<strong>ARC</strong> <strong>International</strong> <strong>Associates</strong> <strong>Inc</strong>.<br />

This information is compiled into the Preferred Alternative Analysis Report. This report<br />

shall document the Lifecycle Cost of the concept selected for development.<br />

<strong>ARC</strong> will present the preferred concept, data and evaluation criteria to the team for final<br />

comment the PANYNJ, its stakeholders and the TSA for evaluation, comments and<br />

finally acceptance. The preferred concept will include:<br />

• Equipment Concept Layout Drawings<br />

• Projected Budget<br />

• Preliminary Phasing Plan to evaluate potential risk and disruption to operations<br />

• Projected Operations Staffing – Airport and TSA personnel requirement to<br />

operate the facility<br />

• Performance Against Design Specifications – Score the Recommended Design<br />

against the Key Specifications defined in the beginning of Part 1.<br />

Once the Stakeholder Team is satisfied, <strong>ARC</strong> will present the Part 1 design output to<br />

the TSA in the form of the Basis of Design Report:<br />

• Detailed Program Requirements<br />

o Planning Assumptions, Boundaries and Limitations<br />

o High Level Description of Operations<br />

o Preferred Alternative Analysis Against Requirements<br />

o Assumed Equipment and Screening Methodology<br />

• High-Level Flow Model<br />

• Concept Plans<br />

• Phasing and Constructability Plan<br />

• Rough Order of Magnitude (ROM) estimate of construction, operating and<br />

maintenance cost<br />

• Documentation of Stakeholder review and approval<br />

• Preliminary Project Schedule<br />

Per the BSIS document, the TSA will provide the following data in response:<br />

• Preliminary Indication of Equipment Type to be Supplied<br />

• Formal Review and Approval / Rejection<br />

2.2.2 Design Part Two<br />

Part Two of the Design project includes the Schematic and Detailed Design<br />

development of the preferred concept. In this phase, <strong>ARC</strong> will produce the baggage,<br />

safety and construction specifications and documentation, as well as the complete<br />

schematic design and phasing plans. This portion of the design project is an iterative<br />

process of design documentation submittal to PANYNJ for review and approval, and<br />

then submittal to the TSA.<br />

Please note that the submittal documents defined in these sections are specific to the<br />

TSA requirements for the baggage system. The approval design packages for PANYNJ<br />

will include non-TSA information, and it will be omitted for the TSA submittal.<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 7 of 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!