<strong>ARC</strong> <strong>International</strong> <strong>Associates</strong> <strong>Inc</strong>.<br />
• Screening Equipment<br />
o Equipment Performance Specifications<br />
o Equipment Installation Guidelines<br />
• Outline of Controls Reporting for the Baggage System<br />
• Updated Estimate of Construction Costs<br />
• Inventory of Decommissioned TSA Screening Equipment that will be available<br />
after the system implementation<br />
• Documentation of Stakeholder Approval<br />
After Review of the 30% Design Package, the TSA will respond with the following:<br />
• Updated indication of equipment provided<br />
• Formal acceptance / rejection<br />
2.2.2.4 70% Design Review<br />
The solution is further defined in a 70% design meeting, first with Stakeholders, and<br />
then a formal submittal to the TSA.<br />
70% Review Package Contents:<br />
• Updated Basis of Design Report (see Section 2.2.1.5)<br />
• Updated Dynamic Simulation Report and AVI file<br />
• 70% Design Plans<br />
o Demolition<br />
o Construction<br />
o Phasing<br />
o Elevation Views and Cross Sections<br />
• Preliminary Contingency Plan in case of:<br />
o Screening equipment failure<br />
o Conveying Equipment Failure<br />
o Loss of utility power<br />
o Unplanned surges in throughput demand<br />
• Specifications<br />
o Construction Documents<br />
o Baggage System Specifications<br />
o Design Performance Requirements<br />
o TSA Commissioning Requirements<br />
o Baggage System Reporting Requirements<br />
• Draft Configuration Management Plan<br />
o Screening System Boundaries<br />
o Areas of Responsibility (PANYNJ, Airlines, TSA)<br />
o Change Management documentation procedures<br />
o Documentation for Site Specific Test Plan<br />
• Evidence of Stakeholder Approval<br />
After Review of the 70% Design Package, the TSA will respond with the following:<br />
• Updated indication of equipment provided<br />
• Formal acceptance / rejection<br />
Phone: 001-203-426-0146<br />