Annual Review - This is Hatch 2007 [pdf, 6.17 MB]
Annual Review - This is Hatch 2007 [pdf, 6.17 MB]
Annual Review - This is Hatch 2007 [pdf, 6.17 MB]
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ENERGY<br />
OIL & GAS<br />
Albian Sands Energy<br />
The Oil & Gas business unit of <strong>Hatch</strong><br />
Energy has signed an engineering-services<br />
contract for Operations Support with Albian<br />
Sands Energy. The services will be provided<br />
to Albian from March 2006 to the end<br />
of February 2009. All engineering will be<br />
carried out in our Calgary offices.<br />
Apache Midale CO 2 Phase 2<br />
<strong>Hatch</strong> Energy was awarded the engineering,<br />
procurement and construction management<br />
of Phase 2 of the Midale CO 2 M<strong>is</strong>cible<br />
Flood Project by Apache Canada Ltd.<br />
The initial scope of work cons<strong>is</strong>ts of<br />
the development of an additional seven<br />
patterns and subsequent satellite and<br />
plant facility upgrades.<br />
Gorgon LNG Facility<br />
<strong>Hatch</strong> <strong>is</strong> working on the prefeasibility<br />
study for the next phase of the Shell<br />
ChevronTexaco Gorgon liquefied natural<br />
gas facility in Australia.<br />
Surmont Oil Sands Development<br />
The ConocoPhillips development southeast<br />
of Fort McMurray will use steam-ass<strong>is</strong>ted<br />
gravity drainage (SAGD) to recover heavy<br />
oil from oil sands where the pay zone <strong>is</strong><br />
too deep for other extraction methods.<br />
Weyburn Compressor Expansion<br />
<strong>Hatch</strong> Energy <strong>is</strong> providing project<br />
management, engineering and procurement<br />
for the EnCana Weyburn recyclecompressor<br />
expansion.<br />
The Weyburn, Saskatchewan oil and gas<br />
field has been on waterflood since 1964<br />
and has been on CO 2 m<strong>is</strong>cible flood since<br />
2000. CO 2 m<strong>is</strong>cible flood will target<br />
recovering another 15-20 percent of the<br />
original oil in place.<br />
ConocoPhillips will use steam-ass<strong>is</strong>ted<br />
gravity drainage to recover oil from<br />
the oil sands in Alberta, Canada.<br />
<strong>Hatch</strong> Energy provided the fast-track<br />
design and construction management<br />
for the award-winning Shikwamkwa<br />
Dam in Ontario, Canada.<br />
14