<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong><br />

<strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close-<strong>Out</strong> Plan<br />

k


<strong>Imperial</strong> <strong>College</strong><br />

<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<br />

<strong>Out</strong><br />

Project Close-<strong>Out</strong> Plan<br />

February 2008<br />

Ove Arup & Partners Ltd<br />

13 <strong>Fit</strong>zroy Street,<br />

<strong>London</strong> W1T 4BQ<br />

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7755 2143<br />

www.arup.com<br />

This report takes into account the<br />

particular instructions and requirements<br />

of our client.<br />

It is not intended for and should not be<br />

relied upon by any third party and no<br />

responsibility is undertaken to any third<br />

party<br />

Job number


Document Verification<br />

Page 1 of 1<br />

Job title<br />

<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Job number<br />

Document title<br />

Project Close <strong>Out</strong> Plan<br />

File reference<br />

Document ref<br />

Revision Date Filename BDFO Project Close <strong>Out</strong> Plan - 08-02-15.doc<br />

Issue 15/02/08 Description Updated issue for Pre-Handover meeting on 19 Feb 08.<br />

Prepared by Checked by Approved by<br />

Name Hugh Dullage Hugh Dullage Hugh Dullage<br />

Signature<br />

Filename<br />

Description<br />

Name<br />

Prepared by Checked by Approved by<br />

Signature<br />

Filename<br />

Description<br />

Name<br />

Prepared by Checked by Approved by<br />

Signature<br />

Filename<br />

Description<br />

Name<br />

Prepared by Checked by Approved by<br />

Signature<br />

Issue Document Verification with Document<br />

<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Contents<br />

Page<br />

1 Construction Completion – Key Milestones 3<br />

1.1 Architectural Completion – 4 th and 5 th Floors 3<br />

1.2 Installation of plantroom fans and ductwork 3<br />

1.3 Architectural Completion – 3 rd Floor 3<br />

1.4 Installation of remaining flues 3<br />

2 Inspection Strategy 4<br />

2.1 Architectural Inspections (BMJ) 4<br />

2.2 M&E Inspections 4<br />

2.3 Structural Supervisor 4<br />

2.4 Client Direct IT Installation 4<br />

2.5 Duty Holders 4<br />

2.6 Lifts 4<br />

2.7 Others 5<br />

3 Commissioning and Integrated Testing Strategy 6<br />

3.1 Uprating of base build air handling plant 6<br />

3.2 Commissioning 6<br />

3.3 Integrated Testing 6<br />

3.4 Building Cause and Effect Testing 7<br />

3.5 BMS Commissioning 7<br />

3.6 Final witness and client acceptance testing 7<br />

3.7 Building Mains Failure – ‘Black Building’ Test 7<br />

3.8 Part L Air Pressure Test 7<br />

4 Third Party Approvals 8<br />

4.1 Building Control 8<br />

4.2 Fire Officer 8<br />

4.3 Local Authority 8<br />

4.4 Party Wall Agreements 8<br />

4.5 LPCB 8<br />

4.6 Insurers 8<br />

5 Files, Logs and Manuals 9<br />

5.1 Operation and Maintenance Manuals 9<br />

5.2 Building Log 9<br />

5.3 BREEAM Certification and Rating 9<br />

5.4 Schedule of other information required by the contract 9<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

6 Client Engagement and Training 10<br />

6.1 Client Training 10<br />

6.2 Spares 10<br />

6.3 Tools and Equipment 10<br />

6.4 Keys 11<br />

6.5 Suited locks 11<br />

6.6 Utilities handover 11<br />

7 Contractual Arrangements 12<br />

7.1 Completion Certificate 12<br />

7.2 Insurances/Bonds/Guarantees 12<br />

7.3 Completion Meeting 12<br />

7.4 Formal Handover Meeting 12<br />

8 Client Occupation/Migration 13<br />

8.1 FF&E 13<br />

8.2 Decanting decision point 13<br />

8.3 Scientific equipment transfer to BD 13<br />

8.4 Re-commissioning of equipment at BD 13<br />

8.5 Personal effects transfer to BD 13<br />

9 Post Completion Certificate Issue 14<br />

9.1 Permit Arrangements 14<br />

9.2 Public Relations/Press Releases/Marketing 14<br />

9.3 Defects Close <strong>Out</strong> Strategy and Programme 14<br />

9.4 Latent Defects Reporting Strategy 14<br />

9.5 Demobilisation Arrangements 14<br />

9.6 Lessons Learned Workshops 14<br />

9.7 Post Handover 14<br />

10 Risks to Handover and Close <strong>Out</strong> 15<br />

Appendices<br />

Appendix A<br />

Project Close-<strong>Out</strong> Status Tracker<br />

Appendix B<br />

Project Handover Programme<br />

Appendix C<br />

Current Defects and <strong>Out</strong>standing Works Lists<br />

Appendix D<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Duty Holder Inspections<br />

Appendix E<br />

WL Commissioning Programme<br />

Appendix F<br />

Witnessing Schedule<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Introduction<br />

Objectives<br />

The objective of Project Close-<strong>Out</strong> for this project is primarily to:<br />

1. Deliver Client satisfaction<br />

2. Identify clearly defined deliverables & achievable time-frames<br />

3. Clarify roles and responsibilities<br />

4. Establish commitment and involvement<br />

This document seeks to be a ‘one-stop shop’ guide for use by all stakeholders to help them<br />

determine what advice, assistance, training, processes and other resources are needed to<br />

meet the objectives.<br />

Distribution list<br />

Once approved this plan will be issued to:<br />

Name Organisation Title<br />

Kieran McDaid <strong>Imperial</strong> <strong>College</strong> Assistant Director of Building<br />

Projects<br />

John Griffith <strong>Imperial</strong> <strong>College</strong> ICL Senior Project Manager<br />

Nick Roalfe <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Roy Dickerson <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Ceri Davies <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Chas Guirey <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Ian Gillet <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Antonio Barbosa <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Peter Seal <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Denis Murphy <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Loretto O'Callaghan, <strong>Imperial</strong> <strong>College</strong> Duty Holder<br />

Matt Lee <strong>Imperial</strong> <strong>College</strong> Client Requirements Director<br />

Steve Pullen <strong>Imperial</strong> <strong>College</strong> User Co-ordinator<br />

Kim Wells <strong>Imperial</strong> <strong>College</strong> Lead User<br />

Christine Hobbs <strong>Imperial</strong> <strong>College</strong> Campus Manager<br />

Allan Webb <strong>Imperial</strong> <strong>College</strong> Building Maintenance Manager<br />

Scott Johnstone BMJ (Arch Supervisor)<br />

Graham Child Banyard Consulting (M&E Supervisor)<br />

Leo Cole Banyard Associates (Commissioning Validation)<br />

Paul Claydon Heery (CDM Coordinator)<br />

Nick Lambert MLM (Approved Inspector)<br />

Jiten Chauhan T&T (Cost Manager)<br />

Steve Edwards Walter Lilly Contracts Manager<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 1<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Name Organisation Title<br />

James Lynch Walter Lilly Project Manager<br />

Patrick Busby Walter Lilly M&E Manager<br />

Mike Morley Axima Operations Manager<br />

Don Bone T Clarke Project Manager<br />

Project Close-<strong>Out</strong> Activities – Status, Roles & Responsibilities Matrix<br />

Please refer to Appendix A for the project close-out Status Tracker which is a matrix<br />

identifying key operations and activities necessary to achieve successful completion of the<br />

project and the main stakeholders responsible for them. A lead stakeholder is designated to<br />

promote ownership of the activity and that stakeholder is expected to ensure effective<br />

communication and cooperation from the inputting stakeholders. The sections of this<br />

document relate to the of the sections of the matrix and provide a more in depth explanation<br />

of them.<br />

Project Close-<strong>Out</strong> Programme<br />

Please refer to Appendix B for the close-out programme. The sections of the programme<br />

also align with the sections of this report.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 2<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

1 Construction Completion – Key Milestones<br />

1.1 Architectural Completion – 4 th and 5 th Floors<br />

Floor 5 is due to be architecturally complete by the end of January 08. Achieved by early<br />

February 08. WL list of outstanding items and defects incorporated into BMJ Defects<br />

Schedule (see Appendix C)<br />

1.2 Installation of plantroom fans and ductwork<br />

The plant room fans and ductwork are on the critical path for completion. They are due to<br />

be finished by 4 February 08. This work is still ongoing. The installation is due to be finished<br />

during w/c 18 February 08.<br />

1.3 Architectural Completion – 3 rd Floor<br />

The 3 rd floor is due to be architecturally complete by 11 February 08. Now due w/c 18<br />

February 08.<br />

1.4 Installation of remaining flues<br />

The remaining flues were installed as planned over the weekend of 26 / 27 January 08.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 3<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

2 Inspection Strategy<br />

2.1 Architectural Inspections (BMJ)<br />

There was a pre-handover inspection on 19 December 2007. Interim inspections are<br />

continuing.<br />

In order to facilitate a smooth handover, the final architectural inspections will be phased as<br />

indicated on the schedule. Walter Lilly have provided a schedule of any outstanding works<br />

to BMJ which has been incorporated into their Defects Schedule – see Appendix C.<br />

Walter Lilly are to ensure that at the end of the final handover inspection BMJ are happy to<br />

confirm that the defects are down to a sufficiently low number that they would not prevent<br />

the Completion certificate from being signed. BMJ will then write to Arup to confirm this by<br />

18 February 08 or as soon thereafter as they are in a position to give that undertaking.<br />

2.2 M&E Inspections<br />

There was a pre-handover inspection on 19 December 2007. A final inspection has been<br />

booked for week commencing 11 th February 2008. Walter Lilly are to provide a schedule of<br />

outstanding works for this date. This is still outstanding.<br />

Walter Lilly are to ensure that at the end of the final handover inspection Banyards are<br />

happy to confirm that the defects are down to a sufficiently low number that they would not<br />

prevent the Completion certificate from being signed. Banyards will then write to Arup to<br />

confirm this by 18 February 08 or as soon thereafter as they are in a position to give that<br />

undertaking.<br />

2.3 Structural Supervisor<br />

Not applicable.<br />

2.4 Client Direct IT Installation<br />

Inspection of the ICL direct IT installation will be done by the relevant duty holder. It is not<br />

part of the main contract works.<br />

There is a requirement for some active equipment to be installed to allow for a connection to<br />

the NHS IT network. This is to be managed direct by ICL (SP/AB). It is not part of the main<br />

contract works.<br />

2.5 Duty Holders<br />

There was a pre-handover inspection on 19 December 2007. Final inspections are booked<br />

for the week commencing 11 February 08. Walter Lilly are to provide a schedule of<br />

outstanding works for this date so that the Duty Holders do not have to comment on known<br />

outstanding items.<br />

Final comments are to be submitted by the Duty Holders no later than the 15 February 08.<br />

Refer to separate schedule in Appendix D for details of planned inspection dates, comments<br />

received/responded to and final sign-offs by Duty Holders.<br />

2.6 Lifts<br />

Not applicable on this project.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 4<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

2.7 Others<br />

Arup Project Management are not aware of any other inspections required prior to<br />

handover. ICL to advise if any others are required.<br />

Inspecting Body<br />

Environment Agency<br />

SO15<br />

HSE<br />

Home Office<br />

Approved Inspector (Building Control)<br />

Section 20<br />

Insurers – confirmed by David Chinn, ICL<br />

LPCB<br />

Required<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

TBC<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 5<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

3 Commissioning and Integrated Testing Strategy<br />

3.1 Uprating of base build air handling plant<br />

The Rebalance and adjustments to existing building plant are not part of the main<br />

contractor’s scope of works. Arup have developed the following proposals to address this.<br />

Air Systems<br />

ICL have agreed to the Arup recommendation to appoint NDY as technical advisor to their<br />

maintenance team to allow them to make the necessary adjustments to the main building<br />

plant and act as liaison between ICL and WL/Axima on the rebalance of the systems. This is<br />

a more efficient approach than appointing an external commissioning engineer because<br />

NDY have all the necessary knowledge and familiarity with the systems and parties involved<br />

already.<br />

NDY have advised that this work will not affect the lower floors because that is a Constant<br />

Volume air system so a full rebalance should not be required.<br />

WL have advised that this work can proceed before final commissioning of special extract<br />

systems.<br />

This work was completed on Friday 1 February 08.<br />

Chilled Water / Low Temperature Hot Water<br />

ICL have agreed that the systems can be signed off on the basis of the proportional balance<br />

carried out by WL using temporary pumps.<br />

A full rebalance may still be necessary post completion. Arup have obtained a quote for this<br />

which is being reviewed and will be issued to ICL.<br />

3.2 Commissioning<br />

During commissioning the various installations and plant items are tested and balanced as<br />

individual entities to ensure that they perform to the required design duties. The culmination<br />

of the individual testing establishes the completeness of the systems and by definition the<br />

building to proceed into the integrated testing processes.<br />

Walter Lilly are responsible for commissioning have developed a commissioning program<br />

which can be seen in Appendix E. Four important milestones have been selected for<br />

monitoring the progress of commissioning at a strategic level. These are:<br />

o<br />

o<br />

o<br />

o<br />

Main air systems<br />

Special extracts<br />

Fume cupboards<br />

Chlorination<br />

Banyards are responsible for witnessing the commissioning. A tracker has been developed<br />

to indicate the progress of this, an example of which can be seen in Appendix F.<br />

3.3 Integrated Testing<br />

This period is specifically to ensure that all of the above is definitively integrated as<br />

determined by the design and specification requirements and incorporates all of the design<br />

changes instructed throughout the duration of the installations.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 6<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

1. Mechanical systems and plant controls interconnections verified<br />

2. Sprinkler systems and plant controls and interconnections verified<br />

3. Electrical systems and plant controls and interconnections verified<br />

4. Fire alarm systems and control/annunciation panels verified<br />

5. BMS fully integrated with all services plant and systems verification<br />

3.4 Building Cause and Effect Testing<br />

Building cause and effect testing and certification will be provided for:<br />

1. Fire alarm<br />

2. Sprinkler system<br />

3. Wet riser system<br />

4. Mechanical systems interface<br />

5. Electrical systems interface<br />

6. BMS and controls interface with all above<br />

3.5 BMS Commissioning<br />

See Banyards witnessing schedule in Appendix G.<br />

The requirements and process for this are set out in ICL Technical Policy Statement EN3.<br />

WL are working to this and need to comply with it fully before Completion can be certified.<br />

