum<br />

MISC Miscellaneous<br />

(N) New<br />

OCPD OverCurrent Protection Device<br />

POCC Point Of Common Coupling<br />

PV Photovoltaic<br />

SF Squarefoot/feet<br />

STC Standard Test Conditions<br />

TBD To Be Determined<br />

TYP Typical<br />

VIF Verify In Field<br />

WP Weather Proof<br />

System Description<br />

This system is a grid-tie, PV system with battery back up, with PV generation consisting of 42 <strong>Solar</strong> World<br />

SW-240 modules with a combined STC rated dc output power of 10,080 watts. The modules are<br />

connected into two groups of five 3-module source circuits and one group of four 3-module source<br />

circuits that feed three Outback FM80 charge controllers. The charge controllers feed the system batteries<br />

and the inverters, which are connected to supply 120/208 volt ac (uninterruptable) to the standby loads<br />

and also to the electric utility grid. The system is provided with all disconnects and labels required by the<br />

National Electrical Code. The system batteries are sized for 610 amp hours at 48V providing approximately<br />

27.0 kWh to standby (uninterruptible) loads.<br />

PV<br />

Array<br />

Charge<br />

Controller<br />

Batteries<br />

Inverter<br />

Uninterruptible<br />

Standby<br />

Loads<br />

Figure 1: PV System block Diagram showing main system components<br />

Main<br />

Distribution<br />

Panel<br />

Interruptible<br />

Loads<br />

When the sun is shining, power from the PV array is used to keep the batteries fully charged. After<br />

charging the batteries, the PV power is made available to the standby loads. If the PV power meets the<br />

requirements of the standby loads, any remaining PV power is then directed to the interruptible loads of<br />

the occupancy. If any PV power remains after the interruptible loads have been powered, it is delivered to<br />

the utility. When utility power is available, but PV power is not available, standby loads are supplied by<br />

the utility. If neither utility nor PV power is available, standby loads are supplied by the batteries. Thus,<br />

the batteries are only cycled if utility power is lost. The batteries used are specially designed, deep cycle,<br />

maintenance free batteries that are capable of undergoing approximately 3,000-4,000 charge-discharge<br />

cycles. Designing the system to minimize battery cycling extends the life of the batteries.<br />

The inverter meets the requirements of IEEE 1547 and UL 1741. This means that if it detects a loss<br />

of utility power, it will automatically disconnect from the utility. When this happens, only the<br />

uninterruptible loads are powered by the inverter. When utility voltage is restored, the inverter<br />

automatically reconnects to the utility grid after verifying the utility voltage and frequency stability.<br />

On a average day of <strong>Florida</strong> sunshine, the system will produce approximately 36.5kWh of clean<br />

energy.<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Symbols and System Description<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 2 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

A-01


<strong>Solar</strong> Array<br />

North Side - Baker School<br />

17'3"<br />

14'<br />

46'x 70' (Approx) 4ft - 6ft High Fencing Surrounding Array<br />

With Access Gate<br />

Provided by others<br />

Equipment Location<br />

SCALE: NTS<br />

Conduit Path (Proposed)<br />

<strong>Solar</strong> Equipment Enclosure<br />

46' x 16'6" Array<br />

N<br />

2 Junction Boxes & 1 Utility Disconnect (Proposed Location)<br />

1 Junction Box to Critical Load Panel<br />

1 Utility Disconnect to Main Distribution Panel<br />

1 Junction Box to Monitoring system<br />

7'2"<br />

Note:<br />

1. Array Location Dimensions and Wire Run Distances and routes are<br />

approximations. Minor Adjustments left to the discretion of the<br />

Contractor may be necessary pending the identification of any<br />

underground utilities and unforeseen obstructions.<br />

2. A double barrier fence no less than 10 ft apart is required around the<br />

perimeter of the construction site during construction.<br />

3. The location of all underground utilities must be performed by the<br />

contractor prior to any construction.<br />

4. Final Array Fencing must be spaced 11' Min from East West and South<br />

sides of Array for a 6ft fence and a 3' Min for a 4ft high fence.<br />

Legend:<br />

PV Array<br />

Location<br />

Electrical Room Location:<br />

Room A 124 (28)<br />

Trench Distance: 180ft & Directional Boring: 0ft<br />

Wire Run - Enclosure to Electrical Room: 205ft<br />

<strong>Solar</strong> World SW240<br />

Module<br />

<strong>Solar</strong> Equipment Enclosure<br />

N<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Equipment Location<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 3 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

A-02


To Utility<br />

(8)<br />

Main Distribution Panel<br />

Or Sub Panel<br />

(9)<br />

Standby Load Panel<br />

Building Interior<br />

(12)<br />

Utility<br />

Disconnect<br />

(14)<br />

Junction<br />

Box<br />

(15)<br />

Junction<br />

Box<br />

System Riser Diagram<br />

SCALE: NTS<br />

Monitoring Wire Conduit (13)<br />

(10)<br />

Meter 1<br />

(11)<br />

Meter 2<br />

Building/<strong>Solar</strong><br />

Equipment Enclosure<br />

Exterior<br />

Building Exterior<br />

FW1000AC (7)<br />

Disconnect Inverter<br />

Bypass and Standby<br />

Load Enclosure<br />

(1)<br />

Photovoltaic Array<br />

Inverter Inverter<br />

(4)<br />

Battery Bank<br />

(6)<br />

<strong>Solar</strong> Equipment Enclosure<br />

Interior<br />

Notes:<br />

Source Circuit<br />

Combiner Boxes<br />

(3)<br />

FW1000DC<br />

Disconnect and GFDI<br />

Enclosure<br />

(2)<br />

(5)<br />

Charge Controller<br />

1. Photovoltaic Array - See Sheet E-01 for array wiring information.<br />

2. Source Circuit Combiner Boxes - Combines the source circuit output. See<br />

Sheet E-01 and E-02 for wiring information.<br />

3. FW1000 DC - Contains DC overcurrent protection and disconnects. See<br />

Sheet E-02 for wiring information. See manufacturer installation manual<br />

for mounting information.<br />

4. Storage Batteries - See Sheet E-04 for battery sizing and wiring<br />

information.<br />

5. MPPT Charge Controller - See Sheet E-02 for wiring information. See<br />

manufacturer installation manual for programming instructions.<br />

6. Inverter - See Sheet E-02 for DC wiring and Sheet E-03 for AC wiring<br />

details. See manufacturer installation manual for programming<br />

information.<br />

7. FW1000 AC - Contains AC disconnects as well as standby load breakers.<br />

See Sheet E-03 for wiring details. See manufacturer installation manual<br />

for mounting information.<br />

8. Main Distribution Panel or or Sub Panel - Serves Serves as the point of utility<br />

connection for the PV system.<br />

9. Standby Load Panel located in building interior.<br />

10. Bidirectional Meter 1<br />

11. Bidirectional Meter 2<br />

12. Utility Disconnect on exterior wall of building<br />

13. Conduit - Cat5 monitoring cable.<br />

14. 4"x4"x2" PVC Junction Box on exterior wall of Building<br />

15. 6"x6"x4" 6"x6"x4" PVC PVC Junction Junction Box Box on on exterior exterior wall wall of of Building<br />

