09.03.2014 Views

BRT Standard - ITDP | Institute for Transportation and Development ...

BRT Standard - ITDP | Institute for Transportation and Development ...

BRT Standard - ITDP | Institute for Transportation and Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The <strong>BRT</strong> <strong>St<strong>and</strong>ard</strong> Version 1.0<br />

24<br />

TransMilenio, Bogotá, Colombia<br />

was the first to introduce<br />

passing lanes at stations,<br />

increasing the system’s capacity.<br />

Passing Lanes at Stations<br />

4 points maximum<br />

Passing lanes at station stops are critical to allow<br />

both express <strong>and</strong> local services. They also allow<br />

stations to accommodate a high volume of buses<br />

without getting congested from backed-up buses<br />

waiting to enter. While more difficult to justify in<br />

low-dem<strong>and</strong> systems, passing lanes are a good<br />

investment, yielding considerable passenger<br />

travel time savings <strong>and</strong> allowing <strong>for</strong> flexibility<br />

as the system grows.<br />

passing lanes<br />

points<br />

At every trunk station 4<br />

At 75% of trunk stations 3<br />

At 50% of trunk stations 2<br />

At 25% of trunk stations 1<br />

At no trunk stations 0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!