84<br />
exhIBIt B<br />
mitigation monitoring & Reporting program for first major Amendment, 1999<br />
ImpACt mItIgAtIon / pRogRAm In ComplIAnCe Comments<br />
Cumulative Transportation<br />
1) Intersection at Seventh Street &<br />
Dwight way (currently at peak period<br />
lOS C) would decline to F.<br />
2) Intersection at San Pablo Avenue &<br />
Dwight way (currently at lOS D) would<br />
decline to F.<br />
3) Intersection at San Pablo Avenue &<br />
Ashby Avenue (currently at lOS D)<br />
would decline to F.<br />
Complete Improvements:<br />
(1) within the existing curb-to-curb, stripe the<br />
eastbound <strong>and</strong> westbound approaches on Dwight<br />
way for two travel lanes (this will require the loss <strong>of</strong><br />
three parking spaces on the north side <strong>of</strong> the<br />
eastbound approach); <strong>and</strong> (2) To improve<br />
intersection efficiency, install overhead signs on the<br />
mast arm to clearly mark which lane is used for left<br />
turns to Dwight way (this will require removal <strong>of</strong><br />
one traffic signal head on the mast arm to<br />
accommodate signs). All improvements will result<br />
in maintaining a lOS C through the year 2010. <strong>Bayer</strong><br />
to fund improvements; <strong>City</strong> to construct.<br />
Complete Improvements:<br />
<strong>City</strong> <strong>and</strong> Caltrans are currently modifying traffic<br />
signal to provide protected left-turn phasing on San<br />
Pablo Avenue. The following additional<br />
improvements are required: Add No Parking zones<br />
on both Dwight way approaches to provide two<br />
lanes at least during peak times (this will result in a<br />
loss <strong>of</strong> one parking space on the north side <strong>of</strong> the<br />
westbound approach <strong>and</strong> three parking spaces on<br />
the south side <strong>of</strong> the eastbound approach during<br />
peak times). All improvements will result in<br />
maintaining a lOS D through the year 2010. <strong>Bayer</strong><br />
to fund the additional improvements; <strong>City</strong> to<br />
construct.<br />
Complete Improvements:<br />
(1) widen the westbound approach on Ashby Avenue<br />
(along the walgreen’s frontage) to provide an<br />
exclusive 80-foot long right-turn lane; (2) Stripe a<br />
northbound San Pablo Avenue right-turn lane within<br />
the existing curb-to-curb; (3) Extend the No Parking<br />
zone on the southbound approach <strong>of</strong> San Pablo<br />
Avenue to provide a right-turn lane within the existing<br />
curb-to-curb (this will require a loss <strong>of</strong> two parking<br />
spaces); <strong>and</strong> (4) Provide a protected-permitted leftturn<br />
phase for eastbound Ashby Avenue.<br />
Improvements as shown in attached Figure 1 <strong>and</strong><br />
detailed in attached preliminary cost estimate will<br />
result in maintaining a lOS D through the year 2010.<br />
Mitigation is based on <strong>City</strong>’s having secured sufficient<br />
right-<strong>of</strong>-way to make the needed widening on the<br />
westbound approach. <strong>Bayer</strong> to fund improvements;<br />
<strong>City</strong> to secure right-<strong>of</strong>-way <strong>and</strong> construct.<br />
yes<br />
$490,033 remaining in this<br />
category to be paid upon<br />
request from the <strong>City</strong>.<br />
yes Same as above<br />
yes $550,000 requested from<br />
<strong>and</strong> provided to <strong>City</strong> in<br />
2004.