Hugh Miller
Hugh Miller
Hugh Miller
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
95 Express, Miami-Dade<br />
• First opened in 2008<br />
• 7 miles long<br />
• 1 segment with<br />
several access points<br />
• 4 ML and 8 GPL<br />
• Registered HOV3+ and<br />
hybrids toll free<br />
• Transponder only<br />
• Toll: $0.25 min and $7.00 max<br />
• Dynamic pricing based on congestion in Express Lanes,<br />
with single rate by direction<br />
• Goal: Keep express lanes operating at > 45 mph,<br />
maximizing person throughput and generating revenue<br />
“An Introduction to Managed Lanes” by <strong>Hugh</strong> <strong>Miller</strong>