WL to advise when the complete documentation will be issued to ICL and when the systems<br />

will be ready for the final 10% client witnessing.<br />

3.6 Final witness and client acceptance testing<br />

To be done during client training sessions or by agreement.<br />

3.7 Building Mains Failure – ‘Black Building’ Test<br />

If required, this will be done post contract because the main plant and back up systems are<br />

all part of the base build. Timing for this would need to be carefully planned and agreed<br />

with all building occupants well in advance to avoid disruption to ongoing research.<br />

3.8 Part L Air Pressure Test<br />

This is not applicable on this project.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 7<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

4 Third Party Approvals<br />

4.1 Building Control<br />

Date of inspection is set for 18 February 08. MLM have advised that they require the<br />

following things ready for the inspection:<br />

1. We require the BS5266 emergency lighting design, installation and commissioning<br />

certificates and to witness a random key switch test.<br />

2. We require the BS5839 fire alarm design, installation and commissioning certificates.<br />

3. We require the design, installation, testing and certificate of conformity for the sprinkler<br />

system (the variation on the certificates is as follows 'agreed by all relevant statutory<br />

authorities to omit sprinkler void coverage in favour of smoke detection). Also on the<br />

sprinkler system Patrick Busby of Walter Lilly is to arrange for a weekend flow switch test to<br />

confirm actuation of flow switches to trigger shut down of services, actuation of any relevant<br />

dampers and system ramp down to mechanical smoke extract mode - a report presenting a<br />

successful test must be given to us so that we may forward this to the local authority to be<br />

granted the Section 20 completion certificate. The local authority will not need to be present<br />

to witness this test.<br />

4. We require to witness a random electromagnetic door device such that it should drop out<br />

on activation of fire alarm, or breakage of green break glass point.<br />

5. We require an access statement form the designer to cover any variations from Approved<br />

Document M<br />

6. We require confirmation the CIBSE designed rates for ventilation in relevant<br />

chemistry/laboratory environments are commissioned and achieved as they were designed.<br />

7. We require to witness an air test on a random sample of drainage.<br />

8. We require to witness a random damper slam test.<br />

4.2 Fire Officer<br />

MLM to confirm.<br />

4.3 Local Authority<br />

4.3.1 Schedule of planning conditions and compliances<br />

Not applicable.<br />

4.3.2 Planning Certification<br />

Not applicable.<br />

4.3.3 Section 106 / 278 Works<br />

Not applicable.<br />

4.4 Party Wall Agreements<br />

Not applicable.<br />

4.5 LPCB<br />

David Chinn (ICL) to advise.<br />

4.6 Insurers<br />

Not applicable – as advised by David Chinn (ICL).<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 8<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

5 Files, Logs and Manuals<br />

This section covers files, logs and manuals that must be complete in order for the<br />

Completion certificate to be issued, as stated in the Works Information.<br />

5.1 Operation and Maintenance Manuals<br />

Final draft offered for review on 14 February 2008. Record drawings and Mechanical<br />

information still missing. WL chasing this up asap.<br />

5.1.1 H&S Information<br />

To be incorporated into O&M manuals, as per ICL specification.<br />

5.1.2 Operation and Maintenance Information<br />

To be incorporated into O&M manuals, as per ICL specification.<br />

5.1.3 Test Certificates<br />

To be included in O&M manuals.<br />

5.1.4 As Built Information<br />

To be included in O&M manuals, as per ICL specification.<br />

5.1.5 Document Collation, Distribution and Handover<br />

Heery to coordinate this process with WL. The process for integration of these manuals<br />

with the existing building manuals needs to be confirmed to ICL. Heery to advise.<br />

5.2 Building Log<br />

The Part L regulations requires that building owners be provided with summary information<br />

about a new or refurbished building, its building services and their maintenance<br />

requirements in a Building Log book to provide details of installed services plant and<br />

controls, their methods of operations and maintenance, and other details that collectively<br />

enable energy consumption to be monitored and controlled.<br />

5.3 BREEAM Certification and Rating<br />

Not applicable.<br />

5.4 Schedule of other information required by the contract<br />

Supervisors to confirm their requirements to WL.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 9<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

6 Client Engagement and Training<br />

6.1 Client Training<br />

WL issued a revised schedule of client training dates and this has commenced.<br />

Attendance list to be forwarded to Arup by Walter Lilly on a daily basis.<br />

6.2 Spares<br />

6.2.1 Architectural Spares<br />

Architectural spares to be provided at Handover<br />

By Who?<br />

1. TBC by BMJ – still awaited BMJ<br />

2.<br />

3.<br />

4.<br />

6.2.2 MEP Services Spares<br />

MEP services spares to be provided at Handover<br />

By Who?<br />

1. TBC by NDY – still awaited NDY<br />

2.<br />

3.<br />

4.<br />

6.3 Tools and Equipment<br />

The following tools and equipment is to be provided at handover.<br />

Tools and equipment to be provided at Handover<br />

By Who?<br />

1. TBC by BMJ/NDY – still awaited NDY/BMJ<br />

2.<br />

3.<br />

4.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 10<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

6.4 Keys<br />

The following keys are to be provided at handover.<br />

Keys to be provided at Handover<br />

By Who?<br />

1. TBC by WL at least a week before handover. WL<br />

2.<br />

3.<br />

4.<br />

Arrangements for handover to be confirmed well in advance.<br />

6.5 Suited locks<br />

ICL will install lock barrels. This is now done. ICL will manage the issue of keys for these<br />

locks to ensure it is controlled.<br />

6.6 Utilities handover<br />

Not applicable on this project because all utilities are already controlled by ICL.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 11<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

7 Contractual Arrangements<br />

The works may be taken over prior to completion now that the WL programme is showing<br />

works ongoing into March 08. If that is the case, a take-over certificate will be issued.<br />

7.1 Completion Certificate<br />

Arup Project Management will issue a contract completion certificate when the works are<br />

complete. There is also an ICL certificate of completion which will be issued at the same<br />

time.<br />

7.2 Insurances/Bonds/Guarantees<br />

<strong>Imperial</strong> <strong>College</strong> are to confirm that completed works will be insured from the 22 nd February,<br />

or the date of Completion if later.<br />

7.3 Completion Meeting<br />

A meeting will be held at 10am on 19 February 08 in the Commonwealth Board Room to<br />

review any Supervisor/Duty Holder/User comments and confirm that all concerned are<br />

happy that the project will be ready for completion and handover by 22 February 08. The<br />

following people are requested to attend:<br />

Kieran McDaid<br />

John Griffith<br />

Nick Roalfe<br />

Matt Lee<br />

Stephen Pullen<br />

Kim Wells<br />

Duty Holders – see schedule in Appendix D<br />

All Supervisors<br />

Steve Edwards<br />

James Lynch<br />

Patrick Busby<br />

Mike Morley<br />

Don Bone<br />

7.4 Formal Handover Meeting<br />

A formal handover meeting will be held in the Neuroscience meeting room on the 5 th floor at<br />

10am on 22 February 08 (this may be rescheduled if works are not finished) for final<br />

confirmation that the project is complete and ready to be handed over to ICL. The following<br />

people are requested to attend:<br />

Kieran McDaid<br />

John Griffith<br />

Nick Roalfe<br />

Matt Lee<br />

Kim Wells<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 12<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

8 Client Occupation/Migration<br />

To be completed by Stephen Pullen and Matt Lee (ICL). Arup have included known<br />

dates on the handover programme or made assumptions in the case of the migration dates.<br />

These will need to be confirmed by ICL.<br />

8.1 FF&E<br />

Fire extinguishers due to be installed w/c 11 February 08.<br />

8.2 Decanting decision point<br />

5 th February 08. Decision made to commence decanting as planned.<br />

8.3 Scientific equipment transfer to BD<br />

8.4 Re-commissioning of equipment at BD<br />

8.5 Personal effects transfer to BD<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 13<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

9 Post Completion Certificate Issue<br />

9.1 Permit Arrangements<br />

Emcor will be responsible for issue permits to the completed areas post completion.<br />

Contract Mark Wilson 07917 394744 mark.wilson2@imperial.ac.uk.<br />

9.2 Public Relations/Press Releases/Marketing<br />

Nothing planned at present.<br />

9.3 Defects Close <strong>Out</strong> Strategy and Programme<br />

This section covers defects known at handover.<br />

9.3.1 Strategy<br />

Walter Lilly to advise Arup. This will need to be discussed with Matt Lee and Christine<br />

Hobbs of ICL.<br />

9.3.2 Programmes<br />

Walter Lilly to advise Arup. The defects correction period is 14 days on this project and this<br />

applies to all items notified as outstanding at Completion.<br />

The details will need to be discussed with Matt Lee and Christine Hobbs of ICL.<br />

9.4 Latent Defects Reporting Strategy<br />

Walter Lilly to advise Arup of the strategy for dealing with this. There is a 14 day defects<br />

correction period identified in the contract data.<br />

9.5 Demobilisation Arrangements<br />

9.5.1 Archiving<br />

The archiving will be done by ICL and will included a full set of O&M information as well as<br />

the CCM records.<br />

9.5.2 Contractor accommodation, Welfare and Storage<br />

To be mainly removed prior to Completion. WL to advise if some space needs to be<br />

retained for their offices post Completion.<br />

9.5.3 Plant, Equipment and Materials<br />

To be removed prior to Completion.<br />

9.5.4 Logistics and Security<br />

Not applicable.<br />

9.6 Lessons Learned Workshops<br />

Target date set for 8 th April 2008. Plans to be reviewed with Zoe Mulholland of ICL.<br />

9.7 Post Handover<br />

ICL have requested WL provide a plan of spares that may required in the future and an<br />

indication of how frequently they will be needed.<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 14<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>HMBD</strong> <strong>0601</strong> - <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

10 Risks to Handover and Close <strong>Out</strong><br />

Risk<br />

Probability<br />

Impact<br />

Action<br />

Who<br />

Lack of progress on<br />

commissioning<br />

Late completion of Special<br />

Extracts<br />

2 4 WL to monitor closely and report<br />

to Banyard/Arup frequently,<br />

especially if any critical delays<br />

occur<br />

4 4 WL to manage and ensure<br />

sufficient resources are applied<br />

to complete works on time.<br />

WL<br />

WL<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Page 15<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Appendix A<br />

Project Close-<strong>Out</strong><br />

Status Tracker<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


Section of handover plan<br />

Activity<br />

Key:<br />

<strong>HMBD</strong><strong>0601</strong> - BURLINGTON DANES FIT OUT<br />

Project Close <strong>Out</strong> Status Tracker<br />

Input from<br />

1. Primary Responsibility<br />

2. Support<br />

<strong>Imperial</strong> <strong>College</strong><br />

Arup<br />

Turner and Townsend<br />

Walter Lilly<br />

Axima<br />

T Clarke<br />

BMJ<br />

NDY<br />

Heery<br />

Banyards (CV)<br />

Banyards (Supervisor)<br />

MLM<br />

Duty Holders<br />

Emcor<br />

John Griffith<br />

Steve Pullen<br />

Christine Hobbs<br />

Schedule<br />

G - On program<br />

A - Behind program - non critical<br />

R - Behind program - critical<br />

Planned<br />

completion date<br />

by activity<br />

owner<br />

1.0 Construction completion - key milestones<br />

1.1 Architectural completion - 4th and 5th floors 1 2 31/01/08 G G Complete bar snagging WL<br />

1.2 Installation of plantroom fans, ductwork and BMS 1 2 2 2 04/02/08 A R WL to advise on progress and work longer hrs. WL<br />

1.3 Architectural completion - 3rd floor 1 2 11/02/08 A A<br />

1.4 Installation of remaining flues 1 2 28/01/08 G G Complete<br />

Status<br />

reported<br />

Status<br />

assessed<br />

by Arup<br />

Action / Comment<br />

By<br />

Reference<br />

Documents<br />

2.0 Inspections<br />

2.1 Architectural -<br />

- 5th floor - final inspection 1 2 31/01/08 G G Final inspection 5/2/08. WL to confirm sign-off date WL<br />

- 4th floor - final inspection 1 2 31/01/08 G G Final inspection 5/2/08. WL to confirm sign-off date WL<br />

- 3rd floor - final inspection 1 2 11/02/08 G A Inspection 5/2/08. WL to confirm sign-off date WL<br />

2.2 M&E 1 1 15/02/08 G G<br />

2.3 Client's IT installation 15/02/08 G R Awaiting confirmation from ICL ICL (AB)<br />

- NHS Switch TBC A R Awaiting confirmation from ICL ICL (AB)<br />

2.4 Duty Holders 1<br />

- Diary Time Booked 1 G G Reference schedule<br />

- Final Inspection 1 15/02/08 G G<br />

2.5 Others -<br />

3.0 Comissioning and Integrated Testing<br />

3.1 Uprate base build air handling plant 2 2 2 2 1 01/02/08 G G Complete<br />

3.2 Commissioning Reference schedule<br />

WL do not have enough commissioning resource on<br />

- Main air systems 1 2 15/02/08 A A site<br />

WL<br />

- Special Extracts 1 2 22/02/08 A R<br />

This will not be complete for 22 Feb. Now due 10<br />

March. WL to provide additional labour.<br />

WL<br />

- Fume cupboards 1 2 22/02/08 A R Dependent on item above. Due 26 Feb. WL<br />

- Chlorination 1 2 20/02/08 G G<br />

3.3 Integrated Testing 1 2 2 2 2 2 TBC A A<br />

3.4 Cause and Effect testing 1 2 2 2 2 2 18/02/08 G G<br />

3.5 BMS Commissioning<br />

- Banyards 100% witness 1 2 2 05/02/08 R R Dependent on completion of special extracts WL<br />

- Handover to ICL maintenance 2 1 29/02/08 R R As above<br />

3.6 Final witness and client acceptance testing 1 2 22/02/08 G A<br />

4.0 Third Party Approvals<br />

4.1 Approved Inspectors Occupation Certificate 1 2 18/02/08 G G<br />

4.2 Fire Officer 2 1 N/A ICL fire offcer inspection done.<br />

4.5 LPCB N/A<br />

4.6 Insurers 1 N/A As advised by ICL - David Chinn.<br />

5.0 Files, logs and manuals<br />

5.1 Health and Safety File<br />

- First draft submitted for approval 1 2 2 2 2 2 Done G G<br />

- Final draft submiited for approval 1 2 2 2 2 2 11/02/08 G G<br />

- Final issue 1 2 2 2 2 2 22/02/08 A A<br />

- Record drawings issued 1 2 2 2 2 2 04/02/08 A R Axima have not issued drafts yet. WL<br />

