ImpACt mItIgAtIon / pRogRAm In ComplIAnCe Comments<br />
8) On-site parking supply <strong>and</strong> peak-hour<br />
trip generation would be impacted.<br />
9) On-site parking supply <strong>and</strong> peak-hour<br />
trip generation would be impacted.<br />
10) On-site parking supply <strong>and</strong> peak-hour<br />
trip generation would be impacted.<br />
11) Both short <strong>and</strong> long- term parking<br />
supplies would be inadequate.<br />
12) Project traffic would increase year 2010<br />
peak hour vehicle delay at 5<br />
intersections by 54 total hours.<br />
west <strong>Berkeley</strong> BARt shuttle:<br />
<strong>Bayer</strong> to provide continued funding <strong>of</strong> publicly<br />
administered shuttle program at maximum level <strong>of</strong><br />
$50,000 annually throughout term <strong>of</strong> Agreement<br />
(2022).<br />
multi-shift employment:<br />
<strong>Bayer</strong> to provide for continuous implementation <strong>of</strong><br />
swing/graveyard employment (traffic <strong>of</strong>f-peak hours)<br />
which averages 18% <strong>of</strong> total work force throughout<br />
term <strong>of</strong> Agreement (2022). Continuation <strong>of</strong> this<br />
program (which is currently in effect) will reduce both<br />
parking <strong>and</strong> traffic impacts.<br />
tDm programs:<br />
<strong>Bayer</strong> to continue implementation <strong>of</strong> transportation<br />
dem<strong>and</strong> management programs from 1992<br />
Development Agreement at current levels throughout<br />
term <strong>of</strong> Agreement (2022). Continuation <strong>of</strong> this<br />
program (which is currently in effect) will reduce both<br />
parking <strong>and</strong> traffic impacts.<br />
project management:<br />
Implement parking program to fully satisfy <strong>Bayer</strong>’s<br />
projected peak parking dem<strong>and</strong>s on site at all times.<br />
Parking supply will be verified at time <strong>of</strong> each new<br />
construction project to demonstrate adequacy both<br />
during construction <strong>and</strong> upon completion/occupancy.<br />
A total <strong>of</strong> 1,078 parking spaces must be available with<br />
anticipated year 2005 construction, <strong>and</strong> 1,329 parking<br />
spaces with full buildout (anticipated in 2010).<br />
sum <strong>of</strong> mitigation measures:<br />
Application <strong>of</strong> traffic mitigation measures “a” through<br />
“k” would provide net reduction in peak hour vehicle<br />
delay at five intersections <strong>of</strong> 350 total hours.<br />
yes $106,348 plus lease cost<br />
paid in 2009<br />
yes<br />
yes<br />
yes<br />
yes