Download PDF - Hatch
Download PDF - Hatch
Download PDF - Hatch
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
This major resource has the<br />
potential to extend mine life<br />
beyond 50 years of economic<br />
production.<br />
The Koniambo Nickel project,<br />
a joint-venture partnership<br />
between Xstrata Nickel and<br />
Société Minière du Sud<br />
Pacifique (SMSP), is a greenfield<br />
pyrometallurgical facility in New<br />
Caledonia designed to develop<br />
one of the world’s largest and<br />
highest-grade nickel laterite<br />
deposits.<br />
The project will process ore<br />
in a 60,000-tonne-per-annum<br />
ferronickel smelter. The<br />
smelter will use a standard<br />
pyromettallurgical process and a<br />
new technology to confine dust.<br />
Because of the scale of the<br />
project and its remote location,<br />
the metallurgical plant was<br />
constructed in 15 separate<br />
modules in Qingdao, China,<br />
then shipped to site. The<br />
modules, weigh up to<br />
3,500 tonnes each and can<br />
be more than 50 metres tall.<br />
They arrived in New Caledonia<br />
between October and<br />
December 2010.<br />
<strong>Hatch</strong>, in joint venture with<br />
Technip in an integrated<br />
owner’s team, is constructing a<br />
metallurgical plant; a<br />
350 MW coal-fired power<br />
station; an ore preparation plant;<br />
an 11.5-kilometre ore conveyor;<br />
a port; and a construction camp<br />
for more than 4,800.<br />
<strong>Hatch</strong>’s Systems & Process<br />
Control group was responsible<br />
for the project’s fully integrated<br />
systems-and-automation<br />
approach, which includes<br />
state-of-the-art communications<br />
infrastructure, operational<br />
systems, fibre optics and<br />
networks, security systems,<br />
management systems and all<br />
automation.<br />
“<br />
Koniambo represents the opportunity to develop an outstanding<br />
nickel operation with cash costs in the lowest quartile and<br />
exciting, low-cost growth potential from its vast resource base.<br />
The project is based on very strong valuation metrics.<br />
— Mick Davis, Xstrata Chief Executive<br />
“<br />
<strong>Hatch</strong> Advantage July 2011 | 23