City of <strong>Greenville</strong> | Bicycle Master Plan<br />
Table <strong>8.</strong>1-9. Key connectivity gaps in the bike route network.<br />
Corridor<br />
Fernwood Lane<br />
Blair Street<br />
Villa Road<br />
Mt Vista Avenue - Augusta Court Rte<br />
Waccamaw Avenue<br />
Fore Avenue -- Evelyn Avenue Rte<br />
Connector Street<br />
Ackley Road<br />
Asteria Street<br />
West Orchard Park Drive<br />
Meyers Drive<br />
Meyers Drive<br />
Glenda Lane<br />
<strong>8.</strong>1.6.5 Major Corridor Studies<br />
In Chapter 7, this plan recommends a comprehensive approach to corridor design and planning for the City’s<br />
major roadway corridors. Such planning and design would include access management approaches to limit the<br />
number and spacing of driveways and turning locations; land use policies to facilitate more bicycle- and<br />
pedestrian-friendly development patterns; connectivity improvements to provide additional parallel route<br />
options; travelway designs that are more appropriate to an urban context; and speed reduction measures for<br />
motor vehicle travel.<br />
This plan recommends that the City continue to coordinate with SCDOT and GPATS to prioritize, fund, and<br />
implement improvements for on these corridors to make them safer and more accessible to all modes of travel,<br />
including bicycles. At least one major corridor study and implementation project should be the focus of City<br />
and partner agency efforts every two years. Additional planning and implementation opportunities may occur<br />
more frequently as resurfacing or other local, state, and/or private investment initiatives occur on these<br />
corridors. The corridors recommended for further planning and design and/or implementation include:<br />
• Augusta Street (High priority bikeway corridor per public input and analysis, including collision<br />
data analysis)<br />
• Woodruff Road (Corridor study complete; needs detailed plans for bikeway improvements)<br />
• Wade Hampton Boulevard (Draft corridor streetscape concepts completed)<br />
• Pelham Road (SCDOT resurfacing project upcoming for portion of the corridor)<br />
• Roper Mountain Road (SCDOT resurfacing project upcoming for portion of the corridor)<br />
• Pleasantburg Drive (Corridor study complete; needs detailed plans for bikeway improvements)<br />
• Church Street/Mills Avenue Corridor (portions of Church St funded for redesign)<br />
• Laurens Road/US 276 (High priority bikeway corridor per public input and analysis)<br />
• Poinsett Highway<br />
• Buncombe Road/Pete Hollis Boulevard<br />
Alta Planning + Design |8-19