A Govt. of Odisha Undertaking - Orissa Tourism Development ...
A Govt. of Odisha Undertaking - Orissa Tourism Development ...
A Govt. of Odisha Undertaking - Orissa Tourism Development ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
ODISHA TOURISM DEVELOPMENT CORPORATION LIMITED<br />
(A <strong>Govt</strong>. <strong>of</strong> <strong>Odisha</strong> <strong>Undertaking</strong>)<br />
Panthanivas (Old Block): Lewis Road: Bhubaneswar-14<br />
(BUILDING PROJECT DIVISION)-I<br />
DETAILED TENDER CALL NOTICE<br />
NAME OF WORK:- Construction <strong>of</strong> Tourist Reception Centre,<br />
Pathway, Parking, & Landscaping etc at<br />
Ghatagaon in Keonjhar Dist.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
2<br />
ODISHA TOURISM DEVELOPMENT CORPORATION LIMITED<br />
(A <strong>Govt</strong>. <strong>of</strong> <strong>Odisha</strong> <strong>Undertaking</strong>)<br />
Panthanivas, (Old Block), Lewis Road, Bhubaneswar-14<br />
No. BP-I/18/2012-13 Date 11.02.2013<br />
DETAILED TENDER CALL NOTICE<br />
Sealed tenders in conformity with DTCN eventually to be drawn in<br />
P.W.D.F-2 are invited percent basis in Double Cover System (Cover-I:-<br />
TECHNICAL BID & Cover-II:- PRICE BID) from registered contractors <strong>of</strong><br />
State PWD/ Irrigation/ CPWD/ MES/ Railway and other Government<br />
Organization for the work as detailed below<br />
Name <strong>of</strong> the work<br />
Construction <strong>of</strong><br />
Tourist Reception<br />
Centre, Pathway,<br />
Parking, &<br />
Landscaping etc<br />
at Ghatagaon in<br />
Keonjhar Dist.<br />
Estimated<br />
amount<br />
(Rs. in lacs)<br />
Rs 95.43<br />
Cost <strong>of</strong> tender<br />
documents<br />
(Non<br />
refundable)<br />
Rs10,000+5%<br />
VAT.<br />
1% <strong>of</strong><br />
Estimated<br />
Cost<br />
Class <strong>of</strong><br />
Contractor<br />
Period <strong>of</strong><br />
completion<br />
Rs.95,430.00 “B‘’ & “A” 9(Nine)<br />
Calendar<br />
Months.<br />
The Detailed Tender documents can be had from our Web site:<br />
www.panthanivas.com. The Tender paper will be received upto 3.00 P.M on<br />
06.03.2013 at O.T.D.C. Head <strong>of</strong>fice by speed post/registered post/courier<br />
and Technical bid will be opened same day on 06.03.2013 at 4.00P.M.<br />
O.T.D.C. Ltd. will not be held responsible for postal delay. Financial bid will<br />
be opened after finalization <strong>of</strong> technical bid and on intimation.<br />
The Authority reserves the right to reject any or all the tenders<br />
without assigning any reason there<strong>of</strong>.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
3<br />
TERMS & CONDITIONS<br />
1. Cost <strong>of</strong> Tender Paper : The Bidders have to pay the cost <strong>of</strong> bid documents<br />
<strong>of</strong> Rs.10,000.00. + 5% VAT (Non-refundable) in shape <strong>of</strong> Demand Draft in<br />
favour <strong>of</strong> Managing Director OTDC Ltd. & Payable at any Schedule Bank,<br />
Bhubaneswar.<br />
2. EMD : 1% ( one percent) <strong>of</strong> estimated cost put to tender (as above) in shape<br />
<strong>of</strong> P.O.S.B./P.O.T.D./N.S.C./K.V.P./Deposit Receipt <strong>of</strong> schedule Bank etc.<br />
duly pledged in favour <strong>of</strong> Managing Director OTDC Ltd. Bhubaneswar.<br />
3. Last Date <strong>of</strong> Receipt <strong>of</strong> Tender Paper : Tenderer should furnish their<br />
tender in the separate sealed covers, the first sealed cover should contain all<br />
the information’s relating to his eligibility in addition to the special condition<br />
if any. On the top <strong>of</strong> the cover, it should be clearly mentioned in bold letters<br />
“COVER-I (TECHNICAL BID).” The second sealed cover should contain the<br />
“PRICE BID” and on top <strong>of</strong> the cover it should be mentioned in bold letters<br />
“COVERI-II (PRICE BID).” should be kept inside one sealed packet super<br />
scribing on the top tender for Construction <strong>of</strong> Tourist Reception Centre,<br />
Pathway, Parking, & Landscaping etc at Ghatagaon in Keonjhar Dist. and will be<br />
received up to 3.00 P.M. on dt.06.03.2013 at OTDC head <strong>of</strong>fice.<br />
4. a) Date and Time <strong>of</strong> Opening <strong>of</strong> Tender Paper Cover-I: Cover-I shall be<br />
opened at 4.00 P.M. on dt.06.03.2013 by the undersigned/ <strong>of</strong> his<br />
authorized Asst. Engg. at O.T.D.C. head <strong>of</strong>fice Bhubaneswar in presence <strong>of</strong><br />
the Tenderers or their authorized representatives.<br />
b) Date and Time <strong>of</strong> Opening <strong>of</strong> Tender Paper : Cover-II- Opening <strong>of</strong> Cover<br />
– II containing Price Bid shall be intimated separately to those tenderers<br />
who will be found eligible as per eligibility criteria mentioned here under.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
4<br />
5. ELIGIBILITY CRITERIA FOR QUALIFYING TECHNICAL BID<br />
For consideration for qualifying the Technical Bid, the followings<br />
are to be submitted in COVER-I.<br />
(A) Cost <strong>of</strong> Tender Paper : Rs.10,000.00+5% VAT<br />
(non-refundable)<br />
(B) EMD : Rs. Rs.95,430.00<br />
(C)<br />
(D)<br />
(E)<br />
(F)<br />
(G)<br />
Attested copy <strong>of</strong> License Registration Certificate.<br />
Attested copy <strong>of</strong> VAT Clearance Certificate in Form <strong>of</strong> VAT-<br />
612/STCC/TIN.<br />
Attested copy <strong>of</strong> PAN CARD.<br />
No Relation/ Relation Certificate : Tenderers should furnish<br />
the required certificate as per the OPWD Code Volume-II,<br />
Appendix-IX, Para-7.<br />
The Tenderers shall have to furnish pro<strong>of</strong> <strong>of</strong> ownership <strong>of</strong> the<br />
following required machineries in their possession and / or<br />
furnish negotiation certificate in the form <strong>of</strong> affidavit for<br />
hiring <strong>of</strong> such machineries from the rightful owners. In case<br />
<strong>of</strong> hiring <strong>of</strong> machineries, documentary evidence <strong>of</strong> ownership<br />
shall have to be furnished along with negotiation certificate.<br />
Tenderers are required to produce original documents within<br />
three working days <strong>of</strong> opening <strong>of</strong> Cover-I, failing which<br />
tenders will be invalid.<br />
List <strong>of</strong> Machineries & T & P<br />
a) Concrete Mixer.<br />
b) Plate compactor/ Needle vibrator<br />
c) Steels Centering Materials<br />
(H)<br />
Contractor/ Firm should furnish list <strong>of</strong> similar works<br />
executed during last five years stating the Agreement No.,<br />
date <strong>of</strong> commencement and completion, actual date <strong>of</strong><br />
completion duly certified by the employer. The applicant<br />
should have completed at least one work <strong>of</strong> similar nature <strong>of</strong><br />
worth 40% <strong>of</strong> the value <strong>of</strong> work put to tender in last five<br />
years. The certificate to that effect has to be obtained from<br />
an <strong>of</strong>ficer not below the rank <strong>of</strong> Executive Engineer<br />
concerned with the work under report.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
5<br />
(I)<br />
(J)<br />
(K)<br />
(L)<br />
Contractor/ Firm should have annual financial turnover <strong>of</strong><br />
not less than 40% <strong>of</strong> the value <strong>of</strong> work put to tender in any<br />
one year in civil construction works during last five years<br />
and the Turn over need to be certified by a registered<br />
Chartered Accountant<br />
The tenderers are required to furnish the documentary<br />
evidence in support <strong>of</strong> required technical personnel employed<br />
under him.<br />
Tenderers have to furnish an affidavit in support <strong>of</strong> nonrescission<br />
<strong>of</strong> any contract due to abandonment/negligence <strong>of</strong><br />
any work by the firm in last 5 years.<br />
‘Bids from joint ventures are not acceptable’.<br />
(M)<br />
(N)<br />
Tenderers have to furnish an affidavit stating that the<br />
information furnished is correct. In case at any stage if any<br />
information are found wrong his tender will be liable for<br />
rejection along with taking up <strong>of</strong> legal action against him as<br />
deemed proper.<br />
The bidder shall possess electrical license from ELBO, <strong>Odisha</strong><br />
or obtain a certificate from such license holder to provide<br />
service to him during execution electrical works<br />
6. If the <strong>of</strong>fice happens to be closed due to subsequent declaration as<br />
holiday in <strong>Govt</strong>. or Local Authority to the last date <strong>of</strong> receipt <strong>of</strong><br />
tenders and date <strong>of</strong> opening as specified above then the date <strong>of</strong><br />
receipt <strong>of</strong> tenders and the date <strong>of</strong> opening will be on the immediate<br />
next working day at same specified time and venue respectively.<br />
7. The authority reserves the right rejects any or all the tender papers<br />
without assigning any reason there<strong>of</strong>.<br />
8. The tender documents should be sealed with wax properly with own<br />
seal.<br />
9. The sealed envelope containing the tender should be super scribed with<br />
the name <strong>of</strong> the work and should be addressed to the Sr.Divisional<br />
Manager (B.P.-I), OTDC Ltd. Bhubaneswar and should contain two<br />
separate sealed envelopes (COVER-I for Technical Bid & COVER-II for<br />
Financial Bid).<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
6<br />
10. IMPORTANT GUIDELINES ON SITE MANAGEMENT, QUALITY,<br />
PAYMENT & RECTIFICATION<br />
a) The contractor shall submit all his running bills through his technical<br />
personnel supported by stage photographs, quality control test reports <strong>of</strong><br />
all materials used and works executed as per standard norms from<br />
<strong>Govt</strong>./<strong>Govt</strong>. approved laboratories and no extra payment shall be given<br />
towards these.<br />
b) The contractor shall erect and maintain the transparency pillar at his<br />
own cost.<br />
c) The contractor shall keep all required survey equipments at site.<br />
d) The period <strong>of</strong> rectification beyond the completion period shall be 1(one)<br />
year from the date <strong>of</strong> completion <strong>of</strong> the project. Security deposit will be<br />
kept withheld for the above period.<br />
11 . (a) The Plan and Specification for the work can be seen at the Office <strong>of</strong><br />
the Sr. Divisional Manager (B.P.-I), O.T.D.C.Ltd, during working hours<br />
and days. Complaints at a future date that the plan and specification<br />
have not been seen will not be entertained.<br />
(b) All other information can be had from <strong>of</strong>fice <strong>of</strong> the Sr. Divisional<br />
Manager, (B.P.-I), O.T.D.C. LTD.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
7<br />
12. EARNEST MONEY DEPOSIT AND INITIAL SECURITY DEPOSIT<br />
The tenderers whose tender is selected for acceptance shall within<br />
a period <strong>of</strong> seven days upon written intimation being given to him <strong>of</strong><br />
acceptance <strong>of</strong> his tender make an initial security deposit <strong>of</strong> 1% (one<br />
percent) <strong>of</strong> the tendered amount so that the earnest money and initial<br />
security deposit will be 2% <strong>of</strong> the tendered amount and sign the<br />
agreement in the Office <strong>of</strong> O.T.D.C. Ltd, failing which, the tender will be<br />
rejected with forfeiture <strong>of</strong> E.M.D.<br />
This security deposit, together with the earnest money and the<br />
amount withheld if any shall be retained as security deposit for the due<br />
fulfillment <strong>of</strong> this contract. Failure to enter into the required agreement<br />
and to make the security deposit, as above shall entail forfeiture <strong>of</strong> the<br />
Earnest Money. No tender shall be finally accepted until the required<br />
amount <strong>of</strong> security deposit (money) is deposited. The written agreement<br />
to be entered into between the contractor and the Corporation shall be<br />
the foundation <strong>of</strong> the right <strong>of</strong> both the parties and the contract shall<br />
deem to be incomplete until the agreement has first been signed by the<br />
contractor and then by the Sr. Divisional Manager (B.P.-I), O.T.D.C. Ltd.<br />
13. Additional performance security shall be deposited by the bidders<br />
when the bid amount is seriously unbalanced i.e less than the<br />
estimated cost by more than 10%. In such an event the bidder will<br />
deposit the additional performance security to the extent <strong>of</strong> the<br />
differential cost <strong>of</strong> the bid amount and 90% <strong>of</strong> the estimated cost in<br />
shape <strong>of</strong> Post Office Savings Bank Account/National Savings<br />
Certificate/Post Office Time Deposit account/Kissan Vikash<br />
Patra/Deposit receipt <strong>of</strong> schedule Bank at the time <strong>of</strong> sanction <strong>of</strong><br />
tender without which the tender will be liable for rejection.<br />
14. (a) The tender will be on percentage rate. The rates be quoted both in<br />
words and figures. In case <strong>of</strong> discrepancy between words and figures,<br />
the words shall prevail.<br />
15. The contractors will be responsible for payment <strong>of</strong> all royalties or other<br />
charges for quarrying materials. All local taxes inclusive <strong>of</strong> State Sales Tax<br />
and Income Tax, Octroi charges, Ferry and Tollage charges are to be paid by<br />
the Contractor.<br />
16. I.T.C.C/PAN and S.T.C.C./VAT C.C :<br />
The tender may not, at the discretion <strong>of</strong> the competent authority, be<br />
considered unless accompanied with attested true copy <strong>of</strong> the PAN card<br />
and VAT clearance certificate as the case may be and the original<br />
certificate to be produced at the time <strong>of</strong> opening <strong>of</strong> tenders.<br />
17. If the contractor removes any materials or stock so supplied to him from<br />
the site <strong>of</strong> work with a view to disposing <strong>of</strong>f the same dishonestly, he<br />
should in addition to any other liabilities Civil or Criminal arising out <strong>of</strong><br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
8<br />
the contract be liable to pay a penalty equivalent to five times the price <strong>of</strong><br />
the materials on stock according to the stipulated rates and the penalty<br />
so imposed shall be recovered from any sum that may then or at any<br />
time thereafter become due to the contractor or from his security.<br />
18. The contractor should be fully liable to indemnify the Corporation for<br />
payment <strong>of</strong> any compensation under Workmen’s Compensation Act-V-III<br />
<strong>of</strong> 1923 on account <strong>of</strong> the workmen being employed by him and the full<br />
amount <strong>of</strong> compensation paid will be recovered from the contractor.<br />
19. Every tenderer must examine the detailed specification <strong>of</strong> <strong>Odisha</strong> before<br />
submitting his tender. The right is reserved without impairing the<br />
contract to make such increase or decrease in the quantities or items <strong>of</strong><br />
work mentioned in the schedule attached to the tender notice as may be<br />
considered necessary to complete the work fully and satisfactorily. Such<br />
increase shall in no case invalidate the contract rates. It shall be<br />
definitely understood that the Corporation does not accept any<br />
responsibility for the correctness or completeness <strong>of</strong> the quantities shown<br />
in the schedule. The schedule is liable to alteration by omissions or<br />
additions or deductions and such omissions/ deductions shall in no case<br />
invalidate the contract and no extra monetary compensation will be<br />
entertained.<br />
20. Engineer contractors desirous to avail the facility <strong>of</strong> exemption <strong>of</strong> EMD<br />
are required to submit affidavit to the effect that he/she has not yet<br />
availed this facility for more than two works during the current financial<br />
year. The name <strong>of</strong> work for which and the authority to whom the tenders<br />
have been submitted, must be mentioned in the affidavit failing which<br />
the tender will be rejected. Exemption <strong>of</strong> EMD will be entered in the<br />
original Registration Certificate <strong>of</strong> the Engineer Contractor at the time <strong>of</strong><br />
participating in the tender. Hence the Engineer Contractor or his<br />
authorized representative has to produce the original license for<br />
necessary entry within 2 days <strong>of</strong> opening <strong>of</strong> the tender<br />
21. (a) If during the progress <strong>of</strong> the work the price <strong>of</strong> any material<br />
incorporated in the work (not being materials supplied from the<br />
Engineer-in-charge’s store in accordance with clause…….there<strong>of</strong>)<br />
Increases or decreases as a result <strong>of</strong> increase or decrease in the<br />
Average Wholesale Price index (all commodities), and the contractor<br />
thereupon accessorily and properly pays in respect <strong>of</strong> that material<br />
