Project Close <strong>Out</strong>-Plan<br />

2 Inspection Strategy<br />

2.1 Architectural Inspections (BMJ)<br />

There was a pre-handover inspection on 19 December 2007. Interim inspections are<br />

continuing.<br />

In order to facilitate a smooth handover, the final architectural inspections will be phased as<br />

indicated on the schedule. Walter Lilly have provided a schedule of any outstanding works<br />

to BMJ which has been incorporated into their Defects Schedule – see Appendix C.<br />

Walter Lilly are to ensure that at the end of the final handover inspection BMJ are happy to<br />

confirm that the defects are down to a sufficiently low number that they would not prevent<br />

the Completion certificate from being signed. BMJ will then write to Arup to confirm this by<br />

18 February 08 or as soon thereafter as they are in a position to give that undertaking.<br />

2.2 M&E Inspections<br />

There was a pre-handover inspection on 19 December 2007. A final inspection has been<br />

booked for week commencing 11 th February 2008. Walter Lilly are to provide a schedule of<br />

outstanding works for this date. This is still outstanding.<br />

Walter Lilly are to ensure that at the end of the final handover inspection Banyards are<br />

happy to confirm that the defects are down to a sufficiently low number that they would not<br />

prevent the Completion certificate from being signed. Banyards will then write to Arup to<br />

confirm this by 18 February 08 or as soon thereafter as they are in a position to give that<br />

undertaking.<br />

2.3 Structural Supervisor<br />

Not applicable.<br />

2.4 Client Direct IT Installation<br />

Inspection of the ICL direct IT installation will be done by the relevant duty holder. It is not<br />

part of the main contract works.<br />

There is a requirement for some active equipment to be installed to allow for a connection to<br />

the NHS IT network. This is to be managed direct by ICL (SP/AB). It is not part of the main<br />

contract works.<br />

2.5 Duty Holders<br />

There was a pre-handover inspection on 19 December 2007. Final inspections are booked<br />

for the week commencing 11 February 08. Walter Lilly are to provide a schedule of<br />

outstanding works for this date so that the Duty Holders do not have to comment on known<br />

outstanding items.<br />

Final comments are to be submitted by the Duty Holders no later than the 15 February 08.<br />

Refer to separate schedule in Appendix D for details of planned inspection dates, comments<br />

received/responded to and final sign-offs by Duty Holders.<br />

2.6 Lifts<br />

Not applicable on this project.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 4<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008