13.03.2014 Views

1992-1996 Dodge Viper RT/10 - Paxton Superchargers

1992-1996 Dodge Viper RT/10 - Paxton Superchargers

1992-1996 Dodge Viper RT/10 - Paxton Superchargers

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 14<br />

FINAL CHECK<br />

14. FINAL CHECK<br />

A. Reconnect the battery.<br />

B. Make sure that all oil feed and oil drain fittings<br />

are connected and tight and that the<br />

engine is filled with factory specified oil.<br />

C. Make sure that the radiator and reservoir are<br />

full.<br />

D. Verify that the power steering reservoir is at<br />

the “full cold” level.<br />

E. Temporarily install a fuel pressure gauge<br />

onto the -6 fitting on the intake manifold.<br />

Cycle the fuel pump several times by turning<br />

the ignition, then off again. Check all<br />

fuel system hose connections and fuel injectors<br />

for leakage.<br />

F. With key on, make sure the cooler water<br />

pump is operating and that water is flowing<br />

through the surge tank. Fill the surge tank as<br />

required. Toggle the water pump several<br />

times to get as much air out of the system as<br />

possible. Do not run the water pump for<br />

extended periods (30 seconds or more) without<br />

water flow. Fill the cooler surge tank frequently<br />

until the level stabilizes.<br />

G. With the engine running, turn the steering<br />

wheel in both directions. Check the power<br />

steering hose connections for leakage.<br />

H. Engine detonation manifests itself as a<br />

metallic rattling sound emanating from the<br />

engine, usually at full throttle. It can quickly<br />

destroy an engine. If detonation is detected,<br />

discontinue hard use until the problem is<br />

fixed.<br />

I. Monitor the fuel pressure at full throttle. The<br />

fuel pressure should reach <strong>10</strong>0 psi at 6000<br />

rpm. If this fuel pressure is not achieved,<br />

add a spring retainer under the FCU spring<br />

or increase the FCU calibration (e.g. replace<br />

6:1 with 8:1).<br />

J. Read the “Street Supercharger System<br />

Owner’s Manual” and return the warranty<br />

registration form within thirty days of purchasing<br />

your supercharger system.<br />

14-1<br />

P/N: 4809646<br />

©2006 <strong>Paxton</strong> Automotive<br />

All Rights Reserved, Intl. Copr. Secured<br />

17FEB06 v2.0 92-96<strong>Viper</strong>(4809646v2.0)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!