18.01.2014 Views

ICA Annual Report 2011 - The Infrastructure Consortium for Africa

ICA Annual Report 2011 - The Infrastructure Consortium for Africa

ICA Annual Report 2011 - The Infrastructure Consortium for Africa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ICA</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2011</strong><br />

11.3. Pillar Three – Increased Knowledge and In<strong>for</strong>mation<br />

Outcome:<br />

Knowledge is developed and shared to support increased financing <strong>for</strong> infrastructure in <strong>Africa</strong>.<br />

<strong>The</strong> sharing of best practices and innovations benefit infrastructure delivery and build a common understanding<br />

<strong>for</strong> a regional public good. Providing stakeholders with access to quality in<strong>for</strong>mation <strong>for</strong> optimum decision-making<br />

is a basic necessity <strong>for</strong> increased investment in <strong>Africa</strong>n infrastructure. To further this goal, <strong>ICA</strong> continues to<br />

promote knowledge-sharing and improved access to in<strong>for</strong>mation. In addition to the sector specific publications<br />

listed under Pillar One sector plat<strong>for</strong>ms, below are some key accomplishments <strong>for</strong> Pillar Three:<br />

Recent Activities and Products<br />

Support was provided to the AfDB Statistics<br />

Department (ESTA) to further develop the AIKP (<strong>for</strong>mer<br />

AICD) database and prepare data collection <strong>for</strong> AIKP<br />

Phase Two. <strong>ICA</strong> covered part of the migration cost<br />

from the WB to the AfDB.<br />

<strong>ICA</strong> has appointed consultants to conduct an<br />

assessment of project preparation facilities in <strong>Africa</strong><br />

as part of <strong>ICA</strong>’s on-going deliverables to the G20<br />

Development Working Group. Work commenced<br />

in April 2012 and results will be submitted to the<br />

DWG in October 2012. This evaluation aims to<br />

rank the per<strong>for</strong>mance of existing infrastructure<br />

project preparation facilities in <strong>Africa</strong> and to provide<br />

recommendations to produce more effective and<br />

efficient facilities.<br />

<strong>ICA</strong> also released the Regional Power Status in <strong>Africa</strong>n<br />

Power Pools report, with in<strong>for</strong>mation on the current<br />

status of the power sector in regional power pools. In<br />

addition, the two reports on private sector engagement<br />

in the energy sector have also been published:<br />

(Light Inside: <strong>The</strong> Experience of Independent Power<br />

Producers in Nigeria, Regional Power Status in <strong>Africa</strong>n<br />

Power Pools, and When the Power Comes: An Analysis<br />

of IPPs in <strong>Africa</strong>).<br />

<strong>The</strong> print version of the <strong>ICA</strong> User Guide to Project<br />

Preparation has been developed into a dynamic, webbased<br />

tool, and a beta-testing version was launched<br />

in May 2012. <strong>The</strong> full <strong>for</strong>mal launch is due to take place<br />

during the final quarter 2012, followed by continued<br />

outreach, and technical and in<strong>for</strong>mational updates in<br />

response to user feedback.<br />

Planned Activities<br />

• <strong>The</strong> <strong>ICA</strong> Secretariat will continue to support the<br />

AIKP study by mobilizing resources <strong>for</strong> the remaining<br />

24 countries and conducting joint thematic studies/<br />

sector reports.<br />

• <strong>The</strong> <strong>ICA</strong> Knowledge Center will be populated with<br />

documents received <strong>for</strong> the <strong>ICA</strong> Members and its<br />

<strong>for</strong>mal launch will take place in the final quarter of<br />

2012. <strong>The</strong> Secretariat will then lead in the promotion<br />

of the <strong>ICA</strong> Knowledge Centre.<br />

• <strong>The</strong> Secretariat will manage the completion of the<br />

<strong>ICA</strong> Assessment of Project Preparation Facilities <strong>for</strong><br />

<strong>Africa</strong>, and host a dissemination and consultation<br />

workshop. <strong>The</strong> report will also be presented to DWG in<br />

October and the implications of any recommendations<br />

and actions will be assessed. <strong>ICA</strong> Secretariat will<br />

then launch and promote the <strong>ICA</strong> Project Preparation<br />

Facility “Fund Finder”<br />

53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!