BRT Standard - ITDP | Institute for Transportation and Development ...
BRT Standard - ITDP | Institute for Transportation and Development ...
BRT Standard - ITDP | Institute for Transportation and Development ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The <strong>BRT</strong> <strong>St<strong>and</strong>ard</strong> Version 1.0<br />
24<br />
TransMilenio, Bogotá, Colombia<br />
was the first to introduce<br />
passing lanes at stations,<br />
increasing the system’s capacity.<br />
Passing Lanes at Stations<br />
4 points maximum<br />
Passing lanes at station stops are critical to allow<br />
both express <strong>and</strong> local services. They also allow<br />
stations to accommodate a high volume of buses<br />
without getting congested from backed-up buses<br />
waiting to enter. While more difficult to justify in<br />
low-dem<strong>and</strong> systems, passing lanes are a good<br />
investment, yielding considerable passenger<br />
travel time savings <strong>and</strong> allowing <strong>for</strong> flexibility<br />
as the system grows.<br />
passing lanes<br />
points<br />
At every trunk station 4<br />
At 75% of trunk stations 3<br />
At 50% of trunk stations 2<br />
At 25% of trunk stations 1<br />
At no trunk stations 0