Building<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

System Riser Diagram<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 4 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

A-03


1 1 1<br />

2 2 2<br />

3 3 3<br />

4 4 4<br />

5 5 5<br />

Combiner Box A<br />

15.22"X9.16"X3.90"<br />

Weatherproof<br />

A<br />

SCCB A<br />

1-5 to DC Enclosure<br />

(See Sheet E-2)<br />

#12 PV Open<br />

Wiring<br />

#10 Bare Copper<br />

Ground Wire<br />

#12USE-2 Wire<br />

1" Conduit<br />

2 #6 THWN-2 &<br />

1 #8 ground in<br />

3/4" Conduit<br />

Module layout<br />

SCALE: NTS<br />

6 6 6<br />

7 7 7<br />

8 8 8<br />

9 9 9<br />

10 10 10<br />

Outside <strong>Solar</strong> Equipment Enclosure<br />

Inside <strong>Solar</strong> Equipment Enclosure<br />

B C<br />

2 #6 THWN-2 &<br />

1 #8 ground in<br />

3/4" Conduit<br />

SCCB B<br />

6-10 to DC Enclosure<br />

(See Sheet E-2)<br />

11 11 11<br />

12 12 12<br />

13 13 13<br />

14 14 14<br />

1" Conduit 1" Conduit<br />

Combiner Box B Combiner Box C<br />

Grounding detail:<br />

<strong>Solar</strong> Panel<br />

Mid Clamp (typ)<br />

<strong>Solar</strong> Panel Frame<br />

WEEB <strong>Solar</strong> Panel<br />

to PV Rail<br />

Bonding Device<br />

PV Module to Rail Bonding<br />

SCCB C<br />

11-14 to DC Enclosure<br />

(See Sheet E-2)<br />

<strong>Solar</strong> PV Rail<br />

WEEB Lug<br />

PV Rail Grounding<br />

A<br />

E-01<br />

2 #6 THWN-2 &<br />

1 #8 ground in<br />

3/4" Conduit<br />

Grounding Conductor<br />

Detail A: CB Wiring<br />

Positive Bus Bar<br />

15 A Breaker<br />

Five or Four<br />

Source<br />

Circuits<br />

Outback PV8 SSCB<br />

15A<br />

Breaker<br />

15A<br />

Breaker<br />

15A<br />

Breaker<br />

#10 Ground<br />

Module Specifications:<br />

Notes:<br />

15A<br />

Breaker<br />

15A<br />

Breaker<br />

2 #6 THWN-2 &<br />

1 #8 ground in 3/4"<br />

Conduit<br />

To FlexWare 1000<br />

DC Distribution<br />

Panel<br />

PV Modules are <strong>Solar</strong>World SW 240<br />

P max = 240W<br />

V oc = 37.2V<br />

V mp = 30.2V<br />

I sc = 8.44A<br />

I mp = 7.96A<br />

Quantities Measured @ 25C<br />

Negative Bus Bar<br />

Terminal<br />

Ground Bus<br />

Bar<br />

1. Grounding conductor loops around all modules and<br />

then runs to Junction Boxes. Use only outdoor-rated<br />

lay-in ground lugs.<br />

2. Modules are pre-wired with #12 PV Wire and have<br />

locking MC-4 Connectors required by the 2008 NEC.<br />

3. Do not use twist connectors as they are not suitable<br />

for DC wiring.<br />

4. Combiner boxes are 15.22”X9.16”x3.9” Outback Flex<br />

Ware PV8 SSCB Combiner boxes. Conduit leaving<br />

Combniner boxes shown contains (2) #6 THWN-2<br />

circuit wires, (1) #8 ground wire in 3/4" conduit.<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Module Layout<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 5 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-01


Mate<br />

Hub<br />

OutBack FlexWare 1000 AC<br />

(See Sheet E-03)<br />

Inverter Wiring Detail<br />

SCALE: NTS<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

-<br />

+<br />

-<br />

+<br />

-<br />

+<br />

GVFX3648<br />

GVFX3648<br />

GVFX3648<br />

(2) 2/0 Battery Wire &<br />

(1) #6 Ground Wire<br />

to Each Inverter<br />

Combiner Box A<br />

15A<br />

+<br />

"BIG BUS"<br />

-<br />

GFDI<br />

+<br />

Outback<br />

PV8 SSCB<br />

#12 PV Open Wiring<br />

Source Circuits 1-5<br />

#10 Bare Copper<br />

Ground Wire Source Circuits 6-10<br />

#12 PV Open Wiring<br />

OutBack FlexWare 1000 DC<br />

175A<br />

80A<br />

GFDI<br />

80A<br />

See Sheet E-04 For Battery Wiring Details<br />

Combiner Box B<br />

15A<br />

+<br />

Outback<br />

PV8 SSCB<br />

SunXtender SunXtender SunXtender SunXtender SunXtender SunXtender SunXtender SunXtender<br />