(incorporated in the work) such increased or decreased price, then he<br />
shall be entitled to reimbursement or liable to refund, quarterly, as the<br />
case may be, such an amount, as shall be equivalent to the plus or<br />
minus difference <strong>of</strong> 75% in between the Average wholesale price index<br />
(all commodities) which is operating for the quarter under<br />
consideration and that operated for the quarter in which the tender<br />
was opened, as per the formula indicated below, provided that the<br />
work has been carried out within the stipulated time or extension<br />
there as are not attributable to him.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
9<br />
(b) Similarly, if during the progress <strong>of</strong> work, the wages <strong>of</strong> labour<br />
increase or decrease as a result <strong>of</strong> increase or decrease in the average<br />
co summers price index for industrial workers (wholesale price), and<br />
the contractor thereupon necessarily and properly pays in respect <strong>of</strong><br />
labour engaged on execution <strong>of</strong> the work such increased or decreased<br />
wages, then heshallbe entitled to reimbursement or liable to refund<br />
quarterly as the case may besuch an amount, as shall be equivalent to<br />
the plus or minus difference in between the Average Consumer’s Price<br />
Index for industrial workers (wholesale price) which is operating for<br />
the quarter under consideration and that operated for the quarter in<br />
which the tender was opened as per the formula indicated below,<br />
provided that the work has been carried out within the stipulated time<br />
or extension there<strong>of</strong> as are not attributable to him.<br />
(c) Similarly, if during the progress <strong>of</strong> work, the price <strong>of</strong> Petrol, oil and<br />
Lubricants (Diesel oil being the representative item for price<br />
adjustment increases or decreases as a result <strong>of</strong> the price fixed<br />
therefore by the Government <strong>of</strong> India and the Contractor thereupon<br />
necessarily and properly payssuch increasedor decreased price<br />
towards Petrol, oil and Lubricants used on execution <strong>of</strong> work, then he<br />
shall be entitled to reimbursement or liable to refund, quarterly, as<br />
the case may be such an amount, as shall be equivalent to the plus or<br />
minus difference in between that price <strong>of</strong> P.O.L. which is operating for<br />
the quarter under consideration and that operated for the quarter in<br />
which the tender was opened as per the formula indicated bewlow;<br />
provided that the work has been carried out within the stipulated time<br />
or extension there<strong>of</strong> as are not attributable to him.<br />
(i) Formula to calculate the increase or decrease in the price <strong>of</strong><br />
materials.<br />
VM=0.75<br />
x<br />
Pm (1 10)<br />
x R<br />
100 I0<br />
VM = Increase or decrease in the cost <strong>of</strong> work during the quarter<br />
under consideration due to changes in the price <strong>of</strong> materials.<br />
R = The value <strong>of</strong> the work done in Rupees during the quarter under<br />
consideration.<br />
i0 = The average wholesale price index (all commodities for the quarter<br />
in which the tenders were opened (as published in R.B.I. Bulletin from<br />
time to time).<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
10<br />
L = The average wholesale price index (all commodities ) in the quarter<br />
under consideration.<br />
Pm = Percentage <strong>of</strong> materials component as per sub-clause <strong>of</strong> this<br />
clause.<br />
(ii) Formula to calculate the increase or decrease in the cost <strong>of</strong> labour :<br />
VI=0.75 x PL (1-10)<br />
x R<br />
100 I0<br />
VI. Increase or decrease in the cost <strong>of</strong> work during the quarter under<br />
consideration due to changes in rates <strong>of</strong> labour<br />
R = The value <strong>of</strong> the work done in Rupees during the quarter under<br />
consideration<br />
I0 = The Average Consumers price Index for Industrial Workers<br />
(Wholesale price) for the quarter in which the tender was opened (as<br />
published in R.B.I. Bulletin from time to time).<br />
I = The average Consumer’s Price Index for Industrial Workers<br />
(wholesale price) for the quarter under consideration.<br />
PL = Percentage <strong>of</strong> labour component as per sub-clause <strong>of</strong> this clause.<br />
iii) Formula to calculate the increase or decrease in the price <strong>of</strong> P.O.I.<br />
KI=0.75 x K2 (D2-D1)<br />
xµ<br />
100 D1<br />
Kl = Increase or decrease in the cost <strong>of</strong> work during the quarter under<br />
consideration due to change in the price <strong>of</strong> P.O.L.<br />
R = The value <strong>of</strong> work done in Rupees during the quarter under<br />
consideration.<br />
D1 = Average price per litre <strong>of</strong> diesel oil which was fixed by the<br />
Government <strong>of</strong> India during the quarter in which the tender was<br />
opened.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
11<br />
D2 = Average price per litre <strong>of</strong> diesel oil which is fixed during the<br />
quarter under consideration.<br />
K2= Percentage <strong>of</strong> P.O.L. component as per Sub-clause <strong>of</strong> this clause<br />
(a) The following shall be the percentage <strong>of</strong> material,labour and P.O.L.<br />
component for reimbursement / refund on variation in price <strong>of</strong><br />
material, labor and P.O.L. as per sub-clauses (a) (b) and (c) <strong>of</strong> this<br />
clause.<br />
Category <strong>of</strong><br />
work<br />
Irrigation Works<br />
:<br />
a) Structural<br />
works<br />
b) Earth work,<br />
Canal work<br />
Embankment<br />
Contractor’s Supply<br />
% <strong>of</strong><br />
Labour<br />
% <strong>of</strong><br />
materials<br />
% <strong>of</strong><br />
P.O.L.<br />
20% 30% 5% 45%<br />
20% 60% 5% 15%<br />
work etc<br />
(R & B works)<br />
a) Bridge work 20% 30% 5% 45%<br />
b) Road work 45% 40% 5% 10%<br />
c) Building<br />
work<br />
30% 30% 5% 35%<br />
Departmental<br />
supply <strong>of</strong><br />
materials<br />
(Where brick is supplied by the Department. If should be 20% instead<br />
<strong>of</strong> 30%)<br />
(e) Reimbursement / refund on variation in price <strong>of</strong> materials,<br />
labour and P.O.L. as per sub-clauses (a) (b) and (c) <strong>of</strong> this clause shall<br />
be applicable only in respect <strong>of</strong> contract <strong>of</strong> one year or more provided<br />
that the work has been carried out within the stipulated time or<br />
extension there<strong>of</strong> as are not attributable to contractor. However,<br />
where the original contractual period is less than one year but<br />
subsequently it has been validly extend and the period becomes one<br />
year or more, escalation clause shall be applicable one for the balance<br />
portion <strong>of</strong> work to be executed beyond one year provided the delay is<br />
not attributable to the contractor.<br />
(f) The contractor shall for the purpose <strong>of</strong> this condition keep such<br />
books <strong>of</strong> accounts and other documents as are necessary to show that<br />
the amount <strong>of</strong> increase claimed or reduction available and shall allow<br />
inspection <strong>of</strong> the same by a duly authorized representative <strong>of</strong><br />
Government and further shall at the Engineer-in-charge may require<br />
any document kept and such other information as the Engineer-incharge<br />
may require.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
12<br />
The Contractor shall within a reasonable time <strong>of</strong> his becoming aware<br />
<strong>of</strong> any alteration in the price <strong>of</strong> such materials and/or wages <strong>of</strong> labour<br />
give notice there<strong>of</strong> to the Engineer-in-charge may require any<br />
documents kept and such other information relating thereto which he<br />
may be in a position to supply<br />
22. The agency should produce valid labour license for the said work before<br />
signing the agreement.<br />
23. The agency should use all building materials such as reinforcement,<br />
sand etc. free from corrosion/corrosive materials etc. No extra payment<br />
will be made for such purpose by O.T.D.C. Ltd.<br />
24. <strong>Odisha</strong> Detailed Standard Specification will be followed during execution<br />
<strong>of</strong> work.<br />
25. All materials including those issued direct to the work will be received by<br />
the contractor from the respective Store <strong>of</strong> the Corporation in the sizes as<br />
per availability <strong>of</strong> stock. After issue, it will be the contractor’s<br />
responsibility for transportation, storage, handling, safe custody and<br />
proper upkeepment <strong>of</strong> materials. The rate <strong>of</strong> the contractor should<br />
include the entire incidental charges required after the issue <strong>of</strong> material<br />
from Corporation store till its lasticized in the work and return <strong>of</strong><br />
surplus and good materials at the issuing store.<br />
26. The contractor will have to bear the cost <strong>of</strong> straightening, cutting,<br />
jointing, welding etc. <strong>of</strong> all steel reinforcement and structural and no cut<br />
pieces less than 1(one) meter length will be accepted. After completion <strong>of</strong><br />
the work the contractor has to return all surplus and good materials at<br />
the issuing store at his own cost failing which the cost <strong>of</strong> the unutilized<br />
balance Corporation materials and such other damaged materials not<br />
receptacle to the Corporation would be recovered from him at 5 (five)<br />
times the stock issue rates.<br />
27. All reinforced cement concrete work should conform to <strong>Odisha</strong> Detailed<br />
Standard Specification and should be <strong>of</strong> grade M-150/200 with 12mm.<br />
Size black hard crusher broken granite stone chips (20mm. Size not to<br />
exceed 25%) having a minimum compressive strength (in work test)<br />
150kg/200kg/cm 2 in 15 cm. cubes at 28 days after mixing and tests<br />
conducted in accordance with IS 456 and IS 516.<br />
28. Shuttering and centering shall be with steel shuttering and centering .<br />
29. The selected contractor may take delivery <strong>of</strong> supply <strong>of</strong> materials<br />
according to his need for the work issued by the Engineer-in-charge <strong>of</strong><br />
the work. The contractor shall make all arrangements for proper storage<br />
<strong>of</strong> materials. But no cost for raising shed for the storage <strong>of</strong> materials and<br />
pay <strong>of</strong> watchmen etc. will be borne by the Corporation. These are all to<br />
be borne by the Contractor. The Corporation is not responsible for<br />
considering the theft <strong>of</strong> materials at site. It is contractor’s risk. Under<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
13<br />
any such plea if the contractor stops the work he shall have to pay the<br />
penalty as per the clauses <strong>of</strong> the contract.<br />
30. For the purpose <strong>of</strong> jurisdiction in the event <strong>of</strong> dispute if any contract<br />
should be deemed to have entered into within the State <strong>of</strong> <strong>Odisha</strong> and it<br />
is agreed that, neither party to the contract nor the agreement will be<br />
competent to bring a suit in regard to the matters covered by this<br />
contract at any place outside the State <strong>of</strong> <strong>Odisha</strong>.<br />
31. After the work is finished, all surplus materials and debris are to be<br />
removed by the contractor and preliminary works such as vats, mixing<br />
platforms, etc. are to be dismantled and all the materials are to be<br />
removed from the site. No extra payment will be made to the contractor<br />
on this account. The rate quoted should be inclusive <strong>of</strong> all these items.<br />
The ground upto 15 meter shall be cleared and rough dressed.<br />
32. The contractor shall not interfere with the execution <strong>of</strong> water supply or<br />
electrical fittings arrangements and any other works entrusted to any<br />
other agency by the Corporation at any time during the progress <strong>of</strong> work.<br />
33. The Corporation will have the right to inspect the scaffolding and<br />
centering made for the work and can reject partly or fully such structures<br />
if found defective in their opinion.<br />
34. The Contractor will have to arrange for water supply for all works and<br />
made sanitary arrangements at his own cost for his Labour camps. The<br />
contractor has to arrange adequate lighting arrangements for night works<br />
whenever necessary at his own cost.<br />
35. Bailing out water from the foundation either rain water or sub-soil water<br />
if necessary should be borne by the contractor. No payment will be made<br />
for benchmarks, level pillars pr<strong>of</strong>iles and benching and leveling ground<br />
where required. The rates quoted should be for finished items <strong>of</strong> work<br />
inclusive <strong>of</strong> these incidental items <strong>of</strong> work<br />
36. All the quantities mentioned in the schedule are combined for ground<br />
floor and multi-floors in case <strong>of</strong> multistoried building and the rates<br />
should be through for the same.<br />
37. Cement concrete in ro<strong>of</strong> slabs, beams and wherever prescribed by the<br />
Engineer-in-charge shall be machine mixed and vibrated, and the<br />
contractor should arrange his own concrete mixers, vibrators, and<br />
pumps etc. for the purpose.<br />
38. It should be understood clearly that no claims whatsoever will be<br />
entertained.<br />
39. The tenderer shall have to abide by the C.P.W. Safety Code introduced by<br />
the <strong>Govt</strong>. <strong>of</strong> India, Ministry <strong>of</strong> Works, Housing and Supply in their<br />
standing orders No.44250 dt.25.11.57.<br />
40. The contractor will abide by the Fair Wages clause as introduced by the<br />
Government.<br />
41. The Corporation have the right to supply at any time in the interest <strong>of</strong><br />
work any Corporation materials to be used in the work in addition to<br />
those mentioned in the clause 13 and the contractor shall use such<br />
materials without any controversy or dispute on that account. The rates<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
14<br />
<strong>of</strong> the materials will be at the stock issue rates fixed by the Corporation<br />
or market rates whichever is higher.<br />
42. The contractor will be responsible for the loss or damage if any <strong>of</strong><br />
Corporation materials supplied to him under clauses 13 and 30 during<br />
execution <strong>of</strong> the work due to reasons whatsoever and the cost <strong>of</strong> such<br />
materials will be recovered from him at the prevailing stock issue rates or<br />
market rates whichever is higher.<br />
43. CONTRACTOR’S TOOLS & PLANT AND SUPPLY OF DEPARTMENTAL<br />
TOOLS & PLAT TO CONTRACTORS.<br />
The contractor should arrange at his own cost necessary tools and plant<br />
such as Pumps, Vibrator, Concrete mixer etc. required for the efficient<br />
execution <strong>of</strong> the work and rates quoted should be inclusive <strong>of</strong> the<br />
running charges <strong>of</strong> such plant and cost <strong>of</strong> consumables.<br />
44. The contractor will have to submit to the Sr. Divisional Manager (B.P.-I),<br />
O.T.D.C. Ltd. monthly return <strong>of</strong> labour both skilled & un-skilled<br />
employed by him on the work.<br />
45. The tenderers are required to go through each clause <strong>of</strong> Corporation<br />
contract form carefully in addition to clauses mentioned herewith before<br />
tendering.<br />
46. No part <strong>of</strong> the contract shall be sublet without written permission <strong>of</strong> the<br />
Sr. Divisional Manager (B.P.-I), O.T.D.C. Ltd., Bhubaneswar or transfer<br />
be made by power <strong>of</strong> attorney , authorize others to receive payment on<br />
the contractor’s behalf.<br />
47. If any further necessary information is required, Sr. Divisional Manager<br />
(B.P.-I), O.T.D.C. Ltd., Bhubaneswar will furnish such but it must be<br />
clearly understood that tenders must be received in order and according<br />
to the instructions.<br />
48. No contractor will be permitted to furnish their tender in their own<br />
manuscript papers.<br />
49. SAMPLE OF MATERIALS:<br />
Every tenderer is expected before quoting his rates to inspect the site <strong>of</strong><br />
proposed work. He should also inspect the quarries and satisfy himself<br />
about the quality, availability <strong>of</strong> materials, medical aids, labour and<br />
foodstuffs etc. and the rates may be inclusive <strong>of</strong> all these items <strong>of</strong> work.<br />
In every case the materials must comply with the relevant specification.<br />
50. O.T.D.C. Ltd. will not however, after acceptance <strong>of</strong> contract rate, pay any<br />
extra charges for lead or for any other reason in case the contractor is<br />
found later on to have mis-judged the materials available.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
