<strong>ARC</strong> <strong>International</strong> <strong>Associates</strong> <strong>Inc</strong>.<br />

• Screening Equipment<br />

o Equipment Performance Specifications<br />

o Equipment Installation Guidelines<br />

• Outline of Controls Reporting for the Baggage System<br />

• Updated Estimate of Construction Costs<br />

• Inventory of Decommissioned TSA Screening Equipment that will be available<br />

after the system implementation<br />

• Documentation of Stakeholder Approval<br />

After Review of the 30% Design Package, the TSA will respond with the following:<br />

• Updated indication of equipment provided<br />

• Formal acceptance / rejection<br />

2.2.2.4 70% Design Review<br />

The solution is further defined in a 70% design meeting, first with Stakeholders, and<br />

then a formal submittal to the TSA.<br />

70% Review Package Contents:<br />

• Updated Basis of Design Report (see Section 2.2.1.5)<br />

• Updated Dynamic Simulation Report and AVI file<br />

• 70% Design Plans<br />

o Demolition<br />

o Construction<br />

o Phasing<br />

o Elevation Views and Cross Sections<br />

• Preliminary Contingency Plan in case of:<br />

o Screening equipment failure<br />

o Conveying Equipment Failure<br />

o Loss of utility power<br />

o Unplanned surges in throughput demand<br />

• Specifications<br />

o Construction Documents<br />

o Baggage System Specifications<br />

o Design Performance Requirements<br />

o TSA Commissioning Requirements<br />

o Baggage System Reporting Requirements<br />

• Draft Configuration Management Plan<br />

o Screening System Boundaries<br />

o Areas of Responsibility (PANYNJ, Airlines, TSA)<br />

o Change Management documentation procedures<br />

o Documentation for Site Specific Test Plan<br />

• Evidence of Stakeholder Approval<br />

After Review of the 70% Design Package, the TSA will respond with the following:<br />

• Updated indication of equipment provided<br />

• Formal acceptance / rejection<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />