31.03.2014 Views

BID DOCUMENT - Chennai Telephones - BSNL

BID DOCUMENT - Chennai Telephones - BSNL

BID DOCUMENT - Chennai Telephones - BSNL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10. TOOLS AND PLANTS<br />

The Contractor shall provide at his own cost all tools, plants appliances, implements etc. required<br />

for proper execution of works. The contractor shall also supply without charge the requisite<br />

number of persons with the means and materials necessary for the purpose of setting out works,<br />

counting, weighing and assisting the measurements for examination at any time and from time to<br />

time. The contractor shall be responsible to make all arrangements, at his own cost for dewatering<br />

of trenches/ducts and de-gasification of the ducts before carrying out the work. The<br />

contractor shall also be responsible to make arrangements, at his own cost, for water required for<br />

carrying of works at sites including curing of CC/RCC works. Failing his so doing, the same may<br />

be provided by the Engineer-in-charge at the expense of the contractor and the expenses shall be<br />

deducted from any money due to the contractor under this contract or otherwise.<br />

Page 42 of 80<br />

Signature of Bidder with seal

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!