15<br />
51. EXTRANEOUS CONDITION:<br />
The tenders containing extraneous conditions not covered by the tender<br />
call notice are liable for rejection.<br />
52. VALIDITY<br />
All tenders received will remain valid for a period <strong>of</strong> ninety days from<br />
the date <strong>of</strong> receipt <strong>of</strong> tenders and validity <strong>of</strong> tender can also be<br />
extended if agreed to by the contractor and the Corporation<br />
53. After completion <strong>of</strong> the work the contractor shall arrange at his own cost all<br />
requisite equipments for testing building if found necessary and bear the<br />
entire cost <strong>of</strong> such test.<br />
54. Quality control tests are to be carried out as per standard norms by the<br />
contractor through a <strong>Govt</strong>. laboratory or any authorized <strong>Govt</strong>. laboratory.<br />
No extra payment will be made for these tests. The department may<br />
conduct separate tests as when felt necessary, the cost <strong>of</strong> which will be<br />
borne by the department.<br />
55. LIST OF WORKS IN HAND, T & P & WORK EXECUTED:<br />
Tenderers are required to submit, (i) list <strong>of</strong> works in the hand in<br />
the following prescribed pr<strong>of</strong>orma ‘A’, (ii) list <strong>of</strong> works executed in the<br />
prescribed pr<strong>of</strong>orma ‘B’ and (iii) the list <strong>of</strong> T & P in the prescribed<br />
pr<strong>of</strong>orma ‘C’ along with the tenders.<br />
56. All reinforced cement concrete works should be finished smooth, Extra<br />
charges for plastering if required to any R.C.C. structures like columns,<br />
beams, chajjas etc. shall not be paid.<br />
57. Income tax, Sales tax and workers welfare cess will be deducted as per<br />
prevailing <strong>Govt</strong>. orders from time to time.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
16<br />
PROFORMA-'C'<br />
CERTIFICATE OF TOOLS AND PLANTS<br />
I/We hereby certify that the following tools and plants, machineries and<br />
vehicles are in my/our possession in working orders.<br />
i.<br />
ii.<br />
iii.<br />
iv.<br />
v.<br />
I/We also note that, non-submission <strong>of</strong> this certificate will render my/our<br />
tender liable for rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date_______________<br />
58. The tenderer shall bear cost <strong>of</strong> various incidental sundries and<br />
contingencies necessitated by the works falling within the following or<br />
similar category.<br />
(a)<br />
(b)<br />
Rent, royalties and other charges <strong>of</strong> materials, Octroi duty, all other taxes<br />
including sales tax, ferry tolls, conveyance charges and other costs on<br />
account <strong>of</strong> land and buildings including temporary buildings required by<br />
the tenderer for collection <strong>of</strong> materials, storage, housing <strong>of</strong> staff or other<br />
purpose <strong>of</strong> the work. No rent however be payable to Corporation for<br />
temporary occupation <strong>of</strong> land owned by the Corporation at the site <strong>of</strong> the<br />
work.<br />
Labour camps and huts necessary to a suitable scale including<br />
conservancy and sanitary arrangements thereon to the satisfaction <strong>of</strong> the<br />
local health authorities.<br />
(c)<br />
(d)<br />
(e)<br />
(f)<br />
Suitable water supply including pipe water supply wherever available for<br />
the staff and labourers for the works.<br />
Fees and dues hired by Municipal, Canal and water supply authorities.<br />
Suitable equipments and wearing apparatus for the labourers engaged in<br />
risky operation.<br />
Suitable fencing barriers, signal including paraffin and electrical signal<br />
where necessary at works and approaches in order to protect the public<br />
and employees from accidents.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
17<br />
(g)<br />
Compensation including cost <strong>of</strong> any suit for injury to person or property<br />
due to neglect <strong>of</strong> any major precautions also sums which may become<br />
payable due to operation <strong>of</strong> workmen’s Compensation Act.<br />
(h)<br />
The contractor has to arrange adequate lighting arrangement for night<br />
works wherever necessary at his own cost.<br />
(i)<br />
The contractor has to arrange all the building materials including the<br />
equipments required for under reamed pile foundation for starting the<br />
work.<br />
59. INTEREST:<br />
Under no circumstances interest is chargeable for the dues or additional<br />
dues if any payable for the work.<br />
60. Special class contractor shall employ under him one Graduate Engineer<br />
and two Diploma Holders belonging to the State <strong>of</strong> <strong>Odisha</strong>, like wise ‘A’<br />
class contractor shall employ under him one Graduate Engineer or two<br />
Diploma Holder belonging to the State <strong>of</strong> <strong>Odisha</strong>. The employment <strong>of</strong><br />
such Graduate Engineer and Diploma Holders under the contractor shall<br />
be full-time and continuous and they shall not be superannuated,<br />
retired, dismissed or removed personnel from any state <strong>Govt</strong>. or Central<br />
<strong>Govt</strong>. service/Public Sector undertaking/Private companies and firms or<br />
be ineligible for appointment to <strong>Govt</strong>. service. The contractor shall pay<br />
them monthly emoluments, which shall not be less than the emoluments<br />
<strong>of</strong> the personnel <strong>of</strong> equivalent qualification employed under the State<br />
<strong>Govt</strong>. <strong>of</strong> <strong>Odisha</strong>. The name <strong>of</strong> such Engineer personnel appointed by the<br />
Contractor should be intimated to the tender receiving authority along<br />
with each tender, as to who would be supervising the work. Each bill <strong>of</strong><br />
the Special Class or ‘A’ class contractor shall be accompanied by an<br />
Employment Roll <strong>of</strong> the Engineering personnel together with a certificate<br />
<strong>of</strong> the Graduate Engineer or Diploma Holder so employed by the<br />
contractor to the effect that the work executed as per the bill has been<br />
supervised by him. A prescribed pr<strong>of</strong>orma is enclosed herewith for<br />
furnishing the required certificate there in under this clause.<br />
61. The quantity/volume <strong>of</strong> item may alter during construction as per field<br />
condition<br />
62. Wherever there is ambiguity or missing data, the work shall be done as<br />
per the direction <strong>of</strong> the Engineer-in-charge.<br />
63. The interested bidders may visit the site and should acquaint themselves<br />
with the field activities to be experienced during construction.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
18<br />
64. The delay if any due to other departments such as digging on road etc.<br />
shall be the responsibility <strong>of</strong> the successful bidder.<br />
65. Statutory clearance if any from electrical inspector shall be the<br />
responsibility <strong>of</strong> the successful bidder.<br />
66. The contractor is to submit running bills supported by photographs <strong>of</strong><br />
works done and quality control test certificates from <strong>Govt</strong>. or <strong>Govt</strong><br />
approved laboratories <strong>of</strong> all materials used, cube test and other reports<br />
etc. as per norm and standard <strong>of</strong> works performed for which no extra<br />
payment shall be made.<br />
67. The contractor must keep Level instrument, theodolite and compass etc<br />
at site at his own cost.<br />
68. The contractor must construct transparency pillar either in masonry or<br />
steel depicting the brief details <strong>of</strong> contract and source <strong>of</strong> funding at his<br />
own cost and maintain the same till completion <strong>of</strong> work.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
19<br />
QUALITY CONTROL REQUIREMENTS<br />
1.0 Earth work<br />
1.1. Density requirements for embankments and sub-grade materials. MoRTH Specification (4 th<br />
Revision).<br />
Sl.<br />
No.<br />
Type <strong>of</strong> work<br />
Maximum dry density at OMC<br />
(IS:2720 Part-8)<br />
1. Embankment upto 3m height not subjected to extensive<br />
flooding<br />
2. Embankment exceeding 3m height or embankment subjected<br />
or embankment subjected to long periods <strong>of</strong> inundation.<br />
Minimum 15.2kN/m 3<br />
Minimum 16kN/m 3<br />
3. Subgrade and earthen shoulder and back fill. Minimum 17.5kN/m 3<br />
1.2. Compaction requirement for embankment and sub-grade.<br />
Sl.<br />
No.<br />
Type <strong>of</strong> work<br />
Percentage <strong>of</strong> Compaction at<br />
OMC<br />
1. Sub-grade and shoulder Minimum 97%<br />
2. Embankment Minimum 95%<br />
3. Expansive clay<br />
a. Sub-grade Not allowed<br />
b. Remaining portion Minimum 90%<br />
1.3. Criteria for small embankment (dams) (IS : 12169)<br />
The general guidelines for embankment sections are furnished in Table No.-1.<br />
TABLE-4<br />
(GENERAL GUIDELINES FOR EMBANKMENT SECTIONS)<br />
SL.<br />
NO.<br />
DESCRIPTION HEIGHT UPTO 5m HT. ABOVE 5M AND<br />
UPTO 10m<br />
1. Type <strong>of</strong> section Homogeneous<br />
Modified<br />
homogeneous<br />
section<br />
Ii Slopes U/S U/S<br />
(H:V) (H:V)<br />
a. Coarse grained soil (GW,<br />
GP, SW, SP)<br />
b. Coarse grained soil<br />
(GW,GP, SW, SP)<br />
c. Fine grained soil (Cl, ML,<br />
Cl, Ml)<br />
d. Fine grained Soil (CH,<br />
MH)<br />
Zoned section/<br />
Modified<br />
homogeneous<br />
section/<br />
homogeneous section<br />
U/S<br />
(H:V)<br />
D/S<br />
(H:V)<br />
HT. ABOVE 10M AND UPTO<br />
15m<br />
Zoned section/ modified<br />
homogeneous section/<br />
homogenous section<br />
U/S<br />
D/S<br />
Not suitable Not suitable Not suitable for core. Suitable<br />
for casing zone.<br />
2:1 2:1 2:1 2:1 Section to be decided based<br />
upon the stability analysis in<br />
accordance with IS: 7894-<br />
1975.<br />
2:1 2:1 25:1 2251:1 -do-<br />
2:1 2:1 3.75:1 25:1 may<br />
be provided<br />
a. Top width -- 3m 3m<br />
Necessary<br />
b. Top level -- 0.5m above MWL 0.5m above MWL<br />
Iv Rock toe height Not necessary upto Necessary H/5, where Necessary H/5, where H is<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
20<br />
3m above 3m ht,<br />
1m, ht <strong>of</strong> rock toe<br />
may be provided<br />
H is the height <strong>of</strong> the<br />
embankment.<br />
the height <strong>of</strong> the embkt.<br />
v. Berms Not necessary Not necessary The berm may be provided as<br />
per design. The min. berm<br />
width shall be 3m. The berm<br />
may be provided also on the<br />
D/S slope for facilities during<br />
maintenance.<br />
1.4. Criteria for small embankments (dams) : (IS : 12169)<br />
The general guidelines regarding suitability <strong>of</strong> soil for construction <strong>of</strong> dams are furnished in table No.<br />
2.<br />
Table – 2<br />
Suitability <strong>of</strong> soil for construction <strong>of</strong> dams.<br />
Relative<br />
suitability<br />
Homogeneous<br />
Dykes<br />
Zone dam<br />
Impervious cure<br />
Pervisou casing<br />
Very GC GC SW,GW GC<br />
Suitable<br />
Suitable CL, Cl Cl, Cl GM CL,Cl<br />
Impervious<br />
blanket<br />
Fairly suitable SP, SM, CH GM, GC, SM, SC, CH SP, GP CH, SM, SC, GC<br />
Poor<br />
Not suitable<br />
1.5. Frequency <strong>of</strong> test<br />
Sl.<br />
No.<br />
Test Designation<br />
Ml, Ml, MH<br />
OLOl, OH, Pt<br />
Table-3<br />
Frequency <strong>of</strong> test as per<br />
MoRTH<br />
Frequency <strong>of</strong> test <strong>of</strong> ODR & VR as<br />
recommended by IRC-SP-20<br />
1. Mechanical analysis <strong>of</strong> soil 2 tests/3000m 3<br />
2. Plastic <strong>of</strong> soil 2 tests/3000m 3<br />
3. Density test <strong>of</strong> soil 2 tests/3000m 3<br />
4. Deleterious content As & when required<br />
5. Moisture content <strong>of</strong> soil 1 tests/250m 3 2-3 tests per 250m 3 <strong>of</strong> loose soil<br />
6. CBR test <strong>of</strong> soil 1 tests/3000m 3 or more<br />
7. Compaction test <strong>of</strong> soil for 5-10 tests/1000m 3 5-10 tests per 1000m 3<br />
each layer<br />
Note : CBR <strong>of</strong> sub-grade should not be less than 2%<br />
MoRTH- Ministry <strong>of</strong> road transport and highways<br />
Table-7<br />
E.W. COMPACTION : The information given should be taken only as an approximate guide<br />
Material Major Division Sub-groups Suitable<br />
type <strong>of</strong><br />
compacting<br />
equipment<br />
No. <strong>of</strong><br />
passes for<br />
satisfactor<br />
y<br />
compactio<br />
n (Min.)<br />
Thickness<br />
<strong>of</strong> loose<br />
layer<br />
(Actual<br />
thickness<br />
depends<br />
on plant<br />
used),<br />
Max cm.<br />
Remarks<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
21<br />
1 2 3 4 5 6 7<br />
Coarse<br />
grained<br />
soil and<br />
other<br />
materials<br />
Fine<br />
grained<br />
soils<br />
Gravel and<br />
gravelly soils<br />
Soils having<br />
low<br />
compressibility<br />
Soils having<br />
high<br />
compressibility<br />
Fibrous<br />
organic soils<br />
with very high<br />
compressibility<br />
Well-graded<br />
gravel, gravels<br />
and mixtures,<br />
little or no fines<br />
Well-graded<br />
gravel sand<br />
mixtures with<br />
excellent clay<br />
blinder uniform<br />
gravel with little<br />
or no fines poorly<br />
graded gravel and<br />
gravel sand<br />
mixtures little or<br />
no fines<br />
Gravel with fines.<br />
Silty gravel,<br />
clayey gravel,<br />
poorly-graded<br />
gravel-sand-clay<br />
mixtures<br />
Well grained<br />
sands and<br />
gravelly sands,<br />
little or no fines<br />
Well-graded sand<br />
with excellent<br />
clay-binder<br />
Uniform sands<br />
with little or no<br />
fines silts<br />
(inorganic) and<br />
very fine sands,<br />
rock flour, silty or<br />
clayey fine sands,<br />
with slight<br />
plasticity. Silty<br />
and sandy clays<br />
(inorganic or<br />
medium<br />
plasticity. Clays<br />
(inorganic) or<br />
medium<br />
plasticity.<br />
Micaceous or<br />
distomaccous<br />
fine sandy and<br />
silty soils, elastic<br />
silts<br />
Clays (inorganic)<br />
or high plasticity,<br />
fat clays<br />
Organic clays <strong>of</strong><br />
high plasticity<br />
pest and other<br />
highly organic<br />
swamp soils.<br />
Smoothwheel<br />
roller<br />
pneumatictyred<br />
roller<br />
vibrating<br />
smooth<br />
wheel roller<br />
heavy<br />
bivrating<br />
plate frogrammer<br />
powerrammer<br />
Smooth<br />
wheel roller<br />
pneumatic<br />
tyred roller<br />
track laying<br />
tractor sheep<br />
foot roller<br />
frog rammer<br />
power<br />
rammer.<br />
6<br />
6<br />
6<br />
2*<br />
3**<br />
4<br />
--<br />
10<br />
30<br />
2*<br />
2*<br />
20<br />
20<br />
20<br />
37.5<br />
37.5<br />
20<br />
20<br />
--<br />
15<br />
15<br />
37.5<br />
20<br />
Vibrating rollers or<br />
vibrators will be<br />
very satisfactory if<br />
the moisture conent<br />
<strong>of</strong> the soil is low,<br />
but may be<br />
uneconomical close<br />
moisture content<br />
control is essential<br />
when the moisture<br />
content is relatively<br />
high it is preferably<br />
to use a pneumatic<br />
tyred roller<br />
--<br />
--<br />
These soils are<br />
considered very<br />
undesirable for use<br />
in earthwork and<br />
should not be<br />
employed if they<br />
are highly<br />
compressible it is<br />
advisable to<br />
compact these soils<br />
at the moisture<br />
content at which no<br />
change will occur<br />
subsequently<br />
As for micaceious or<br />
distomaceous fine<br />
sandy and silty soils<br />
these soils are<br />
entirely unsuitable<br />
for earthwork<br />
construction.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
22<br />
5. Materials for cement concrete :<br />
This includes the I.S. specification <strong>of</strong> the materials such as cement, coarse and fine aggregate,<br />
water, and reinforcement. For details respective I.S. specification may be referred to.<br />
5.1. Fine aggregate : IS 383<br />
O.T.D. . Zoning: The fine aggregates suitable for concrete shall be in zone-I, II or III. Fine<br />
aggregate in zone-IV are not suitable for concrete. The zone can be decided by grain size<br />
analysis by sieving as follows.<br />
Table-21 (IS-383-Table No.-4)<br />
IS Sieve<br />
Percentage passing for<br />
Designation<br />
Grading Zone-I Grading Zone-II Grading Zone-III Grading Zone-IV<br />
10m. 100 100 100 100<br />
4.75mm 90-100 90-100 90-100 95-100<br />
2.36mm 60-95 75-100 85-100 95-100<br />
1.18mm 30-70 55-90 75-100 90-100<br />
600 micron 15-34 35-59 60-79 80-100<br />
300 micron 5-20 8-30 12-40 15-50<br />
150 micron 0-10 0-10 0-10 0-15<br />
5.1.2. Bulkage :- Maximum buklage shall be limited to 20%<br />
5.2. Quality <strong>of</strong> coarse aggregates:<br />
5.2.1. Crushing value Permissible Value Method <strong>of</strong> test<br />
a. All concrete woks except<br />
wearing surface.<br />
Maximum 45% IS 2386-1963 part –IV<br />
b For wearing surface -do- 30% -do-<br />
5.2.2. Impact value Permissible Limit Method <strong>of</strong> test<br />
a. All concrete woks except<br />
wearing surface.<br />
Maximum 45% IS 2386-1963 part –IV<br />
b For wearing surface -do- 30% -do-<br />
5.2.3. Abrasion value<br />
a. All concrete woks except<br />