SunXtender<br />

SunXtender<br />

#6 Ground<br />

Wire<br />

(2) 4/0 Battery Wire<br />

in 2" Flexible Metal<br />

Conduit<br />

SunXtender<br />

SunXtender<br />

80A<br />

SunXtender<br />

80A<br />

-<br />

SunXtender<br />

#8 Ground<br />

Wire<br />

Batt Temp Sensor Wire to CC<br />

#10 Bare Copper<br />

Ground Wire<br />

FM-80<br />

FLEXmax<br />

PV BATT<br />

FM-80<br />

FLEXmax<br />

PV BATT<br />

(2) 4/0 Battery Wire &<br />

(1) Temp sensor wire in<br />

2" Flexible Metal Conduit<br />

SunXtender<br />

SunXtender<br />

Combiner Box C<br />

15A<br />

+<br />

- -<br />

Source Circuits 11-14<br />

#12 PV Open Wiring<br />

Outback<br />

PV8 SSCB<br />

#10 Bare Copper<br />

Ground Wire<br />

FM-80<br />

FLEXmax<br />

PV BATT<br />

Notes:<br />

(2) #6 THWN-2 &<br />

(1) #8 ground in<br />

3/4" Conduit<br />

(2) #6 THWN-2<br />

(1) #4 THWN-2 &<br />

(1) #8 Ground Wire in<br />

1" Conduit<br />

1. Read the installation manuals for the<br />

OUTBACK GVFX 3648 Inverter/Charger and<br />

the FlexMax FM-80 Charge Controller before<br />

making any connections.<br />

2. Proper Communication among inverters is<br />

essential. Outback GVFX3648 installation<br />

manual details control wiring for system.<br />

Follow Factory instructions for<br />

reprogramming GVFX for 120/208 V 3ɸ<br />

operation.<br />

3. Install Battery temperature sensor and<br />

connect per instructions in Outback inverter<br />

installation manual.<br />

4. Monitoring System not shown on this<br />

diagram. Final system will have web-based<br />

monitoring system.<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Inverter/Charger Wiring Detail<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 6 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-02


1 1/4" conduit<br />

(4) #4 &<br />

(1) #10 THWN-2 in<br />

1 1/4" conduit<br />

Utility Disconnect<br />

3P 100A<br />

JB<br />

JB<br />

L1 L2 L3<br />

100A 120/208 V<br />

Critical Load Panel<br />

Do not bond neutral<br />

to ground in meter<br />

can.<br />

Do not bond neutral<br />

to ground in meter<br />

can.<br />

50A<br />

Line side of 3-phase meter<br />

50A<br />

1" conduit<br />

Building Interior Building Exterior/ PV Shed<br />

L1 L2 L3<br />

120/208 V MDP<br />

Minimum Busbar Ampacity = 300A<br />

3 Phase Bi-Directional<br />

Meter<br />

M1<br />

Bi-directional meter<br />

M2<br />

3/4" conduit w/cat5<br />

(4) #6 and (1) #10<br />

THWN-2 in<br />

1" conduit<br />

1" conduit<br />

N<br />

AC In<br />

Inverter/AC Wiring Diagram<br />

SCALE: NTS<br />

50A<br />

B<br />

(4) #4 &<br />

(1) #10 THWN-2 in<br />

1 1/4" conduit<br />

A<br />

ByPass<br />

B<br />

AC and DC Have<br />

Common Ground<br />

AC Out<br />

All Circuit breakers are 50A<br />

Switching sequence for A and B Inverter Bypass Circuit<br />

Breakers:<br />

1. A on and B off - Normal Operation<br />

2. B on and A off - Inverter Bypass<br />

3. Both off - No Standby Power<br />

4. Both on - Not Possible<br />

(Bypass breakers are mechanically linked to<br />

achieve indicated switching)<br />

OutBack FlexWare 1000 AC<br />

A<br />

B<br />

A<br />

Inverter AC Out<br />

Note:<br />

1. Building Interior Panels ( Critical / Standby Load<br />

Panel and Main Distribution/Array Point of Utility<br />

Connection Panel) Furnished and Installed by<br />

Others<br />

2. All AC current carrying conductors are #6 THWN-2<br />

except as noted.<br />

3. Equipment grounding conductors are #6.<br />

#6 THWN-2<br />

#6 THWN-2<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

-<br />

+<br />

-<br />

+<br />

(1) #10 Ground Wire to Each Inverter<br />

#6 THWN-2<br />

-<br />

+<br />

Inverter 1<br />

GVFX3648<br />

DC In<br />

Inverter 2<br />

GVFX3648<br />

DC In<br />

Inverter 3<br />

GVFX3648<br />

PV <strong>Energy</strong> Production is equal to algebraic sum of the two meter readings.<br />

M1 can run forward during the day but will run backward during the<br />

night. M2 always runs forward.<br />

Critical Load Panel Note: 120 V loads only. Do not connect<br />

multiwire branch circuits. Limit 3420 VA total or 1140 VA<br />

per phase.<br />

DC In<br />

DC In<br />

DC In<br />

DC In<br />

OutBack FlexWare 1000 DC<br />

(See Sheet E-02)<br />

Battery Bank<br />

(See Sheet E-04)<br />

Notes:<br />

1. Monitoring system is not included on this<br />

diagram.<br />

2. Install battery temperature sensor per<br />

instructions in installation manual.<br />

3. Revenue meter cans to be installed. If<br />

utility does not require them, then install<br />

reconditioned meters to perform<br />

indicated functions.<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Inverter/AC Wiring Detail<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 7 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-03