5.2 Building Log 1 2 2 2 11/02/08 A A<br />

5.3 Final issue of commissioning test certifcates 1 2 2 2 27/02/08 A A<br />

6.0 Client engagement and training<br />

6.1 Client training 1 2 2 22/02/08 G G<br />

6.2 Handover spares 1 2 2 22/02/08 G A<br />

6.3 Handover tools and equipment 1 2 2 22/02/08 G A<br />

6.4 Handover Keys 1 2 22/02/08 G G<br />

6.5 Suited locks 2 1 31/01/08 G G ICL have installed locks<br />

7.0 Contractual Arrangements<br />

7.1 Completion certificate 1 25/02/08 R R Now due in mid March, after BMS complete.<br />

7.2 <strong>Imperial</strong> insurances commence 1 1 1 22/02/08 G G All insurance via ICL.<br />

7.3 Completion meeting 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 19/02/08 G G<br />

7.4 Formal handover meeting 1 2 2 2 22/02/08 A A Dependent on h/o date.<br />

8.0 Client Occupation/Migration<br />

8.1 FF&E Batch 1 2 1 TBC G G<br />

8.2 Decanting decision point 2 2 1 2 05/02/08 G G<br />

8.3 Scientific equipment transfer to BD 1 20/02/08 R R Dates tbc by ICL pending robust WL programme ICL (ML/SP)<br />

8.4 Re-commissioning of equipment at BD 1 22/02/08 R R Dates tbc by ICL pending robust WL programme ICL (ML/SP)<br />

8.5 Personal effects transfer to BD 1 25/02/08 R R Dates tbc by ICL pending robust WL programme ICL (ML/SP)<br />

9.0 Post Practical Completion<br />

9.1 Issue of permits post-PC 1 N/A<br />

9.2 Reporting of latent defects 2 2 1 N/A<br />

9.3 Demobilisation from site 1 2 2 22/02/08 A A<br />

9.4 Lessons learned workshop 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 08/04/08 G G<br />

J:\119796-00\04-Internal_Project_Data\4-05-Reports\Handover Plan\Issue 2\Template schedule - 08-02-14.xls 14/02/2008


<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Appendix B<br />

Project Handover<br />

Programme<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


Activity<br />

ID<br />

Construc - Construction<br />

Description<br />

Early<br />

Start<br />

Early<br />

Finish<br />

Original<br />

Duration<br />

0002 Fifth floor architectural completion 21/JAN/08 01/FEB/08 9<br />

0003 Fourth floor architectural completion 21/JAN/08 08/FEB/08 14<br />

0004 Third floor architectural completion 21/JAN/08 18/FEB/08 20<br />

0005 Plant room fans, ductwork and BMS 21/JAN/08 19/FEB/08 21<br />

0006 Installation of remaining flues 28/JAN/08 * 0<br />

Duty Hol - Duty Holder and User Inspections<br />

0038 Pre-handover inspections 21/JAN/08 22/JAN/08 1<br />

0062 Director level walkround 01/FEB/08 0<br />

0039 Final Duty Holder handover inspections 12/FEB/08 * 14/FEB/08 3<br />

0040 Deadline for all Duty Holder and User comments 15/FEB/08 * 0<br />

0041 Handover pre-meeting 19/FEB/08 * 0<br />

0042 Final Handover meeting & sign-off 22/FEB/08 * 0<br />

0052 Project Completion and handover to ICL 17/MAR/08 0<br />

Commissi - Commissioning and Testing<br />

0069 ICL/NDY to uprate air handling plant 28/JAN/08 * 01/FEB/08 5<br />

0209 Main air systems 28/JAN/08 15/FEB/08 15<br />

0008 Special extracts 14/FEB/08 29/FEB/08 11<br />

0010 Chlorination 18/FEB/08 * 20/FEB/08 3<br />

0011 Fume cupboards 22/FEB/08 29/FEB/08 5<br />

0050 BMS - 100% witnessing by Banyards 27/FEB/08 05/MAR/08 5<br />

0080 BMS - Preparation of documentation 03/MAR/08 10/MAR/08 5<br />

0060 BMS - ICL check of docs and 10% witness 10/MAR/08 17/MAR/08 5<br />

0051 Completion of commissioning 17/MAR/08 0<br />

0070 BMS - Handover to ICL Maintenance 17/MAR/08 0<br />

Document - Files, Logs and Manuals<br />

0013 O&M Production inc H&S File 21/JAN/08 11/FEB/08 15<br />

0015 Record drawing production 21/JAN/08 04/FEB/08 10<br />

0016 Issue of final draft of record drawings 04/FEB/08 0<br />

0014 Issue of final draft of O&M inc H&S File 12/FEB/08 0<br />

0047 Draft issue of commissioning certificates 12/FEB/08 0<br />

0218 Approved Inspector's Occupation Certificate 12/FEB/08 0<br />

0017 Final issue of commissioning test certs 17/MAR/08 0<br />

Training - Client Training<br />

0020 Client training (see schedule for details) 31/JAN/08 05/MAR/08 24<br />

0021 All client training completed 05/MAR/08 0<br />

Client E - Client Occupation / Migration<br />

0025 Soap / towel dispensers 21/JAN/08 22/JAN/08 1<br />

0030 AV 21/JAN/08 22/JAN/08 1<br />

0032 Dishwasher 21/JAN/08 22/JAN/08 1<br />

0034 Drying cabinets 21/JAN/08 22/JAN/08 1<br />

0231 Autoclaves 21/JAN/08 20/FEB/08 22<br />

0023 Office furniture 04/FEB/08 * 21/FEB/08 14<br />

0027 Class II cabinets 04/FEB/08 * 08/FEB/08 5<br />

0028 Class I cabinet 04/FEB/08 * 08/FEB/08 5<br />

0033 Laminar flow hood 04/FEB/08 * 08/FEB/08 5<br />

0026 Lab chairs 11/FEB/08 * 26/FEB/08 12<br />

0036 Fire Extinguishers 11/FEB/08 * 15/FEB/08 5<br />

0089 ICL lock barrels 11/FEB/08 * 15/FEB/08 5<br />

0054 Decision Point - confirm decant dates 11/FEB/08 * 0<br />

0024 Signage 18/FEB/08 * 22/FEB/08 5<br />

0029 Phone installation and data patching 18/FEB/08 * 22/FEB/08 5<br />

0035 Active IT equipment 18/FEB/08 * 22/FEB/08 5<br />

0244 Scientific equipment transfer to BD 20/FEB/08 05/MAR/08 10<br />

0066 Earliest start for office occupation 25/FEB/08 0<br />

0045 Re-commissioning of equipment at BD 29/FEB/08 07/MAR/08 5<br />

0049 MSC Commissioning (Scanlaf and Bioquell) 29/FEB/08 * 07/MAR/08 5<br />

0059 VHP cycle development 29/FEB/08 * 07/MAR/08 5<br />

0046 Personal effects transfer to BD 03/MAR/08 10/MAR/08 5<br />

0079 Complete client equip/furniture instal & commisn 07/MAR/08 0<br />

0056 Users fully operational 17/MAR/08 0<br />

14<br />

JAN<br />

21<br />

28<br />

2008<br />

FEB<br />

MAR<br />

04 11 18 25 03 10 17 24<br />

Data date<br />

Run date<br />

Number/Version<br />

21/JAN/08<br />

15/FEB/08<br />

<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong> Handover Programme<br />

© Primavera Systems, Inc.


<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Appendix C<br />

Current Defects and<br />

<strong>Out</strong>standing Works<br />

Lists<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


DEFECTS LIST<br />

IMPERIAL COLLEGE LONDON Issue No. : 01 – Visit 05/01/08<br />

BURLINGTON DANES<br />

Issue Date : 12 th February 2008<br />

UPPER STACK FIT OUT<br />

HAMMERSMITH CAMPUS <strong>HMBD</strong> <strong>0601</strong><br />

Job No. : 2288<br />

Item<br />

Observations Comments Date<br />

Completed<br />

1 E521 Cleaners / Bin Store Make good around trap penetration through<br />

wall<br />

2 Seal around sockets<br />

3 Seal around pipe penetration through wall<br />

4 Reinstate missing screws to stainless steel<br />

panel<br />

5 E522 Tissue Culture 3 Align leg frames<br />

6 Sealant missing from back of IPS<br />

7 Install collar around duct penetration through<br />

ceiling<br />

8 Install ceiling trim around trunking<br />

9 Install collars to co2 pipes through ceiling<br />

10 E523 Tissue Culture 5 Clean paint from IPS panels<br />

11 Chipped trespa worktop to right hand side of<br />

sink<br />

12 Remove paint from skirting adjacent pipe<br />

13 Replace ceiling tile at sounder<br />

14 E524 Store Confirm access panels are fire rated<br />

15 E525 Tissue Culture 4 Seal underside of sill and top of upstand at<br />

south west corner of the room<br />

16 E527 General Histology Seal around IPS Panel<br />

17 Vinyl at IPS missing<br />

18 Touch up paint around light switch<br />

19 Peninsular RO shelf missing<br />

20 Complete boxing to AFOS bench ductwork<br />

21 Install front panel to AFOS bench<br />

22 E526 Cold Room Benching to be installed<br />

23 Cam lock missing from panel<br />

24 Pipe penetrations to be properly sealed<br />

25 Poor panel joints adjacent door<br />

26 E531 Balance / Gel Bench Lab Collar required to flammables ductwork at<br />

ceiling penetration<br />

27 Gap at bottom rear corner of fume<br />

cupboards to be made good<br />

28 Side panels of fume cupboards to be<br />

cleaned<br />

29 PPE consumables cupboard to be installed<br />

30 Close up around fume cupboards and clean<br />

side panels<br />

31 E529B General Dark Room Make good mastic joint at upstand to<br />

benching<br />

32 Install break out panel to revolving door<br />

33 E529A General Fluorescent Pullcords for light switching missing<br />

Microscopes<br />

34 Switching mechanism for lighting confusing.<br />

May require labelling<br />

Signed<br />

Off by<br />

<strong>London</strong> Projects:2200-2299 series:2288 - BDFO <strong>HMBD</strong> <strong>0601</strong>:2288 Supervisor:2288 Defects:2288 Defects Report 001 120208.doc Page 1 of 3


35 Seal around light switch<br />

36 What is pipe cap at low level benching for?<br />

37 E529 -80 General freezers & Swipe reader on wrong side of wall. Should<br />

E530 -80 Brain Bank Freezers be at Write Up side<br />

38 Tidy paint and mastic around extract grilles<br />

39 Remove masking tape from screens<br />

40 Fixing batten for CO2 cylinders on mesh<br />

screen required<br />

41 E532 -20 Freezers Window leaking at both corners<br />

42 Trunking incomplete and damaged<br />

43 E535 Primary Laboratory Undershelf light damaged<br />

44 Remove dirty marks from ceiling tiles<br />

45 Touch up paint adjacent bench upstands<br />

46 Glassware shelves to be installed<br />

47 E533 Wash Up Room Glazed screen to lab damaged at corner<br />

48 Trunking dented in places<br />

49 E534 Bacteriology Remove paint from skirting trim<br />

50 E536 Radiation Lab Ceiling tile around fire detector damaged<br />

51 Touch up paint around light switch<br />

52 E538A Dark Room Room incomplete and not available for<br />

inspection<br />

53 E539 Liquid Nitrogen Extract ductwork to be painted. Currently<br />

incomplete<br />

54 Seal around door frame<br />

55 E540 Muscle Physiology Collar to neederman snorkel to be installed<br />

56 E540A Electro Physiology Make good light switch<br />

LAB AREAS GENERALLY<br />

57 Intumescent strips to doors missing or<br />

different colours<br />

58 Silicone seal between sinks and trespa<br />

worktops with clear silicone sealant<br />

59 Screws to peninsular bench shelving to be<br />

countersunk<br />

60 Fused spur switches on dado on peninsular<br />

benches installed at 90deg? Please confirm<br />

reason for this<br />

61 Some face plates of trunking misaligned and<br />

not clipping in properly<br />

62 RO Water Polisher shelves above sinks to<br />

be installed throughout<br />

63 CO2 Pipework to be painted<br />

OFFICE AREAS GENERALLY<br />

65 Fill gap between top of trunking and wall<br />

66 Remove paint from glass sidelights to doors<br />

67 Make good sealant between window frame<br />

and sill<br />

68 E519 Meeting Room Flooring uneven<br />

69 Sockets missing<br />

70 E596 Lobby & E597 WC Make good and refurbish when works<br />

complete<br />

LEVEL 4<br />

71 E421 Bin Store Make good around trap penetration through<br />

wall<br />

72 Seal around sockets<br />

73 Seal around pipe penetration through wall<br />

74 Reinstate missing screws to stainless steel<br />

panel<br />

75 E422 HPLC Room General clean required<br />

76 Intumescent seal missing from door<br />

<strong>London</strong> Projects:2200-2299 series:2288 - BDFO <strong>HMBD</strong> <strong>0601</strong>:2288 Supervisor:2288 Defects:2288 Defects Report 001 120208.doc Page 2 of 3


77 E423 Tissue Culture 2 Human Make good pipes at wall<br />

78 Repair damage to wall adjacent window<br />

79 Seal underside of window sill<br />

80 Level the socket located below the light<br />

switch<br />

81 E425 Tissue Culture 1 Repair water damage<br />

82 E426 Cold Room Benching to be installed<br />

83 Pipe penetrations to be properly sealed<br />

84 Poor panel joints adjacent door<br />

85 E427 18Deg Constant Temp Clean dust plumb lines from ceiling<br />

86 Clean marks from walls<br />

87 Seal vinyl upstand at door junction<br />

88 E429 Human Tissue Prep Make good wall at window<br />

89 Make good pipe penetrations through wall<br />

90 Cap at end of bench frame missing<br />

91 Intumescent strip to door missing<br />

92 E430C EM Microtome Room Gap at boxing excessive<br />

93 E432 Touch up paint between sill and dado<br />

trunking<br />

94 Silicone seal trespa benching worktop joints<br />

95 E431 Brain Bank Touch up paint around all ceiling<br />

penetrations (sprinkler heads etc)<br />

96 Fixing batten for CO2 cylinders on mesh<br />

screen required<br />

97 E433 Cryostat Make good between cill and dado<br />

98 PPE consumables cupboard to be installed<br />

99 Close up around fume cupboards and clean<br />

side panels<br />

100 E437 Primary Lab Clean ceiling tiles<br />

101 Glassware shelves to be installed<br />

102 E434 -20 Freezers Make good around pipe penetrations<br />

103 E435 NMU NHS Lab Seal between boxing and column at AFOS<br />

bench<br />

104 Install face panel to AFOS bench<br />

105 Complete boxing to AFOS bench ductwork<br />

106 Install front panel to AFOS bench<br />

107 E436 Human Histology Dado trunking misaligned<br />

108 Complete boxing to AFOS bench ductwork<br />

109 Install front panel to AFOS bench<br />

110 E439A Brain Cut Up Works progressing therefore unavailable for<br />

defects inspection<br />

111 E438 Fluorescent Scopes Works progressing therefore unavailable for<br />

defects inspection<br />

112 E441 NMU Scopes Make good trunking to ceiling connection<br />

113 E480 Tea Point Install integrated fridge freezer<br />

114 End door of single wall cupboard to hang in<br />

opposite direction<br />

115 E401 PA Office Infill between door frame and wall<br />

116 E417 MS Tissue Bank Office Carpet tiles laid over bolt on floor<br />

117<br />

118 LAB AREAS GENERALLY As per Level 5 general items<br />

119 OFFICE AREAS GENERALLY Make good cables at window actuators<br />

120 As per level 5 items<br />

121 Lobby Area Smashed pane of glass to be replaced<br />

122 Works progressing therefore unavailable for<br />

defects inspection<br />

123 LEVEL 3 Works progressing therefore unavailable for<br />

defects inspection<br />

<strong>London</strong> Projects:2200-2299 series:2288 - BDFO <strong>HMBD</strong> <strong>0601</strong>:2288 Supervisor:2288 Defects:2288 Defects Report 001 120208.doc Page 3 of 3


