ICA Annual Report 2011 - The Infrastructure Consortium for Africa
ICA Annual Report 2011 - The Infrastructure Consortium for Africa
ICA Annual Report 2011 - The Infrastructure Consortium for Africa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ICA</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2011</strong><br />
Annex 3 Continental Map of Water Projects<br />
MOROCCO<br />
ALGERIA<br />
TUNISIA<br />
LIBYA<br />
N R: R<br />
C I<br />
W R M-<br />
C B<br />
C NASA<br />
Don.: WB<br />
Com.: $ 5.6<br />
EGYPT<br />
N R: TA <br />
CB P <br />
T W R<br />
Don.: WB, SIDA, WHO<br />
Com.: WB $ 4.5<br />
Proj.: $ 13.1<br />
N R: MENA -<br />
D E L-<br />
K S<br />
Don.: WB<br />
Com.: $ 1<br />
WESTERN<br />
SAHARA<br />
Lake Nubia<br />
MAURITANIA<br />
Sénégal<br />
SENEGAL<br />
GAMBIA<br />
GUINEA<br />
BISSAU GUINEA<br />
SIERRA<br />
LEONE<br />
LIBERIA<br />
IVORY<br />
COAST<br />
N: K H -<br />
N B W R<br />
D S<br />
E M<br />
P - APL 2A<br />
Don.: WB, AfDB, Arab Funds,<br />
ECOWAS, AFD, IsDB<br />
Com.: WB $ 153<br />
Proj.: $ 689<br />
E R: IGAD I<br />
W M-<br />
<br />
Don.: EC<br />
Com.: $ 14.4<br />
MALI<br />
Niger<br />
Kadanji<br />
BURKINA<br />
FASO<br />
Volta BENIN<br />
TOGO<br />
GHANA<br />
NIGER<br />
NIGERIA<br />
Lake Tchad<br />
CAMEROON<br />
EQUATORIAL<br />
GUINEA<br />
GABON<br />
CONGO<br />
CHAD<br />
U: W -<br />
P<br />
Don.: Germany<br />
Com.:<br />
CENTRAL<br />
$ 20<br />
AFR<strong>ICA</strong>N<br />
U: REPUBLIC K M-<br />
D W<br />
D<br />
Don.: France<br />
Com.: $ 20<br />
Congo<br />
ANGOLA<br />
DEMOCRATIC<br />
REPUBLIC<br />
OF THE CONGO<br />
ZAMBIA<br />
SUDAN<br />
SOUTH<br />
SUDAN<br />
Nil<br />
Lake Turkana<br />
UGANDA<br />
Lake Victoria<br />
RWANDA<br />
BURUNDI<br />
TANZANIA<br />
Lake Tangayika<br />
Lake Malawi<br />
MALAWI<br />
ERITREA<br />
DJIBOUTI<br />
K: E <br />
<br />
ETHIOPIA<br />
Don.: Germany<br />
Com.: $ 5<br />
KENYA<br />
SOMALIA<br />
L V B: WATSAN<br />
- K W<br />
Don.: EIB, Germany, France<br />
Com.: EIB $ 105<br />
Proj.: $ 297<br />
L V B: L<br />
V S W <br />
S S<br />
Don.: Germany (KfW)<br />
Com.: $ 46<br />
COUNTRY<br />
NATIONAL CAPITAL<br />
International Boundary<br />
Northern Region<br />
Eastern Region<br />
Western Region<br />
Central Region<br />
Southern Region<br />
C<br />
P<br />
Project Location<br />
Water Supply & Sanitation<br />
CB <strong>for</strong> Riverbasin Org.<br />
Dam<br />
Don. Donors<br />
Com. Commitment to Project<br />
Proj. Total Project Estimate<br />
$ Millions of Dollars<br />
0 500 1,000 km<br />
RSA: T C T<br />
A<br />
Don.: Germany<br />
Com.: $ 45<br />
NAMIBIA<br />
Zambèze<br />
Okavango<br />
BOTSWANA<br />
Orange<br />
SOUTH AFR<strong>ICA</strong><br />
ZIMBABWE<br />
LESOTHO<br />
Limpopo<br />
SWAZILAND<br />
MOZAMBIQUE<br />
MADAGASCAR<br />
L, RSA: H<br />
W II<br />
Don.: EIB, Germany (KfW)<br />
Proj.: $ 841<br />
S R: S-<br />
G M-<br />
SADC M<br />
C<br />
Don.: WB<br />
Com.: $ 18<br />
Sebastian Mogos-Lindemann, November 2012<br />
58