13. INFRASTRUCTURE &<br />

LOGISTICS<br />

Opening Ceremony<br />

Closing Ceremony<br />

Closing Party:<br />

A (private) festive end to the elite sports week for athletes,<br />

companions and Festival Makers. A short ceremonial programme<br />

in line with the guidelines laid down in the EOC Charter<br />

followed by a party with music, appetizers and refreshments.<br />

3,300 athletes and officials<br />

1,500 Festival Makers<br />

•<br />

350 guests (national and international)<br />

Flag parade with 49 delegates from all participating countries<br />

Speeches by EYOF Utrecht 2013 Chair Rinda den Besten,<br />

EOC President Patrick Hickey Mayor Aleid Wolfsen of Utrecht<br />

and Mayor George Ugulava of Tbilisi<br />

• Extinguishing of the Flame, by CEO EYOF Utrecht 2013<br />

Henny Smorenburg and Tournament Director Pieter van<br />

den Hoogenband.<br />

• Performance by Charmplay, singing the official EYOF<br />

song Gold<br />

DJ Skyradio<br />

Free snack for athletes and Festival Makers<br />

• Separate VIP tent (300 guests) with small stand for approx.<br />

70 people<br />

Medal Ceremony<br />

Medal Ceremonies<br />

Organising appealing medal ceremonies in line with EOC<br />

guidelines. All ceremonies had to proceed swiftly and perfectly<br />

to do justice to the athletes’ achievements.<br />

690 medals (225 gold, 225 silver, 240 bronze)<br />

112 medal presentations<br />

49 national anthems<br />

• 7 sets of 49 national flags<br />

9 persons in charge of the ceremonies (one per sport)<br />

73 Festival Makers (who collectively worked 283 ‘shifts’)<br />

Observer programme<br />

Organising an observer programme within the set budget to give<br />

future organisers the opportunity to learn from the organisation<br />

of the EYOF Utrecht 2013 and thus transfer the knowledge on<br />

how to organise an EOC event.<br />

• 2 days<br />

25 observers of 4 foreign organisations (EYOF Vorarlberg-<br />

Liechtenstein 2015, EYOF Tbilisi 2015, EYOF Gyor 2017,<br />

NOC Turkey)<br />

• 8 participants of Dutch organisations (Municipality of Utrecht,<br />

EUG Rotterdam 2014)<br />

Tour of 7 venues and 2 Olympic Villages<br />

14 presentations<br />

• Contribution of €195 per participant<br />

NUMBERS OF INTERNATIONAL AND NATIONAL VIP GUESTS<br />

International guests: 551<br />

NOC: 497<br />

IOC: 3<br />

EOC: 22<br />

Observers: 29<br />

National guests: 574<br />

Opening Ceremony: 102<br />

Opening and matches: 372<br />

Medal Ceremony presenters: 100<br />

OBJECTIVE<br />

The sports venues were one of the most important showpieces<br />

of EYOF Utrecht 2013. Therefore it was of high importance, that<br />

they were well organised and had the right look and feel.<br />

PROCESS<br />

A contract was drawn up between EYOF Utrecht 2013 and the<br />

individual Dutch sports federations. It stipulated that the sports<br />

federations were responsible for organising the sports related<br />

aspects and EYOF for the facilities and layout. The sports<br />

federations were asked to provide a full overview of the materials<br />

present and required per sport and of the layout of the venue<br />

at an early stage.<br />

By centrally purchasing the bulk of the materials an element<br />

of unity was created between the venues when it came to<br />

equipment and image. It also led to clear savings.<br />

FACTS AND FIGURES<br />

500 motor hoists<br />

2 km of truss<br />

1 km of 10m curtains<br />

1 km of boarding /branding<br />

40,000 kg of steel for the construction of platforms<br />

25,000 stand seats (incl. opening)<br />

500 sports ground floodlights<br />

40,000 carpet tiles<br />

1.5 km of platform skirting<br />

30 line array sound systems<br />

140 channel mixing panel for the opening show<br />

16 temporary changing rooms incl. showers<br />

2 complete boiler houses for the hot water supply<br />

6,000 m2 of mobile sports flooring<br />

10,000 m2 of blind floors<br />

2,000 m2 of platforms<br />

• 400 walkie-talkies<br />

26 27