wearing surface.<br />
Maximum 50% -do-<br />
b For wearing surface -do- 30% -do-<br />
O.T.D. . Deleterious materials : Maximum percentage shall be 5%.<br />
5.2.5. Alkali aggregate reaction:- It is harmful for concrete. The test shall be conducted and use <strong>of</strong><br />
pozzolanic cement or pozzolanic admixture shall be studied.<br />
5.2.6. Gradation <strong>of</strong> coarse aggregate <strong>of</strong> nominal size:<br />
Table-22<br />
IS Sieve (mm)<br />
Percentage passing for graded aggregates <strong>of</strong> nominal size<br />
40 20 15 12.5<br />
80 100 -- -- --<br />
40 95-100 100 -- --<br />
20 30-70 95-100 100 100<br />
16 -- -- 90-100 --<br />
12.5 -- -- -- 90-100<br />
10 10.35 25.55 30.70 40-85<br />
4.75 0-5 0-10 0-10 0-10<br />
2.36 -- -- -- --<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
23<br />
5.3. Cement : The normal type <strong>of</strong> cement used are :<br />
1. Ordinary Portland cement 33 grade, 43 grade, 53 grade conforming to IS: 269, IS:8112 &<br />
IS:12269 respectively.<br />
2. Port land slag cement IS: 544<br />
3. Port land pozzolana cement I.S : 1489<br />
5.3.1. Standard <strong>of</strong> physical test <strong>of</strong> cement<br />
a. Initial setting time - minimum 30 minutes<br />
b. Final setting time - Maximum 10 hrs.<br />
c. Fineness - (i) 225 (m 2 /kg) for OPC & PSC<br />
(ii) 300 (m 2 /kg) for PPC<br />
d. Soundness - a. 10mm maximum (Lechat expansion)<br />
b. Maximum 0.8% in Autoclave<br />
e. Compressive Strength :<br />
Time<br />
33 grade OPC, PSC,<br />
PPC<br />
43 grade OPC 53 grade OPC<br />
a. 72 hrs. 16MP2 23MP2 27MP2<br />
b. 7 days 22MP2 33MP2 37MP2<br />
c. 28 days 33MP2 43MP2 53MP2<br />
O.T.D. . Standards for chemical test :<br />
Table – 23<br />
Percentage by mass (Max.)<br />
Types <strong>of</strong> cement OPC PPC PSC Remarks<br />
33 43 53<br />
1. Magnesia 6 6 6 6 8<br />
2. Insoluble residue 4 2 2 x+4(100-x)<br />
100<br />
4 Where x=% <strong>of</strong> pozollana<br />
in cement<br />
3. Sulphur trioxide 2.5d 2.5d 2.5d 3 3 Where d-3% when<br />
C,A>5%<br />
4. Sulphur as sulphide -- -- -- -- 1.5<br />
5. Loss on ignition 5 5 4 5 5<br />
6. Chloride 0.5 0.05 0.05 -- -- Maximum for prestressed<br />
and long span<br />
structures<br />
5.4. Water :<br />
Normal potable water shall be used for concrete. The pH value shall be not less than 6.<br />
Permissible limits <strong>of</strong> solids – I.S. :3025.<br />
Organic - 2000mg/litre<br />
Chloride - 2000mg/litre<br />
Inorganic - 3000mg/litre<br />
Sulphate - 400 mg/litre<br />
Suspended matter - 2000mg/litre<br />
5.5. Reinforcement steel :<br />
The normal reinforcement steel bars may be mild and medium tensile steel bars or high<br />
strength deformed steel bars conforming to I.S.-432 and IS:1786 respectively. The limits <strong>of</strong><br />
physical and chemicals properties <strong>of</strong> deformed bar.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
24<br />
O....<br />
Mechanical properties<br />
Sl.<br />
No.<br />
Table – 24 (IS : 1786, Table No.-3)<br />
Property F3415 Grade Fc500 Fe550<br />
1 2 3 4 5<br />
1 0.2% pro<strong>of</strong> stress/yield stress,<br />
Min, N.mm 2<br />
2. Elongation, percent, Min, on<br />
gauge length 5.56 v(A), where<br />
A is the cross sectional area <strong>of</strong><br />
the test piece.<br />
3. Tensile strength, Min 10%more than the<br />
actual 0.2% pro<strong>of</strong><br />
stress but not less<br />
than 485.0 N/mm 2<br />
415.0 500.0 550.0<br />
14.5 12.0 8.0<br />
8% more than the<br />
actual 0.2% pro<strong>of</strong><br />
stress but not less<br />
than 545.0 N/mm 2<br />
6% more than the<br />
actual 0.2% pro<strong>of</strong><br />
stress but not less<br />
than 585.0 N/mm 2<br />
b. Chemical properties :<br />
Table – 24 (IS : 1786)<br />
Constituent<br />
Percent, maximum<br />
Fe415 Fe500 Fe550<br />
Carbon 0.30 0.30 0.30<br />
Sulphur 0.060 0.055 0.055<br />
Phosphorous 0.060 0.055 0.050<br />
Sulphur and phosphorous 0.11 0.105 0.10<br />
c. Frequency <strong>of</strong> test (IS : 1786)<br />
One test <strong>of</strong> each type <strong>of</strong> MS rod to be used in each structure.<br />
d. Pull out test : As per IS:2770<br />
e. Bend and rebend test : IS : 1786.<br />
f. Mass and cross sectional area (IS : 1786).<br />
Nominal size (mm) Sectional area (mm 2 ) Mass per meter (kg)<br />
6 28.3 0.222<br />
8 50.3 0.395<br />
10 78.6 0.617<br />
12 113.1 0.888<br />
16 201.2 1.580<br />
20 314.3 2.47<br />
25 491.1 3.85<br />
28 616.0 4.83<br />
32 804.6 6.31<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
25<br />
O.T. . . Construction joints :<br />
The concreting shall be done up to construction joints, but while commencing the<br />
work on the cold joints, the aggregates shall be exposed with high pressure water jet or any<br />
other method. It is preferable to expose the aggregates previously i.e. just after the closer <strong>of</strong><br />
the work by wire brushing and cleaning. Cleaning may be done by air water jetting or any<br />
other method.<br />
6. Concrete works.<br />
6.1. Grade <strong>of</strong> concrete<br />
The grade designation shall be as follows.<br />
a. Ordinary concrete M10, M15 & M20<br />
b. Standard concrete M25, M30, M35, M40, M45, M50 & M55<br />
c. High strength concrete M60, M65, M70, M75 & M80<br />
d. Concrete exposed to seawater shall be at least M20 & M30 for P.C.C. & R.C.C.<br />
respectively. The use <strong>of</strong> slag or pozzolana cement is advantageous under such conditions.<br />
6.2. Workability <strong>of</strong> concrete<br />
Table –26<br />
Placing conditions<br />
Binding concrete; shallow sections; pavements using<br />
lavers;<br />
Mass concrete; lightly reinforced sections in slabs,<br />
beams, walls, columns; floors; hand placed<br />
pavements; canal lining; strip footings.<br />
Heavily reinforced sections in slabs, beams, walls,<br />
columns; slipfonn work; pumped concrete<br />
Trench fill;<br />
In-situ pilling<br />
Degree <strong>of</strong><br />
workability<br />
Slump (mm)<br />
1 2 3<br />
Very low Compacting factor from 0.75<br />
to 0.8 is suggested<br />
Low 25-75<br />
Medium 50-100<br />
75-10<br />
High 100-150<br />
Tremie concrete; Very high Refer IS :9103<br />
Note : For most <strong>of</strong> the placing conditions, internal vibrators (neddle vibrators) are suitable.<br />
The diameter <strong>of</strong> the needle shall be determined based on the density and spacing <strong>of</strong> reinforcement<br />
bars and thickness <strong>of</strong> sections. For tremie concrete, vibrators are not required to be used.<br />
6.3. Mild : Concrete surfaces protected against weather or aggressive conditions except those<br />
situated in coastal area.<br />
O.T.D. . Moderate : Concrete surfaces sheltered from severe rain or freezing whilst wet.<br />
Concrete exposed to condensation and rain.<br />
Concrete continuously under water.<br />
Concrete in contact <strong>of</strong> buried under non-aggressive soils/ ground water.<br />
Concrete surfaces sheltered from saturated salt air in coastal area.<br />
6.3.3. Severe : Concrete surfaces exposed to severe rain, alternate wetting and drying or occasional<br />
freezing whilst wet or severe condensation. Concrete lasticize immersed in sea water<br />
concrete expose to coastal environment.<br />
6.3.4. Very severe : Concrete surfaces exposed to sea water spray, corrosive fumes or severe freezing<br />
conditions whiles wet.<br />
Concrete incontact with or buried under aggressive sub-soil/ ground water.<br />
6.3.5. Extreme : Surface <strong>of</strong> members in tidal zone.<br />
Members indirect contact with liquid / solid aggressive chemicals.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
26<br />
Exposure a.PCC<br />
Minimum W/C grade<br />
Cement<br />
ratio<br />
Content<br />
maximum<br />
Kg/(m 3 )<br />
Mild 220 0.6 --<br />
Moderate 240 0.6 M15<br />
Severe 250 0.50 M20<br />
Very severe 260 0.45 M20<br />
Extreme 280 0.40 M25<br />
b.PCC<br />
Mild 300 0.55 M20<br />
Moderate 300 0.50 M25<br />
Severe 320 0.45 M30<br />
Very severe 340 0.45 M35<br />
Extreme 360 0.40 M40<br />
6.4. Nominal mix concrete<br />
The nominal mix concrete may be used for concrete <strong>of</strong> M20 grade and lower as per the table<br />
below:<br />
Table – 27<br />
Grade <strong>of</strong> concrete<br />
Total qty. <strong>of</strong> dry<br />
aggregate for 50kg <strong>of</strong><br />
cement in kg<br />
Proportion <strong>of</strong> fine to<br />
coarse aggregate by<br />
mass<br />
Max. qty. <strong>of</strong> water<br />
per 50kg <strong>of</strong> cement<br />
in litre<br />
M5 800 Generally 60<br />
M 7.5 625 1:2 45<br />
M10 480 -- 34<br />
M15 330 -- 32<br />
M20 250 -- 30<br />
6.5. Design Mix : Ref. IS : 10262<br />
6.6. Placing : The concrete shall be placed and compacted before initial setting time <strong>of</strong> cement.<br />
6.7. Curing : The period for moisture curing shall be minimum 10 days. It may be extended upto<br />
28 days.<br />
6.8. Stripping time : Following stripping time may followed.<br />
Type <strong>of</strong> form work<br />
a. Vertical 16-25 h<br />
b. S<strong>of</strong>fit form work to slab 3 days<br />
c. S<strong>of</strong>fit form work to beam 7 days<br />
d. Props to slab<br />
(i) Spanning upto 4.5m<br />
(ii) Spanning over 4.5m<br />
O.T. . . Nominal cover:<br />
Minimum period before striking form work.<br />
7 days<br />
14 days<br />
Cover to be provided depending on exposure condition.<br />
Exposure<br />
Cover in mm<br />
Mild 20<br />
Moderate 30<br />
Sever 45<br />
6.9. Frequency <strong>of</strong> sampling : Depending on quantity <strong>of</strong> work, number <strong>of</strong> samples are to be taken.<br />
Qty. in m 3 No. <strong>of</strong> samples<br />
1-5 1 Set<br />
6-15 2 Set<br />
16-30 3 Set<br />
31-50 4 Set<br />
51 to above 4 plus one additional<br />
set for each 50m 3 or part.<br />
(one set= 6 Nos. <strong>of</strong> samples)<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
27<br />
6.10. Concrete works :<br />
Table – 28<br />
Sl.<br />
No.<br />
A. Coarse aggregate<br />
Test<br />
Frequency as per MoRTH<br />
1. Sieve analysis flakiness and elongation index One test for every 150m 3 or less<br />
2. Specific gravity, bulk density, moisture content<br />
and absorption.<br />
-do-<br />
3. Soundness -do-<br />
4. Abrasion, impact, aggregate crushing value -do-<br />
5. Organic impurities value<br />
6. Alkali-aggregate reactivity Twice in one season<br />
7. Petro-graphic test -do-<br />
B. Fine Aggregates<br />
1. Sieve analysis One test for every 1.50m 3 <strong>of</strong> sand<br />
2. Organic impurities -do-<br />
3. Soundness -do-<br />
4. Sp. Gravity, moisture contents and absorption -do-<br />
C. Cement<br />
1. Fineness One test for each brand and batch <strong>of</strong> cement<br />
2. Setting time -do-<br />
3. Compressive strength<br />
D. Finished concrete<br />
1. Slump test One test for each shift both at mixer and at placement<br />
site. As frequently as possible.<br />
2. Compressive strength -do-<br />
3. Cement content One test every 3 months<br />
6.12 Aceptance criteria for concrete (IS : 456-2000, clause-16):<br />
The concrete shall be deemed to comply with the strength requirements when both the<br />
following conditions are met.<br />
a. The mean strength determined from any group <strong>of</strong> four consecutive tests results shall<br />
satisfy the following conditions.<br />
(i) Mean strength :<br />
a. For M13 grade : fa + 0.825 x established standard deviation<br />
(rounded to 0.5) N/mm 2<br />
OR<br />
Fa + 3N/mm 2 (which ever is greater).<br />
b. For M20 grade : Mean strengthfa + 0.825 standard<br />
or above deviation (rounded to nearest 0.5) N/mm 2<br />
OR<br />
Fa + 4N/mm 2 (which ever is greater).<br />
In absence <strong>of</strong> data for SD, the SD may be taken 3.5 for M10 and M15 grade, 4 for M20 and M25 grade<br />
and 5 for M30 to M50 grade.<br />
b. Individual test results :<br />
For M13 grade<br />
Strength fck – 3N/mm 2<br />
For M20 grade or above<br />
Strength fck – 4N/mm 2<br />
(Where fck is the characteristic strength <strong>of</strong> concrete)<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
28<br />
7. Common Burnt clay bricks :<br />
7.1. Brick classification : (IS : 1077 & IS : 2180)<br />
Class<br />
Average compressive strength<br />
(M/mm 2 )<br />
100 100<br />
75 75<br />
35 35<br />
30 30<br />
25 25<br />
20 20<br />
17.5 17.5<br />
15 15<br />
12.5 12.5<br />
10 10<br />
7.5 7.5<br />
5 5<br />
3.5<br />
7.2. Dimension : (IS : 1077)<br />
a. Modular<br />
Length (mm) Width (mm) Height (mm)<br />
190 90 90<br />
190 90 90<br />
b. Non-modular<br />
Length (mm) Width (mm) Height (mm)<br />
230 110 70<br />
230 110 30<br />
N. B. : Tolerance for 20 bricks <strong>of</strong> modular and non-modular are 80 mm &<br />
40mm for different heights.<br />
7.3. Water absorption : (IS : 3495).<br />
After immersion in cold water for 24 hours<br />
a. Upto class 12.5 : Maximum 20%<br />
b. Higher pressure : Maximum 15%<br />
7.4. Frequency <strong>of</strong> tests :<br />
20 bricks shall be tested out <strong>of</strong> 50,000 & 1,00,000 bricks in class 100 & 75.<br />
7.5. Grading <strong>of</strong> sand for plaster (IS : 1542).<br />
IS sieve designation (mm)<br />
Percentage passing by weight<br />
10 100<br />
4.75 95.100<br />
2.236 95-100<br />
1.18 90-100<br />
600 micron 80-100<br />
300 micron 20-65<br />
150 micron 0-50<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
29<br />
8. Pipes, pipe fitting valves and specials:<br />
WATER SUPPLY<br />
Pipes <strong>of</strong> different types and classes, pipe fittings, valves and specials used for pipe laying work should be<br />
manufacturer and factory tested hy7drostatically as per the relevant I.S. specifications as given below. The CI and<br />
DI pipes on DGS&D contract are to be tested by the agency authorized by DGS&D/EPM and PVC pipes and fittings<br />
are to be tested by CIPET (Central Institute <strong>of</strong> Plastic Engineering and technology).<br />
8.1. Pipe<br />
O.T... Reference to I.S. code :<br />
IS : 1536 Specification for centrifugally cast spun iron pressure pipe for water, gas & lasti.<br />
IS : 8329 Specification for centrifugally cast (spun) ductile iron pressure pipe for water, gas & lasti.<br />
IS : 3589<br />
IS : 4985<br />
Specification for electrically welded steel pipe (first revision)<br />
Specification for electrically welded steel pipes (first revision)<br />
IS : 4958 Un lasticized PVC pipes for potable water supplies.<br />
IS : 10221<br />
Code <strong>of</strong> practice for coating and wrapping under ground steel pipes.<br />
IS : 11906<br />
Recommendation for cement master lining <strong>of</strong> cast iron milk steel and ductile Iron pipes<br />
and fitting for transport <strong>of</strong><br />
water.<br />
8.2. Pipe fittings and jointing materials.<br />
8.2.1. Reference to code :<br />
IS : 1538 Specification for cast iron fitting for pressure pipe (para 1 to 24) for water, gas & sewge<br />
IS : 10124 Febricated PVC fitting for potable water samples(para 1 to 13)<br />
IS : 782<br />
IS : 5383<br />
O.T...<br />
Specification for caulking lead<br />
Rubber gaskets for double iron pipes.<br />
Valves and specials<br />
IS : 780<br />
IS : 2906<br />
IS : 2685<br />
IS : 5312<br />
Specification for sluice valves for water works purpose (50mm to 300mm)<br />
Specification for sluice valves for water works purpose (350mm to 1200mm)<br />
Code <strong>of</strong> practice for selection installation and maintenance <strong>of</strong> sluice values.<br />
Specification for swing check type reflux (Non-return valves) for water works<br />
purpose.<br />
8.3. Inspection <strong>of</strong> pipes before final acceptance.<br />
Each pipe shall have cast, stamped or indelibly painted the trade mark <strong>of</strong> manufacturer, the nominal dia,<br />
class weight, batch number, last two digits <strong>of</strong> the year <strong>of</strong> manufacturer and also with ISI certificate mark. The<br />
pipes should bear the stamping <strong>of</strong> testing agency like DGS & D in case <strong>of</strong> CI & DI pipes CIPET in case <strong>of</strong> PVC pipes<br />
etc.<br />
8.3.1. Pipe laying<br />
8.3.2. Laying <strong>of</strong> cast iron pipes :<br />
Inspection <strong>of</strong> pipes before laying :<br />
Before laying the pipes and fittings shall be inspected for defects and be rung with a light hammer,<br />
preferably while suspended, to detect cracks. Smearing the outside with chalk dust helps in the location <strong>of</strong> cracks.<br />
If doubt persists further confirmation may be obtained by pouring a little kerosene on the inside <strong>of</strong> the pipe at the<br />
suspected spot. If crack is present, the kerosene seeps thorough and shows on the outer surface. Any pipe found<br />
unsuitable after inspection before laying shall be rejected.<br />
Laying should be done as per IS code <strong>of</strong> practice 3114 (Third Revision).<br />
a) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be less than 900mm measured from the top <strong>of</strong><br />
pipe to the surface <strong>of</strong> ground and not less than 750mm else where.<br />
b) Width <strong>of</strong> Trench : The width <strong>of</strong> trench should be 200 mm more on either side <strong>of</strong> the external dia<br />
<strong>of</strong> pipe (i.e. External dia <strong>of</strong> pipe + 2 x 200mm). Additional width shall be provided at position <strong>of</strong><br />
sockets and flanges for jointing.<br />
