18.01.2014 Views

ICA Annual Report 2011 - The Infrastructure Consortium for Africa

ICA Annual Report 2011 - The Infrastructure Consortium for Africa

ICA Annual Report 2011 - The Infrastructure Consortium for Africa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ICA</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2011</strong><br />

Annex 4 Continental Map of ICT Projects<br />

A: GMES (K)<br />

M -<br />

A<br />

MESA<br />

D.: EC<br />

C.: $ 52<br />

A: AAP <strong>2011</strong> - AIR<br />

EGNOS : <br />

-<br />

ACP<br />

Don.: EC<br />

Com.: $ 12.6<br />

ALGIERS<br />

TUNIS<br />

RABAT<br />

MOROCCO<br />

TUNISIA<br />

TRIPOLI<br />

W A R C-<br />

I<br />

P WESTERN (WARICP) APL 1 + 1<br />

SAHARA<br />

Don.: WB<br />

Com.: $ 92 + $ 56.6 = $ 146.6<br />

Proj.: $ MAURITANIA 92 + $ 56.6 = $ 146.6<br />

NOUAKCHOTT<br />

DAKAR<br />

SENEGAL<br />

BANJUL<br />

GAMBIA<br />

BISSAU<br />

GUINEA<br />

BISSAU<br />

GUINEA<br />

CONAKRY<br />

FREETOWN<br />

SIERRA<br />

LEONE<br />

BAMAKO<br />

IVORY<br />

COAST<br />

YAMOUSSOUKR<br />

MONROVIA<br />

LIBERIA<br />

ALGERIA<br />

W A R C-<br />

I<br />

P (WARICP) APL 1 + 2<br />

Don.: WB<br />

Com.: $ 35 + $ 84 = $ 119<br />

Proj.: $ 35 + $ 80 = $ 115<br />

MALI<br />

NIGER<br />

BURKINA<br />

FASO<br />

S T P:<br />

C A B<br />

(CAB) APL 2<br />

Don.: WB<br />

Com.: $ 14.9<br />

Proj.: $ 26.8<br />

BENIN<br />

TOGO<br />

GHANA<br />

G: C A B-<br />

P APL 4<br />

Don.: WB<br />

Proj.: $ 58<br />

ACCRA LOMÉ<br />

NIAMEY<br />

PORTO-NOVO<br />

NIGERIA<br />

ABUJA<br />

Lake Nyos<br />

CAMEROON<br />

YAOUNDE<br />

MALABO<br />

EQUATORIAL<br />

GUINEA<br />

LIBREVILLE<br />

GABON<br />

N'DJAMENA<br />

BRAZZAVILLE<br />

KINSHASA<br />

LUANDA<br />

LIBYA<br />

CONGO<br />

CHAD<br />

Sangha<br />

ANGOLA<br />

CENTRAL<br />

AFR<strong>ICA</strong>N<br />

REPUBLIC<br />

BANGUI<br />

Ubangi<br />

EGYPT<br />

CAIRO<br />

CAR, C: C A<br />

B (CAB) APL ERITREA 1B<br />

ASMARA<br />

Don.: WB, Private Sources<br />

KHARTOUM<br />

Com.: WB $ 50<br />

DJIBOUTI<br />

Proj.: SUDAN $ 58<br />

DJIBOUTI<br />

R C: C<br />

ADDIS ABABA<br />

A B (CAB) APL 3<br />

ETHIOPIA<br />

Don.: WB, Republic of Congo<br />

Com.: WB $ 15<br />

Proj.: $ 30<br />

SOMALIA<br />

DEMOCRATIC<br />

UGANDA KENYA<br />

REPUBLIC<br />

Kirandich<br />

KAMPALA<br />

OF THE CONGO<br />

Kiambere<br />

KIGALI<br />

NAIROBI<br />

RWANDA<br />

BUJUMBURA<br />

BURUNDI<br />

ZAMBIA<br />

LUSAKA<br />

TANZANIA<br />

MALAWI<br />

LILONGWE<br />

DAR ES SALAAM<br />

MOGADISHU<br />

Don.<br />

Com.<br />

Proj.<br />

$<br />

COUNTRY<br />

NATIONAL CAPITAL<br />

International Boundary<br />

Northern Region<br />

Eastern Region<br />

Western Region<br />

Central Region<br />

Southern Region<br />

C<br />

P<br />

Project Location<br />

Satellite<br />

Cabel Connection<br />

Donors<br />

Commitment to Project<br />

Total Project Estimate<br />

Millions of Dollars<br />

NAMIBIA<br />

WINDHOEK<br />

BOTSWANA<br />

GABORONE<br />

SOUTH AFR<strong>ICA</strong><br />

HARARE<br />

MOZAMBIQUE<br />

ZIMBABWE<br />

PRETORIA<br />

MASERU<br />

LESOTHO<br />

MAPUTO<br />

MBABANE<br />

SWAZILAND<br />

ANTANANARIVO<br />

MADAGASCAR<br />

S R: S-<br />

S C<br />

Don.: EIB, AfDB<br />

Com.: $ 11.2<br />

Proj.: $ 38.2<br />

S R: R<br />

C I-<br />

P (RCIP) – APL4<br />

Don.: WB<br />

Com.: $ 84<br />

Proj.: $ 92<br />

0 500 1,000 km<br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!