ICA Annual Report 2011 - The Infrastructure Consortium for Africa
ICA Annual Report 2011 - The Infrastructure Consortium for Africa
ICA Annual Report 2011 - The Infrastructure Consortium for Africa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ICA</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2011</strong><br />
8.5. Box – Top 20 Regional <strong>Infrastructure</strong> Projects completed in the last 5 years<br />
Project Region Countries<br />
1 Port Expansion Project<br />
2 Transmed Pipeline<br />
Expansion<br />
3 Marrakech-Agadir<br />
Motorway Construction<br />
Project<br />
4 <strong>Infrastructure</strong> Development<br />
5 ONE - Interconnections<br />
II<br />
6 Mwanza Border-Tinte<br />
and Isaka-Nzga Road<br />
Rehabilitaion Project<br />
7 El Jem-Sfax Motorway<br />
Construction Project<br />
8 STEG II - Electricity<br />
Interconnection<br />
Funding<br />
scheme<br />
Financiers<br />
Southern RSA Loan Japan Private financial<br />
institutions<br />
Northern<br />
Algeria, Tunisia,<br />
Italy<br />
(year)<br />
Sector<br />
Financiers<br />
Co-<br />
Completion<br />
Commitment<br />
(USD m)<br />
2010 Transport 357<br />
Loan EIB N/A 2010 Energy 259<br />
Northern Algeria Loan Japan N/A 2010 Transport 222<br />
Southern RSA Loan Japan Private financial<br />
institutions<br />
Northern<br />
Eastern<br />
Morocco,<br />
Algeria,<br />
Spain<br />
Tanzania/<br />
RSA<br />
<strong>2011</strong> Transport 200<br />
Loan EIB France, AfDB 2008 Energy 168<br />
EDF<br />
Grant<br />
EC N/A 2007 Transport 161<br />
Northern Tunisia Loan Japan N/A 2008 Transport 157<br />
Northern<br />
Morocco,<br />
Algeria,<br />
Tunisia<br />
9 9 EDF Road Programe Central Cameroon EDF<br />
Grant<br />
10 RN 12 Gitega-Karuzi-<br />
Muyinga<br />
11 West <strong>Africa</strong>n Gas<br />
Pipeline<br />
Central Burundi EDF<br />
Grant<br />
Loan EIB N/A 2008 Energy 126<br />
EC<br />
Government of<br />
Cameroon<br />
2010 Transport 114<br />
EC N/A 2010 Transport 111<br />
Western Loan EIB N/A 2010 Energy 105<br />
12 Enfidha Airport Northern Tunisia Loan EIB AfDB, IFC,<br />
OFID, France<br />
(Proparco)<br />
13 Strengthening of the<br />
Northern Corridor<br />
Road<br />
14 Ayorou-Gao Paved<br />
Road Construction<br />
2009 Transport 98<br />
Eastern Grant EC N/A <strong>2011</strong> Transport 97<br />
Western Mali Grant EC N/A <strong>2011</strong> Transport 97<br />
15 ASECNA IV All <strong>Africa</strong> Loan EIB France, IDA 2007 Transport 93<br />
16 N2 Nzerekore-PK15<br />
Road Reconstruction<br />
17 RN 1 Brazza-Kinkala<br />
on Troncon Ngangalingolo<br />
- Reconstruction<br />
Works<br />
18 Transport <strong>Infrastructure</strong><br />
programme TRIP<br />
III (Kumasi-Techiman,<br />
Axim-Tarkwa Roads)<br />
19 Rosso-Saint-Louis<br />
Road Construction<br />
20 Kampala Northern<br />
By-pass (regional<br />
corridor road)<br />
Western<br />
Central<br />
Congo-<br />
Brazzaville<br />
EDF<br />
Grant<br />
EDF<br />
Grant<br />
Western Ghana EDF<br />
Grant<br />
Western<br />
Eastern<br />
Uganda/<br />
East <strong>Africa</strong><br />
EDF<br />
Grant<br />
EDF<br />
Grant<br />
EC N/A 2010 Transport 88<br />
EC N/A 2010 Transport 88<br />
EC N/A 2007 Transport 86<br />
EC N/A 2010 Transport 79<br />
EC N/A 2010 Transport 74<br />
Sebastian Mogos-Lindemann, November 2012<br />
42