c) Cover over the pipe- Minimum cover <strong>of</strong> 1M in recommended under road way and may be<br />
modified to meet the local condition.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
30<br />
8.3.3. Laying and jointing <strong>of</strong> ductile iron pipes :<br />
The pipes should be laid as per the specification laid down in IS : 12288.<br />
a) Width <strong>of</strong> Trench :- The width <strong>of</strong> trench at bottom shall provide not less than 200mm clearance on<br />
both sides <strong>of</strong> pipe (i.e. external dia <strong>of</strong> pipe + 2x 200mm)<br />
b) Cover over the pipe – In agricultural land the depth should be sufficient to provide cover not less<br />
than 900mm and under a roadway the cover should be minimum 1.0M.<br />
8.3.4. Laying <strong>of</strong> welded steel pipes :<br />
The laying should be done as per IS – 5822 (First revision).<br />
a) Width <strong>of</strong> Trench – The width at the bottom below in the faces should not be less than 200 mm<br />
clearance on either side <strong>of</strong> the pipes.<br />
b) Cover over the pipe – When the pipeline is under a roadway, a minimum cover <strong>of</strong> 1.0 Meter should<br />
be provided and can be modified to suit the local condition by taking necessary precaution.<br />
c) Pipe welding :- In case <strong>of</strong> welding the pipe in the trench, additional excavation <strong>of</strong> not more than 600<br />
mm in depth 900mm in length should be provided all round the pipe at the position <strong>of</strong> the joints for<br />
facility <strong>of</strong> welding.<br />
d) Coating and wrapping <strong>of</strong> pipes :- Against internal corrosion, steel pipes are given epoxy lining or hot<br />
applied coal tar/asphalt lining or rich cement mortar lining at works or the field by centrifugal<br />
process. The outer coating for under ground pipeline may be in cement sand gunniting or hot applied<br />
coal tar asphalt enamel reinforced with fiber glass fabric yarn. Coating and wrapping should be done<br />
as per IS 10221.<br />
8.3.5. Laying <strong>of</strong> PVC pipes :<br />
Laying and joining <strong>of</strong> PVC pipes should be done as per IS: 7634 (part – III).<br />
a) Width <strong>of</strong> trench :- The trench should be as narrow as practicable. As a normal practice this may be kept<br />
from 0.30M over the outside dia or pipe (i..e external dia <strong>of</strong> pipe + 30 cum.).<br />
b) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be 1.00M from the ground level.<br />
c) The trench bottom where it is rocky and un-even a layer <strong>of</strong> sand or alluvial earth <strong>of</strong> 100mm depth should<br />
be provided under the pipe.<br />
d) Jointing <strong>of</strong> pipes : Solvent welding technique <strong>of</strong>fers as easy and ample type <strong>of</strong> joint in PVC pipe used<br />
spigot and socket type joints. The cement solvent to be used for jointing should be as per the<br />
recommendations <strong>of</strong> the pipe manufacturer.<br />
8.4. Testing <strong>of</strong> pipe line after laying (field test pressure).<br />
After laying and jointing, the mains shall be slowly and carefully charged with water, so that all air is<br />
expelled from the main by providing a25mm inlet with a stop cock, allowed to stand full <strong>of</strong> water for a few days if<br />
time permits, and then tested with pressure.<br />
The field test pressure to be imposed should be not less than the maximum <strong>of</strong> the following.<br />
a) 1.5times the maximum sustained operating pressure.<br />
b) 1.5 times the maximum pipeline static pressure.<br />
c) Sum <strong>of</strong> the maximum sustained operating pressure and the maximum surge pressure.<br />
d) Sum <strong>of</strong> the maximum pipe line static pressure and the maximum equal to the work test pressure for any<br />
pipe fitting in corporate.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
31<br />
9.0. Production wells (large dia tube wells):<br />
9.1. Materials for constructions :<br />
1. Casting pipes should be mild steel or UPVC pipes. Mild steel pipes should conform to IS :4270<br />
and ASTM-DN-1785. The UPVC pipes should be <strong>of</strong> ASTM quality (Sch-40, Sch-80 or Sch-120<br />
depending on site condition) and should also confirm to IS:2818.<br />
2. Well screens and slotted pipes should conform to IS : 8110. The well screens may be monometal,<br />
bimetal, stainless steel or PVC.<br />
Sufficient opening should be provided for screens and slotted pipes so that 70% or more <strong>of</strong> sand grains in<br />
the natural aquifer where uniformity co-efficient should range between 2.0 to 2.50. For soils with uniformly<br />
coefficient less than 1.5, pea gravel pack should be used.<br />
The total area <strong>of</strong> opening should be such s to maintain on entrance velocity less than necessary to carry<br />
the finest particle <strong>of</strong> sand that is to be excluded by the screen. In general, it should be 4 to 6 cm/sec. With the<br />
gravel shrouding.<br />
The opening should preferably be ‘V’ shaped.<br />
O.... Gravel to be used for shrouding (packing around the casing pipe) should confirm to IS : 4099.<br />
The gravel wall provided may vary in thickness to suit the size and depth <strong>of</strong> boring and may vary<br />
from 10cm to 25cm but usually 10cm.<br />
9.2. Construction <strong>of</strong> tube well :<br />
The drilling operation should be taken up with rotary drilling rig. Down the whole Hammer Rig or<br />
Combination Rig depending on type <strong>of</strong> strata and conforming to IS :2800 (Part-I).<br />
For drilling with rotary drilling rig in s<strong>of</strong>t formations, bentonite powder should be used in place <strong>of</strong> local<br />
mud as sealing compound to facilitate drilling operation. The casing pipe and well strainer should be lowered<br />
perfectly vertically and well screen should be properly placed against the aquifers. The casing pipe should be<br />
extended to at least 60 cm above the ground level.<br />
The annular space between the bore and the housing pipe (casing pipe) should be cement grouted upto at<br />
least 5m below ground level to provide a sanitary sealing.<br />
9.3. Testing and development <strong>of</strong> tube well :<br />
9.3.1. The testing <strong>of</strong> tube well should be conducted as per IS : 2800 (part-II).<br />
Tube wells are to be tested for plumbness and alignment normally after completion <strong>of</strong> drilling but<br />
immediately after the housing pipes are installed and prior to commencement <strong>of</strong> gravel fitting in the case <strong>of</strong> gravel<br />
shrouded tube well. For wells encased with pipes less than 350mm dia meter, the verticality <strong>of</strong> tube well shall have<br />
a deviation not exceeding 10cm per 30 m depth <strong>of</strong> the tube well and the deviation shall be in one direction and in<br />
one place only.<br />
In the case gravel shrouded tube well, if the pipe assembly is found included in a start position. It should<br />
be pulled in a desired directions to rectify the stantness and bringing the pipe assembly into permissible limit <strong>of</strong><br />
verticality.<br />
9.3.2. <strong>Development</strong> <strong>of</strong> tubewell :<br />
into service.<br />
The object <strong>of</strong> well development is the removal <strong>of</strong> silt, fine sand and other such materials form a zone<br />
immediately around the well, screen, there by creating larger passage in the formation through which<br />
water can flow more freely towards the wells.<br />
Well development includes the operation <strong>of</strong> flushing, testing and equipping the wells before they are put<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
32<br />
The development should be carried on with an air compressor <strong>of</strong> suitable capacity (to develop 7kg to<br />
10kg/Cm 2 and airflow <strong>of</strong> 2m 3 /min) In accordance with IS : 11189, and the process should be continued<br />
until the stabilization <strong>of</strong> sand gravel pack and discharge <strong>of</strong> clear water is fully assured.<br />
10. Pumping sets :<br />
10.1. Reference & code<br />
The pumping sets and accessories should conform to following IS specification:<br />
IS 1520 Horizontal centrifugal pumps for clear cold fresh water (2 nd revision)<br />
IS 6595<br />
IS 9684<br />
IS 1710<br />
IS 8034<br />
IS 10825<br />
IS 325/19758<br />
IS 7538<br />
Horizontal centrifugal pumps for clear cold fresh water for Agricultural purpose (first revision).<br />
Selection, installation, operation and maintenance <strong>of</strong> Horizontal centrifugal pumps for<br />
agricultural purpose.<br />
Vertical turbine pumps for clear. Cold fresh water (1 st revision).<br />
Submersible pump sets for clear, cold, fresh water.<br />
Foot valve, Reflex value or non return valve and bore valves to be used in suction line <strong>of</strong><br />
agriculture pumping sets. (first revision).<br />
Three phase induction motors.<br />
Motors for submersible pumps<br />
10.2. Inspection <strong>of</strong> pumps before final acceptance.<br />
1. The name plates <strong>of</strong> the pump and motor with details like Sl. No.- Head, Discharge, rpm, HP/KW<br />
<strong>of</strong> motor etc engraved on the name plate should be clearly verified to confirm within the<br />
pumping set is as per the supply order.<br />
2. Manufacturer’s test report along with laboratory hydrostatic test reports <strong>of</strong> the pumps should be<br />
verified to know the duty <strong>of</strong> pump.<br />
3. The supplier should give at lest one copy <strong>of</strong> specific installation and operation manual <strong>of</strong> the<br />
pumping sets supplied by them.<br />
4. The field test for pumps should be conducted to confirm the duty <strong>of</strong> pumps after ins installation.<br />
10.3. Pump installation<br />
The installation <strong>of</strong> centrifugal pumps should proceed through five stages in the following order.<br />
1. Preparing the foundation and locate the foundation bolts.<br />
2. Locating the pump on the foundation bolts, however resting on leveling wedges, which permit not only<br />
easy leveling but also space for fitting the grunt later on.<br />
3. Levelling<br />
4. Grouting<br />
5. Alignment<br />
The foundation should be sufficiently substantial to absorb vibrating and to form a permanent, rigid<br />
support for the base plate.<br />
Alignment <strong>of</strong> the pump sets should be checked even if they are received aligned by the<br />
manufacturer. The alignment should be proper both for parallelism (by filler gauge) and for coasiablity<br />
(by straight edge or by dial gauge).<br />
During all alignment- checks both the shafts should be pressed hard, over to one side while<br />
talking the readings alignment should also be checked after fastening the piping and there after<br />
periodically during operation.<br />
Submersible pumps with wet type motors should be fitted with water and the opening should<br />
be properly plugged after filling water.<br />
Pumps kept in storage for a long time should be thoroughly cleaned before installation.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
33<br />
10.4. Testing <strong>of</strong> pumps :<br />
There are two types <strong>of</strong> pumps testing.<br />
1. in the shop or laboratory at the manufacturer works.<br />
2. Testing in the field after installation<br />
(i)<br />
(ii)<br />
(iii)<br />
Every pump must be tested before it is finally accepted. It is necessary for comparision <strong>of</strong><br />
specified, predicated and actual performance after installation, relating to head, discharge<br />
power, efficiency and suction requirements centrifugal pumps should be listed as per IS-9137<br />
(Class ‘C’ code <strong>of</strong> testing) and IS-11346.<br />
The scheme <strong>of</strong> testing includes taking readings, doing calculation and plotting <strong>of</strong><br />
The H-Q characteristics<br />
11. Water Quality<br />
The P-Q characteristics.<br />
The efficiency versus Q characteristics<br />
11.1. Recommended guidelines for physical and chemical parameter:<br />
Sl.<br />
No.<br />
Characteristics *Acceptable **Cause for<br />
1. Turbidity (NTU) 1 10<br />
2. Colour (Units on Platinum Cobalt scale) 5 25<br />
3. Teste and Odour Unobjectionable Objectionable<br />
4. PH 7.0 to 8.5 9.0<br />
5. Total dissolved solids (mg/I) 500 2000<br />
6. Chlorides (as CI) (mg/I) 20 600<br />
7. Chlorides (as CI) (mg/I) 200 1000<br />
8. Sulphates (as SO4 (mg/I) 200 400<br />
9. Fluorides (as F) (mg/I) 1.0 1.5<br />
10. Nitrates (as NO3 (mg/I) 45 45<br />
11. Calcium (as Ca) (mg/I) 75 200<br />
12. Magnesium (as Mg) (mg/I) 30 150<br />
If there are 250 mg/I <strong>of</strong> sulphates, Mg content can be increased to maximum <strong>of</strong><br />
125mg/I with the reduction <strong>of</strong> sulphates at the rate <strong>of</strong> I unit per every 2.5 units <strong>of</strong> sulphates.<br />
Sl.<br />
No.<br />
Characteristics *Acceptable **Cause for<br />
13. Iron (as Fe) mg/I 0.1 1.0<br />
14. Manganese (as Mn) mg/I 0.05 0.5<br />
15. Copper (as Cu) (mg/I) 0.05 1.5<br />
16. Aluminium (as AI) (mg/I) 0.03 0.2<br />
17. Residual Chloride (mg/I) 0.2 >1.0<br />
18. Zinc (as Zn) (mg/I) 5.0 15.0<br />
19. Phenolic compounds (as Phenol) (mg/I) 0.001 0.002<br />
20. Anionic detergents (mg/I) (as MBAS) 0.2 1.0<br />
21. Mineral Oil (mg/I) 0.01 0.03<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
34<br />
TOXIC MATERIALS<br />
22. Arsenic (as As) (mg/I) 0.01 0.05<br />
23. Cadmium (as CD) (mg/I) 0.01 0.01<br />
24. Chromium<br />
(as hexavalent Cr) (mg/I) 0.05 0.05<br />
25. Cyanides (as CN) (mg/I) 0.05 0.05<br />
26. Lead (as Pb) (mg/I) 0.05 0.05<br />
27. Selenium (as SC) (mg/I) 0.01 0.01<br />
28. Mercury (total as Hg)<br />
(mg/I) 0.001 0.001<br />
29. Polynuclear aromatic 0.2 0.2<br />
Hydrocarbons (PAH) (ug/I)<br />
Pesticides (total, mg/I) Absent Refer to WHO<br />
guidelines for drinking<br />
water quality Vol.-I-<br />
1993<br />
RADIO ACTIVITY<br />
30. Gross Alpha activity (Bq/I) 0.1 0.1<br />
31. Gross Beta activity (Bq/I) 0.1 1.0<br />
The figures indicated under the column ‘Acceptable’ are the limits upto which water is<br />
generally acceptable to the consumers.<br />
Figures in excess <strong>of</strong> those mentioned under ‘Acceptable’ render the water not<br />
acceptable, but still may be tolerated in the absence <strong>of</strong> an alternative and better source but<br />
upto the limits indicated under column “Cause for Rejection” above which the sources will<br />
have to be rejected.<br />
It is possible that some mine and spring waters may exceed these radio activity limits and in<br />
such cases it is necessary to analyses the individual radio-nuclide order to assess the acceptability or<br />
otherwise for public consumption.<br />
<br />
Sr. Divisional Manager<br />
(Building Project)-I<br />
O.T.D.C. Ltd.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
PROFORMA-‘A’<br />
35<br />
past.<br />
CERTIFICATE OF LIST OF WORKS IN HAND (Clause No.49 (i) <strong>of</strong> DTCN)<br />
I/We do hereby certify that the following works have been executed by me/us in the<br />
Approximate<br />
value <strong>of</strong> work<br />
Particulars <strong>of</strong><br />
Sl.<br />
Amount <strong>of</strong><br />
Period which the done against Deptt. Under<br />
works now in<br />
No.<br />
each work<br />
work is stipulated to each work on the which the work is<br />
hand<br />
be completed<br />
date <strong>of</strong><br />
being taken up.<br />
Remarks<br />
(in month)<br />
submission <strong>of</strong><br />
Tender<br />
1 2 3 4 5 6 7<br />
I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date________________<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
CERTIFICATE OF EMPLOYMENT OF UN-EMPLOYED GRADUATE ENGINEERS/DIPLOMA HOLDERS<br />
(For Special Class and ‘A’ Class Contractors only)<br />
I/We do hereby certify that at present the following Engineering personnel are working with<br />
me/in our firm/company and their bio-data are furnished below:<br />
Sl.<br />
No.<br />
Name <strong>of</strong><br />
Engineering<br />
personnel<br />
appointed for<br />
supervising<br />
contractor’s<br />
works with<br />
address<br />
Qualificatio<br />
n<br />
Date <strong>of</strong><br />
appointme<br />
nt<br />
Monthly<br />
emolumen<br />
t<br />
Whether<br />
full time<br />
engagemen<br />
t and<br />
continuous<br />
If they are<br />
Superannuated/<br />
Retired/ dismissed or<br />
removed personnel<br />
from State <strong>Govt</strong>./<br />
Central <strong>Govt</strong>./ Public<br />
sector undertakings/<br />
Private companies<br />
and firms or any one<br />
ineligible for <strong>Govt</strong>.<br />
service.<br />
1 2 3 4 5 6 7<br />
36<br />
I/We also note that non-submission <strong>of</strong> this certificate will render my/our tenders liable for<br />
rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date________________<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
PROFORMA-‘B’<br />
37<br />
V<br />
Sl.<br />
No.<br />
Particulars<br />
<strong>of</strong> works<br />
already<br />
executed<br />
CERTIFICATE OF LIST OF WORKS EXECUTED (Clause<br />
No.49(ii) <strong>of</strong> DTCN)<br />
I/We do hereby certify that the following works have been<br />
executed by me/us in last five(5) years.<br />
Approxi<br />
mate<br />
amount<br />
<strong>of</strong> each<br />
work<br />