250A-160VDC in-line DC Fuse.<br />

Fuse - West Marine Model# 215089<br />

Fuse Block - West Marine Model# 10093813<br />

FlexWare Mounting Plate<br />

2 rows of 8 Batteries in series.<br />

Batteries are Sun Xtender 3050T Batteries.<br />

(See Sheet DS-03:04 for Battery Specifications).<br />

12.75"<br />

10.25"<br />

250A Inline DC Fuse<br />

Ground Anchor<br />

and Strap<br />

To positive DC Busbar in<br />

FlexMax 1000 Power<br />

Distribution Panel<br />

#2/0 To Negative DC<br />

Terminals Of<br />

Inverters<br />

# 4/0 From Battery<br />

Negative<br />

Conduit Tie Down bracket<br />

Wood Subfloor<br />

#4/0 battery cable<br />

Must be equal length 4/0 Battery Cables<br />

Battery Temperature Sensor Wire to one Charge Controller<br />

#4/0 battery cable<br />

Must be equal length<br />

4/0 Pos Battery<br />

Cable<br />

Battery Temp<br />

Sensor Wire<br />

Skids<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

Concrete Block<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

#2/0 To Positive DC<br />

Terminals Of<br />

Inverters<br />

175 ADC<br />

# 4/0 From Battery<br />

Positive<br />

DC Busbar Detail in FlexMax 1000 Power Distribution Panel<br />

2" Flexible Metal<br />

Conduit<br />

Plastic Bushing<br />

4/0 Neg Battery<br />

Cable<br />

96.00"<br />

Battery Bank to DC Enclosure connection Detail<br />

Battery Wiring Detail<br />

SCALE: NTS<br />

2" Flexible Metal<br />

Conduit Connector<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

Battery Temperature<br />

Sensor<br />

29"<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

Battery Connection Detail<br />

Batteries are Concorde SunExtender PVX-3050T<br />

6V, 354Ah @ C/100 Battery bank supplies 27.0KWh @ 80% DOD<br />

Wiring Method:<br />

Battery System Wiring. Connect eight<br />

batteries in series to create a 48V array.<br />

Connect two groups in parallel. The<br />

batteries will deliver 27.0 kWh. Use only<br />

UL listed cables and lugs and UL listed<br />

crimp tools. Use 4/0 cables for battery to<br />

battery connections.<br />

Use only UL listed cables and lugs and UL<br />

listed crimp tool. Do not use fine stranded<br />

wire under the set screws inside the<br />

Outback Inverter.<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

Notes:<br />

Sun-Xtender<br />

PVX-3050T<br />

6V AGM Battery<br />

To negative DC Busbar in<br />

FlexMax 1000 Power<br />

Distribution Panel<br />

1. Batteries are Sun-Xtender PVX-3050T; 6<br />

volt batteries. Total battery capacity:<br />

27.0KWh @ (C/100) and 80% DOD.<br />

2. Positive and Negative battery cable<br />

length between batteries and busbar<br />

must be equal.<br />

3. Use heat shrink on all crimp lugs<br />

4. Disconnects for batteries are located on<br />

the FlexWare 1000 DC Power Distibution<br />

Panel.<br />

5. Install all batteries in accordance to NEC.<br />

6. Install Batteries in a well ventilated area<br />

to keep them as cool as possible.<br />

7. Fuse Information<br />

Fuse Rating: 250A@160VDC<br />

Manufacturer: Blue Sea Systems<br />

Manufacturer part #: 5118<br />

West Marine part #: 215089<br />

Fuse Block<br />

Model #: 10093813<br />

Manufacturer part #: 5502<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Battery Wiring Detail<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 8 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-04


PV System Electrical Calculations for Code Compliance VOC = 37.2 Vm = 30.2<br />

ISC= 8.44 Im = 7.96<br />

DVOC/DT = -0.34 %/°C DVm/DT = -0.47 %/°C<br />

Component Manufacturer Model # Series modules = 3 3 Pm = 240<br />

Outback GVFX3648 # Parallel modules = 4 5 (2) Parray 15 module = 3,600 W<br />

<strong>Solar</strong>World SW-240 Total # modules = 12 15 (1) Parray 12 module = 2,880 W<br />

# Of Inverters 3 # Charge Controllers = 3<br />

Ptotal = 10,080W<br />

30 o C Temp Conduit Conduit Derated<br />

PV Circuits ISC 1.25ISC 1.56ISC Conductor Ampacity Temp Derate Fill Fill DerateAmpacity<br />

Source Circuits 8.44 10.55 13.17 #12 THWN-2 30 60 0.71 9 0.7 14.91<br />

(2) Output Circuits 15 module 42.2 52.75 65.83 #6 THWN-2 75 30 1 2 1 75<br />

(1) Output Circuit 12 module 33.76 42.20 52.67 #6 THWN-2 75 30 1 2 1 75<br />

Charge Cont Circuits I 1.25I 1.56I Conductor Ampacity Temp Derate Fill Fill DerateAmpacity<br />

Charge Controller Output 67.8 80.0 80.0 #4 THWN-2 95 30 1 2 1 95<br />

Charge controller output current limited to 80A<br />

Overcurrent Protection I (rated) 1.25xI 1.56xI conductor ampacity C.B.<br />

Charge Controller Input 15 module 42.2 52.75 65.83 #6 THWN-2 75 80A All circuit breakers rated for<br />

Charge Controller Input 12 module 33.76 42.20 52.67 #6 THWN-2 75 80A continuous duty<br />

Charge Controller Output 15 module 67.8 80.00 80.0 #4 THWN-2 95 80A<br />

Charge Controller Output 12 module 54.3 67.85 80.0 #4 THWN-2 95 80A<br />

Inverter DC Input 75.0 93.8 #2/0 RHW 195 175 A<br />

Inverter AC In 40 50 #4 THWN-2 95 50A<br />

Inverter AC Out 40 50 #6 THWN-2 75 50A<br />

Voltage Drops Maximum<br />

Circuit Wire Size W/kft I V Length (feet)<br />

PV Source Circuits #12 THWN-2 1.93 7.96 90.6 58<br />

PV Output Circuit #6 THWN-2 0.491 39.8 90.6 46 Lowest Array Temp deg C -10<br />

Charge Controller Output #4 THWN-2 0.308 67.8 52 24 Highest Array Temp deg C 60<br />

Inverter AC in #4 THWN-2 0.308 30 120 337 Highest Array V OC 124.49<br />

Inverter AC out #6 THWN-2 0.491 9.5 120 385 Lowest Array V mp 76.33<br />

Electrical Calculations<br />

SCALE: NTS<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Electrical Calculations<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 9 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-05


