The project won the<br />

Project Management<br />

Institute Project of<br />

the Year Award in<br />

Québec. UGS is<br />

at Sorel-Tracy,<br />

Québec, on the<br />

St. Lawrence River.<br />

The project was then entered<br />

into the International Project of<br />

the Year competition, against<br />

competitors from more than 60<br />

nations, and Rio Tinto captured<br />

that honor as well.<br />

It was a global project:<br />

• All the main production<br />

equipment was designed at<br />

<strong>Hatch</strong> Mississauga in Canada;<br />

• The preliminary design studies<br />

were completed in <strong>Hatch</strong><br />

Montréal and <strong>Hatch</strong> Sorel-<br />

Tracy; and<br />

• The structural engineering<br />

and steel detailing of the<br />

Slag-Preparation Plant were<br />

assigned to the team at<br />

Woodmead, South Africa.<br />

<strong>Hatch</strong>'s scope of services were<br />

engineering, procurement and<br />

construction management, i.e.<br />

the “full EPCM.”<br />

<strong>Hatch</strong> also designed the process<br />

equipment including the<br />

reactor, dryer, and classifier; and<br />

programmed the controls.<br />

More than 400 piping,<br />

mechanical, and electrical tie-ins<br />

were needed.<br />

A dozen major pieces of<br />

equipment were installed.<br />

Through it all, production<br />

continued without interruption.<br />

The Acid-Leach Plant was on<br />

stream after two days. The<br />

Slag-Preparation Plant was<br />

operational in a week.<br />