Name <strong>of</strong><br />
Deptt.<br />
under<br />
which the<br />
works were<br />
executed<br />
Period <strong>of</strong><br />
commence<br />
ment and<br />
period <strong>of</strong><br />
completion<br />
Whether the<br />
works were<br />
completed in<br />
stipulated<br />
period<br />
1 2 3 4 5 6 7<br />
Remark<br />
s<br />
I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for<br />
rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date_______________<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
38<br />
WORK PROGRAMME<br />
Name <strong>of</strong> the Work: - Construction <strong>of</strong><br />
Tourist Reception Centre, Pathway,<br />
Parking, & Landscaping etc at Ghatagaon in Keonjhar Dist.<br />
Time<br />
Description <strong>of</strong> work<br />
1 st Month…………………………………………………………………………………………………<br />
2 nd Month………………………..…………………………………………………………………………<br />
3 rd Month………………………………………………………………………………………………<br />
4 th Month…………………………………………………………………………………………………<br />
5 th Month…………………………………………………………………………………………………<br />
6 th Month…………………………………………………………………………………………………<br />
7 th Month…………………………………………………………………………………………………<br />
8 th Month…………………………………………………………………………………………………<br />
9 th Month…………………………………………………………………………………………………<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
FINANCIAL BID (COVER –II)<br />
DETAILED TENDER SCHEDULE FOR THE WORK:- “Construction <strong>of</strong><br />
Tourist Reception Centre, Pathway,Parking, & Landscaping etc at<br />
Ghatagaon in Keonjhar Dist”<br />
39<br />
SL DESCRIPTION QTY UNIT RATE AMOUNT<br />
NO<br />
TOURIST RECEPTION CENTRE CUM<br />
PUBLIC CONVENIENCE<br />
1 Earthwork in excavation in foundation in<br />
Hard soil/gravelly soil including dressing <strong>of</strong><br />
sides and leveling the bed up to the<br />
required depth and depositing the<br />
excavated materials away from the work<br />
site with all leads and lifts, including<br />
shoring, shuttering and dewatering (if<br />
required) with cost <strong>of</strong> labour, hire &<br />
running charges <strong>of</strong> water pumps sundries &<br />
T&P required for the work complete as<br />
directed by the Engineer-in-charge. 158.09 Each cum 87.60 13848.68<br />
2 Filling foundation trenches and plinth with<br />
excavated earth including laying the earth<br />
in layers not exceeding 23.5cm (9”) thick<br />
ramming and watering with all leads and<br />
lifts including cost <strong>of</strong> all labour, T&P etc.<br />
complete as directed by the Engineer-incharge.<br />
52.70 Each cum 48.60 2561.22<br />
3 Supplying and filling in foundation trenches<br />
and plinth, ditches with sand well watered<br />
and rammed in layers not exceeding 23 cm.<br />
In depth with all lead and lift including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
(Measurement will be taken on<br />
finished compacted section only). 162.29 Each cum 463.50 75221.42<br />
4 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:4:8) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 4 cm. Size black hard crusher broken<br />
granite stone metal and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and 71.02 Each cum 3250.20 230829.20<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
cleaned including hoisting, lowering, laying<br />
concrete, ramming, watering and curing<br />
etc. complete to required levels laid in<br />
layers not exceeding 15 cm thick in each<br />
layer including cost, conveyance, loading,<br />
unloading, royalties and taxes all materials<br />
and cost all labours, sundries, T & P<br />
required for the work including shoring,<br />
shuttering and dewatering if required<br />
including hire & running charges <strong>of</strong> water<br />
pump complete as per specification and<br />
direction <strong>of</strong> Engineer-in-charge.<br />
5 Supplying, Diluting & Spreading<br />
Chemical Emulsion like CHLORPYRIPHOS<br />
OR Other Chemical approved by the<br />
Central Insecticides Board as directed by<br />
the manufacturer and spraying the mixture<br />
uniformly by the sprayer as preconstructional<br />
anti-termite treatment and<br />
creating a chemical barrier under and<br />
around the column pits, wall trenches,<br />
basement excavation, top surface <strong>of</strong><br />
plinth filling, junction <strong>of</strong> walls and floors<br />
along with external perimeter <strong>of</strong> the<br />
building, expansion joints, surrounding the<br />
pipes and conduits etc. complete at the<br />
rate <strong>of</strong> 7.5 liters (or as directed by the<br />
manufacturer) per sqm on vertical and 5.0<br />
liters per sqm on horizontal surfaces, 50%<br />
<strong>of</strong> the emulsion to be filled in center to<br />
center etc. complete as per the holes made<br />
in trenches at 150m.m IS:6313/1981(Part-<br />
II) complete including cost, conveyance,<br />
loading, unloading and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, T&P, sundries<br />
and scaffolding where required for the<br />
work etc. as directed by the Engineer -in -<br />
charge. ( The payment shall be made on the<br />
basis <strong>of</strong> the actual measurement <strong>of</strong> the<br />
plinth area <strong>of</strong> the building at Ground Floor<br />
and vertical faces will not be measured for<br />
payment) 218.64 Each cum 90.90 19874.38<br />
6 First class kiln burnt brick masonry using<br />
K.B. bricks <strong>of</strong> size 25cm x 12 cm x 8 cm<br />
having crushing strength not less than 75<br />
kg. Per Sqr. Cm. In cement mortar <strong>of</strong> 16.96 Each cum 3340.60 56656.58<br />
40<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
mix(1:6) with Portland slag cement (PSC)<br />
and screened and washed sharp sand for<br />
mortar after immersing the bricks for 6<br />
(six) hours in water before use in<br />
foundation, plinth, basement and for<br />
ornamental flower beds, plinth moulding<br />
and similar such type <strong>of</strong> works with all<br />
necessary projections, splays cutting,<br />
circular moulding, corbelling, chamfering,<br />
watering and curing etc. including cost,<br />
conveyance, loading unloading, royalties and<br />
taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />
labour, sundries, T & P required for the<br />
works etc. complete in all respect as<br />
directed by the Engineer-in-Charge.<br />
7 First class kiln burnt brick masonry using<br />
K.B. bricks <strong>of</strong> size 25 cm. x 12 cm. x 8 cm.<br />
having crushing strength not less than 75<br />
kg. Per. Sqr. Cm. in cement mortar <strong>of</strong> mix(<br />
1:6) with ordinary Portland slag<br />
cement(PSC) and screened & washed sand<br />
for mortar after immersing the bricks for<br />
6 (Six) hours in water before use in<br />
superstructure including splays cutting,<br />
circular moulding, corbelling, chamfering<br />
and similar such type <strong>of</strong> works, watering<br />
and curing etc. including cost, conveyance,<br />
loading, unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, scaffolding,<br />
sundries, T&P required for the works etc.<br />
complete in all respect as directed by the<br />
Engineer-in-Charge.<br />
i)Ground floor 36.74 Each cum 3374.00 123960.76<br />
ii)First floor 24.43 Each cum 3493.20 85338.88<br />
8 First class kiln burnt brick masonry using<br />
K.B. bricks <strong>of</strong> size 25cm x 12 cm x 8 cm<br />
having crushing strength not less than 75<br />
kg. Per Sqr. Cm. In cement mortar <strong>of</strong><br />
mix(1:4) with Portland slag cement (PSC)<br />
and screened and washed sharp sand for<br />
mortar after immersing the bricks for 6<br />
(six) hours in water before use in<br />
superstructure, with all necessary<br />
projections, splays cutting, circular<br />
moulding, corbelling, chamfering, watering<br />
and curing etc. including cost, conveyance,<br />
41<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
loading unloading, royalties and taxes <strong>of</strong> all<br />
materials and cost <strong>of</strong> all labour, sundries, T<br />
& P required for the works etc. complete in<br />
all respect as directed by the Engineer-in-<br />
Charge.<br />
i)Ground floor 5.50 Each cum 3633.50 19984.25<br />
ii)First floor 9.22 Each cum 3752.70 34599.89<br />
9 Providing, lifting, hoisting and laying<br />
Reinforced cement concrete <strong>of</strong> M-200<br />
grade as per approved designs and<br />
drawings having a minimum compressive<br />
strength (in work test) 200 Kg. / Square<br />
cm. in 15 cm. cubes at 28 days after mixing<br />
and test conducted in accordance with I.S.<br />
516 using 12 mm. to 20 mm. size black hard<br />
crushed broken granite stone chips and<br />
screened and washed sharp sand for<br />
mortar <strong>of</strong> approved quality from approved<br />
quarry, washed and cleaned ( 20mm. size<br />
chips not to exceeds 25 % ) to be mixed in<br />
concrete mixture with Portland slag<br />
cement (PSC) including hoisting, lowering,<br />
laying and compaction concrete by using<br />
vibrators, watering and curing for 28 days,<br />
centering and shuttering then after<br />
dismantling and removing debris from the<br />
work site and finishing the exposed<br />
surface smooth providing grooves or beads<br />
wherever necessary including cost,<br />
conveyance, loading, unloading, royalties<br />
and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />
labours, sundries, T & P required <strong>of</strong> the<br />
work etc. complete in all respect as<br />
directed by the Engineer-in-Charge. But<br />
excluding cost and conveyance <strong>of</strong> M.S. rods<br />
or Tor steel and binding wires and labour<br />
charges for straightening, cutting, bending<br />
etc. <strong>of</strong> M.S. rods or tor steel tying the<br />
grills and placing in proper position.<br />
a) Column base 30.61 Each cum 4690.90 143588.45<br />
b) Column<br />
i)Ground floor 7.48 Each cum 7866.30 58839.92<br />
ii)First floor 3.88 Each cum 8562.24 33221.49<br />
c) Plinth band/ Grade beam<br />
i)Ground floor 7.36 Each cum 4956.60 36480.58<br />
d) Lintel<br />
42<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
i)Ground floor 1.55 Each cum 7134.70 11058.79<br />
ii)First floor 0.97 Each cum 7684.30 7453.77<br />
e) Beam<br />
i)Ground floor 12.19 Each cum 7866.30 95890.20<br />
ii)First floor 6.45 Each cum 8562.24 55226.45<br />
f) Ro<strong>of</strong> slab<br />
i)Ground floor 28.08 Each cum 7327.00 205742.16<br />
ii)First floor 12.29 Each cum 7915.10 97276.58<br />
g) Staircase<br />
i)Ground floor 1.32 Each cum 7543.50 9957.42<br />
ii)First floor 1.32 Each cum 8174.90 10790.87<br />
h) Chajja<br />
i)Ground floor 1.33 Each cum 600.00 798.00<br />
ii)First floor 0.45 Each cum 663.00 298.35<br />
i) Cornice<br />
i)Ground floor 1.90 Each cum 7327.00 13921.30<br />
ii)First floor 0.54 Each cum 7915.10 4274.15<br />
10 Providing, lifting, hoisting and laying<br />
Reinforced cement concrete <strong>of</strong> M-15<br />
Grade in different works with 12mm to<br />
20mm size black hard crusher broken<br />
granite chips <strong>of</strong> approved quality from<br />
approved quarry including mixing and<br />
compacting to proper shape and size, level<br />
and plumbs and finishing the exposed<br />
surfaces smooth including cost <strong>of</strong><br />
scaffolding, watering and curing for the<br />
required period including cost <strong>of</strong> all<br />
materials with taxes, royalties<br />
transportation, loading and unloading, all<br />
labour, sundries, T&P including hire &<br />
running charges <strong>of</strong> concrete mixer and<br />
vibrator etc completed as per the<br />
direction <strong>of</strong> the Engineer-in-charge but<br />
excluding the cost <strong>of</strong> materials and labour<br />
for reinforcement bars & including the<br />
cost <strong>of</strong> centering and shuttering for the<br />
works.<br />
Kitchen slab 1.87 Each cum 6794.20 12705.15<br />
11 Providing, fixing and placing <strong>of</strong> MS bars/<br />
Tor steel (HYSD) Fe-500 for RCC work in<br />
all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />
quality with straightening, Cutting,<br />
bending, binding welding or jointing if<br />
necessary, bending, binding, tying the grills<br />
as required for R.C.C. works, providing fan<br />
43<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
hooks where necessary and hoisting,<br />
lowering and placing in proper position<br />
according to approved designs and<br />
drawings including cost, conveyance,<br />
loading, unloading, taxes <strong>of</strong> M.S. rods or<br />
Tor steel and binding wires <strong>of</strong> 18 to 20<br />
gauge required for the work and cost <strong>of</strong> all<br />
labour, sundries, T & P and scaffolding<br />
complete in all respect as directed by the<br />
Engineer-in-Charge ( payment will be made<br />
according to the actual weight <strong>of</strong> M.S rod<br />
/Tor steel consumed in the work and no<br />
separate payment will be made towards<br />
weight <strong>of</strong> binding wires which is to be<br />
borne by the contractor at his own cost<br />
i)Ground floor 136.39 Each Qntl 6031.10 822581.73<br />
ii)First floor 32.20 Each Qntl 6041.60 194539.52<br />
12 Providing 12mm. thick cement plaster with<br />
cement mortar <strong>of</strong> mix (1:6) in all floors<br />
with Portland slag cement (PSC) with neat<br />
cement punning and two coats <strong>of</strong> bitumen<br />
painting over top <strong>of</strong> the walls complete<br />
including watering and curing along with<br />
the cost, conveyance, loading and unloading,<br />
royalties and taxes <strong>of</strong> all materials and<br />
cost <strong>of</strong> all labours, sundries, T&P and<br />
scaffolding required for the work etc.<br />
complete in all respect as directed by the<br />
Engineer–in-Charge.<br />
i)Ground floor 763.10 Each Sqm 84.70 64634.57<br />
ii)First floor 310.54 Each Sqm 87.10 27048.03<br />
13 Providing 16mm thick cement plaster in all<br />
floors at all height with cement mortar <strong>of</strong><br />
mix (1:6) with Portland slag cement (PSC)<br />
and with screened and washed sharp sand<br />
for mortar and finished smooth to the<br />
rough surface <strong>of</strong> brick masonry walls after<br />
racking out joints including watering and<br />
curing rounding <strong>of</strong> corners etc. complete<br />
with cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, T&P, sundries and scaffolding<br />
required for the work etc. with providing<br />
grooves as directed by the Engineer-in-<br />
Charge<br />
i)Ground floor 265.95 Each Sqm 115.90 30823.61<br />
44<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
ii)First floor 137.54 Each Sqm 118.10 16243.47<br />
14 Providing 6 mm. thick cement plaster with<br />
cement mortar <strong>of</strong> mix (1:4) in all floors at<br />
all height with screened and washed sharp<br />
sand for mortar to ceiling plaster <strong>of</strong> ro<strong>of</strong><br />
slab, staircase, landings, chajja and shelves<br />
etc. including roughening, scraping,<br />
chiseling, cleaning to all R.C.C surface<br />
including cost, conveyance, loading,<br />
unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, sundries, T&P<br />
, scaffolding, watering and curing etc.<br />
complete in all respect as per specification<br />
and direction <strong>of</strong> Engineer-in-charge.<br />
i)Ground floor 278.67 Each Sqm 74.40 20733.05<br />
ii)First floor 68.29 Each Sqm 75.90 5183.21<br />
15 Providing Ornamental Cement Plaster (as<br />
per approved Design & Approved Drawing)<br />
using good quality <strong>of</strong> Sand & Cement with<br />
cost, conveyance, loading, unloading and<br />
taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour,<br />
sundries, T & P, scaffolding, watering and<br />
curing etc. complete as directed by the<br />
Engineer-in-charge & Architect.<br />
Ground floor 8.53 Each Sqm 500.00 4265.00<br />
16 Providing 25mm thick grading concrete in<br />
C.C. (1:2:2) laid in proper slope over<br />
terrace ro<strong>of</strong> slab by using two part <strong>of</strong><br />
sand, one part <strong>of</strong> cement and two parts <strong>of</strong><br />
6mm size black hard crusher broken<br />
granite chips with addition <strong>of</strong> water<br />
pro<strong>of</strong>ing compound <strong>of</strong> approved quality to<br />
be mixed with specified ratio including<br />
watering, curing, cost, conveyance,<br />
royalties, taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />
labour, T&P etc. complete as required for<br />
the finished item <strong>of</strong> work as directed by<br />
the Engineer-in-charge. 232.99 Each Sqm 201.90 47040.68<br />
17 Providing and painting two coats with<br />
plastic emulsion paint <strong>of</strong> approved quality<br />
and approved shade manufactured by<br />
reputed manufacture like NEROLAC<br />
/ASIAN /BERGER /DULOX or equivalent<br />
to make in all floors at all height by making<br />
the surface to the interior plastered<br />
surface <strong>of</strong> wall smooth with a coat <strong>of</strong><br />
45<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Acrylic Putty and primer <strong>of</strong> approved<br />
quality including cost, conveyance, loading<br />
and unloading and taxes <strong>of</strong> all materials,<br />
cost <strong>of</strong> all labour, sundries, T & P,<br />
scaffolding etc. required for the work and<br />
complete in all respect as per specification<br />
and direction <strong>of</strong> Engineer-in-charge.<br />
i)Ground floor 1041.77 Each Sqm 128.70 134075.80<br />