THIS BUILDING CONTAINS DUAL<br />

POWER SOURCES. THE SECOND<br />

5"<br />

SOURCE IS A PHOTOVOLTAIC<br />

SYSTEM. DISCONNECTS FOR THE<br />

SYSTEM ARE LOCATED AT THE SOLAR<br />

EQUIPMENT ENCLOSURE IN FRONT<br />

OF OR ADJACENT THE PV ARRAY<br />

5"<br />

A<br />

B<br />

C<br />

6"<br />

WARNING<br />

PLACARD TO BE PLACED NEXT TO METER OR MAIN<br />

SERVICE DISCONNECT<br />

SCALE: NTS<br />

Photovoltaic System<br />

Point Of Utility Connection<br />

Located Inside This Panel<br />

LABEL LOCATED ON MDP PANEL<br />

SCALE: NTS<br />

6"<br />

MAIN PV SYSTEM UTILITY<br />

AC DISCONNECT<br />

WARNING<br />

ELECTRIC SHOCK HAZARD<br />

DO NOT TOUCH TERMINALS<br />

SYSTEM CONNECTED TO THE CUSTOMER<br />

SIDE OF THE MAIN CIRCUIT BREAKER.<br />

INTERACTIVE SOLAR PV SYSTEM RATINGS<br />

MAX. OPERATING CURRENT 60A / POLE<br />

OPERATING VOLTAGE 120/208 VAC<br />

LABELS FOR UTILITY PV AC DISCONNECT SWITCH<br />

SCALE: NTS<br />

2 1 2 "<br />

2 1 2 "<br />

3"<br />

2 1 2 "<br />

G<br />

INVERTER 1<br />

Maximum DC Voltage: 68 V<br />

Normal Operating Voltage: 48 V<br />

Maximum AC Input Current: 60 A<br />

Normal AC Output Current: 60 A<br />

Maximum DC Input Current: 82 A<br />

SOLAR COMBINER BOX 1<br />

Maximum Open Circuit Voltage: 126 V<br />

Normal Maximum Power Voltage: 78 V<br />

Maximum Short Circuit Current: 64 A<br />

Normal Operating Current: 41 A<br />

4" 4" 4"<br />

WARNING<br />

Electric Shock Hazard<br />

DO NOT TOUCH TERMINALS<br />

Terminals on both Line and Load sides<br />

may be energized in the Open Position.<br />

DC VOLTAGE IS ALWAYS PRESENT WHEN<br />

SOLAR MODULES ARE EXPOSED TO SUNLIGHT<br />

WARNING<br />

120-Volt Supplies<br />

Do not connect three phase or multiwire<br />

branch circuits<br />

LABEL GOES ON STANDBY LOAD PANEL<br />

SCALE: NTS<br />

INVERTER 2<br />

Maximum DC Voltage: 68 V<br />

Normal Operating Voltage: 48 V<br />

Maximum AC Input Current: 60 A<br />

Normal AC Output Current: 60 A<br />

Maximum DC Input Current: 82 A<br />

SOLAR COMBINER BOX 2<br />

Maximum Open Circuit Voltage: 126 V<br />

Normal Maximum Power Voltage: 78 V<br />

Maximum Short Circuit Current: 64 A<br />

Normal Operating Current: 41 A<br />

WARNING<br />

Electric Shock Hazard<br />

DO NOT TOUCH TERMINALS<br />

Terminals on both Line and Load sides<br />

may be energized in the Open Position.<br />

DC VOLTAGE IS ALWAYS PRESENT WHEN<br />

SOLAR MODULES ARE EXPOSED TO SUNLIGHT<br />

H<br />

D<br />

E<br />

F<br />

INVERTER LABELS<br />

SCALE: NTS<br />

COMBINER BOX LABELS<br />

SCALE: NTS<br />

COMBINER BOX LABELS<br />

SCALE: NTS<br />

WARNING<br />

Electric Shock Hazard<br />

If a ground fault is indicated, normally<br />

grounded conductors may be<br />

ungrounded and energized.<br />

LABEL GOES ON FW1000DC-UNDER GFDI<br />

SCALE: NTS<br />

INVERTER 3<br />

Maximum DC Voltage: 68 V<br />

Normal Operating Voltage: 48 V<br />

Maximum AC Input Current: 60 A<br />

Normal AC Output Current: 60 A<br />

Maximum DC Input Current: 82 A<br />

SOLAR COMBINER BOX 3<br />

Maximum Open Circuit Voltage: 126 V<br />

Normal Maximum Power Voltage: 78 V<br />

Maximum Short Circuit Current: 51 A<br />

Normal Operating Current: 32.88 A<br />

WARNING<br />

Electric Shock Hazard<br />

DO NOT TOUCH TERMINALS<br />

Terminals on both Line and Load sides<br />

may be energized in the Open Position.<br />

DC VOLTAGE IS ALWAYS PRESENT WHEN<br />

SOLAR MODULES ARE EXPOSED TO SUNLIGHT<br />

I<br />

WARNING<br />

INVERTER OUTPUT CONNECTION<br />

DO NOT Relocate This<br />

Overcurrent Device.<br />

LABEL GOES NEXT TO PV BREAKER IN MAIN PANEL<br />

SCALE: NTS<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Labels and Markings<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 10 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-06


A<br />

C<br />

MONITORING SYSTEM<br />

SCALE: NTS<br />

APRS WDL Wiring<br />

SCALE: NTS<br />

APRS World Wind Data Logger supply Voltage is 7 to 32 volts<br />

DC @ 500mA max.<br />

Distance between Combiner and Splitter boxes not to exceed<br />

50' (16m) with 3' (1m) patch cables to unit.<br />

Minimum wire size is #24 AWG.<br />

Lightning arrestor per local code.<br />

Patch cords are Cat 5E, 4 pair, #24 AWG.<br />

green House Computers, LLC<br />

Title:<br />

SunSmart Schools<br />

Description:<br />

Wiring diagram for SunSmart Schools Project<br />

Notes: green House Computers, LLC<br />

Title:<br />

APRS WDL Wiring<br />

Description:<br />

Wiring diagram for APRS World Wind Data logger<br />

and sensors.<br />

B<br />

D<br />

5-Sensor Combiner Box<br />

SCALE: NTS<br />

Notes:<br />

All internal wiring is 24 AWG<br />

Insulation displacement connectors used<br />

throughout.<br />

Enclosure must be placed in a dry location.<br />

Notes:<br />

5-Sensor Combiner Box<br />

SCALE: NTS<br />

All internal wiring is 24 AWG<br />

Insulation displacement connectors used<br />

throughout.<br />

Enclosure must be placed in a dry location.<br />

green House Computers, LLC<br />

Title:<br />

5-Sensor Combiner box<br />

Description:<br />

Combiner box for 2 wind and 3 analog sensors<br />

green House Computers, LLC<br />

Title:<br />

5-Sensor Combiner box (environmental)<br />

Description:<br />

Combiner box for 2 wind and 3 analog sensors<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

