Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB
Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB
Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Proposed Cost Reductions 2013/14 – Adults<br />
Annex 4<br />
Proposed cost reductions as part of the MtC programme Cost £000<br />
Improved commissioning of services (Commenced during 2011/12)<br />
The impact of demographic changes and increases in demand provides opportunities for<br />
improved commissioning. Regional work continues to underpin this with the highlighting of<br />
good practice and where interventions are working well. Contracts will be re-negotiated<br />
and/or re-tendered as a result of this work. In addition demographic factors and increased<br />
choice for individuals, as Personal Budgets are available to all existing and new services<br />
users, will also have an impact.<br />
Controls and Service redesign (Commenced during 2011/12)<br />
Linked in with improved commissioning of services the way that social care continues to<br />
dramatically change as people are given much more choice and control over the way that<br />
they are supported. The number of people receiving a personal budget is increasing and<br />
services are being redesigned to support these changes.<br />
Restructuring (Commenced during 2011/12)<br />
The Integration Programme continues to develop the locality and management structures<br />
for the provision of front line support and services for Older People and People with a<br />
Physical Disabilities. This will remove boundaries for service users as they will received<br />
support from a multi-disciplinarily team setting.<br />
-3,000<br />
-6,000<br />
-270<br />
TOTAL ADULTS -9,270<br />
51