B Y T H E N U M B E R S<br />
QIT’s UGS,<br />
the third and<br />
best expansion<br />
525,000<br />
work-hours without a lost-time injury<br />
3 months<br />
ahead of schedule<br />
$15 million<br />
under budget<br />
400+<br />
piping, mechanical and<br />
elecrical tie-ins required<br />
Every objective was met with the<br />
highly successful third expansion<br />
of Rio Tinto's UGS to 375,000<br />
tons per year.<br />
The project was fast-tracked from<br />
the outset and was completed<br />
three months ahead of schedule<br />
and $15 million under budget.<br />
During the 525,000 work-hours<br />
dedicated to the expansion<br />
project in a facility operating<br />
at full capacity there was not a<br />
single lost-time injury.<br />
Rio Tinto had concluded<br />
that a 15-percent increase<br />
of production could best be<br />
accomplished with two new<br />
production lines.<br />
15 % production increase<br />