green House Computers, LLC<br />

Monitoring System<br />

SCALE: green House NTS Computers, LLC<br />

DRAWN Drawn By: BY: Julie RB,HB Haugh<br />

CHECKED Date: 02 BY: /09/11<br />

EC<br />

DATE: 10/03/11<br />

SHEET 11 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-07


A<br />

C<br />

Current Transducer Wiring<br />

SCALE: NTS<br />

<strong>Solar</strong> Irradiation Sensor Bracket<br />

SCALE: NTS<br />

Notes:<br />

Morning Star Relay Driver input voltage 8- 68VDC. Supply from<br />

battery or AC adapter.<br />

Relay Driver load without relays is 20mA.<br />

Individual Channel maximum output is 750mA<br />

Current transducer output voltage 0 - 10VDC.<br />

Current transducer sensor wiring #18 AWG<br />

Sensed wire must pass through center of current transducer window<br />

DC wiring colors: Black= NEG, Red= POS or per code.<br />

Notes: green House Computers, LLC<br />

This bracket is designed to mount a solar<br />

irradiance sensor in the plane of the array. Before<br />

affixing the irradiance sensor to the array, verify<br />

that the sensor is level with respect to the<br />

mounting bracket.<br />

Install such that shadows are not cast on an<br />

adjacent solar panel.<br />

green House Computers, LLC<br />

Title:<br />

Current transducer wiring, 120 /240 single phase<br />

Description:<br />

Wiring diagram showing two current transducers<br />

connected to a Morningstar Relay Driver.<br />

Title:<br />

<strong>Solar</strong> irradiation sensor Bracket<br />

Description:<br />

Bracket for mounting APRS6557 to solar array<br />

racking.<br />

B<br />

greenMonitor lite connector diagram<br />

SCALE: NTS<br />

green House Computers, LLC<br />

Austin, TX<br />

"Bringing Intelligence to <strong>Energy</strong> Conservation and Renewable <strong>Energy</strong>"<br />

SunSmart Schools System Content<br />

OutBack System Monitoring<br />

greenMonitor Lite, 8GB Flash, greenMonitor “Individual Advanced”<br />

software with Modbus enablement.<br />

15VDC / 120VAC adapter<br />

RS-232 Mate-wired serial cable, 6', shielded hoods.<br />

Cat 5 network cable, 7' (2m)<br />

4 port USB Hub, unpowered.<br />

Load Center Monitoring<br />

Critical Loads Panel (Inverter output connectors):<br />

Morningstar Relay Driver<br />

3 x Veris Industries Hawkeye 923 Current Transducer<br />

USB-to-Serial Adapter<br />

Grid Connection (Inverter input connectors):<br />

Morningstar Relay Driver<br />

3 x Veris Industries Hawkeye 923 Current Transducer<br />

USB-to-Serial Adapter<br />

Environmental Monitoring<br />

APRS World Wind Data Logger<br />

4x4 PVC junction box with 2 x 3/4” openings for power,<br />

communication and sensor wiring.<br />

15VDC / 120VAC adapter<br />

1' RS-232 to stripped leads pigtail, unshielded hood.<br />

USB-to-Serial Adapter<br />

#40R Anemometer<br />

1' anemometer stub, 1/2” galvanized EMT.<br />

Davis Instruments Pyranometer<br />

Pyranometer bracket<br />

Ambient temperature sensor, 30' cable<br />

Stevenson Screen for ambient temperature sensor<br />

Panel temperature sensor, 7' cable<br />

D<br />

Monitoring System Content<br />

SCALE: NTS<br />

Notes: green House Computers, LLC<br />

greenMonitor Lite includes<br />

Mate-wired serial cable, 7' (2m)<br />

Cat 5 /5E cable, Power over Ethernet (PoE)<br />

injector and 15 VDC 120 VAC adapter.<br />

Title:<br />

greenMonitor lite connector diagram<br />

Description:<br />

Diagram of connectors and indicator lights for a<br />

greenMonitor Lite.<br />

5 sensor combiner<br />

wind speed and direction (not included) with 3<br />

analog sensors to combined output<br />

5 sensor splitter<br />

combined input to wind and analog input<br />

50' patch cable<br />

splitter to combiner interconnection.<br />

2 x 1' Cat 5 patch cable<br />

splitter to wind and analog inputs<br />

splitter to wind and analog inputs<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

SCALE: green House NTS Computers, LLC<br />

DRAWN Drawn By: BY: Julie RB,HB Haugh<br />

CHECKED Date: 02 BY: /09/11<br />

EC<br />

DATE: 10/03/11<br />

SHEET 12 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

green House Computers, LLC<br />

Monitoring System<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

E-08


Battery Backup Grid-Connected Photovoltaic Emergency Power System Installation Notes<br />

The following is a brief summary of equipment installation notes. The owner and the installer will be provided<br />

with all manufacturers' instruction manuals as well as a copy of the materials that have been submitted to the <strong>Florida</strong> <strong>Solar</strong><br />

<strong>Energy</strong> Center for design review of the system.<br />

Summary of Major Equipment Manufacturer, Model and Listing/Compliance<br />

Note that the Outback GVFX3648 Inverters will supply a maximum of 10,800 watts if the utility grid is down. When the<br />

utility grid is up, the three inverters will pass through 50A @ 120V, or 18,000 VA. If the utility grid is down, the system<br />

operates as a stand-alone PV system and is thus subject to the provisions of NEC 690.10(A). When the utility grid is<br />

operational, the PV system loads are subject to NEC 220.<br />

Note also that the PV system can be expected to generate approximately 36 kWh per day as long as the day is mostly<br />

sunny. In the event of a utility outage, run times of loads may need to be adjusted on a daily basis to avoid having the<br />

inverter shut down if the battery state of charge reaches the minimum allowable limit of 44 volts.<br />

When the utility is in operation, the kWh consumption is no longer limited by battery capacity, since the grid will supply<br />

14,400 VA continuously (50A C.B.) via the inverter if necessary.<br />

I. PV Module Installation<br />

Item Manufacturer Model Listing<br />

PV Modules <strong>Solar</strong> World SW 240 Poly UL<br />

Source ckt Combiner<br />

Box<br />

DC Component<br />

Enclosure<br />

Outback Power<br />

Outback Power<br />

PV8<br />

FW1000DC<br />

ETL<br />

ETL<br />

GFDI Device Outback Power OBDC-GFP2 ETL<br />

Inverter Outback Power GVFX3648 ETL (to UL1741)<br />

Charge Controller Outback Power FM-80 ETL<br />

AC Component<br />

Enclosure<br />

Outback Power FW1000AC ETL<br />

Storage Batteries Sun-Xtender PVX-3050T ЯU<br />

A. Electrical Notes<br />

1. Modules are prewired with #12 PV Wire conductors with molded W/P connectors. Use only the connectors<br />

provided for connecting modules in series. Do not cut connectors off as this may void the manufacturer's<br />

warranty. Do not disconnect connectors under load.<br />

2. Module output is DC. Twist-on connectors are not suitable for use with DC. Use only the terminal strips or<br />

Polaris taps enclosed in a weatherproof junction box to transition wires if needed.<br />

