Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB
Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB
Agenda item 4 - MTFS (Final) Cab 070213 , item 9. PDF 1 MB
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Proposed cost reductions as part of the MtC programme Cost £000<br />
Recovery against Grants (Commenced during 2011/12)<br />
On a phased basis over a three year period savings have been identified in grant funding<br />
and have been appropriately targeted against existing services releasing mainstream<br />
funding.<br />
Service Redesign following reductions in Early Intervention Grant and changes in<br />
education funding<br />
In 2012/13 the total Early Intervention Grant (EIG) is £21million. EIG funds services such as<br />
children centres, youth services (both currently being put out to contract) disabled children’s<br />
services, family support and specialist early years services. The government has confirmed<br />
that it will transfer an element of the grant to the Dedicated Schools Grant to fund the new<br />
offer to 2 year olds, and apply a significant reductions of 26% to the EIG, with the remaining<br />
element being routed through the local authority funding formula. In addition a number of<br />
changes to education funding mean a reduction in central budgets.<br />
-500<br />
-2,300<br />
To release the significant savings required to meet the grant reductions all future<br />
commitments against the grant and education spend have been reviewed. As a<br />
consequence commissioning plans have been revised, some existing services will be<br />
redesigned or reduced, and there will be no continuation of temporary/one off funding; all<br />
contingencies will be released.<br />
TOTAL CHILDREN AND FAMILIES -6,600<br />
53