M&E Supervisor’s Site Visit Report<br />

Project <strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong> <strong>Out</strong> (<strong>HMBD</strong><strong>0601</strong>) Job No: 074353<br />

Date: 6 th February 2008<br />

Report by: Ken Matthews (KJM)<br />

Present:<br />

Site Visit<br />

No: 21<br />

Had some contact with Patrick Busby during the afternoon and Brian<br />

Dempsey of Walter Lilly accompanied KJM to visit the Roof Fume<br />

Extract installation.<br />

21.000 Notes<br />

This visit was to check and clear snag/observation items within BC report No 20 that had been<br />

reported as completed by WL.<br />

The visit also included a general inspection of the Plastic ducting and fans installation at roof plant<br />

level.<br />

Any current comments relative to previous observations/snags under section 21.200 below are<br />

shown Bold.<br />

Explanatory Notes<br />

There are items retained under section 21.200 for information purposes that relate to Base Build<br />

services and effect the WL installations, such as the water pressure at basin taps.<br />

Item 9.106. Room E497. Refers to Base build and is for ICL attention through Arup.<br />

Other retained items that remain included for information only are where BC reported differences<br />

between T Clarke’s construction drawings and that as actually installed with regard to power and<br />

data points locations. Based on WL advice, these rooms/areas have been fitted out in accordance<br />

with drawings issued by BJM and we take it therefore that BJM would check to their satisfaction.<br />

Accordingly BC have amended all the associated items concerning this within our list below to one<br />

common statement, e.g. as in item No 20.107.<br />

21.100 Site Visit Observations of M & E current works<br />

21.101 Roof Plant installation of Fume Extract Fans and associated ducting and electrics.<br />

1. The west installation is the most advanced. All of the covered area ducting has been<br />

installed and fans and ducting including attenuators currently in progress within the Fans<br />

Chamber. Much activity was evident at the time of the visit with mechanical installation,<br />

electrical 1 st fix and sealing of duct entries all happening within the West chamber.<br />

2. Most of the East side covered plant space ducting has been installed with exception of the<br />

150dia duct that will connect to fan R/11. The new fan sets are in position and ducting has<br />

been installed within the chamber to fans R/9 and R/10. No other ducting, apart from the<br />

high level discharges, has been installed at present. There was no evidence of any activity<br />

within this chamber at the time of the visit.<br />

3. It was noted that the NRD’s, where shown on the drawing as located with the fan chambers,<br />

are in fact now being fitted to the ducts further back within the covered plant area. This is a<br />

practical solution because they are more easily accessed but this is mentioned to ensure<br />

those concerned get them shown correctly on the record drawings.<br />

4. There are a few places on the duct runs within the roofed plant area where the duct support<br />

spacing is up to about 3.5 – 4 metres. This exceeds guidelines for supports and the writer<br />

has mentioned this to the site installer. On the west side duct run to R/2, with rising double<br />

set. There are 3 on the East side. One each on duct to R/6 and R/8, and two on duct to R/7.<br />

The latter extended distances from high level horizontal bend and at rising double sets<br />

closer to outer wall.<br />

5. In the cases of both fan chambers, the inverters have been mounted and interconnecting<br />

cables have been installed and connected back to the control board.<br />

C:\Documents and Settings\hugh.dullage\Desktop\18-Monthly Report January 08\080206 BH Site Visit Report No 21.doc<br />

Page 1 of 4


M&E Supervisor’s Site Visit Report<br />

21.200 Previous Observations with some outstanding content.<br />

The following observations have been previously raised on earlier site visit reports and as such<br />

the numbering is in accordance with the numbering of the report on which the observation was<br />

raised. Any earlier observations not listed below have been cleared / actioned to our satisfaction.<br />

Current BC comments are Black bold. WL comments in Red are retained for information<br />

purposes.<br />

20.101 E310 The Luminaire first right inside door was not working. Final lighting checks to be<br />

carried out in conjunction with the BMS element.<br />

20.102 E310 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

20.105 E310 Hand basin. Drv on HWS return has not been labelled. <strong>Out</strong>standing.<br />

20.107 E309 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

20.109 E309 Hand basin. Drv on HWS return has not been labelled. <strong>Out</strong>standing.<br />

20.110 E309 Low level insulated pipes at window end of room to be ID banded. <strong>Out</strong>standing.<br />

20.120 E301 Tea point. Ensure that the metal sink is earth bonded. <strong>Out</strong>standing<br />

19.101 5 th floor It was noted that water supplies are now on at two island, bench end sinks on the south<br />

side of Lab 535 but as yet, no hot water is available. The lack of hot water also applies<br />

to all the basins. Base Build connections not made. Remedial works and<br />

chlorination of systems will be complete by Weds 20/2/08.<br />

19.102 4 th floor Primary laboratory E437. Grid F – E. Two of the four emergency lights in this area did<br />

not appear to have green neon lamps. Are they the correct fittings? TBC<br />

19.103 4 th floor Constant temperature room E427. The two fittings designated as emergency lights did<br />

not appear to have green neon indication lamps. Are they the correct fittings? Correct<br />

fittings, but neons need to be checked.<br />

19.105 E436 Human Histology. It was noted that a spurred power supply was in the process of being<br />

installed to serve the Trox VB 4/02 unit associated with the low - level fume extract. It is<br />

understood that similar spur connections have recently been installed to similar units on<br />

the 5 th floor. Complete. 06/02/08. Patrick advises that Trox unit to be built in and<br />

local controller now to be set into casing, therefore, part outstanding.<br />

18.101 5 th floor General. Wash Basins. The pressure and flow at both hot and cold taps is excessive<br />

and currently liable to splash over rim of basins. Needs adjustment. Base Build system<br />

pressure. Adjustments to be made by Emcore/ICL.<br />

18.102 E580 Tea Station. No earth bond to s/s sink. <strong>Out</strong>standing<br />

18.103 E580 Tea Station. Twin power socket under sink is at rear of cabinet casing, boxed in and not<br />

accessible. Is this power for “Zip-tap” boiler? Also Geoff Owens has queried if the local<br />

socket should be RCD protected. Ref email 21/12/07. Complete. 06/02/08. Further<br />

check needed by Patrick to investigate the other power socket behind cabinet.<br />

18.104 E580 Tea Station. Reference Patrick Busby. Apparently, the “zip-tap” boiler cable requires a<br />

plug to fit the socket. <strong>Out</strong>standing<br />

18.107 General It is noted that none of the store cupboards that also house electrical distribution boards<br />

are provided with emergency lighting. Should this not be referred to NDY for<br />

confirmation? <strong>Out</strong>standing<br />

18.110 General Special gas services wall drops where surface fixed. Apparently the installer has<br />

attempted to clean the carbon staining at soldered joints but this has not been very<br />

successful and unsightly dark patches remain. Perhaps painting these pipes would be<br />

acceptable. Installation as the specification. 06.02.08. BC noted that WL however<br />

now appear to be painting these pipes even though not specified.<br />

C:\Documents and Settings\hugh.dullage\Desktop\18-Monthly Report January 08\080206 BH Site Visit Report No 21.doc<br />

Page 2 of 4


M&E Supervisor’s Site Visit Report<br />

18.111 General Lab gas pipes. T Clark to show where the gas services have been earth bonded.<br />

<strong>Out</strong>standing<br />

18.114 5 th floor General comments on lighting. It was noted that many of the emergency light fitting<br />

green neons were not illuminated. Also quite a few Luminaires were not working. In<br />

some rooms all lights were not working and in other instances there would be one or two<br />

fittings not working on a common LCM. Possibly not plugged in. Final lighting checks<br />

to be carried out in conjunction with the BMS element.<br />

17.106 E423 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

17.108 E427 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

17.113 E435 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

17.115 E480 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

16.107 E535 Alignment of power sockets on island dado trunking has varying gaps mainly along the<br />

top. TBC. 06/02/08. Mainly on south side.<br />

16.111 General All applicable Laboratory areas and floors. Earth bonding to metal frames and bench<br />

supports. No change. TBC<br />

16.112 E533 Why are three low-level twin sockets in surface boxes and not recessed? As BMJ<br />

room elevation drawings.<br />

16.115 E534 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

16.123 E538a As previous comments. Earth bond metal framework and pipes including steel sinks etc.<br />

No change. TBC<br />

16.124 E540a Query. Lab Gas service does not drop to above sink. Does this need relocation? No<br />

change. As BMJ room elevation drawings.<br />

16.125 General item all areas all floors. Ensure that BCWS and HWS flow correctly to all sinks and<br />

basins following completion of feed connection from base build. Base Build system pressure.<br />

Adjustments to be made by Emcore/ICL.<br />

16.126 E540a Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

16.127 E540a Noisy vent? No change. Airside commissioning ongoing.<br />

15.109 E525 Variance between T Clarke’s Drawing working drawing and installation of power points.<br />

Viz, positions and/or quantity. WL/ T Clarke, please ensure that record drawings are<br />

accurate. As BMJ room elevation drawings.<br />

14.101 Roof Level External Fume Extract Fan Area. Relocation of installed Condenser units for internal<br />

cool rooms. To improve service access. Apparently still subject to installation of new fans and<br />

ducting. <strong>Out</strong>standing<br />

9.106 E497 Existing toilet.<br />

b) Rear wall of toilet above ceiling has been marked “Firewall”, however, there is no fire damper<br />

in existing extract duct at the wall penetration. ICL. Base Build Item – Arup’s to advise.<br />

C:\Documents and Settings\hugh.dullage\Desktop\18-Monthly Report January 08\080206 BH Site Visit Report No 21.doc<br />

Page 3 of 4


M&E Supervisor’s Site Visit Report<br />

8.106 General item.<br />

a) Method for fire stopping pipes and electrical trunking etc at firewalls? TBC<br />

Distribution H.Dullage Arup Project Management hugh.dullage@arup.com<br />

P. Busby Walter Lilly busbyp@walter-lilly.co.uk<br />

A. Butt Norman Disney Young a.butt@ndy.com<br />

S. Rawlings Axima steve.rawlings@axima-uk.com<br />

D. Bone T. Clarke don.bone@tclarke.co.uk<br />

C:\Documents and Settings\hugh.dullage\Desktop\18-Monthly Report January 08\080206 BH Site Visit Report No 21.doc<br />

Page 4 of 4


<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Appendix D<br />

Duty Holder<br />

Inspections<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


BDFO - Duty Holder Inspection Schedule<br />

Duty Holder<br />

Responsibility<br />

Inspection<br />

Date<br />

Comments<br />

Received<br />

Response<br />

Issued<br />

Final<br />

Sign-off<br />

Antonio Barbosa ICT 22-Jan-08<br />

Ceri Davies Security 13-Feb-08<br />

Roy Dickerson (Geoff Owens) Engineering 12-Feb-08 15-Feb-08<br />

Ian Gillett Safety 12-Feb-08<br />

Chas Guirey Maintenance 12-Feb-08 12-Feb-08<br />

Denis Murphy Construction Safety 14-Feb-08<br />

Loretto O'Callaghan Disability Access TBC<br />

Nicholas Roalfe Facility Management TBC<br />

Peter Seal Fire 13-Feb-08<br />

J:\119796-00\04-Internal_Project_Data\4-05-Reports\Handover Plan\Issue 2\Template schedule - 08-02-14.xls 15/02/2008


<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Appendix E<br />

WL Commissioning<br />

Programme<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


WALTER LILLY & CO lTD<br />

BURLINGTON DANES FIT OUT<br />

ID<br />

1<br />

2<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

37<br />

38<br />

39<br />

40<br />

41<br />

42<br />

43<br />

44<br />

45<br />

46<br />

47<br />

48<br />

49<br />

50<br />

51<br />

52<br />

53<br />

54<br />

55<br />

56<br />

57<br />

58<br />

59<br />

60<br />

61<br />

62<br />

63<br />

64<br />

65<br />

66<br />

67<br />

68<br />

69<br />

70<br />

71<br />

72<br />

73<br />

74<br />

75<br />

76<br />

77<br />

78<br />

79<br />

80<br />

81<br />

82<br />

83<br />

84<br />

85<br />

86<br />

Activity<br />

No<br />

Name<br />

MECHANICAL SERVICES<br />

5th FLOOR<br />

Mains Water For Flushing & Cleaning<br />

Adequate supply & presssure ( W.L. )<br />

Drainage For Flushing & Cleaning<br />

Adequate discharge allowance ( W.L. )<br />

Electrical Power For Temporary Pumps<br />

Connect Temporary Pumps - Htg & Chilled<br />

Cold water feed connected<br />

Drainage connected<br />

Flush & Clean. Heating & Chilled<br />

Dynamic flush<br />

Chemical clean<br />

2nd Dynamic flush<br />

Biocide wash<br />

3rd Dynamic flush<br />

Dose with biocide & inhibitor<br />

Bach flush FCUs & VAVs<br />

Final dose<br />

Re- connect control valves<br />

Balance Water Systems<br />

Balance chilled<br />

Balance heating<br />

Balance Air Systems<br />

Measure FCU's<br />

Riser E-1 Control check of VAVs<br />

Measure VAVs<br />

Riser S-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-2-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-3-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-3-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-3-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-3-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

