18.12.2013 Views

ESP Jib REEfing & fuRling unit 1, 2, 3 - Harken

ESP Jib REEfing & fuRling unit 1, 2, 3 - Harken

ESP Jib REEfing & fuRling unit 1, 2, 3 - Harken

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Assembly<br />

Leg Kit with Toggle Assembly<br />

19a. Make sure flat holes in leg line up with threaded crosspin flats.<br />

Line up flats<br />

19b. Secure using washers and locknuts.<br />

Tools: Socket or Open End Wrench<br />

Unit<br />

Size<br />

2 16 mm<br />

3 18 mm<br />

If stay length is set, use side cutters<br />

or needlenose pliers to bend cotter<br />

pin to secure turnbuckle.<br />

20. Capture legs in one of the two collars.<br />

Tip: If the legs do not fit collar, loosen<br />

Locknuts at threaded crosspin.<br />

Collar<br />

20 <strong>ESP</strong> Unit 2, 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!