29.03.2014 Views

Download the catalogue - legrand

Download the catalogue - legrand

Download the catalogue - legrand

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

underfloor power distribution systems<br />

Installation principle<br />

All dimensions are in mm<br />

End View A<br />

A<br />

75 250 109<br />

Ø 25<br />

46<br />

47<br />

End View B<br />

B<br />

118 68<br />

32<br />

15<br />

65<br />

Feeds<br />

Busbar feed box<br />

Integral fixing<br />

brackets 1.2 m<br />

average<br />

spacing<br />

Busbar<br />

Tap off<br />

Busbar connector<br />

End View<br />

Integral fixing bracket<br />

fixing centres<br />

92<br />

1<br />

Fix track feed to surface first<br />

Busbar feed box<br />

Direction of<br />

track run<br />

Make chalk line to<br />

align busbar lengths<br />

2<br />

Remove<br />

dust cover<br />

Integral busbar<br />

connector<br />

Busbar<br />

Push down<br />

Busbar feed box<br />

Make sure busbar<br />

connector clips are<br />

fully pushed home on<br />

both sides of busbar<br />

Busbar &<br />

integral busbar<br />

connector<br />

3<br />

Remove dust cover<br />

before connecting<br />

busbar connector<br />

First busbar<br />

fixing bracket<br />

Busbar outlets<br />

reusable plastic<br />

dust covers<br />

4<br />

Pull out busbar fixing<br />

bracket lugs and<br />

screw fix on both sides<br />

All integral busbar fixing<br />

brackets must be fixed to surface<br />

at 1.2 m fixing centres from first<br />

bracket on each busbar length<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!