3. If junction boxes are used, use cord connector strain relief at junction box entries of module open wiring<br />

conductors. Be sure connectors are tightened sufficiently to prevent water entry into the junction box along the<br />

wires.<br />

4. Use lay-in ground lugs or WEEB components for grounding modules and module racking. Mount ground lugs to<br />

modules using #10-32 self-threading stainless steel bolts, nuts and lockwashers that are provided with the lugs.<br />

Use #10 solid bare wire in continuous runs to ground modules. Removal of any module from the system must not<br />

affect the grounding of the remaining modules.<br />

5. Bond all array mounting structure to modules using approved bonding clips. Use one clip for each individual<br />

length of mounting rail.<br />

6. Strap all module open wiring neatly to the mounting frame using UV resistant wire straps.<br />

7. Follow school building code requirements for all electrical conduit and and components.<br />

8. If DC wiring passes through building interior space, NEC690.31(E) requires that the wiring be enclosed in<br />

metallic conduit up to the first readily accessible disconnecting means.<br />

B. Mechanical Notes<br />

1. Use Stainless Steel hardware to attach PV Modules to PV Array mounting frame<br />

2. Follow module mounting detail shown in mechanical drawings of mounting frame.<br />

II. Source Circuit Combiner Box Installation<br />

Follow manufacturer's instructions.<br />

III. FW1000 AC and DC Disconnect Enclosure Installation<br />

Follow manufacturer's instructions.<br />

IV. System Batteries Installation<br />

Follow manufacturer's instructions and install in accordance with NEC requirements. Maintenance free<br />

batteries will only need to be vented at the top and bottom of battery container to keep the batteries cool, as per<br />

IEEE 1187 and the terminals will need to be protected from accidental short circuits.<br />

Use only UL listed cables and cable lugs crimped with approved UL crimping tool. The use of fine stranded<br />

battery cables is highly recommended to reduce the strain on battery terminals. Do not use battery lugs that have an<br />

inspection peep hole for battery connections, as these lugs are not suitable for use with batteries.<br />

V. GVFX 3648 Inverter Installation<br />

Follow manufacturer's instructions for installation and programming via the MATE system controller.<br />

VI. MX-80 MPPT Charge Controller Installation<br />

Follow manufacturer's instructions for installation and programming via the MATE system controller.<br />

VII. Balance of System (BOS) Component Installation<br />

The balance of system components are shown on the electrical schematic diagram. These are standard AC<br />

components that require wiring according to NEC, using standard wiring practices. In particular, the point of<br />

utility connection (PUC) has been designed to meet the requirements of NEC 690.64.<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Notes<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 13 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

N-01


Ground Anchor<br />

and Strap<br />

5 8 " x 8'<br />

Ground Rod<br />

(driven below ground)<br />

72.00"<br />

111.00"<br />

3"x 3" x 1 4" Stainless or<br />

Galvanized Steel Post<br />

36.00" 1" Conduit<br />

72.00"<br />

48.00"<br />

Optional shed location to<br />

be Min 8' east or west of Array<br />

Note: This Drawing is intended to show array structure and equipment enclosure placement only.<br />

See Structural drawings S-1 and S-2 for Array Structural and footer details.<br />

See Sheet A01 of 07 through A07 of 07 for <strong>Solar</strong> Equipment Enclosure Structural and Anchoring (see A07 of 07)<br />

details.<br />

A<br />

Skids<br />

Concrete Block<br />

1" LB<br />

3/4" LB<br />

Meter<br />

Approx - 96.00"<br />

<strong>Solar</strong> Equipment Enclosure Location vs Array East Elevation<br />

SCALE: 1/2" = 1'-0"<br />

Treated soil beneath<br />

equipment enclosure<br />

75.00"<br />

Steel Plate<br />

20.00"± 10"<br />

12.00"<br />

36.00"<br />

68.50"<br />

3/4" Conduit<br />

For Monitoring Wires<br />

16.00"<br />

Connector/Bushings<br />

82.00"<br />

198.00"<br />

Rail<br />

C Channel<br />

1" Conduit<br />

1" Conduit<br />

68.50"<br />

Module<br />

Notes:<br />

53.00"<br />

This Drawing is<br />

intended to show<br />

Enclosure and Array<br />

Placement only.<br />

See the attached<br />

Enclosure plans for<br />

detailed enclosure<br />

specifications.<br />

20.00"±10"<br />

Legend:<br />

<strong>Solar</strong> Panel<br />

C-chanel<br />

24.00"<br />

Galvanized Post<br />

Rail<br />

N<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

<strong>Solar</strong> Equipment Enclosure<br />

Location vs Array<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 14 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