4th FLOOR<br />

Mains Water For Flushing & Cleaning<br />

Adequate supply & presssure ( W.L. )<br />

Drainage For Flushing & Cleaning<br />

Adequate discharge allowance ( W.L. )<br />

Electrical Power For Temporary Pumps<br />

3 Phase temporary supply ( W.L.)<br />

Connect Temporary Pumps - Htg & Chilled<br />

Cold water feed connected<br />

Drainage connected<br />

Flush & Clean. Heating & Chilled<br />

Dynamic flush<br />

Chemical clean<br />

2nd Dynamic flush<br />

Biocide wash<br />

3rd Dynamic flush<br />

Dose with biocide & inhibitor<br />

Bach flush FCUs & VAVs<br />

Final dose<br />

Re- connect control valves<br />

Balance Water Systems<br />

Balance chilled<br />

Balance heating<br />

Balance Air Systems<br />

Measure FCU's<br />

Riser E-1 Control check of VAVs<br />

Measure VAVs<br />

Riser S-1-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-2-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-3-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-3-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-3-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-3-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

3th FLOOR<br />

Mains Water For Flushing & Cleaning<br />

Adequate supply & presssure ( W.L. )<br />

Drainage For Flushing & Cleaning<br />

Adequate discharge allowance ( W.L. )<br />

Electrical Power For Temporary Pumps<br />

3 Phase temporary supply ( W.L.)<br />

Connect Temporary Pumps - Htg & Chilled<br />

Cold water feed connected<br />

Drainage connected<br />

Flush & Clean. Heating & Chilled<br />

Dynamic flush<br />

Chemical clean<br />

2nd Dynamic flush<br />

Baseline<br />

Start<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

Baseline<br />

Finish<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

2007 2008<br />

Actual ActualSeptember October November December January February<br />

Duration<br />

Start Finish%<br />

10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25<br />

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

2d<br />

2d<br />

2d<br />

13d<br />

1d<br />

1d<br />

1d<br />

3d<br />

1d<br />

100%<br />

nd Dynamic flush 100% FS<br />

100%<br />

rd Dynamic 100% flush FS<br />

1d Dose with 100% biocide... FS<br />

2d Bach flush 100% FCUs &... FS<br />

1d Final 100% dose FS<br />

2d 100% connect contr... FS<br />

6d Balance 100% chilled FS<br />

4d Balance 100% heating FS<br />

6d 100%<br />

20d 91.3%<br />

10d 100%<br />

1d 90%<br />

1d 35%<br />

2d 100%<br />

2d 100%<br />

2d 100%<br />

2d 100%<br />

1d 90%<br />

1d 20%<br />

1d 100%<br />

1d 100%<br />

2d 100%<br />

2d 100%<br />

1d 100%<br />

1d 100%<br />

1d 90%<br />

1d 50%<br />

1d 90%<br />

1d 50%<br />

3d 90%<br />

3d 90%<br />

1d 90%<br />

1d 90%<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

2d<br />

2d<br />

2d<br />

12d<br />

1d<br />

1d<br />

1d<br />

3d<br />

1d<br />

1d<br />

2d<br />

1d<br />

2d<br />

6d<br />

4d<br />

6d<br />

21d<br />

10d<br />

1d<br />

1d<br />

2d<br />

2d<br />

2d<br />

2d<br />

1d<br />

1d<br />

1d<br />

1d<br />

2d<br />

2d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

3d<br />

3d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

2d<br />

2d<br />

2d<br />

12d<br />

1d<br />

1d<br />

1d<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100% Chemical clean FS<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

75.6%<br />

100%<br />

90%<br />

20%<br />

90%<br />

65%<br />

90%<br />

35%<br />

90%<br />

30%<br />

90%<br />

30%<br />

90%<br />

35%<br />

90%<br />

35%<br />

90%<br />

45%<br />

90%<br />

45%<br />

90%<br />

65%<br />

90%<br />

65%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

nd Dynamic flush FS<br />

Biocide wash FS<br />

49:3rd Dynamic flush FS<br />

50:Dose with biocide... FS<br />

87:Biocide wash FS<br />

Drawn by: A.N.Scott Date: 31st January 2008 M & E Services Commissioning Programme No.: 1348/ME1 - rev9


ID<br />

87<br />

88<br />

89<br />

90<br />

91<br />

92<br />

93<br />

94<br />

95<br />

96<br />

97<br />

98<br />

99<br />

100<br />

101<br />

102<br />

103<br />

104<br />

105<br />

106<br />

107<br />

108<br />

109<br />

110<br />

111<br />

112<br />

113<br />

114<br />

115<br />

116<br />

117<br />

118<br />

119<br />

120<br />

Activity<br />

No<br />

Name<br />

Biocide wash<br />

3rd Dynamic flush<br />

Dose with biocide & inhibitor<br />

Bach flush FCUs & VAVs<br />

Final dose<br />

Re- connect control valves<br />

Balance Water Systems<br />

Balance chilled<br />

Balance heating<br />

Balance Air Systems<br />

Measure FCU's<br />

Riser E-1 Control check of VAVs<br />

Measure VAVs<br />

Riser S-1-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-2-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser E-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-1 Control check of VAVs<br />

Measure VAVs & terminals<br />

Riser S-2-2 Control check of VAVs<br />

Measure VAVs & terminals<br />

Special Extract Systems<br />

SER2 (Special Extract Fan ) + Fume cupboard<br />

SER5 (Special Extract Fan ) + Safety cabinet<br />

SER8 (Special Extract Fan ) + Ventilated bench<br />

SER10 (Special Extract Fan ) + Safety cabinet<br />

SER4 (Special Extract Fan ) + Safety cabinet<br />

SER1 (Special Extract Fan ) + Ventilated benches<br />

SER3 (Special Extract Fan ) + Fume cupboard<br />

SER6 (Special Extract Fan ) + Fume cupboard<br />

SER7 (Special Extract Fan ) + Safety cabinets<br />

SER9 (Special Extract Fan ) + Safety cabinets<br />

Chlorination<br />

BCWS<br />

HWS<br />

Training<br />

Training<br />

WALTER LILLY & CO lTD<br />

BURLINGTON DANES FIT OUT<br />

Baseline<br />

Start<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

Baseline<br />

Finish<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

2007 2008<br />

Actual ActualSeptember October November December January February<br />

Duration<br />

Start Finish%<br />

10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25<br />

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53<br />

3d<br />

1d<br />

1d<br />

2d<br />

1d<br />

2d<br />

6d<br />

4d<br />

6d<br />

9d<br />

5d<br />

0.5d<br />

0.5d<br />

1d<br />

1d<br />

0.5d<br />

0.5d<br />

1d<br />

1d<br />

0.5d<br />

0.5d<br />

0.5d<br />

0.5d<br />

5d<br />

1d<br />

1d<br />

1d<br />

2d<br />

2d<br />

2d<br />

2d<br />

2d<br />

1d<br />

2d<br />

5d<br />

5d<br />

5d<br />

5d<br />

5d<br />

nd Dynamic 100% flush FS<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

73.1%<br />

100%<br />

90%<br />

0%<br />

90%<br />

50%<br />

90%<br />

0%<br />

90%<br />

0%<br />

90%<br />

40%<br />

90%<br />

40%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

121<br />

122<br />

123<br />

124<br />

125<br />

126<br />

127<br />

128<br />

129<br />

130<br />

131<br />

132<br />

133<br />

134<br />

135<br />

136<br />

137<br />

138<br />

139<br />

140<br />

141<br />

142<br />

143<br />

144<br />

145<br />

146<br />

147<br />

148<br />

149<br />

150<br />

151<br />

152<br />

153<br />

154<br />

155<br />

156<br />

157<br />

158<br />

159<br />

160<br />

161<br />

162<br />

163<br />

164<br />

165<br />

166<br />

167<br />

168<br />

169<br />

170<br />

171<br />

172<br />

173<br />

174<br />

175<br />

176<br />

177<br />

178<br />

179<br />

180<br />

181<br />

182<br />

183<br />

184<br />

ELECTRICAL SERVICES<br />

Finals & Testing<br />

Dead Test SWA ref P529 (DB MCP SP1 )<br />

Dead Test SWA ref P528 (DB E/LP/5/6 )<br />

Dead Test SWA ref P527 (DB E/LP/5/5 )<br />

Dead Test SWA ref P575 (DB E/P/5/4 )<br />

Dead Test SWA ref P574 (DB E/P/5/3 )<br />

Dead Test SWA ref P526 (DB E/LP/4/6 )<br />

Dead Test SWA ref P525 (DB E/LP/4/5 )<br />

Dead Test SWA ref P573 (DB E/P/4/4 )<br />

Dead Test SWA ref P572 (DB E/P/4/3 )<br />

Dead Test SWA ref P524 (DB E/LP/3/4 )<br />

Dead Test SWA ref P571 (DB E/P/3/3 )<br />

LiveTest SWA ref P529<br />

LiveTest SWA ref P528<br />

LiveTest SWA ref P527<br />

LiveTest SWA ref P575<br />

LiveTest SWA ref P574<br />

LiveTest SWA ref P526<br />

LiveTest SWA ref P525<br />

LiveTest SWA ref P573<br />

LiveTest SWA ref P572<br />

LiveTest SWA ref P524<br />

LiveTest SWA ref P571<br />

Dead Test supply from new tap off ref P592<br />

Live Test supply from new tap off ref P592<br />

Dead Test SWA ref 580 (Autoclave )<br />

Dead Test SWA ref 579 (Autoclave )<br />

Live Test SWA ref 580 (Autoclave )<br />

Live Test SWA ref 579 (Autoclave )<br />

DB E/LP/5/6<br />

DB E/LP/5/5<br />

DB E/P/5/4<br />

DB E/P/5/3<br />

DB E/LP/4/6<br />

DB E/LP/4/5<br />

DB E/P/4/4<br />

DB E/P/4/3<br />

DB E/LP/3/4<br />

DB E/P/3/3<br />

DATA<br />

Test of voice CW1358<br />

Test of fibre OS1 9/125<br />

Test of data cabling<br />

Submit test results for warranty<br />

10% Witness testing<br />

Witness test snagging<br />

Sign off by ICT/consultants<br />

FIRE ALARM<br />

Set up temp. panel on L3<br />

Test loop on Level 5<br />

Programme devices. Names & locations<br />

Test devices on temp. panel<br />

Tranfer loop into main panel<br />

Test C & E on main panel<br />

Test loop on Level 4<br />

Programme devices. Names & locations<br />

Test devices on temp. panel<br />

Tranfer loop into main panel<br />

Test C & E on main panel<br />

Test loop on Level 3<br />

Programme devices. Names & locations<br />

Test devices on temp. panel<br />

Tranfer loop into main panel<br />

Test C & E on main panel<br />

Test loop in basement (neuroscience store )<br />

Programme devices. Names & locations<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

35d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

1d<br />

7d<br />

7d<br />

7d<br />

7d<br />

7d<br />

7d<br />

7d<br />

7d<br />

7d<br />

7d<br />

0d<br />

3d<br />

3d<br />

3d<br />

1d<br />

1d<br />

2d<br />

1d<br />

4d<br />

2d<br />

10d<br />

5d<br />

1d<br />

10d<br />

2d<br />

10d<br />

5d<br />

1d<br />

10d<br />

1d<br />

10d<br />

5d<br />

1d<br />

10d<br />

2d<br />

3d<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

0%<br />

100%<br />

100%<br />

100%<br />

100%<br />

0%<br />

0%<br />

0%<br />

100%<br />

100%<br />

100%<br />

100%<br />

100%<br />

0%<br />

100%<br />

100%<br />

100%<br />

100%<br />

0%<br />

100%<br />

100%<br />

100%<br />

100%<br />

0%<br />

100%<br />

100%<br />

185:Test C & E on mai... FS<br />

Drawn by: A.N.Scott Date: 31st January 2008 M & E Services Commissioning Programme No.: 1348/ME1 - rev9


WALTER LILLY & CO lTD<br />

BURLINGTON DANES FIT OUT<br />

ID<br />

185<br />

Activity<br />

No<br />

Name<br />

Test C & E on main panel<br />

Baseline<br />

Start<br />

NA<br />

Baseline<br />

Finish<br />

NA<br />

2007 2008<br />

Actual ActualSeptember October November December January February<br />

Duration<br />

Start Finish%<br />

10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25<br />

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53<br />

10d 0% 184:Programme devices... FS<br />

186<br />

187<br />

188<br />

189<br />

190<br />

191<br />

192<br />

193<br />

194<br />

195<br />

196<br />

197<br />

198<br />

199<br />

200<br />

201<br />

BMS Commissioning<br />

5th Floor<br />

Commissioning<br />

Prepare Witnessing Documentation<br />

100% Point to point witnessing<br />

100% Functionality Witnessing<br />

4th Floor<br />

Commissioning<br />

Prepare Witnessing Documentation<br />

100% Point to point witnessing<br />

100% Functionality Witnessing<br />

3rd Floor<br />

Commissioning<br />

Prepare Witnessing Documentation<br />

100% Point to point witnessing<br />

100% Functionality Witnessing<br />

Plantroom & Special Extract System<br />

Commissioning<br />

Prepare Witnessing Documentation<br />

100% Point to point witnessing<br />

100% Functionality Witnessing<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

69d<br />

37d<br />

20d<br />

2d<br />

10d<br />

5d<br />

37d<br />

20d<br />

2d<br />

10d<br />

5d<br />

28d<br />

15d<br />

2d<br />

7d<br />

4d<br />

13d<br />

8d<br />

2d<br />

2d<br />

3d<br />

88.5%<br />

95.3%<br />

95%<br />

100%<br />

95%<br />

95%<br />

95.3%<br />

95%<br />

100%<br />

95%<br />

95%<br />

95.4%<br />

95%<br />

100%<br />

95%<br />

95%<br />

42.7%<br />

55%<br />

100%<br />

0%<br />

0%<br />

202<br />

203<br />

204<br />

205<br />

ICL Handover Requirements<br />

Compile Required ICL Documentation<br />

ICL Review of Documentation<br />

10% Input/<strong>Out</strong>put Witnessing<br />

BMS System Uploaded onto ICL Servers<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

NA<br />

10d<br />

5d<br />

2d<br />

3d<br />

3d<br />

0%<br />

0%<br />

0%<br />

0%<br />

0%<br />

Drawn by: A.N.Scott Date: 31st January 2008 M & E Services Commissioning Programme No.: 1348/ME1 - rev9


<strong>Burlington</strong> <strong>Danes</strong> <strong>Fit</strong>-<strong>Out</strong><br />