ii)First floor 378.83 Each Sqm 130.00 49247.90<br />
18 Wall painting two coats with 100% Acrylic<br />
emulsion paint (1 st quality) exterior grade<br />
(weather coat) <strong>of</strong> approved make & shade<br />
manufactured by reputed manufacture like<br />
NEROLAC /ASIAN /BERGER /DULOX or<br />
equivalent to make an even finished<br />
surface over a coat <strong>of</strong> primer with water<br />
bond cement primer in all heights with all<br />
scaffolding and staging charges including<br />
cost, conveyance, taxes <strong>of</strong> all materials,<br />
cost <strong>of</strong> all labour, etc. complete as per<br />
specification and direction <strong>of</strong> Engineer-in-<br />
Charge.<br />
i)Ground floor 265.95 Each Sqm 76.70 20398.37<br />
ii)First floor 137.54 Each Sqm 78.00 10728.12<br />
19 Providing and painting two coats with<br />
synthetic enamel paint <strong>of</strong> approved quality<br />
and approved shade confirming to ISI on<br />
iron work to give an even shade over a coat<br />
<strong>of</strong> primer <strong>of</strong> approved quality and shade<br />
including sand papering and making the<br />
surface smooth in all floors at all height<br />
with cost, conveyance, loading, unloading<br />
and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />
labour, sundries, T& P scaffolding and<br />
taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour,<br />
sundries, T & P scaffolding etc. required<br />
for the work and complete in all respect<br />
as directed by the Engineer-in-charge. 23.00 Each Sqm 98.90 2274.70<br />
20 Providing and painting two coats with<br />
synthetic enamel paint <strong>of</strong> approved quality<br />
and approved shade confirming to ISI on<br />
wood work to give an even shade over a<br />
coat <strong>of</strong> primer <strong>of</strong> approved quality and<br />
shade including sand papering and making<br />
the surface smooth in all floors at all<br />
height with cost, conveyance, loading, 18.22 Each Sqm 102.20 1862.08<br />
46<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
unloading and taxes <strong>of</strong> all materials, cost<br />
<strong>of</strong> all labour, sundries, T& P scaffolding<br />
and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />
labour, sundries, T & P scaffolding etc.<br />
required for the work and complete in all<br />
respect as directed by the Engineer-incharge.<br />
21 Providing vitrified tile flooring using<br />
vitrified tiles <strong>of</strong> premium grade having<br />
thick <strong>of</strong> 8mm to 10mm conforming to IS<br />
13756 <strong>of</strong> 600mmx600mm coloured /<br />
printed series(homogeneous)<strong>of</strong> approved<br />
quality, colour in floors, treads on steps<br />
and landings in all floors at all height on<br />
25mm thick bed <strong>of</strong> cement mortar <strong>of</strong> mix<br />
(1:4) laid in proper slope and gradient with<br />
screened and washed sharp sand for<br />
mortar and grouted with neat white<br />
cement slurry jointing the tile with neat<br />
white cement slurry mixed with required<br />
quantities <strong>of</strong> pigments <strong>of</strong> approved marks<br />
to match the shades <strong>of</strong> the vitrified tile if<br />
required watering and curing for 21 days,<br />
including cost, conveyance, loading,<br />
unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, sundries, T&P<br />
required for the work including rubbing<br />
mechanically and wax polishing etc.<br />
complete in all respect as per specification<br />
and direction <strong>of</strong> Engineer-incharge.(Make:-JONSON/NITCO)<br />
i)Ground floor 156.63 Each Sqm 894.30 140074.21<br />
ii)First floor 44.75 Each Sqm 902.40 40382.40<br />
22 Providing vitrified tile flooring using<br />
vitrified tiles <strong>of</strong> premium grade having<br />
thick <strong>of</strong> 8mm to 10mm conforming to IS<br />
13756 <strong>of</strong> 600mmx600mm coloured /<br />
printed series(homogeneous)<strong>of</strong> approved<br />
quality, colour on 12mmm thick cement<br />
plaster (1:3) with screened and washed<br />
sharp sand for mortar and grouted with<br />
neat white cement slurry joining the tile<br />
with neat white cement slurry mixed with<br />
required quantities <strong>of</strong> pigments <strong>of</strong><br />
approved marks to match the shades <strong>of</strong><br />
the vitrified tile if required watering and<br />
47<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
curing for 21 days, including cost,<br />
conveyance, loading, unloading, royalties<br />
and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />
labour, sundries, T&P required for the<br />
work including rubbing mechanically and<br />
wax polishing etc. complete in all respect<br />
as per specification and direction <strong>of</strong><br />
Engineer-in-charge.<br />
i)Ground floor 17.98 Each Sqm 873.00 15696.54<br />
ii)First floor 5.12 Each Sqm 879.40 4502.53<br />
23 Providing 10mm thick granite tile flooring<br />
(above 0.1 Sqm. Up to 0.4 sqm) <strong>of</strong> approved<br />
quality, colour and size in floors, treads on<br />
steps and landings in all floors at all height<br />
on 25mm thick bed <strong>of</strong> cement mortar <strong>of</strong><br />
mix (1:1) laid in proper slope and gradient<br />
with screened and washed sharp sand for<br />
mortar and grouted with neat white<br />
cement slurry joining the tile with neat<br />
white cement slurry mixed with required<br />
quantities <strong>of</strong> pigments <strong>of</strong> approved marks<br />
to match the shades <strong>of</strong> the granite tile if<br />
required watering and curing for 21 days,<br />
including cost, conveyance, loading,<br />
unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, sundries, T&P<br />
required for the work including rubbing<br />
mechanically and wax polishing etc.<br />
complete in all respect as per specification<br />
and direction <strong>of</strong> Engineer-in-charge.<br />
i)Ground floor 15.42 Each Sqm 1441.90 22234.10<br />
ii)First floor 7.48 Each Sqm 1446.10 10816.83<br />
24 Providing 30cmx30cm/40cmx40cm special<br />
plain/printed series ceramic floor tiles <strong>of</strong><br />
premium grade having thickness 7mm to<br />
8mm conforming IS13755 for ceramic tile<br />
flooring <strong>of</strong> approved quality, colour and<br />
size in floors, treads on steps and landings<br />
in all floors at all height on 10mm thick bed<br />
<strong>of</strong> cement mortar <strong>of</strong> mix (1:1) laid in proper<br />
slope and gradiant with screened and<br />
washed sharp sand for mortar and with<br />
ordinary Portland slag cement (PSC)<br />
grouted with neat white cement slurry<br />
joining the tile with neat white cement<br />
slurry mixed with required quantities <strong>of</strong><br />
48<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
pigments <strong>of</strong> approved marks to match the<br />
shades <strong>of</strong> the ceramic tile if required ,<br />
watering and curing for 21 days, including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work including rubbing mechanically and<br />
wax polishing etc. complete in all respect<br />
as directed by the Engineer-in-charge.<br />
i)Ground floor 25.06 Each Sqm 687.00 17216.22<br />
ii)First floor 24.54 Each Sqm 693.70 17023.40<br />
25 Providing 20cmx30cm/20cmx20cm size<br />
special plain/printed series ceramic<br />
glazed wall tiles <strong>of</strong> premium grade having<br />
thickness 6.5mm to 6.7mm conforming to<br />
IS 13753 <strong>of</strong> approved make & shade in<br />
Dadoes over 12mm thick cement plaster 1:3<br />
(1 Cement: 3 Coarse sand) finished with<br />
modular pointing in white cement & pigment<br />
to match the shade <strong>of</strong> the tiles including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour curing sundries and T & P etc.<br />
required for the work etc. complete as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
i)Ground floor 111.77 Each Sqm 590.20 65966.65<br />
ii)First floor 33.48 Each Sqm 596.60 19974.17<br />
26 Providing ,fitting and fixing <strong>of</strong> flush door<br />
<strong>of</strong> 32 mm thick (Green /National<br />
/Equivalent make) using 32mm single<br />
leaf/double leaf <strong>of</strong> solid core <strong>of</strong><br />
blockboard type bonded with 1mm thick<br />
lamination board (Royal touch/ Merino or<br />
equivalent) pasted on both sides with<br />
8mm thick teak wood external leaping . The<br />
shutter shall be shop prepared for taking<br />
mortice lock & latches suitable block <strong>of</strong><br />
wood may be provided for fixing the<br />
hardware.The size <strong>of</strong> block, shall pefectly<br />
correspond to the maximum size <strong>of</strong> lock.<br />
All the four edges <strong>of</strong> the door shutter<br />
shall be square . The shutter shall be free<br />
from twist or warp in its plane and <strong>of</strong><br />
required size etc complete as directed<br />
including fixing <strong>of</strong> Dorma Ball bearing 37.19 Each Sqm 8458.30 314564.18<br />
49<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
hinges 5knuckle 2ball bearing butt hinges<br />
BB 3090F with metal screws 100mm X<br />
75mm X 3mm grade SS304, 3200-2<br />
Surface Mounted Tower bolt <strong>of</strong> Length 8"<br />
in Satin chrome finish, Dorma pull Handle<br />
TGDI-D 150mm back to back with<br />
adjustable fixing for glass, wood and<br />
metal doors in satin stainless steel. The<br />
pull handles should have supporting washer<br />
with raised bevelling on the outer surface.<br />
Length =150mm, 19mm dia, -SS304<br />
Dorma ZS 8100 set for fire door type 1<br />
with lock 281 and strike plate epc 60mm<br />
Dorma TS 71 door closer with std arm EN<br />
3/4 max door width 1100mm Melamine<br />
polish as per the specification complete<br />
with all materials , as per instruction <strong>of</strong><br />
Engineer-in-Charge.<br />
27 Supplying, fitting and fixing well dressed<br />
and well seasoned sal wood choukaths <strong>of</strong><br />
different length and 6.35cm. x 12.70cm.<br />
sizes in all floors in proper position<br />
including two coats coats <strong>of</strong> coaltaring to<br />
wall and lintel side faces <strong>of</strong> choukaths<br />
including cost <strong>of</strong> coaltar and labour for<br />
coaltaring and fixing required nos. <strong>of</strong> W.I.<br />
clamps to the choukaths with approved<br />
qualities <strong>of</strong> screws including cost,<br />
conveyance, loading, sundries, T&P required<br />
for the work etc. complete in all respect as<br />
directed by the Engineer-in-charge 0.94 Each cum 43434.30 40828.24<br />
28 Providing and fixing rolling shutters <strong>of</strong><br />
approved make,made <strong>of</strong> 80x1.25mm laths<br />
interlocked together through their entire<br />
length and jointed at the by end locks<br />
mounted on specially designed pipe shaft<br />
with brackets, side guides and<br />
arrangements for inside and outside<br />
locking with push and pull operation<br />
complete including the cost <strong>of</strong> providing<br />
and fixing necessary 27.5 cm long wire<br />
springs grade no 2. and M.S. top cover<br />
1.25mm thick for rolling shutter. Item<br />
include providing and fixing 2 nos ball<br />
bearings <strong>of</strong> approved make in rolling<br />
shutter. Item also include painting <strong>of</strong> 4.89 Each Sqm 2467.90 12068.03<br />
50<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
shutter with 2 coats <strong>of</strong> synthetic enamel<br />
paint over a coat <strong>of</strong> metal primer <strong>of</strong><br />
approved make & shade and fixing <strong>of</strong><br />
shutter with lugs <strong>of</strong> 15x 6mm in<br />
15cmx10cmx10cm cement concrete blocks<br />
<strong>of</strong> 1:2:4 (1cement:2 coarse sand:4 graded<br />
stone aggregate). The rate should include<br />
cost <strong>of</strong> all materials, labour etc.<br />
29 Providing and fixing factory made UPVC<br />
frame with shutter for windows made <strong>of</strong><br />
UPVC extruded section having an overall<br />
dimension,as below (tolerence ± 1mm) with<br />
all thickness 2mm ± 0.2mm .Corners <strong>of</strong> the<br />
door frame to be jointed with galvanized<br />
brackets and stainless steel screws,jointed<br />
and mitred and plastic wilded.The hinge<br />
side vertical <strong>of</strong> the frame reinforced by<br />
galvanised M.S tube <strong>of</strong> size 19mmx19mm<br />
and 1mm ± 0.1mm wall thickness and 3 nos<br />
stainless stell hinges fixed to the frame<br />
with 5mm clear glass complete as per<br />
manufacture specification and direction <strong>of</strong><br />
Engineer in charge.(Extruded section<br />
pr<strong>of</strong>ile HS3 WHITE :MAKE : FENESTA). 27.72 Each Sqm 7531.40 208770.41<br />
30 Providing & fittiing up <strong>of</strong> fixed ventilator<br />
using OEL aluminum anodized section<br />
No.9210 &9207 as single groov and double<br />
groov respectively as horizontal &vertical<br />
member and OEL section 4660 as Tapered<br />
clip for fixing up <strong>of</strong> 5mm thick black glass<br />
and jointing angle No.1855 etc completye<br />
as per direction <strong>of</strong> Engg. in charge. 20.62 One Kg 378.30 7800.55<br />
31 Providing, fittiing & placing <strong>of</strong> 5mm thick<br />
glass in fixed ventilator including cost,<br />
royalties and taxes <strong>of</strong> all Materials, cost <strong>of</strong><br />
all Labour, T&P, etc. required for the work<br />
complete as directed by the Engineer-incharge.<br />
4.03 Each Sqm 676.90 2727.91<br />
32 Supplying ,fitting and fixing <strong>of</strong> Karakum<br />
Brick tile <strong>of</strong> Eurocon make <strong>of</strong> size<br />
102mmx102mm in exterior walls <strong>of</strong><br />
approved make c<strong>of</strong>irming to IS:13755 laid<br />
on 12mm thick cement mortar (1:3) and<br />
filling joints with white cement <strong>of</strong><br />
approved quality including cost <strong>of</strong> all<br />
materials ,labour ,T & P etc required for<br />
51<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
the work all complete as per direction <strong>of</strong><br />
E-I-C. (MAKE: EUROCON TILES:Karakum)<br />
i)Ground floor 265.95 Each Sqm 1013.50 269540.33<br />
ii)First floor 137.54 Each Sqm 1019.90 140277.05<br />
33 Supplying ,fitting and fixing Cordoba tile<br />
<strong>of</strong> Eurocon make <strong>of</strong> size 152mmx152mm on<br />
planter box wall <strong>of</strong> approved make for<br />
decorative purpose c<strong>of</strong>irming to IS:13755<br />
laid on 12mm thick cement mortar (1:3) and<br />
filling joints with white cement <strong>of</strong><br />
approved quality including cost <strong>of</strong> all<br />
materials ,labour ,T & P etc required for<br />
the work all complete as per direction <strong>of</strong><br />
E-I-C. (MAKE: EUROCON TILES:Cordoba) 1.96 Each Sqm 828.40 1623.66<br />
34 Providing 25mm thick Eurocon make<br />
AVANTE floor tile on ro<strong>of</strong> terrace <strong>of</strong><br />
approved quality, colour and size in in all<br />
floors at all height on 25mm thick bed <strong>of</strong><br />
cement mortar <strong>of</strong> mix (1:1) laid in proper<br />
slope and gradient with screened and<br />
washed sharp sand for mortar and grouted<br />
with neat white cement slurry joining the<br />
tile with neat white cement slurry mixed<br />
with required quantities <strong>of</strong> pigments <strong>of</strong><br />
approved marks to match the shades <strong>of</strong><br />
the tile if required watering and curing<br />
for 21 days, including cost, conveyance,<br />
loading, unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, sundries, T&P<br />
required for the work including rubbing<br />
mechanically and wax polishing etc.<br />
complete in all respect as per specification<br />
and direction <strong>of</strong> Engineer-in-charge. 85.11 Each Sqm 892.30 75943.65<br />
35 Supplying, fitting and fixing <strong>of</strong> M.S grills,<br />
grill gates with top and bottom rails, steel<br />
windows, steel doors, steel frames for<br />
doors and windows, staircase and parapet<br />
railing ( as per I.S. specification and as per<br />
approved drawings ) in proper position in all<br />
floors and at all height including making<br />
holes to brick walls/ R.C.C structure/wood<br />
work etc. and making good to the damaged<br />
walls/ structures with cement concrete<br />
(1:2:4) with black hard crusher broken<br />
granite stone chips <strong>of</strong> 12mm to 20mm size<br />
( 20mm size not to exceeds 25% ) including 618.75 One Kg 59.87 37044.56<br />
52<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
watering and curing etc. complete in all<br />
respect as directed by the Engineer in<br />
charge ( W.I. / M.S. windows grills, grill<br />
gates, collapsible gates with top and<br />
bottom rails, steel windows, steel doors,<br />
steel frames for doors and windows,<br />
staircase and parapet railings square bar<br />
along with required nos. <strong>of</strong> nails and screws<br />
and other required materials <strong>of</strong> approved<br />
quality and approved size shall be supplied<br />
by the contractor at his own cost.)<br />
36 Labour charges for fitting fixing <strong>of</strong> MS<br />
grill in position including all cost <strong>of</strong><br />
material all taxes as per direction <strong>of</strong> the<br />
Engineer-in-charge. 23.00 Each Sqm 70.10 1612.30<br />
37 Supplying, fitting and fixing <strong>of</strong> ,surface<br />
