exhIBIt h: monItoRIng & RepoRtIng pRogR Am<br />
DA pAge/<br />
Item # ImpACt mItIgAtIon/pRogRAm In ComplIAnCe Comments<br />
Air Quality<br />
H-8/Item 1 Asbestos: Demolition <strong>of</strong> 34<br />
buildings—11 in each <strong>of</strong> Phases I <strong>and</strong><br />
II, 13 in Phase III—could cause<br />
asbestos to be released into the<br />
atmosphere, potentially endangering<br />
workers. 5F-6<br />
H-8/Item 2 Building Contamination: when<br />
buildings 46 <strong>and</strong> 46A, used to<br />
manufacture plague vaccine, are<br />
demolished in Phase I, any vestige <strong>of</strong><br />
plague not eradicated could cause<br />
health impact to those in the<br />
immediate vicinity on-site. 5F-6<br />
H-9/Item 3 fumigation: Fumigation <strong>of</strong><br />
contaminated buildings could cause<br />
air quality impacts, depending upon<br />
the chemicals used. The use <strong>of</strong><br />
formaldehyde in fumigating the<br />
plague building could have significant<br />
impacts. 5F-6<br />
H-9/Item 4 Construction Dust: Construction on<br />
each block would emit approximately<br />
one ton <strong>of</strong> dust per month for one to<br />
two months. If dust suppression<br />
measures were not carried out, this<br />
would be a significant impact. 5F-7<br />
H-9/Item 5 Construction vehicles: Construction<br />
vehicles/equipment emitting exhaust<br />
at construction sites have the<br />
potential <strong>of</strong> significant air quality<br />
impact. 5F-8<br />
H-9/Item 6 overall phase I Impacts:<br />
Construction would occur in four<br />
blocks over a period <strong>of</strong> five years.<br />
During those years, there would be<br />
four to eight months in which<br />
approximately one ton <strong>of</strong> dust per<br />
month would be stirred up. 5F-8<br />
H-9/Item 7 pilot plant: There would be a period<br />
<strong>of</strong> one to two months during which<br />
approximately one ton <strong>of</strong> dust per<br />
month would be emitted. 5F-8<br />
H-9/Item 8 phase II: During Phase II, over five years,<br />
there would be six to twelve months<br />
during which approximately one ton <strong>of</strong><br />
dust per month would be emitted. 5F-9<br />
<strong>Bayer</strong> will comply with Federal<br />
regulations governing asbestos<br />
removal.<br />
Prior to demolition, <strong>Bayer</strong> will<br />
decontaminate buildings 46 <strong>and</strong><br />
46A in accordance with Federal,<br />
State <strong>and</strong> local regulations <strong>and</strong><br />
st<strong>and</strong>ards.<br />
<strong>Bayer</strong> will conduct fumigation<br />
operations in accordance with<br />
Federal <strong>and</strong> State health <strong>and</strong> safety<br />
regulations.<br />
<strong>Bayer</strong> will carry out dust<br />
suppression measures per<br />
Construction/Demolition Dust<br />
Suppression Program.<br />
<strong>Bayer</strong> will comply with existing <strong>City</strong><br />
ordinances <strong>and</strong> constraints imposed<br />
by use permits to reduce exhausts<br />
emitted from construction vehicles/<br />
equipment.<br />
<strong>Bayer</strong> will carry out dust suppression<br />
measures per Construction/<br />
Demolition Dust Suppression<br />
Program.<br />
<strong>Bayer</strong> will carry out dust<br />
suppression measures per<br />
Construction/Demolition Dust<br />
Suppression Program.<br />
<strong>Bayer</strong> will carry out dust<br />
suppression measures per<br />
Construction/Demolition Dust<br />
Suppression Program.<br />
yes<br />
yes<br />
yes<br />
yes*<br />
yes<br />
yes*<br />
yes*<br />
yes*<br />