35 Seal around light switch<br />

36 What is pipe cap at low level benching for?<br />

37 E529 -80 General freezers & Swipe reader on wrong side of wall. Should<br />

E530 -80 Brain Bank Freezers be at Write Up side<br />

38 Tidy paint and mastic around extract grilles<br />

39 Remove masking tape from screens<br />

40 Fixing batten for CO2 cylinders on mesh<br />

screen required<br />

41 E532 -20 Freezers Window leaking at both corners<br />

42 Trunking incomplete and damaged<br />

43 E535 Primary Laboratory Undershelf light damaged<br />

44 Remove dirty marks from ceiling tiles<br />

45 Touch up paint adjacent bench upstands<br />

46 Glassware shelves to be installed<br />

47 E533 Wash Up Room Glazed screen to lab damaged at corner<br />

48 Trunking dented in places<br />

49 E534 Bacteriology Remove paint from skirting trim<br />

50 E536 Radiation Lab Ceiling tile around fire detector damaged<br />

51 Touch up paint around light switch<br />

52 E538A Dark Room Room incomplete and not available for<br />

inspection<br />

53 E539 Liquid Nitrogen Extract ductwork to be painted. Currently<br />

incomplete<br />

54 Seal around door frame<br />

55 E540 Muscle Physiology Collar to neederman snorkel to be installed<br />

56 E540A Electro Physiology Make good light switch<br />

LAB AREAS GENERALLY<br />

57 Intumescent strips to doors missing or<br />

different colours<br />

58 Silicone seal between sinks and trespa<br />

worktops with clear silicone sealant<br />

59 Screws to peninsular bench shelving to be<br />

countersunk<br />

60 Fused spur switches on dado on peninsular<br />

benches installed at 90deg? Please confirm<br />

reason for this<br />

61 Some face plates of trunking misaligned and<br />

not clipping in properly<br />

62 RO Water Polisher shelves above sinks to<br />

be installed throughout<br />

63 CO2 Pipework to be painted<br />

OFFICE AREAS GENERALLY<br />

65 Fill gap between top of trunking and wall<br />

66 Remove paint from glass sidelights to doors<br />

67 Make good sealant between window frame<br />

and sill<br />

68 E519 Meeting Room Flooring uneven<br />

69 Sockets missing<br />

70 E596 Lobby & E597 WC Make good and refurbish when works<br />

complete<br />

LEVEL 4<br />

71 E421 Bin Store Make good around trap penetration through<br />

wall<br />

72 Seal around sockets<br />

73 Seal around pipe penetration through wall<br />

74 Reinstate missing screws to stainless steel<br />

panel<br />

75 E422 HPLC Room General clean required<br />

76 Intumescent seal missing from door<br />

<strong>London</strong> Projects:2200-2299 series:2288 - BDFO <strong>HMBD</strong> <strong>0601</strong>:2288 Supervisor:2288 Defects:2288 Defects Report 001 120208.doc Page 2 of 3