Project Close <strong>Out</strong>-Plan<br />

Appendix F<br />

Witnessing Schedule<br />

J:\119796-00\04-INTERNAL_PROJECT_DATA\4-05-REPORTS\HANDOVER<br />

PLAN\ISSUE 2\BDFO PROJECT CLOSE OUT PLAN - 08-02-15.DOC<br />

Ove Arup & Partners Ltd<br />

Issue 15 February 2008


<strong>Imperial</strong> <strong>College</strong><br />

Board/Cable Ref Source Location<br />

Progress Updated.<br />

Planned Power<br />

On Date<br />

BDIC <strong>Fit</strong> <strong>Out</strong><br />

ELECTRICAL System - Progress Schedule<br />

14 Jan '08 Issue No.<br />

Install'n/Cabling Progress<br />

Test Sheets<br />

Circuits Live<br />

Power On<br />

Tested<br />

Total Cables Total Circuits Dead Tested Issued Signed/Comment<br />

LV Switch Boards<br />

SW/BD/NE/Level 5 Existing Level 5<br />

SW/BD/NE/Level 4 Existing Level 4<br />

SW/BD/NE/Level 3 Existing Level 3<br />

SW/BD/E/Level 5 Existing Level 5<br />

SW/BD/E/Level 4 Existing Level 4<br />

SW/BD/E/Level 3 Existing Level 3<br />

E/P/5/4 SW/BD/NE/Level 5 Level 5 1 48 Yes Yes Yes<br />

E/P/5/3 SW/BD/NE/Level 5 Level 5<br />

E/P/5/1 SW/BD/NE/Level 5 Level 5<br />

E/P/4/4 SW/BD/NE/Level 4 Level 4<br />

E/P/4/3 SW/BD/NE/Level 4 Level 4<br />

E/P/4/1 SW/BD/NE/Level 4 Level 4<br />

E/P/3/3 SW/BD/NE/Level 3 Level 3<br />

E/P/3/1 SW/BD/NE/Level 3 Level 3<br />

MCCP SP 1 LEVEL 5 SW/BD/E/Level 5 Level 5<br />

E/LP/5/6 SW/BD/E/Level 5 Level 5 1 49 Yes Yes Yes<br />

E/LP/5//5 SW/BD/E/Level 5 Level 5 1 37 Yes Yes Yes<br />

E/LP/5/2 SW/BD/E/Level 5 Level 5<br />

E/LP/4/6 SW/BD/E/Level 4 Level 4<br />

E/LP/4/5 SW/BD/E/Level 4 Level 4<br />

E/LP/4/2 SW/BD/E/Level 4 Level 4<br />

E/LP/3/4 SW/BD/E/Level 3 Level 3<br />

E/LP/4/2 SW/BD/E/Level 3 Level 3


<strong>Imperial</strong> <strong>College</strong> <strong>London</strong><br />

Progress Updated.<br />

23/07/2007 Issue No.<br />

BDIC <strong>Fit</strong> <strong>Out</strong><br />

District Surveyor - Progress Schedule<br />

Item<br />

Number<br />

Description<br />

Pre-commissioned<br />

Documentation<br />

Available<br />

Devices 100%<br />

Cause and Effect test<br />

Sign Off /<br />

Correspondence<br />

Issued<br />

Comments<br />

Fire Detection & Protection Systems<br />

1 Fire detection system Yes<br />

2 Fire/voice alarm system Yes<br />

3 Interfaces - Security Yes<br />

4 Interfaces - Sprinklers Yes<br />

5 Interfaces - Mechanical Yes<br />

6 Interfaces - Lifts / escalators Yes<br />

7 Fire Telephones Yes<br />

Mechanical Systems & Components<br />

8 Plant Shutdown Yes<br />

9 Smoke Extract - General Yes<br />

10 Fire dampers Yes<br />

11 Smoke Dampers Yes<br />

12 Toilet Systems Yes<br />

Electrical Systems & Components<br />

13 Emergency Lighting - Level 3 Yes<br />

14 Emergency Lighting - Level 4 Yes<br />

15 Emergency Lighting - Level 5 Yes<br />

16 Fuel & Gas shut off/interfaces Yes<br />

17 Lighting Control Yes<br />

18 Security-Door Release Yes


<strong>Imperial</strong> <strong>College</strong> <strong>London</strong><br />

Guy Scadding<br />

BMS System - Progress Schedule<br />

Progress Updated. 23/07/2007 Issue No.<br />

MCC<br />

Location<br />

Plant Ref<br />

Factory Testing<br />

Held<br />

Approval<br />

Description of<br />

operations<br />

Points<br />

schedule<br />

MCC<br />

Factory Test<br />

Software<br />

Power<br />

Pre-com<br />

Control<br />

Network<br />

Commissioning<br />

Hardwire<br />

Software<br />

Test<br />

sheets<br />

received<br />

Functional<br />

Witnessing<br />

3rd Party<br />

interface<br />

Graphics<br />

Comments<br />

Level 3<br />

Non Essential Electrical Metering<br />

Level 4 Non Essential Electrical Metering<br />

Level 5<br />

Non Essential Electrical Metering<br />

Level 3<br />

Essential Electrical Metering<br />

Level 4<br />

Essential Electrical Metering<br />

Level 5<br />

Essential Electrical Metering<br />

SEF 6<br />

SEF7<br />

SEF8<br />

SEF9<br />

SEF10<br />

SEF11


<strong>Imperial</strong> <strong>College</strong> <strong>London</strong><br />

BDIC <strong>Fit</strong> <strong>Out</strong><br />

Mechanical - Progress Schedule<br />

Plant Ref<br />

Description<br />

Factory<br />

Test<br />

Progress Updated.<br />

Method<br />

Statement<br />

R'cvd<br />

Related MCC<br />

23/07/2007 Issue No.<br />

02/04/2007<br />

Panel<br />

Mechanical<br />

Test Sheets<br />

Pre-<br />

Duty % Witness Comments/Location<br />

Comm Power On Pre-<br />

Comm R'cvd Signed<br />

Comm<br />

existing Primary Air Plant N/A<br />

existing LTHW Plant N/A<br />

existing CHW Plant N/A<br />

Special Extract Fans<br />

SEF1<br />

SEF2<br />

SEF3<br />

SEF4<br />

SEF5<br />

SEF 6<br />

SEF7<br />

SEF8<br />

Fume Cupboard Level 4<br />

Ventilated Bench Level 3<br />

Ventilated Bench Level 3<br />

Ventilated Bench Level 3<br />

Fume Cupboard Level 5 (Radiation)<br />

Fume Cupboard Level 4<br />

Fume Cupboard Level 4<br />

Fume Cupboard Level 4<br />

Fume Cupboard Level 3<br />

Safety Cabinet Level 3<br />

Safety Cabinet Level 3<br />

Safety Cabinet Level 3<br />

Safety Cabinet Level 5 (Radiation)<br />

Fume Cupboard Level 5<br />

Fume Cupboard Level 5<br />

Fume Cupboard Level 5<br />

Fume Cupboard Level 4<br />

Fume Cupboard Level 4


<strong>Imperial</strong> <strong>College</strong> <strong>London</strong><br />

BDIC <strong>Fit</strong> <strong>Out</strong><br />

Mechanical - Progress Schedule<br />

Plant Ref<br />

Description<br />

Factory<br />

Test<br />

Progress Updated.<br />

Method<br />

Statement<br />

R'cvd<br />

Related MCC<br />

23/07/2007 Issue No.<br />

02/04/2007<br />

Panel<br />

Mechanical<br />

Test Sheets<br />

Pre-<br />

Duty % Witness Comments/Location<br />

Comm Power On Pre-<br />

Comm R'cvd Signed<br />

Comm<br />

Safety Cabinet Level 4<br />

Safety Cabinet Level 4<br />

SEF9<br />

Ventilated Bench Level 5<br />

SEF10<br />

Safety Cabinet Level 4<br />

Safety Cabinet Level 4<br />

Safety Cabinet Level 4<br />

Safety Cabinet Level 4<br />

Safety Cabinet Level 4<br />

SEF11<br />

Safety Cabinet Level 5<br />

Safety Cabinet Level 5<br />

Safety Cabinet Level 5<br />

Safety Cabinet Level 5<br />

Safety Cabinet Level 5<br />

Safety Cabinet Level 5<br />

Safety Cabinet Level 5


IMPERIAL COLLEGE<br />

BDIC<br />

18/01/08 Issue No.<br />

Plant Ref<br />

Description<br />

IQ<br />

Software<br />

POWER NETWORK 100% Pre- 100%<br />

ON ED Comm Comm<br />

Cooling<br />

Heating<br />

Test Sheets<br />

BA Graphic IC<br />

Return Supply<br />

Return Temp Supply temp Witness Points Witness R'cvd Signed<br />

Temp temp<br />

Comments/Location<br />

FAN COL UNITS<br />

FCU 3/01 LEVEL 3 Y Y Y Y 20.28 11.56 22.56 -0.04 Y Y<br />

FCU 3/02 LEVEL 3 Y Y Y Y 18.70 18.88 21.66 18.61 Y Y<br />

FCU3/03 LEVEL 3 Y Y Y Y 18.66 12.22 31.87 44.39 Y Y<br />

FCU3/04 LEVEL 3 Y Y Y Y 17.93 14.95 44.17 28.63 Y Y<br />

FCU3/05 LEVEL 3 Y Y Y Y 18.34 14.08 20.77 25.93 Y Y<br />

FCU3/06 LEVEL 3 Y Y Y Y 18.03 12.21 18.23 12.31 Y Y<br />

FCU3/07 LEVEL 3 Y Y Y Y 19.52 13.09 31.97 43.49 Y Y<br />

FCU3/08 LEVEL 3 Y Y Y Y 19.47 12.18 28.05 40.55 Y Y<br />

SUPPLY VAV<br />

VAV301 LEVEL 3 Y Y Y Y 20.70 1.00 -0.04 22.56 Y Y<br />

VAV302 LEVEL 3 Y Y Y Y 20.59 14.69 21.75 27.55 Y Y<br />

VAV303 LEVEL 3 Y Y Y Y 18.93 14.48 19.26 21.70 Y Y<br />

VAV304 LEVEL 3 Y Y Y Y 18.51 16.99 17.34 26.58 Y Y<br />

VAV305 LEVEL 3 Y Y Y Y 21.07 1.00 1.00 23.59 Y Y<br />

VAV306 LEVEL 3 Y Y Y Y 17.37 0.00 0.00 17.06 Y Y<br />

VAV307 LEVEL 3 Y Y Y Y 21.86 0.00 0.00 24.21 Y Y<br />

EXTRACT VAV<br />

VAV301E LEVEL 3 Y Y Y Y Y Y<br />

VAV302E LEVEL 3 Y Y Y Y Y Y<br />

VAV303E LEVEL 3 Y Y Y Y Y Y<br />

VAV304E LEVEL 3 Y Y Y Y Y Y<br />

VAV305E LEVEL 3 Y Y Y Y Y Y<br />

VAV306E LEVEL 3 Y Y Y Y Y Y<br />

SPECIAL EXTRACT VAV<br />

SEVAV301 LEVEL 3<br />

SEVAV302 LEVEL 3<br />

SEVAV303 LEVEL 3<br />

FAN COL UNITS<br />

FC401 Level 4 Y Y Y Y 17.04 12.08 29.04 42.69 Y Y<br />

FC402 Level 4 Y Y Y Y 18.80 12.45 27.58 25.46 Y Y<br />

FC403 Level 4 Y Y Y Y 20.88 22.61 23.11 26.73 Y Y<br />

FC404 Level 4 Y Y Y Y 21.40 19.80 26.19 32.15 Y Y<br />

FC405 Level 4 Y Y Y Y 20.87 18.10 22.26 21.37 Y Y<br />

FC406 Level 4 Y Y Y Y 21.00 16.54 22.83 26.72 Y Y<br />

FC407 Level 4 Y Y Y Y 20.64 20.36 22.90 25.14 Y Y<br />

FC408 Level 4 Y Y Y Y 20.96 18.53 22.97 24.84 Y Y<br />

FC409 Level 4 Y Y Y Y 0.00 1.00 Y Y<br />

FC410 Level 4 Y Y Y Y 17.71 13.83 22.40 22.85 Y Y<br />

FC411 Level 4 Y Y Y Y 16.77 12.23 20.84 22.13 Y Y<br />

FC412 Level 4 Y Y Y Y 20.95 18.16 22.86 21.29 Y Y<br />

FC413 Level 4 Y Y Y Y 21.05 18.58 23.10 26.14 Y Y<br />

FC414 Level 4 Y Y Y Y 20.84 20.24 23.83 25.30 Y Y<br />

FC415 Level 4 Y Y Y Y 21.00 15.47 22.85 25.18 Y Y<br />

FC416 Level 4 Y Y Y Y 20.98 18.05 22.95 23.51 Y Y<br />

FC417 Level 4 Y Y Y Y 21.14 20.55 23.87 28.74 Y Y<br />

FC418 Level 4 Y Y Y Y 21.07 18.76 23.04 21.18 Y Y<br />

FC419 Level 4 Y Y Y Y 20.54 15.45 23.95 27.53 Y Y<br />

FC420 Level 4 Y Y Y Y 19.62 14.61 23.05 24.54 Y Y<br />

FC421 Level 4 Y Y Y Y 20.75 17.61 25.69 32.13 Y Y<br />

FC422 Level 4 Y Y Y Y 20.97 19.44 22.94 23.32 Y Y<br />

FC423 Level 4 Y Y Y Y 20.97 16.98 22.54 19.96 Y Y<br />

FC424 Level 4 Y Y Y Y 20.98 19.57 25.59 30.68 Y Y<br />

SUPPLY VAV<br />

VAV401 Level 4 Y Y Y Y 20.15 19.71 26.54 27.45 Y Y<br />

VAV402 Level 4 Y Y Y Y 21.01 17.81 24.81 32.54 Y Y<br />

VAV403 Level 4 Y Y Y Y 20.28 18.43 27.60 34.69 Y Y<br />

VAV404 Level 4 Y Y Y Y Y Y<br />

VAV405 Level 4 Y Y Y Y 20.53 15.86 28.63 38.45 Y Y<br />

VAV406 Level 4 Y Y Y Y 20.59 16.54 27.09 38.32 Y Y<br />

VAV407 Level 4 Y Y Y Y 20.45 16.25 23.14 17.58 Y Y<br />

VAV408 Level 4 Y Y Y Y 21.65 22.19 21.99 33.47 Y Y<br />

VAV409 Level 4 Y Y Y Y 20.06 16.85 29.55 34.64 Y Y<br />

VAV410 Level 4 Y Y Y Y 20.51 18.94 28.44 43.23 Y Y<br />

VAV411 Level 4 Y Y Y Y 21.11 16.88 23.13 18.11 Y Y<br />

VAV412 Level 4 Y Y Y Y 21.59 22.08 26.10 42.34 Y Y<br />

VAV413 Level 4 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV414 Level 4 Y Y Y Y 20.53 1.00 Y Y<br />

