ICA Annual Report 2011 - The Infrastructure Consortium for Africa
ICA Annual Report 2011 - The Infrastructure Consortium for Africa
ICA Annual Report 2011 - The Infrastructure Consortium for Africa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ICA</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2011</strong><br />
8.3. Box – Top 20 Commitments to Regional <strong>Infrastructure</strong> Projects in <strong>2011</strong><br />
Project Region Countries<br />
1 Mombasa-Nairobi-Addis<br />
Ababa Phase III<br />
Eastern<br />
Kenya,<br />
Ethiopia<br />
Funding<br />
scheme<br />
Financiers<br />
Co-<br />
Financiers<br />
Loans AfDB Local Governments<br />
Commitm.<br />
Sector (millions)<br />
Transport 351<br />
2 Regional and Domestic<br />
Power Markets Development<br />
Project<br />
3 Abidjan-Lagos Corridor:<br />
Lomé-Cotonou Transport facilitation<br />
Road Rehabilitation<br />
Project Phase 1<br />
4 Great East Road Rehabilitation<br />
Project<br />
5 CEMAC Transport and Transit<br />
Facility II<br />
6 Lake Victoria WATSAN -<br />
Kampala Water<br />
7 Trans-Gambia River Crossing<br />
Project<br />
8 West <strong>Africa</strong> Regional Communications<br />
<strong>Infrastructure</strong><br />
Program APL1B<br />
Central DRC IDA grant WB AfDB, Germany,<br />
DRC<br />
Western Benin, Togo Loan &<br />
Grants<br />
Southern Southern Investment<br />
Loan<br />
Central Cameroon Concessional<br />
loan<br />
(IDA)<br />
Eastern Uganda Investment<br />
Loan<br />
Western<br />
Senegal,<br />
Gambia<br />
9 Kazungula Bridge Project Southern Zambia,<br />
Botswana<br />
10 West <strong>Africa</strong> Regional Communications<br />
<strong>Infrastructure</strong><br />
Program – APL1A<br />
11 A1 Trunk Road Rehabilitation<br />
Phase IV<br />
12 GMES (Kopernicus) Monitoring<br />
<strong>for</strong> environment and<br />
security in <strong>Africa</strong> MESA<br />
Loan &<br />
Grants<br />
Energy 283<br />
AfDB UEMOA Transport 122<br />
EIB<br />
EC, AfDB,<br />
France<br />
Transport 112<br />
WB N/A Transport 112<br />
EIB<br />
AfDB<br />
Germany,<br />
France<br />
Local Governments<br />
Water 105<br />
Transport 104<br />
Western Western IDA grant WB N/A ICT 92<br />
Western Western Concessional<br />
loan<br />
(IDA)<br />
13 Geothermal Power Program Eastern Rwanda,<br />
Kenya,<br />
Ethiopia,<br />
Uganda,<br />
Tanzania<br />
14 Central <strong>Africa</strong>n Backbone<br />
(CAB) - APL1B<br />
15 Rusumo International Bridge<br />
and One Stop Border Post<br />
Facilities Construction<br />
16 WAPP Inter-Zonal Transmission<br />
Hub Program Phase 1<br />
17 Lake Victoria South Water<br />
and Sanitation Supply<br />
Program<br />
18 Trans Caledon Tunnel Authority<br />
Loans AfDB EU ITF,<br />
France<br />
Transport 80<br />
WB N/A ICT 57<br />
Eastern Ethopia Grant Japan N/A Transport 52<br />
<strong>Africa</strong> <strong>Africa</strong> Grant EC N/A ICT 52<br />
Central CAR, Chad Concessional<br />
loan<br />
(IDA), IDA<br />
Grant<br />
Eastern,<br />
Central<br />
N/A Germany N/A Energy 50<br />
WB<br />
Foreign<br />
Private<br />
Commercial<br />
Sources<br />
ICT 50<br />
Tanzania Grant Japan N/A Transport 48<br />
Western Western Concessional<br />
loan<br />
(IDA)<br />
19 Rift Valley Railways Project Western Kenya,<br />
Uganda<br />
WB EIB, France Energy 47<br />
Eastern Kenya N/A Germany N/A Water 46<br />
RSA RSA N/A Germany N/A Water 45<br />
Senior Loan AfDB N/A Transport 40<br />
20 Zanzibar Island: Rein<strong>for</strong>cement<br />
of Power Distribution<br />
Eastern Tanzania Grant Japan N/A Energy 38<br />
Sebastian Mogos-Lindemann, November 2012<br />
40