11.3. Pillar Three – Increased Knowledge and In<strong>for</strong>mation<br />
Outcome:<br />
Knowledge is developed and shared to support increased financing <strong>for</strong> infrastructure in <strong>Africa</strong>.<br />
<strong>The</strong> sharing of best practices and innovations benefit infrastructure delivery and build a common understanding<br />
<strong>for</strong> a regional public good. Providing stakeholders with access to quality in<strong>for</strong>mation <strong>for</strong> optimum decision-making<br />
is a basic necessity <strong>for</strong> increased investment in <strong>Africa</strong>n infrastructure. To further this goal, <strong>ICA</strong> continues to<br />
promote knowledge-sharing and improved access to in<strong>for</strong>mation. In addition to the sector specific publications<br />
listed under Pillar One sector plat<strong>for</strong>ms, below are some key accomplishments <strong>for</strong> Pillar Three:<br />
Recent Activities and Products<br />
Support was provided to the AfDB Statistics<br />
Department (ESTA) to further develop the AIKP (<strong>for</strong>mer<br />
AICD) database and prepare data collection <strong>for</strong> AIKP<br />
Phase Two. <strong>ICA</strong> covered part of the migration cost<br />
from the WB to the AfDB.<br />
<strong>ICA</strong> has appointed consultants to conduct an<br />
assessment of project preparation facilities in <strong>Africa</strong><br />
as part of <strong>ICA</strong>’s on-going deliverables to the G20<br />
Development Working Group. Work commenced<br />
in April 2012 and results will be submitted to the<br />
DWG in October 2012. This evaluation aims to<br />
rank the per<strong>for</strong>mance of existing infrastructure<br />
project preparation facilities in <strong>Africa</strong> and to provide<br />
recommendations to produce more effective and<br />
efficient facilities.<br />
<strong>ICA</strong> also released the Regional Power Status in <strong>Africa</strong>n<br />
Power Pools report, with in<strong>for</strong>mation on the current<br />
status of the power sector in regional power pools. In<br />
addition, the two reports on private sector engagement<br />
in the energy sector have also been published:<br />
(Light Inside: <strong>The</strong> Experience of Independent Power<br />
Producers in Nigeria, Regional Power Status in <strong>Africa</strong>n<br />
Power Pools, and When the Power Comes: An Analysis<br />
of IPPs in <strong>Africa</strong>).<br />
<strong>The</strong> print version of the <strong>ICA</strong> User Guide to Project<br />
Preparation has been developed into a dynamic, webbased<br />
tool, and a beta-testing version was launched<br />
in May 2012. <strong>The</strong> full <strong>for</strong>mal launch is due to take place<br />
during the final quarter 2012, followed by continued<br />
outreach, and technical and in<strong>for</strong>mational updates in<br />
response to user feedback.<br />
Planned Activities<br />
• <strong>The</strong> <strong>ICA</strong> Secretariat will continue to support the<br />
AIKP study by mobilizing resources <strong>for</strong> the remaining<br />
24 countries and conducting joint thematic studies/<br />
sector reports.<br />
• <strong>The</strong> <strong>ICA</strong> Knowledge Center will be populated with<br />
documents received <strong>for</strong> the <strong>ICA</strong> Members and its<br />
<strong>for</strong>mal launch will take place in the final quarter of<br />
2012. <strong>The</strong> Secretariat will then lead in the promotion<br />
of the <strong>ICA</strong> Knowledge Centre.<br />
• <strong>The</strong> Secretariat will manage the completion of the<br />
<strong>ICA</strong> Assessment of Project Preparation Facilities <strong>for</strong><br />
<strong>Africa</strong>, and host a dissemination and consultation<br />
workshop. <strong>The</strong> report will also be presented to DWG in<br />
October and the implications of any recommendations<br />
and actions will be assessed. <strong>ICA</strong> Secretariat will<br />
then launch and promote the <strong>ICA</strong> Project Preparation<br />
Facility “Fund Finder”<br />