18.12.2013 Views

ESP Jib REEfing & fuRling unit 1, 2, 3 - Harken

ESP Jib REEfing & fuRling unit 1, 2, 3 - Harken

ESP Jib REEfing & fuRling unit 1, 2, 3 - Harken

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Assembly<br />

Leg Kit with Toggle Assembly<br />

21. Slip Leg Kit assembly onto neck of<br />

drum assembly and fit other collar.<br />

22. Secure using Collar Screws.<br />

Tools: Hex Key<br />

Unit<br />

Size<br />

2 6 mm<br />

3 8 mm<br />

23. Push the assembled foils up toward the<br />

top of the stay leaving 1" to 2" (25 to<br />

50 mm) of space between the top of<br />

the deflector or the trim cap and bottom<br />

of marine eye. Align all three holes at<br />

bottom of adjuster tube. Check to make<br />

sure there is space above halyard<br />

deflector or trim cap.<br />

Unit<br />

Approximate Space<br />

mm in<br />

2 30 1 1 /4<br />

3 50 2<br />

<strong>ESP</strong> Unit 2, 3 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!