M-01


A<br />

C<br />

3/4”<br />

Metal LB<br />

4”X4”X2”<br />

PVC<br />

Junction<br />

Box<br />

3/4” Sch 80 PVC<br />

W/ Cat 5<br />

12.75"<br />

40.5"<br />

Mate<br />

3/4” EMT<br />

Conduit<br />

Hub<br />

Input /Output<br />

Bypass Kit<br />

AC Breakers<br />

3/4” Sealing<br />

Locknut<br />

Exterior Wall Of School<br />

1” EMT<br />

Conduit<br />

1”<br />

Metal LB<br />

2 Hole PVC Strap<br />

11.5"<br />

OutBack FlexWare 1000 AC<br />

Power Distribution Panel<br />

(See Sheet E-03)<br />

6”X6”X4”<br />

PVC<br />

Junction<br />

Box<br />

Power in<br />

1” Sealing<br />

Locknut<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

AC In<br />

H<br />

N<br />

AC Out<br />

H<br />

N<br />

To Shed To Shed To Shed<br />

1 1/4” EMT<br />

Conduit<br />

1 1/4”<br />

Metal LB<br />

GVFX3648<br />

PV BATT PV BATT<br />

-<br />

+<br />

-<br />

+<br />

GVFX3648<br />

GVFX3648<br />

FlexWare Mounting Plate<br />

47"<br />

Conduit Tie Down bracket<br />

2 rows of 8 Batteries in series.<br />

Batteries are Sun Xtender 3050T Batteries.<br />

(See Sheet DS-03:04 for Battery Specifications).<br />

4/0 Pos Battery<br />

Cable<br />

250A Inline DC Fuse<br />

Battery Temp<br />

Sensor Wire<br />

10.25"<br />

Wall<br />

Light Fixture<br />

GFCI Outlet<br />

Ground Anchor<br />

and Strap<br />

Outback GVFX Inverter<br />

AC Adapter<br />

DC Adapter<br />

Wood Subfloor<br />

-<br />

+<br />

Utility<br />

Disconnect<br />

15.25"<br />

Skids<br />

Power out<br />

9.25"<br />

Combiner Box A<br />

(See Sheet E-02)<br />

Concrete Block<br />

96.00"<br />

1 1/4” Hub<br />

Combiner Box B<br />

(See Sheet E-02)<br />

OutBack FlexWare 1000 DC<br />

Power Distribution Panel<br />

(See Sheet E-02)<br />

FW 1000<br />

DC Enclosure<br />

DC Breakers<br />

FLEXmax<br />

FLEXmax<br />

PV BATT<br />

Combiner Box C<br />

(See Sheet E-02)<br />

FLEXmax<br />

2" Flexible Metal<br />

Conduit<br />

Outback MX 80<br />

Charge Controller<br />

Cable Raceway<br />

Entrance<br />

PV+ and Batt+ Breakers<br />

Plastic Bushing<br />

4/0 Neg Battery<br />

Cable<br />

2" Flexible Metal<br />

Conduit Connector<br />

<strong>Solar</strong> Equipment Enclosure Interior South Elevation<br />

SCALE: 1/2"=1'0" B<br />

1" Sch 80<br />

Conduit w/10 # 12 USE-2<br />

& 1 #10 ground<br />

from Array<br />

to Combiner Boxes A, B, C<br />

Entrance<br />

29"<br />

8'<br />

In From PV Array<br />

Exterior Wall Of <strong>Solar</strong> Equipment Enclosure<br />

1" LB<br />

2 Hole PVC Strap<br />

3/4"<br />

LB<br />

3/4" Sch 80 Conduit<br />

w/mon wires From Array<br />

3/4" Sch 80 Conduit<br />

W/Cat5<br />

Meter 1<br />

Meter 2<br />

Out To Building<br />

36.00"<br />

1” Sch 80 PVC<br />

W/4 #6 &<br />

1 #10 Ground<br />

1 1/4” Sch 80 PVC<br />

W/ 4 #4 &<br />

1 #10 Ground<br />

1 1/4" Sch 80 1" Sch 80 Conduit<br />

Conduit<br />

w/4 #6, &<br />

w/4 #4 and 1 #10 Ground To<br />

Note: Use caulking<br />

around all wall<br />

penetrations.<br />

1 #10<br />

Ground To<br />

Building<br />

18” below grade<br />

Building<br />

18” below grade<br />

96.00"<br />

Combiner Box A<br />

(See Sheet E-02)<br />

1" Conduit from Array<br />

Single Door Entrance<br />

1" LB<br />

1" Conduit<br />

Combiner Box A<br />

(See Sheet E-02)<br />

<strong>Solar</strong> Equipment Enclosure Layout<br />

SCALE: 1/2" = 1'0"<br />

School Wall Connections<br />

<strong>Solar</strong> Equipment Enclosure North Elevation<br />

SCALE: 3/8"=1'0" D SCALE: 3/8"=1'0"<br />

E<br />

PV<br />

ARRAY<br />

Flexware<br />

Mounting<br />

Plate<br />

30.00"<br />

96.00"<br />

FlexWare 1000 DC Enclosure<br />

FlexWare 1000 AC Enclosure<br />

12.75"<br />

Combiner Box A<br />

(See Sheet E-02)<br />

PV<br />

ARRAY<br />

7"<br />

Meter 1 Meter 2<br />

Cat5 Wire Out<br />

Monitoring Wires From Array<br />

1'-4"<br />

4"<br />

Outback Combiner Box<br />

FlexWare 1000 AC Enclosure<br />

36.00"<br />

36.00"<br />

Minimum clearance needed<br />

Outback GVFX<br />

3648 Inverter<br />

Battery Bank<br />

2 Rows of<br />

8 Batteries in Series<br />

Wood Subfloor<br />

Skids<br />

Concrete Block<br />

72.00"<br />

Wall<br />

72.00"<br />

72.00"<br />

Vent (Mechanical-Optional)<br />

<strong>Solar</strong> Equipment Enclosure West Elevation<br />

SCALE: 3/8"=1'0"<br />

Light Fixture<br />

GFCI Outlet<br />

96.00"<br />

Ground Anchor<br />

and Strap<br />

N<br />

Notes:<br />

N<br />

This Drawing is<br />

intended to show<br />

equipment placement<br />

inside of enclosure<br />

only.<br />

See the attached<br />

enclosure plans for<br />

detailed enclosure<br />

specifications.<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

<strong>Solar</strong> Equipment Enclosure<br />

School Wall Detail<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 15 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

M-02


1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

PV Watts<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 16 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

P-01


<strong>Solar</strong> Panel - Inverter Data Sheet<br />

SCALE: NTS<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Data Sheet<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 17 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

DS-01


Charge Controller - Combiner Box Data Sheet<br />

SCALE: NTS<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Data Sheet<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 18 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

DS-02


Battery Data Sheet<br />

SCALE: NTS<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Data Sheet<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 19 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

DS-03


Battery Specifications - Data Sheet<br />

SCALE: NTS<br />

1369 14th Street, Baker, FL 32531<br />

Design for:<br />

I CERTIFY THAT THIS PV<br />

SYSTEM FULLY COMPLIES<br />

WITH THE REQUIREMENTS<br />

OF NEC 690.<br />

PV SYSTEM<br />

Total Output:<br />

# Modules:<br />

Manufacturer:<br />

Model:<br />

Baker School<br />

<strong>Solar</strong> School Shelters<br />

Battery Backup PV System<br />

Data Sheet<br />

SCALE: NTS<br />

DRAWN BY: RB,HB<br />

CHECKED BY: EC<br />

DATE: 10/03/11<br />

SHEET 20 OF 20<br />

Revision:<br />

00<br />

10.08 kW<br />

42<br />

<strong>Solar</strong> World<br />

240<br />

Sheet:<br />

E.E. Castillo, PE<br />

Licensed Engineer #: PE52590<br />

Certification of Authorization #28406<br />

3601 N. DIXIE HWY, BAY 16 BOCA RATON, FL 33431<br />

PHONE: 561.750.8677 FAX:561.750.0518<br />

DS-04