14.3 Termination for Insolvency:<br />
14.3.1. <strong>BSNL</strong> may at any time terminate the Contract by giving written notice to the Contractor,<br />
without compensation to Contractor, if the contractor becomes bankrupt or otherwise<br />
insolvent as declared by the competent court provided that such termination will not prejudice<br />
or affect any right or action or remedy which has accrued or will thereafter to <strong>BSNL</strong>.<br />
14.4 Optional Termination by <strong>BSNL</strong> (Other than due to default of the Contractor )<br />
14.4.1. <strong>BSNL</strong> may, at any time, at its option cancel and terminate this contract by written notice to<br />
the contractor, in which event the contractor shall be entitled to payment for the work done up<br />
to the time of such cancellation and a reasonable compensation in accordance with the<br />
contract prices for any additional expenses already incurred for balance work exclusive of<br />
purchases and/or whole of material, machinery and other equipment for use in or in respect<br />
of the work.<br />
14.4.2 In the event of the termination of the contract, the contractor shall forthwith clear the site of<br />
all the contractor’s materials, machinery and equipments and hand over possession of the<br />
work / operations concerned to <strong>BSNL</strong> or as <strong>BSNL</strong> may direct.<br />
14.4.3 <strong>BSNL</strong> may, at its option, cancel or omit the execution of one or more items of work under<br />
this contract and may cancel part of such items without any compensation whatsoever to the<br />
contractor.<br />
14.5. Issuance of Notice.<br />
14.5.1 The Assistant General Manager/Divisional Engineer in-charge of work shall issue show<br />
cause notice as and when required, giving details of lapses, violation of terms and conditions<br />
of the contract, wrongful delays or suspension of work or slow progress to the contractor<br />
directing the contractor to take corrective action. A definite time schedule for corrective<br />
action shall be mentioned in the show cause notice. If the contractor fails to take corrective<br />
action within the stipulated time frame, the Assistant General Manager/Divisional Engineer<br />
in-charge shall issue a final notice to the contractor along with a detailed report to the<br />
competent authority who had accepted the contract.<br />
14.5.2 The final notice for rescission of contract to the contractor shall expressly state the precise<br />
date and time from which the rescission would become effective. The following safe guards<br />
shall be taken while issuing the final notice.<br />
During the period of service notice and its effectiveness, the contractor should not be allowed<br />
to remove from the site any material / equipment belonging to <strong>BSNL</strong><br />
The contractor shall give in writing the tools and plants he would like to take away/remove<br />
from the site. Such of the materials as belongs to him and which may not be required for<br />
future execution of balance work may be allowed by the Assistant General<br />
Manager/Divisional Engineer in-charge of work to be removed with proper records<br />
No new construction beneficial to the contractor shall be allowed.<br />
Adequate security arrangement by <strong>BSNL</strong> in replacement of the contractor watch and ward<br />
shall be made forthwith. Expenses on this account are recoverable from the security deposit<br />
or any amount due to the contractor.<br />
15. INDEMNITIES:<br />
15.1 The contractor shall at all times hold <strong>BSNL</strong> harmless and indemnify from against all action,<br />
suits, proceedings, works, cost, damages, charges claims and demands of every nature and<br />
descriptions, brought or procured against <strong>BSNL</strong>, its officers and employees and forthwith upon<br />
demand and without protest or demur to pay to <strong>BSNL</strong> any and all losses and damages and cost<br />
Page 30 of 80<br />
Signature of Bidder with seal