08.03.2014 Views

three phase lcd multifunction meters

three phase lcd multifunction meters

three phase lcd multifunction meters

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

l<br />

Powering the instrument you can see the following page<br />

Introduction page.<br />

RAE<br />

PowerOn<br />

Ready<br />

TRMS<br />

Prog<br />

Maintaining pressure on the front button you will see the<br />

para<strong>meters</strong> displayed on this page<br />

Releasing the button the measurements will be shown<br />

27.12.04<br />

1RAEM<br />

OPERATION<br />

22.0<br />

Software date revision and version.<br />

Update<br />

First powering page. A different page can be selected within the available page present on this type.<br />

At first powering the display shows automatically this page<br />

RAE<br />

TRMS<br />

22.0<br />

Program page.Entering in this page and maintaining pressed the button, it is possible to program the para<strong>meters</strong> of<br />

instruments. “Prog” flashes until to enter in program <strong>phase</strong>. (<br />

* )<br />

3V: F:<br />

I1 I2 I3<br />

Medium <strong>phase</strong> voltage (L1+L2+L3)/3<br />

Current I1, I2, I3<br />

Frequency<br />

Maintaining pressure on the front button you will see the<br />

para<strong>meters</strong> displayed on this page.<br />

Releasing the button the measurements will be shown<br />

Maintaining pressure on the front button you will see the<br />

para<strong>meters</strong> displayed on this page.<br />

Releasing the button the measurements will be shown<br />

Vp V12 V23 V31<br />

A I1 I2 I3<br />

Vn V1 V2 V3<br />

A I1 I2 I3<br />

Phase-<strong>phase</strong> voltage L1-L2, L2-L3, L3-L1<br />

Current I1, I2, I3<br />

Phase-neutral voltage L1-N, L2-N, L3-N<br />

Current I1, I2, I3<br />

To enter in program <strong>phase</strong>, see “OPERATION” (red rectangle)<br />

The sliding of “programmation para<strong>meters</strong>” pages is automatic.<br />

To intervene on one or more of these pages it is enough to press the button and start with a serie of short pressure and releases to increase the numbers one by<br />

one; to fasr forward maintain pressure on the front button.<br />

Once selected the needed number, release the button and the actual page will advance to the next. At the end of the forecasted pages the instrument will go itself<br />

to “measurement visualization” mode and, in case of any modification madde, will save the new values in the permanent memory.<br />

(<br />

* ) Program Program mode page.<br />

mode<br />

Selection of current transformer ratio.<br />

VT Set<br />

231<br />

CONFIGURATION SELECTION MENU<br />

End scale, nominal measurement ph-n. Calibrated in factory. This page is used on models with voltage transformer only.<br />

Mathematical medium n° of samples, practically it is the stability filter of the measurements. Calibrated in<br />

factory. In case of not stabilized measurement, increase the number.<br />

Default<br />

Page<br />

CT Set<br />

1000<br />

Average<br />

Choose of first page at first powering. “Power On Ready” page selected in factory is useful when it is important to know<br />

if an electric interrumption occoured.<br />

CONNECTION DIAGRAM<br />

3<br />

N<br />

L3<br />

L2<br />

L1<br />

L<br />

y<br />

p p<br />

u<br />

r S<br />

e<br />

N<br />

P1<br />

S1<br />

P2<br />

S2<br />

P1<br />

S1<br />

P2<br />

S2<br />

P1<br />

S1<br />

P2<br />

S2<br />

L O A D<br />

N<br />

L3<br />

L2<br />

L1<br />

(+)<br />

w<br />

o<br />

P<br />

17 18 21 22 23 24<br />

6 8 10 12<br />

V<br />

N<br />

L1 L2 L3<br />

89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!