18.04.2014 Views

Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB

Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB

Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Proposed cost reductions as part of the MtC programme Cost £000<br />

Recovery against Grants (Commenced during 2011/12)<br />

On a phased basis over a three year period savings have been identified in grant funding<br />

and have been appropriately targeted against existing services releasing mainstream<br />

funding.<br />

Service Redesign following reductions in Early Intervention Grant and changes in<br />

education funding<br />

In 2012/13 the total Early Intervention Grant (EIG) is £21million. EIG funds services such as<br />

children centres, youth services (both currently being put out to contract) disabled children’s<br />

services, family support and specialist early years services. The government has confirmed<br />

that it will transfer an element of the grant to the Dedicated Schools Grant to fund the new<br />

offer to 2 year olds, and apply a significant reductions of 26% to the EIG, with the remaining<br />

element being routed through the local authority funding formula. In addition a number of<br />

changes to education funding mean a reduction in central budgets.<br />

-500<br />

-2,300<br />

To release the significant savings required to meet the grant reductions all future<br />

commitments against the grant and education spend have been reviewed. As a<br />

consequence commissioning plans have been revised, some existing services will be<br />

redesigned or reduced, and there will be no continuation of temporary/one off funding; all<br />

contingencies will be released.<br />

TOTAL CHILDREN AND FAMILIES -6,600<br />

53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!