Download PDF - Hatch
Download PDF - Hatch
Download PDF - Hatch
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BY THE NUMBERS<br />
Dalrymple Bay:<br />
Award-winning<br />
terminal<br />
expansion<br />
$1.26 billion capital cost<br />
56 % increase in capacity<br />
85 Mtpa<br />
upgraded terminal capability<br />
When the award-winning<br />
Dalrymple Bay Coal Terminal’s<br />
(DBCT) seventh expansion<br />
concluded, the capacity of the<br />
terminal was increased by<br />
56 percent from 54.5 million<br />
tonnes per annum (mtpa) to<br />
85 mtpa, making it one of the<br />
largest export terminals in the<br />
world.<br />
Under <strong>Hatch</strong>’s leadership the<br />
Aurecon <strong>Hatch</strong> JV provided<br />
full engineering, procurement,<br />
construction and project<br />
management services. The<br />
$1.26 billion project had a total<br />
of 5.5 million hours worked<br />
and more than 21,000 audits of<br />
safety protocols.<br />
The DBCT project won the<br />
2010 Queensland Engineering<br />
18