Why Build Green? – By showing interest in Green Building, Milwaukee County Public<br />

Works already understands the positive benefits of responsible building. Though initial<br />

building cost may be affected, the lifecycle benefits of Green Building make it a great<br />

business decision. Through <strong>ARC</strong>’s LEED building capabilities, Milwaukee County Public<br />

Works can perceive the following benefits:<br />

• Reduce Energy Use by as much as 50%<br />

• Reduce CO 2 Emissions in excess of 30%<br />

• Reduce Water Use by as much as 40%<br />

• Reduce Solid Waste by as much as 70%<br />

• <strong>Inc</strong>rease Worker Productivity by as much as 16%<br />

2.2 Understanding of the Project<br />

The Project is broken into two parts:<br />

Part One includes Requirements Definition, Alternative Concepting (including evaluation<br />

of the previous concepts using current best-of-breed technology), structural review of<br />

major beam interference, and concept recommendation (with high-level budget and<br />

constructability analysis).<br />

Part Two is the Detailed Design of the selected and approved Baggage Screening<br />

Improvement Plan. Scope includes the Schematic Design, Design Development and<br />

Construction Contract Document Preparation. This phase shall be not proceed until<br />

authorized in writing by Milwaukee County.<br />

2.2.1 Design Part One<br />

The Part One Design follows the specifications as defined in the TSA Standards for<br />

Checked Baggage Inspection Systems – Pre-Design and Schematic Design Steps. The<br />

steps are modified from the TSA criteria due to the previous work performed during the<br />

Phase 1 Baggage System Upgrade.<br />

2.2.1.1 Pre-Design Criteria<br />

The project begins with data collection, site inventory and analysis of the existing work<br />

performed (Phase 1).<br />

The team of stakeholders meets and agrees on the design requirements of the system:<br />

• Current Peak and Average Baggage Throughput<br />

• Design Year<br />

• Annual projection increases (decreases)<br />

• EDS Machines – Assume existing or new EDS machines – Throughput and<br />

infrastructure support requirements (floor loading, accessibility, service<br />

requirement assumptions)<br />

• Resolution room throughput<br />

o Expected EDS First-Time bag clearance rate<br />

o Threshold operator bag clearance time and % assumptions<br />

o Expected resolution room volume – design peak and average<br />

Phone: 001-203-426-0146<br />

e-mail: arc-djt@worldnet.att.net<br />

Fax: 001-203-426-3213 web: http://home.att.net/~arc-djt<br />

Page 5 of 14