03.05.2014 Views

Helicopter guidelines for land seismic & helirig operations - OGP

Helicopter guidelines for land seismic & helirig operations - OGP

Helicopter guidelines for land seismic & helirig operations - OGP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

International Association of Oil & Gas Producers<br />

Programme development: primary steps<br />

Create a Fatigue Management Development Committee, which should include pilots/engineers<br />

and management. <strong>Helicopter</strong> providers should ensure that pilots and engineers are consulted<br />

in the development and implementation of fatigue management programmes, including the<br />

making of changes to such programmes. The Fatigue Management Plan should address the<br />

following:<br />

The inter-related causes of fatigue including:<br />

• The time of day that work takes place<br />

• Stress<br />

• Circadian rhythms<br />

• Sleep debt<br />

• Corporate culture<br />

• Job requirements<br />

• PPE or lack of (adequate hearing protection, com<strong>for</strong>table seating, etc)<br />

• Exposure<br />

• Individual health<br />

• Nutrition<br />

• Hydration<br />

• Life style choices<br />

• Physical and mental activity<br />

• The length of time spent at work and in work related duties<br />

• The type and duration of a work task and the environment in which it is per<strong>for</strong>med (longline<br />

<strong>operations</strong> require intense levels of concentration <strong>for</strong> short periods of time)<br />

• The quantity and quality of rest obtained prior to and after a work period<br />

• Activities outside of work, such as second jobs and family commitments and life style<br />

• Individual factors such as sleeping disorders.<br />

• Define programme objectives<br />

• Conduct a needs assessment.<br />

Programme development: core components<br />

• Pre approve tentative schedules to meet operational, environmental, and travel<br />

considerations.<br />

• Provide core training as outlined above to all personnel involved or affected by these types<br />

of <strong>operations</strong>.<br />

72<br />

© <strong>OGP</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!