10.04.2014 Views

Douglas J. Tobin - ARC International Associates Inc

Douglas J. Tobin - ARC International Associates Inc

Douglas J. Tobin - ARC International Associates Inc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ARC</strong> <strong>International</strong> <strong>Associates</strong> <strong>Inc</strong>.<br />

Architects Engineers Planners<br />

14 Sand Hill Road<br />

Sandy Hook, CT<br />

USA 06482-1624<br />

Airport Baggage Handling Systems & Terminals<br />

<strong>ARC</strong> <strong>International</strong> <strong>Associates</strong> <strong>Inc</strong>. - <strong>Douglas</strong> J. <strong>Tobin</strong> Architects Engineers Planners<br />

specialists in Airport Facility Project Development have been involved with over 40<br />

Airport Baggage Handling Systems for Airport Passenger Terminals. We have<br />

performed the full scope of services required for the Master Planning, Design<br />

Development, Construction Documents and Construction Implementation Management<br />

of the Baggage Handling Systems project works. The following provides an upper<br />

management outline of the project development process.<br />

<strong>ARC</strong> divides a Baggage Handling Systems Project into the following Program<br />

Development categories:<br />

Part 1 - Master Planning, Concept Design, Numerical Analysis - Phase 1 Report<br />

Part 2 - Baggage Handling Design Development – CAD Concept Drawing Development<br />

Part 3 - Architectural Engineering Infrastructure Definitions for the Baggage Handling<br />

Systems<br />

Part 4 – Baggage Handling Systems Engineering – CAD Specification Drawings<br />

Part 5 – Baggage Handling Systems Specifications – Contract Documents<br />

Part 6 - Tender Evaluation, Contract Negotiation and Award<br />

Part 7 - Project Implementation Management<br />

Our expertise includes the following main components of Baggage Handling Systems<br />

Passenger Terminal development:<br />

! Project Program Development<br />

! Overall Baggage Handling System Site and Facility Master Planning<br />

! Baggage Handling Systems Facility Planning, Cost & Numerical Analysis<br />

! Baggage Handling Systems Design and Program Management<br />

! Structural, Mechanical, Electrical Engineering for the BHS<br />

! Fire Protection and Security Systems Engineering for the BHS<br />

! Baggage Handling Systems Engineering Contract Documents<br />

! Security/Customs X-ray & Inspection Systems Design Development<br />

The following are some sample projects executed by <strong>ARC</strong>:<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 1 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!