HMBD 0601 - Burlington Danes Fit-Out - Imperial College London
HMBD 0601 - Burlington Danes Fit-Out - Imperial College London
HMBD 0601 - Burlington Danes Fit-Out - Imperial College London
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />
Project Close <strong>Out</strong>-Plan<br />
6 Client Engagement and Training<br />
6.1 Client Training<br />
WL issued a revised schedule of client training dates and this has commenced.<br />
Attendance list to be forwarded to Arup by Walter Lilly on a daily basis.<br />
6.2 Spares<br />
6.2.1 Architectural Spares<br />
Architectural spares to be provided at Handover<br />
By Who?<br />
1. TBC by BMJ – still awaited BMJ<br />
2.<br />
3.<br />
4.<br />
6.2.2 MEP Services Spares<br />
MEP services spares to be provided at Handover<br />
By Who?<br />
1. TBC by NDY – still awaited NDY<br />
2.<br />
3.<br />
4.<br />
6.3 Tools and Equipment<br />
The following tools and equipment is to be provided at handover.<br />
Tools and equipment to be provided at Handover<br />
By Who?<br />
1. TBC by BMJ/NDY – still awaited NDY/BMJ<br />
2.<br />
3.<br />
4.<br />
J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />
PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />
Page 10<br />
Ove Arup & Partners Ltd<br />
Issue 15 February 2008