VAV415 Level 4 Y Y Y Y 20.18 14.71 28.49 1.00 Y Y<br />

VAV416 Level 4 Y Y Y Y 20.38 19.05 28.95 40.35 Y Y<br />

VAV417 Level 4 Y Y Y Y 27.80 33.09 Y Y<br />

VAV418 Level 4 Y Y Y Y -28.21 18.08 -28.21 40.25 Y Y<br />

VAV419 Level 4 Y Y Y Y 0.00 17.94 0.00 36.08 Y Y<br />

VAV420 Level 4 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV421 Level 4 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV422 Level 4 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV423 Level 4 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV424 Level 4 Y Y Y Y 23.46 16.36 23.46 17.45 Y Y<br />

VAV425 Level 4 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV426 Level 4 Y Y Y Y 20.70 1.00 26.13 1.00 Y Y<br />

VAV427 Level 4 Y Y Y Y 20.32 1.00 28.25 1.00 Y Y<br />

VAV428 Level 4 Y Y Y Y Y Y<br />

EXTRACT VAV<br />

VAV401E Level 4 Y Y Y Y Y Y<br />

VAV402E Level 4 Y Y Y Y Y Y<br />

VAV403E Level 4 Y Y Y Y Y Y<br />

VAV504E Level 4 Y Y Y Y Y Y<br />

VAV405E Level 4 Y Y Y Y Y Y<br />

VAV406E Level 4 Y Y Y Y Y Y<br />

VAV407E Level 4 Y Y Y Y Y Y<br />

VAV408E Level 4 Y Y Y Y 0.00 0.00 Y Y<br />

VAV409E Level 4 Y Y Y Y Y Y<br />

VAV410E Level 4 Y Y Y Y Y Y<br />

VAV411E Level 4 Y Y Y Y Y Y<br />

VAV412E Level 4 Y Y Y Y Y Y<br />

VAV413E Level 4 Y Y Y Y Y Y<br />

VAV414E Level 4 Y Y Y Y Y Y<br />

VAV415E Level 4 Y Y Y Y Y Y<br />

VAV416E Level 4 Y Y Y Y Y Y<br />

VAV417E Level 4 Y Y Y Y Y Y<br />

VAV418E Level 4 Y Y Y Y Y Y<br />

VAV419E Level 4 Y Y Y Y Y Y<br />

VAV420E Level 4 Y Y Y Y Y Y<br />

Coolstore 20.78 0.00<br />

Lighting Control<br />

LC4-01 Level 4 Y Y Y Y Y Y<br />

LC4-02 Level 4 Y Y Y Y Y Y<br />

LC4-03 Level 4 Y Y Y Y Y Y<br />

LC4-04 Level 4 Y Y Y Y Y Y<br />

LC4-05 Level 4 Y Y Y Y Y Y<br />

LC4-06 Level 4 Y Y Y Y Y Y<br />

LC4-07 Level 4 Y Y Y Y Y Y<br />

LC4-08 Level 4 Y Y Y Y Y Y<br />

LC4-09 Level 4 Y Y Y Y Y Y<br />

LC4-10 Level 4 Y Y Y Y Y Y


LC4-11 Level 4 Y Y Y Y Y Y<br />

LC4-12 Level 4 Y Y Y Y Y Y<br />

LC4-13 Level 4 Y Y Y Y Y Y<br />

LC4-14 Level 4 Y Y Y Y Y Y<br />

LC4-15 Level 4 Y Y Y Y Y Y<br />

FAN COIL UNITS<br />

FC501 Level 5 Y Y Y Y 15.35 12.66 26.63 24.66 Y Y<br />

FC502 Level 5 Y Y Y Y 18.74 18.05 27.35 34.49 Y Y<br />

FC503 Level 5 Y Y Y Y 19.87 15.44 32.32 40.40 Y Y<br />

FC504 Level 5 Y Y Y Y 18.97 16.80 35.33 41.70 Y Y<br />

FC505 Level 5 Y Y Y Y 18.80 13.54 30.73 25.57 Y Y<br />

FC506 Level 5 Y Y Y Y 16.60 12.30 20.88 19.47 Y Y<br />

FC507 Level 5 Y Y Y Y 15.49 11.88 27.38 21.63 Y Y<br />

FC508 Level 5 Y Y Y Y 20.88 18.58 26.45 31.47 Y Y<br />

FC509 Level 5 Y Y Y Y 18.30 12.69 24.28 17.30 Y Y<br />

FC510 Level 5 Y Y Y Y 16.59 11.30 21.79 22.95 Y Y<br />

FC511 Level 5 Y Y Y Y 14.76 11.74 18.67 17.90 Y Y<br />

FC512 Level 5 Y Y Y Y 19.16 12.93 23.60 21.97 Y Y<br />

FC513 Level 5 Y Y Y Y 18.40 16.61 32.88 41.38 Y Y<br />

FC514 Level 5 Y Y Y Y 13.02 12.69 31.53 35.74 Y Y<br />

FC515 Level 5 Y Y Y Y 22.56 21.31 31.25 43.52 Y Y<br />

FC516 Level 5 Y Y Y Y 15.63 12.47 29.58 38.48 Y Y<br />

FC517 Level 5 Y Y Y Y 21.02 27.03 33.83 42.07 Y Y<br />

FC518 Level 5 Y Y Y Y 17.19 13.02 27.53 22.60 Y Y<br />

FC519 Level 5 Y Y Y Y 17.38 14.33 28.69 29.19 Y Y<br />

FC520 Level 5 Y Y Y Y 16.00 12.11 27.53 30.08 Y Y<br />

FC521 Level 5 Y Y Y Y 19.55 15.36 30.98 37.10 Y Y<br />

FC522 Level 5 Y Y Y Y 16.04 12.84 27.53 30.62 Y Y<br />

FC523 Level 5 Y Y Y Y -28.21 13.46 28.21 31.34 Y Y<br />

FC524 Level 5 Y Y Y Y 18.89 16.65 30.04 40.82 Y Y<br />

FCU525 Level 5 Y Y Y Y 32.15 43.40 32.15 43.40<br />

FCU526 Level 5 Y Y Y Y 16.31 22.41 22.41 16.31<br />

FCU527 Level 5 Y Y Y Y 18.87 24.64 24.64 18.87<br />

Supply VAV<br />

VAV501 Level 5 Y Y Y Y 17.84 0.00 -28.21 0.00 Y Y<br />

VAV502 Level 5 Y Y Y Y 20.54 0.00 28.89 0.00 Y Y<br />

VAV503 Level 5 Y Y Y Y 19.41 0.00 31.20 0.00 Y Y<br />

VAV504 Level 5 Y Y Y Y 14.45 -28.21 17.43 -28.21 Y Y<br />

VAV505 Level 5 Y Y Y Y 18.52 -28.21 27.14 -28.21 Y Y<br />

VAV506 Level 5 Y Y Y Y 21.06 0.00 30.00 0.00 Y Y<br />

VAV507 Level 5 Y Y Y Y 20.62 0.00 28.39 0.00 Y Y<br />

VAV508 Level 5 Y Y Y Y 20.70 0.00 32.57 0.00 Y Y<br />

VAV509 Level 5 Y Y Y Y 23.00 0.00 34.23 0.00 Y Y<br />

VAV510 Level 5 Y Y Y Y 19.17 -28.21 26.08 -28.21 Y Y<br />

VAV511 Level 5 Y Y Y Y 18.80 -28.21 25.55 -28.21 Y Y<br />

VAV512 Level 5 Y Y Y Y 18.48 0.00 26.78 0.00 Y Y<br />

VAV513 Level 5 Y Y Y Y 20.53 -0.04 28.27 -0.04 Y Y<br />

VAV514 Level 5 Y Y Y Y 18.93 -28.21 26.45 -28.21 Y Y<br />

VAV515 Level 5 Y Y Y Y 18.87 -28.21 30.30 -28.21 Y Y<br />

VAV516 Level 5 Y Y Y Y 22.26 -28.21 30.94 -28.21 Y Y<br />

VAV517 Level 5 Y Y Y Y 20.42 0.00 26.04 0.00 Y Y<br />

VAV518 Level 5 Y Y Y Y 20.37 -0.04 26.46 -0.04 Y Y<br />

VAV519 Level 5 Y Y Y Y 22.68 -28.21 30.53 -28.21 Y Y<br />

VAV520 Level 5 Y Y Y Y 19.26 0.00 30.99 0.00 Y Y<br />

VAV521 Level 5 Y Y Y Y 20.14 0.00 23.05 0.00 Y Y<br />

VAV522 Level 5 Y Y Y Y 19.39 -28.21 29.29 -28.21 Y Y<br />

VAV523 Level 5 Y Y Y Y 22.22 -28.21 31.13 -28.21 Y Y<br />

VAV524 Level 5 Y Y Y Y 19.30 -0.04 27.79 -0.04 Y Y<br />

VAV526 Level 5 Y Y Y Y 18.97 1.00 26.32 1.00 Y Y<br />

VAV527 Level 5 Y Y Y Y 18.47 -28.21 29.52 -28.21 Y Y<br />

VAV525 Level 5 Y Y Y Y 19.67 -0.04 27.30 -0.04 Y Y<br />

Extract VAV<br />

VAV501E Level 5 Y Y Y Y -28.21 0.00 -28.21 0.00 Y Y<br />

VAV502E Level 5 Y Y Y Y 23.46 0.00 29.52 0.00 Y Y<br />

VAV503E Level 5 Y Y Y Y 19.57 0.00 31.18 0.00 Y Y<br />

VAV504E Level 5 Y Y Y Y 15.20 0.00 19.26 0.00 Y Y<br />

VAV505E Level 5 Y Y Y Y 15.34 0.00 23.10 0.00 Y Y<br />

VAV506E Level 5 Y Y Y Y 21.40 0.00 30.53 0.00 Y Y<br />

VAV507E Level 5 Y Y Y Y -28.21 0.00 -28.21 0.00 Y Y<br />

VAV508E Level 5 Y Y Y Y 23.78 0.00 31.80 0.00 Y Y<br />

VAV509E Level 5 Y Y Y Y 19.77 0.00 29.43 0.00 Y Y<br />

VAV510E Level 5 Y Y Y Y 20.06 0.00 26.49 0.00 Y Y<br />

VAV511E Level 5 Y Y Y Y 17.93 0.00 26.71 0.00 Y Y<br />

VAV512E Level 5 Y Y Y Y 15.62 0.00 22.01 0.00 Y Y<br />

VAV513E Level 5 Y Y Y Y 20.72 0.13 29.55 0.00 Y Y<br />

VAV514E Level 5 Y Y Y Y 23.96 0.00 30.28 0.00 Y Y<br />

VAV515E Level 5 Y Y Y Y 21.59 0.00 25.86 0.00 Y Y<br />

VAV516E Level 5 Y Y Y Y 20.43 0.00 26.61 0.00 Y Y<br />

VAV517E Level 5 Y Y Y Y 20.46 0.00 22.16 0.00 Y Y<br />

VAV518E Level 5 Y Y Y Y 23.15 0.00 26.25 0.00 Y Y<br />

VAV519E Level 5 Y Y Y Y 19.25 0.00 33.64 0.00 Y Y<br />

VAV520E Level 5 Y Y Y Y -28.21 0.00 -28.21 0.00 Y Y<br />

VAV521E Level 5 Y Y Y Y 0.00 0.00 0.00 0.00 Y Y<br />

VAV522E Level 5 Y Y Y Y 17.80 0.00 29.60 0.00 Y Y<br />

Lighting Control<br />

LC5-01 Level 5 Y Y Y Y Y Y<br />

LC5-02 Level 5 Y Y Y Y Y Y<br />

LC5-03 Level 5 Y Y Y Y Y Y<br />

LC5-04 Level 5 Y Y Y Y Y Y<br />

LC5-05 Level 5 Y Y Y Y Y Y<br />

LC5-06 Level 5 Y Y Y Y Y Y<br />

LC5-07 Level 5 Y Y Y Y Y Y<br />

LC5-08 Level 5 Y Y Y Y Y Y<br />

LC5-09 Level 5 Y Y Y Y Y Y<br />

LC5-10 Level 5 Y Y Y Y Y Y<br />

LC5-11 Level 5 Y Y Y Y Y Y<br />

LC5-12 Level 5 Y Y Y Y Y Y<br />

SPECIAL EXTRACT VAV<br />

SEVAVR01E ROOF Y Y<br />

SEVAVR02E ROOF Y Y<br />

SEVAVR03E ROOF Y Y<br />

SEVAVR04E ROOF Y Y<br />

SEVAVR05E ROOF Y Y<br />

SEVAVR06E ROOF Y Y<br />

SEVAVR07E ROOF Y Y<br />

SEVAVR08E ROOF Y Y<br />

SEVAVR09E ROOF Y Y<br />

SEVAVR10E ROOF Y Y


<strong>Imperial</strong> <strong>College</strong> <strong>London</strong><br />

BDIC <strong>Fit</strong> <strong>Out</strong><br />

Mechanical FCU - Progress Schedule<br />

Progress Updated.<br />

03/12/07 Issue No.<br />

Plant Ref<br />

Description<br />

Factory<br />

Test<br />

method<br />

statement<br />

rcvd<br />

Related MCC<br />

Panel<br />

Pre-<br />

Pre-<br />

Comm Power On Comm<br />

Mechanical<br />

Test Sheets<br />

Duty % Witness<br />

Comm R'cvd Signed<br />

Comments/Location<br />

FAN COL UNITS<br />

ATRIUM<br />

FCU 3/01 LEVEL 3 n/a yes n/a n/a yes yes yes 111% yes yes yes<br />

FCU 3/02 LEVEL 3 n/a yes n/a n/a yes yes yes no no no Grille not <strong>Fit</strong>ted<br />

FCU3/03 LEVEL 3 n/a yes n/a n/a yes yes yes 115% yes yes yes<br />

FCU3/04 LEVEL 3 n/a yes n/a n/a yes yes no 103% no no no<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

FCU3/05 LEVEL 3 n/a yes n/a n/a yes yes yes 105% yes yes yes<br />

FCU3/06 LEVEL 3 n/a yes n/a n/a yes yes yes 102% yes yes yes<br />

FCU3/07 LEVEL 3 n/a yes n/a n/a yes yes yes no no no Grille not <strong>Fit</strong>ted<br />

FCU3/08 LEVEL 3 n/a yes n/a n/a yes yes no no no no<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

