Nickel Rim, a new<br />

nickel mine in the<br />

Sudbury basin,<br />

shows a modern<br />

face in its design and<br />

project execution<br />

Xstrata Nickel assigned the full<br />

EPCM scope for engineering,<br />

procurement, and construction<br />

management to <strong>Hatch</strong> in jointventure<br />

with a local partner.<br />

The <strong>Hatch</strong> EPCM team peaked<br />

at 120 members managing five<br />

design groups and up to 15<br />

contracting firms on site at the<br />

same time.<br />

Strict access rules and<br />

performance standards were<br />

imposed on all site personnel,<br />

contractors and suppliers to<br />

guarantee that safety protocols<br />

were obeyed to the letter.<br />

When the project was completed<br />

more than seven million hours<br />

were expended including a run<br />

of five million without a<br />

lost-time injury.<br />

The project’s scope included<br />

all surface and underground<br />

infrastructure, a ventilation shaft<br />

sunk to 1,685 metres, and a<br />

production shaft sunk to<br />

1,750 metres.<br />

The underground infrastructure<br />

includes 25 km of lateral mine<br />

development, and, to prove ore<br />

body geometry, mineral grades<br />

and tonnage some 125 km of<br />

diamond-drilling.<br />

Nickel Rim is now producing at<br />

1.2 million tonnes per annum;<br />

however hoisting infrastructure<br />

is designed to extract up to a<br />

maximum of 1.7 million tpa of<br />

combined ore and waste rock,<br />

when required.<br />

The project was completed<br />

safely, three percent below<br />

budget with first production<br />

ahead of schedule.<br />

Meet the Specialists<br />

Environmental Services Group<br />

Permitting can be a long and tedious step in<br />

the development of a mine, port or power<br />

generation facility.<br />

Protecting the environment, engaging aboriginal<br />

groups and controlling energy costs require special<br />

expertise and knowledge.<br />

Corinne Boone<br />

Global Director<br />

Environmental Services Group<br />

Benchmark: We can show you where you are…and where you should be.<br />

<strong>Hatch</strong> Advantage July 2011 | 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!