Download the catalogue - legrand
Download the catalogue - legrand
Download the catalogue - legrand
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
underfloor power distribution systems<br />
Installation principle<br />
All dimensions are in mm<br />
End View A<br />
A<br />
75 250 109<br />
Ø 25<br />
46<br />
47<br />
End View B<br />
B<br />
118 68<br />
32<br />
15<br />
65<br />
Feeds<br />
Busbar feed box<br />
Integral fixing<br />
brackets 1.2 m<br />
average<br />
spacing<br />
Busbar<br />
Tap off<br />
Busbar connector<br />
End View<br />
Integral fixing bracket<br />
fixing centres<br />
92<br />
1<br />
Fix track feed to surface first<br />
Busbar feed box<br />
Direction of<br />
track run<br />
Make chalk line to<br />
align busbar lengths<br />
2<br />
Remove<br />
dust cover<br />
Integral busbar<br />
connector<br />
Busbar<br />
Push down<br />
Busbar feed box<br />
Make sure busbar<br />
connector clips are<br />
fully pushed home on<br />
both sides of busbar<br />
Busbar &<br />
integral busbar<br />
connector<br />
3<br />
Remove dust cover<br />
before connecting<br />
busbar connector<br />
First busbar<br />
fixing bracket<br />
Busbar outlets<br />
reusable plastic<br />
dust covers<br />
4<br />
Pull out busbar fixing<br />
bracket lugs and<br />
screw fix on both sides<br />
All integral busbar fixing<br />
brackets must be fixed to surface<br />
at 1.2 m fixing centres from first<br />
bracket on each busbar length<br />
16