SUPPLY VAV<br />

VAV301 LEVEL 3 n/a yes n/a n/a yes<br />

VAV302 LEVEL 3 n/a yes n/a n/a yes<br />

VAV303 LEVEL 3 n/a yes n/a n/a yes<br />

VAV304 LEVEL 3 n/a yes n/a n/a yes<br />

VAV305 LEVEL 3 n/a yes n/a n/a yes<br />

VAV306 LEVEL 3 n/a yes n/a n/a yes<br />

VAV307 LEVEL 3 n/a yes n/a n/a yes<br />

EXTRACT VAV<br />

VAV301E LEVEL 3 n/a yes n/a n/a yes<br />

VAV302E LEVEL 3 n/a yes n/a n/a yes<br />

VAV303E LEVEL 3 n/a yes n/a n/a yes<br />

VAV304E LEVEL 3 n/a yes n/a n/a yes<br />

VAV305E LEVEL 3 n/a yes n/a n/a yes<br />

VAV306E LEVEL 3 n/a yes n/a n/a yes<br />

SPECIAL EXTRACT VAV<br />

SEVAV301 LEVEL 3 n/a yes n/a n/a yes<br />

SEVAV302 LEVEL 3 n/a yes n/a n/a yes<br />

SEVAV303 LEVEL 3 n/a yes n/a n/a yes<br />

FAN COL UNITS<br />

FC401 Level 4 n/a yes n/a n/a yes yes yes 106% yes yes yes<br />

FC402 Level 4 n/a yes n/a n/a yes yes yes 101% yes yes yes<br />

FC403 Level 4 n/a yes n/a n/a yes yes<br />

FC404 Level 4 n/a yes n/a n/a yes yes yes 109% yes yes yes<br />

FC405 Level 4 n/a yes n/a n/a yes yes<br />

FC406 Level 4 n/a yes n/a n/a yes yes yes 101% yes yes yes<br />

FC407 Level 4 n/a yes n/a n/a yes yes yes 105% yes yes yes<br />

FC408 Level 4 n/a yes n/a n/a yes yes yes 105% yes yes yes<br />

FC409 Level 4 n/a yes n/a n/a yes yes yes 104% yes yes yes<br />

FC410 Level 4 n/a yes n/a n/a yes yes yes 110% yes yes yes<br />

FC411 Level 4 n/a yes n/a n/a yes yes yes 105% yes yes yes<br />

FC412 Level 4 n/a yes n/a n/a yes yes<br />

FC413 Level 4 n/a yes n/a n/a yes yes yes 102% yes yes yes<br />

FC414 Level 4 n/a yes n/a n/a yes yes yes 109% yes yes yes<br />

FC415 Level 4 n/a yes n/a n/a yes yes yes 103% yes yes yes<br />

FC416 Level 4 n/a yes n/a n/a yes yes yes 107% yes yes yes<br />

FC417 Level 4 n/a yes n/a n/a yes yes yes 107% yes yes yes<br />

FC418 Level 4 n/a yes n/a n/a yes yes<br />

FC419 Level 4 n/a yes n/a n/a yes yes yes 113% yes yes yes<br />

FC420 Level 4 n/a yes n/a n/a yes yes yes 103% yes yes yes<br />

FC421 Level 4 n/a yes n/a n/a yes yes yes 109% yes yes yes<br />

FC422 Level 4 n/a yes n/a n/a yes yes yes 101% yes yes yes<br />

FC423 Level 4 n/a yes n/a n/a yes yes<br />

FC424 Level 4 n/a yes n/a n/a yes yes yes 107% yes yes yes<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

SUPPLY VAV<br />

VAV401 Level 4 n/a yes n/a n/a yes yes<br />

VAV402 Level 4 n/a yes n/a n/a yes yes<br />

VAV403 Level 4 n/a yes n/a n/a yes yes<br />

VAV404 Level 4 n/a yes n/a n/a yes yes<br />

VAV405 Level 4 n/a yes n/a n/a yes yes<br />

VAV406 Level 4 n/a yes n/a n/a yes yes<br />

VAV407 Level 4 n/a yes n/a n/a yes yes<br />

VAV408 Level 4 n/a yes n/a n/a yes yes<br />

VAV409 Level 4 n/a yes n/a n/a yes yes<br />

VAV410 Level 4 n/a yes n/a n/a yes yes<br />

VAV411 Level 4 n/a yes n/a n/a yes yes<br />

VAV412 Level 4 n/a yes n/a n/a yes yes<br />

VAV413 Level 4 n/a yes n/a n/a yes yes<br />

VAV414 Level 4 n/a yes n/a n/a yes yes<br />

VAV415 Level 4 n/a yes n/a n/a yes yes<br />

VAV416 Level 4 n/a yes n/a n/a yes yes<br />

VAV417 Level 4 n/a yes n/a n/a yes yes<br />

VAV418 Level 4 n/a yes n/a n/a yes yes<br />

VAV419 Level 4 n/a yes n/a n/a yes yes<br />

VAV420 Level 4 n/a yes n/a n/a yes yes<br />

VAV421 Level 4 n/a yes n/a n/a yes yes<br />

VAV422 Level 4 n/a yes n/a n/a yes yes<br />

VAV423 Level 4 n/a yes n/a n/a yes yes<br />

VAV424 Level 4 n/a yes n/a n/a yes yes<br />

VAV425 Level 4 n/a yes n/a n/a yes yes<br />

VAV426 Level 4 n/a yes n/a n/a yes yes<br />

VAV427 Level 4 n/a yes n/a n/a yes yes<br />

VAV428 Level 4 n/a yes n/a n/a yes yes<br />

EXTRACT VAV<br />

VAV401E Level 4 n/a yes n/a n/a yes yes<br />

VAV402E Level 4 n/a yes n/a n/a yes yes<br />

VAV403E Level 4 n/a yes n/a n/a yes yes<br />

VAV504E Level 4 n/a yes n/a n/a yes yes<br />

VAV405E Level 4 n/a yes n/a n/a yes yes<br />

VAV406E Level 4 n/a yes n/a n/a yes yes<br />

VAV407E Level 4 n/a yes n/a n/a yes yes<br />

VAV408E Level 4 n/a yes n/a n/a yes yes<br />

VAV409E Level 4 n/a yes n/a n/a yes yes<br />

VAV410E Level 4 n/a yes n/a n/a yes yes<br />

VAV411E Level 4 n/a yes n/a n/a yes yes<br />

VAV412E Level 4 n/a yes n/a n/a yes yes<br />

VAV413E Level 4 n/a yes n/a n/a yes yes


VAV414E Level 4 n/a yes n/a n/a yes yes<br />

VAV415E Level 4 n/a yes n/a n/a yes yes<br />

VAV416E Level 4 n/a yes n/a n/a yes yes<br />

VAV417E Level 4 n/a yes n/a n/a yes yes<br />

VAV418E Level 4 n/a yes n/a n/a yes yes<br />

VAV419E Level 4 n/a yes n/a n/a yes yes<br />

VAV420E Level 4 n/a yes n/a n/a yes yes<br />

SPECIAL EXTRACT VAV<br />

SEVAV401E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV402E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV403E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV404E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV405E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV406E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV407E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV408E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV409E Level 4 n/a yes n/a n/a yes yes<br />

SEVAV410E Level 4 n/a yes n/a n/a yes yes<br />

FAN COIL UNITS<br />

FC501 Level 5 n/a yes n/a n/a yes yes yes 102% yes yes yes<br />

FC502 Level 5 n/a yes n/a n/a yes yes yes 103% yes yes yes<br />

FC503 Level 5 n/a yes n/a n/a yes yes yes 104% yes yes yes<br />

FC504 Level 5 n/a yes n/a n/a yes yes yes 111% yes yes yes<br />

FC505 Level 5 n/a yes n/a n/a yes yes<br />

FC506 Level 5 n/a yes n/a n/a yes yes yes 106% yes yes yes<br />

FC507 Level 5 n/a yes n/a n/a yes yes yes 103% yes yes yes<br />

FC508 Level 5 n/a yes n/a n/a yes yes yes 106% yes yes yes<br />

FC509 Level 5 n/a yes n/a n/a yes yes yes 94% yes yes yes<br />

FC510 Level 5 n/a yes n/a n/a yes yes yes 97% yes yes yes<br />

FC511 Level 5 n/a yes n/a n/a yes yes yes 104% yes yes yes<br />

FC512 Level 5 n/a yes n/a n/a yes yes yes 100% yes yes yes<br />

FC513 Level 5 n/a yes n/a n/a yes yes<br />

FC514 Level 5 n/a yes n/a n/a yes yes yes 105% yes yes yes<br />

FC515 Level 5 n/a yes n/a n/a yes yes yes 106% yes yes yes<br />

FC516 Level 5 n/a yes n/a n/a yes yes yes 97% yes yes yes<br />

FC517 Level 5 n/a yes n/a n/a yes yes yes 111% yes yes yes<br />

FC518 Level 5 n/a yes n/a n/a yes yes<br />

FC519 Level 5 n/a yes n/a n/a yes yes<br />

FC520 Level 5 n/a yes n/a n/a yes yes yes 108% yes yes yes<br />

FC521 Level 5 n/a yes n/a n/a yes yes yes 108% yes yes yes<br />

FC522 Level 5 n/a yes n/a n/a yes yes yes 105% yes yes yes<br />

FC523 Level 5 n/a yes n/a n/a yes yes yes 109% yes yes yes<br />

FC524 Level 5 n/a yes n/a n/a yes yes yes 102% yes yes yes<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

slightly low volumes - fans at speed 2<br />

this is acceptable by Banyards<br />

slightly low volumes - fans at speed 2<br />

this is acceptable by Banyards<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

slightly low volumes - fans at speed 2<br />

this is acceptable by Banyards<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

Factor 1.29 - the diffusers on all<br />

these need sealing and reprovin<br />

Supply VAV<br />

VAV501 Level 5 n/a yes n/a n/a yes yes<br />

VAV502 Level 5 n/a yes n/a n/a yes yes<br />

VAV503 Level 5 n/a yes n/a n/a yes yes<br />

VAV504 Level 5 n/a yes n/a n/a yes yes<br />

VAV505 Level 5 n/a yes n/a n/a yes yes<br />

VAV506 Level 5 n/a yes n/a n/a yes yes<br />

VAV507 Level 5 n/a yes n/a n/a yes yes<br />

VAV508 Level 5 n/a yes n/a n/a yes yes<br />

VAV509 Level 5 n/a yes n/a n/a yes yes<br />

VAV510 Level 5 n/a yes n/a n/a yes yes<br />

VAV511 Level 5 n/a yes n/a n/a yes yes<br />

VAV512 Level 5 n/a yes n/a n/a yes yes<br />

VAV513 Level 5 n/a yes n/a n/a yes yes<br />

VAV514 Level 5 n/a yes n/a n/a yes yes<br />

VAV515 Level 5 n/a yes n/a n/a yes yes<br />

VAV516 Level 5 n/a yes n/a n/a yes yes<br />

VAV517 Level 5 n/a yes n/a n/a yes yes<br />

VAV518 Level 5 n/a yes n/a n/a yes yes<br />

VAV519 Level 5 n/a yes n/a n/a yes yes<br />

VAV520 Level 5 n/a yes n/a n/a yes yes<br />

VAV521 Level 5 n/a yes n/a n/a yes yes<br />

VAV522 Level 5 n/a yes n/a n/a yes yes<br />

VAV523 Level 5 n/a yes n/a n/a yes yes<br />

VAV524 Level 5 n/a yes n/a n/a yes yes<br />

VAV526 Level 5 n/a yes n/a n/a yes yes<br />

VAV527 Level 5 n/a yes n/a n/a yes yes<br />

Extract VAV<br />

VAV501E Level 5 n/a yes n/a n/a yes yes<br />

VAV502E Level 5 n/a yes n/a n/a yes yes<br />

VAV503E Level 5 n/a yes n/a n/a yes yes<br />

VAV504E Level 5 n/a yes n/a n/a yes yes<br />

VAV505E Level 5 n/a yes n/a n/a yes yes<br />

VAV506E Level 5 n/a yes n/a n/a yes yes<br />

VAV507E Level 5 n/a yes n/a n/a yes yes<br />

VAV508E Level 5 n/a yes n/a n/a yes yes<br />

VAV509E Level 5 n/a yes n/a n/a yes yes<br />

VAV510E Level 5 n/a yes n/a n/a yes yes<br />

VAV511E Level 5 n/a yes n/a n/a yes yes<br />

VAV512E Level 5 n/a yes n/a n/a yes yes<br />

VAV513E Level 5 n/a yes n/a n/a yes yes<br />

VAV514E Level 5 n/a yes n/a n/a yes yes<br />

VAV515E Level 5 n/a yes n/a n/a yes yes<br />

VAV516E Level 5 n/a yes n/a n/a yes yes<br />

VAV517E Level 5 n/a yes n/a n/a yes yes<br />

VAV518E Level 5 n/a yes n/a n/a yes yes<br />

VAV519E Level 5 n/a yes n/a n/a yes yes<br />

VAV520E Level 5 n/a yes n/a n/a yes yes<br />

VAV521E Level 5 n/a yes n/a n/a yes yes<br />

VAV522E Level 5 n/a yes n/a n/a yes yes<br />

SPECIAL EXTRACT VAV<br />

SEVAV501E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV502E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV503E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV504E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV505E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV506E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV507E Level 5 n/a yes n/a n/a yes yes<br />

SEVAV508E Level 5 n/a yes n/a n/a yes yes<br />

SPECIAL EXTRACT VAV<br />

SEVAVR01E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR02E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR03E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR04E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR05E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR06E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR07E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR08E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR09E ROOF n/a yes n/a n/a yes yes<br />

SEVAVR10E ROOF n/a yes n/a n/a yes yes


Progress Updated. 23/07/2007 Issue No.<br />

<strong>Imperial</strong> <strong>College</strong> <strong>London</strong><br />

BDIC <strong>Fit</strong> <strong>Out</strong><br />

Miscellaneous Systems - Progress Schedule<br />

Location<br />

Plant Ref<br />

Approval Factory Test Pre-com Commissioning Test<br />

Factory Testing<br />

sheets<br />

Description Points<br />

Held<br />

MCC Software Power Control Software Devices received<br />

of operations schedule<br />

Network<br />

System<br />

Witnessing<br />

Interface<br />

BMS<br />

With<br />

Graphic<br />

Others<br />

Comments<br />

Level 3<br />

Metering<br />

Gas<br />

Water<br />

Electric<br />

Fresh Air Dampers<br />

Sprinklers<br />

Pipework/Heads<br />

Level 4<br />

Metering<br />

Circ 3 Pipe Detector to be tested<br />

when fitted. General alarm to be<br />

added<br />

Gas<br />

Water<br />

Electric<br />

Roof leak Detection to be tested<br />

when fitted<br />

Fresh Air Dampers<br />

Sprinklers<br />

Pipework/Heads<br />

Level 5<br />

No underfloor Devices tested as<br />

no access<br />

Metering<br />

Gas<br />

Water<br />

Electric<br />

Fresh Air Dampers<br />

Sprinklers<br />

Pipework/Heads