Polished Granite Slab for resting wash<br />
basin along with kitchen slab which is<br />
durable and made <strong>of</strong> environmentally safe<br />
material by using four sided piece <strong>of</strong><br />
granite stone as a broad and<br />
thick.Resistant to corrosion, scratches,<br />
and heat,having designed size which is<br />
much larger than a tile etc. over RCC slab<br />
for the work all complete as per direction<br />
<strong>of</strong> Engineer-in-Charge. 9.12 Each Sqm 1441.90 13150.13<br />
38 Supplying, fitting and fixing <strong>of</strong> Stainless<br />
steel <strong>of</strong> 304 grade in hand railing using<br />
50mm dia <strong>of</strong> 2mm thick circular pipe with<br />
balustrade <strong>of</strong> size 32mm x 32mm x 2mm @<br />
0.90mtr. C/C and stainless square pipe<br />
bracing <strong>of</strong> size 32mm x 32mm x 2mm in 3<br />
rows in stair case as per approved design<br />
and specification, buffing, polishing etc.<br />
with cost, conveyance, taxes <strong>of</strong> all<br />
materials, T & P etc. required for the<br />
complete in all respect as directed by the<br />
Engineer-in-charge. 93.09 One Kg 306.60 28541.39<br />
39 Dismantling and removing doors, windows &<br />
ventilators including stacking the useful<br />
materials for reuse and removing the<br />
derrises with all lead and lift complete as<br />
per direction <strong>of</strong> Engineer-in-charge. 12.74 Each Sqm 145.80 1857.49<br />
40 Dismantling and removing cement plaster<br />
from walls including racking out joints<br />
12mm deep including stacking the useful 494.32 Each Sqm 18.20 8996.62<br />
53<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
materials for reuse and removing the<br />
debris within 50m lead including cost <strong>of</strong> all<br />
labour, T & P, sundries, scaffolding<br />
required for the work etc. complete in all<br />
respect as directed by the Engineer-incharge.<br />
41 Dismantling and removing marble chips<br />
flooring including stacking the useful<br />
materials for reuse and removing the<br />
debris within 50m lead including cost <strong>of</strong> all<br />
labour, T & P, sundries, scaffolding<br />
required for the work etc. complete in all<br />
respect as directed by the Engineer-incharge.<br />
107.91 Each Sqm 41.10 4435.10<br />
PH<br />
42 Providing and installing vitreous China<br />
<strong>Orissa</strong> Pattern water closet pan <strong>of</strong> size<br />
580x440mm <strong>of</strong> Hindware make catalouge<br />
no 20076 with integral type foot rest and<br />
100 mm PVC P trap, with 10 lit capasity low<br />
level flushing cistern <strong>of</strong> hindware catalouge<br />
no 21001 or equivalent <strong>of</strong> Parryware /<br />
Jaquar make, MS brackets, 450mm long<br />
connection pipe having cat no ALD 803B or<br />
equivalent <strong>of</strong> Parryware / Hindware make,<br />
32 mm diameter flush pipe with fittings<br />
and clamps, overflow arrangements with<br />
specials and mosquitoes coupling <strong>of</strong><br />
apprived municipal design including<br />
painting <strong>of</strong> fittings and brackets,cuttings<br />
and making good the walls and floors<br />
whereever required etc complete as per<br />
direction <strong>of</strong> Engineer-in-charge. 6 Each No 4881.20 29287.20<br />
43 Supplying all materials,labours,T&P and<br />
fixing the extended wall mounted vitreous<br />
china wash down European one piece water<br />
closet with P/S trap <strong>of</strong> Hindware make<br />
having cat no 20058 <strong>of</strong> Studio or<br />
equivalent <strong>of</strong> Parryware / Jaquar make and<br />
cistern <strong>of</strong> cat no 21028 or equivalent <strong>of</strong><br />
Parryware / Jaquar make and 450mm long<br />
connection pipe having cat no ALD 803B or<br />
equivalent <strong>of</strong> Parryware / Hindware make<br />
to the floor with wooden plug and<br />
chromium plated pedestal screws including<br />
jointing the trap with soil pipe in cement 8 Each No 9231.90 73855.20<br />
54<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
mortar (1:1) fixing plastic seat and cover<br />
for wash down water closet with chromium<br />
plated brass hinges and rubber buffers<br />
including polishing etc all complete as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
44 Providing and fixing 49cm dia counter top<br />
wash hand basin <strong>of</strong> Hind Ware make having<br />
cat no 10052 <strong>of</strong> Round starlet or equivalent<br />
<strong>of</strong> Parryware / Jaquar make with a pair <strong>of</strong><br />
CI bracket, 32mm dia CP bottle trap <strong>of</strong><br />
Jaquar cat no ALD 769, connection pipe<br />
with CP nut 450mm long <strong>of</strong> cat no ALD<br />
803B, 15mm dia pillar cock Jaquar make<br />
having cat no-KUB-35001 or equivalent <strong>of</strong><br />
Parryware / Hindware including cutting<br />
walls and making good the damages in CC<br />
(1:2:4) as per specification all complete<br />
including cost <strong>of</strong> all materials as per PH<br />
specification and direction <strong>of</strong> the<br />
Engineer-in-charge. 11 Each No 5731.10 63042.10<br />
45 Supply <strong>of</strong> all materials, labour, T&P , fitting<br />
and fixing in all floors fixed type beveled<br />
plate glass mirror <strong>of</strong> size 600mm x<br />
450mm size thick best Indian make ,supply<br />
<strong>of</strong> 13mm thick asbestos backing and CP<br />
Brass screw including cost conveyance,<br />
taxes <strong>of</strong> all materials complete as per<br />
specification and direction <strong>of</strong> Engineer-incharge(Make<br />
Parryware C8613 reflextion<br />
type) 11 Each No 1839.80 20237.80<br />
46 Providing and fixing C.P. Glass shelf<br />
Continental Cat. No.-1171N(JAQUAR make<br />
) with Glass <strong>of</strong> size 22” x 5” fixed to wall<br />
including cutting the wall and making good<br />
the damages, including cost <strong>of</strong> all materials<br />
complete as per PH specification and<br />
direction <strong>of</strong> Engineering-in-charge. 11 Each No 1227.60 13503.60<br />
47 Supplying all materials, labour, T&P and<br />
fixing standard sized CP towel rail -Single<br />
Towel Rail 600mm Long (JAQUAR ,Cat.No<br />
ACN-1121N)complete including cutting the<br />
wall and making good the damages,<br />
including cost <strong>of</strong> all materials complete as<br />
per PH specification and direction <strong>of</strong><br />
Engineering-in-charge. 11 Each No 916.50 10081.50<br />
55<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
1 Supplying all materials, labour, T&P and<br />
fixing standard sized CP Soap dispenser<br />
Glass Bottle (JAQUAR Cat. AKB<br />
No.:35735) complete including cutting the<br />
wall and making good the damages,<br />
including cost <strong>of</strong> all materials complete as<br />
per PH specification and direction <strong>of</strong><br />
Engineering-in-charge. 11 Each No 1218.70 13405.70<br />
48 Supplying all materials, labour, T&P and<br />
fixing standard sized CP Soap holder<br />
(Jaquar(AKB-35731)) complete including<br />
cutting the wall and making good the<br />
damages, including cost <strong>of</strong> all materials<br />
complete as per PH specification and<br />
direction <strong>of</strong> Engineering-in-charge. 7 Each No 941.00 6587.00<br />
49 Supplying all materials, labour, T&P and<br />
fixing standard sized CP Shower<br />
(JAQUAR Cat. No.1999) complete including<br />
cutting the wall and making good the<br />
damages, including cost <strong>of</strong> all materials<br />
complete as per PH specification and<br />
direction <strong>of</strong> Engineering-in-charge. 8 Each No 1847.70 14781.60<br />
50 Supplying all materials, labour, T&P and<br />
fixing standard sized grab bar (JAQUAR<br />
Cat. No.15101) complete including cutting<br />
the wall and making good the damages,<br />
including cost <strong>of</strong> all materials complete as<br />
per PH specification and direction <strong>of</strong><br />
Engineering-in-charge. 4 Each No 753.80 3015.20<br />
51 Supplying all materials, labour, T&P and<br />
fixing standard sized Toilet Roll Holder<br />
with Flap (JAQUAR ,Continental, Cat.No-<br />
ACN1155N) complete including cutting the<br />
wall and making good the damages,<br />
including cost <strong>of</strong> all materials complete as<br />
per PH specification and direction <strong>of</strong><br />
Engineering-in-charge. 5 Each No 486.50 2432.50<br />
52 Supplying all materials, labour, T&P and<br />
fitting and fixing 110mm dia U-PVC SWR<br />
soil waste ventilating pipes and fittings to<br />
walls with nails, bobbins and wooden plugs<br />
or laying in trenches including earthwork in<br />
excavation in all kinds <strong>of</strong> soil and refilling<br />
<strong>of</strong> trenches as per specification and<br />
direction <strong>of</strong> the engineer in charge 5.00 Each Rm 278.40 1392.00<br />
53 Providing and fixing 110mm dia PVC door 10 Each No 149.75 1497.50<br />
56<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
end <strong>of</strong> required degree with access door,<br />
insertion rubber washer 3mm thick, bolts<br />
and nuts complete as per specification and<br />
direction <strong>of</strong> the engineer in charge<br />
54 Providing and fixing 110mm dia PVC plain<br />
bend <strong>of</strong> required degree with access door,<br />
insertion rubber washer 3mm thick, bolts<br />
and nuts complete as per specification and<br />
direction <strong>of</strong> the engineer in charge 10 Each No 119.40 1194.00<br />
55 Providing & fixing 110mm dia PVC heel rest<br />
sanitary bends: 5 Each No 106.10 530.50<br />
56 Providing & fixing 110mm dia PVC SWR<br />
Door tee 10 Each No 194.45 1944.50<br />
57 Providing & fixing 110mm dia PVC SWR<br />
cross tee 5 Each No 247.30 1236.50<br />
58 Providing & fixing 110mm dia PVC SWR cowl 5 Each No 28.15 140.75<br />
59 Providing and fixing circular type stainless<br />
steel jalli (grating) with hole for floor<br />
/nahani trap etc complete as per<br />
specification and direction <strong>of</strong> the engineer<br />
in charge 14 Each No 104.00 1456.00<br />
60 Providing & fixing sand cast iron trap <strong>of</strong><br />
110mm dia inlet and 110mm dia outlet <strong>of</strong><br />
self cleaning design with sand cast iron<br />
screwed down or hinged grating with or<br />
without vent arm complete, including cost<br />
<strong>of</strong> cutting and making good the walls and<br />
floors etc complete as per direction <strong>of</strong><br />
Engineer-in-charge. 4 Each No 207.10 828.40<br />
61 Supplying all materials,labours,T&P and<br />
providing and fixing to wall or ceiling and<br />
floor PVC pipes conforming to ASTM-D-<br />
1785/89 (Sch-80) and pipe fittings <strong>of</strong> the<br />
following nominal bore with clamps<br />
including making good the wall,ceiling and<br />
floor all complete as per specification and<br />
direction <strong>of</strong> the Engineer-in-charge.<br />
a)15 mm dia PVC ASTM pipe (sch-80) 25.00 Each Rm 88.40 2210.00<br />
b)20 mm dia PVC ASTM pipe (sch-80) 35.00 Each Rm 111.40 3899.00<br />
c)25 mm dia PVC ASTM pipe (sch-80) 45.00 Each Rm 148.20 6669.00<br />
d)75 mm dia PVC ASTM pipe (sch-80) 40.00 Each Rm 168.90 6756.00<br />
62 Supplying all materials, labour, T&P and<br />
fixing standard sized 15mm CP Long body<br />
Bib cock(JAQUAR ,LYR Cat. No. - 38037)<br />
complete including cutting the wall and<br />
making good the damages, including cost <strong>of</strong> 9 Each No 1226.20 11035.80<br />
57<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
all materials complete as per PH<br />
specification and direction <strong>of</strong> Engineeringin-charge.<br />
63 Supplying all materials, labour, T&P and<br />
fixing standard sized in all basins 15mm CP<br />
pillar cock with extension body (JAQUAR<br />
,LYR Cat. No. - ARI-39011) complete<br />
including cutting the wall and making good<br />
the damages, including cost <strong>of</strong> all materials<br />
complete as per PH specification and<br />
direction <strong>of</strong> Engineering-in-charge. 11 Each No 1276.74 14044.14<br />
64 Supplying all materials, labour, T&P and<br />
fixing standard sized 15mm dia Angular<br />
Stop cock (JAQUAR,Cat. No.-051)<br />
complete including cutting the wall and<br />
making good the damages, including cost <strong>of</strong><br />
all materials complete as per PH<br />
specification and direction <strong>of</strong> Engineeringin-charge.<br />
6 Each No 923.20 5539.20<br />
65 Providing and fixing 25mm nominal bore<br />
brass fullyway valve with C.I. wheel <strong>of</strong><br />
approved quality (screwed end) with supply<br />
<strong>of</strong> all jointing materials complete as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
6 Each No 577.00 3462.00<br />
66 Supplying all materials <strong>of</strong> cubicle rest<br />
rooms <strong>of</strong> size 6'6"X6'6" / 4'0"X5'2" ,<br />
12mm thickness <strong>of</strong> compacted laminated<br />
board with 600mm door size and overall<br />
height <strong>of</strong> cubicles is 2003 mm (including a<br />
gap <strong>of</strong> 150 mm from the ground) Standard<br />
Besco Accessories Details (Per Cubicle<br />
Unit).Accessories: SS Top Rail (Epoxy<br />
Powder Coated Aluminium in SS mill finish),<br />
SS 304 Grade coat hook , SS Gravity<br />
Hinges (Stainless Steel Grade 304 with<br />
Satin Finish),SS Latch cum Occupancy<br />
Indicator (Stainless Steel Grade 304 with<br />
Satin Finish),6063 micron Aluminum “U”<br />
Channel,SS Palm Design Adjustable Foot<br />
(Stainless Steel Grade 304 with Satin<br />
Finish), SS Screws & Inserts (Stainless<br />
Steel Grade 304 with Satin Finish), Epoxy<br />
powder coated Aluminium door stopper<br />
channel as per site requirement and<br />
direction <strong>of</strong> Engineer-in-chrage. 6 Each No 28598.29 171589.74<br />
58<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
67 Supplying all materials,labour,T&P and<br />
fixing Rotational moulded polyethylene<br />
syndical vertical water storage tanks <strong>of</strong><br />
2000 ltr capacity confirming to IS:12701-<br />
1996 including cutting holes through the<br />
tank and fixing mild steel tubes and<br />
fittings and providing extra sockets and<br />
jam nuts, fixing ball valve etc, including<br />
hoisting up to a height <strong>of</strong> 5 mtr above<br />
ground level and placing the tank to the<br />
required position including conveyance <strong>of</strong><br />
all materials to worksite etc all complete<br />
as per specification and direction <strong>of</strong><br />
Engineer-in-charge. 1 Each No 13136.00 13136.00<br />
68 Providing, laying cement concrete 1:4:8 (1<br />
cement : 4 fine sand : 8 graded stone<br />
aggregate 40 mm nominal size) bedding for<br />
100mm dia PVC pipes and necessary<br />
formwork and curing complete as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
40.00 Each Rm 155.90 6236.00<br />
69 Supplying all materials, labours, T&P and<br />
constructing gully trap chamber <strong>of</strong><br />
250mmx250mm inside size with 8cm thick<br />
RCC precast cover slab in cement concrete<br />
(1:2:4) mix using 12mm size hg chips,<br />
foundation concrete (1:4:8) using 40mm<br />
size hard granite metal on bed and around<br />
trap, KB brickwork in cement mortar (1:6)<br />
in F&P and inside 12mm thick cement<br />
plaster in cement mortar (1:3) finished<br />
with a floating coat <strong>of</strong> neat cement<br />
including fixing 100mmx100mm size HCI<br />
gully trap,150mm x150mm size CI grating<br />
etc all complete as per approved drawing,<br />
PH specification and direction <strong>of</strong> Engineerin-charge.<br />
5 Each No 940.20 4701.00<br />
70 Supplying all materials, labours, T&P and<br />
constructing inspection chamber <strong>of</strong><br />
760mmx760mmx460mm inside size with<br />
cement concrete (1:3:6) mix using 40mm<br />
size hg metal on bed,1st class KB brickwork<br />
in cement mortar (1:6),moulding and<br />
shaping the channel inside and benching<br />
with cement concrete (1:2:4) using 12mm<br />
size hg chips,12mm thick cement plaster in 4 Each No 4807.10 19228.40<br />
59<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
cement mortar (1:3) with punning to inside,<br />
cement flush pointing (1:3) to outside, RCC<br />
cover slab in (1:2:4)using 12mm size hg<br />
chips with RCC man hole cover, earthwork<br />
in excavation in all kinds <strong>of</strong> soil and<br />
refilling the cavity around the chamber<br />
including watering curing conveyance <strong>of</strong> all<br />
materials to worksite, payment <strong>of</strong> royalty,<br />
taxes etc all complete as per approved<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
71 Supplying all materials, labours, T&P and<br />
constructing 1.22m dia and 2.1m depth soak<br />
way pit with precast RCC rings joined<br />
loose, gravel backing in the rear <strong>of</strong> well<br />
staining, precast RCC cover slab in cement<br />
concrete (1:2:4) using 12mm size hg chips<br />
fitted with iron lifting handles including<br />
cutting hole in the rings for inlet pipe,<br />
earthwork in open well excavation in all<br />
kinds <strong>of</strong> soil and refilling <strong>of</strong> cavity around<br />
the pit & painting the iron works, watering,<br />
curing, conveyance <strong>of</strong> all materials to<br />
worksite, payment <strong>of</strong> royalty, taxes etc all<br />
complete as per approved specification and<br />
direction <strong>of</strong> Engineer-in-charge. 1 Each No 8269.90 8269.90<br />
72 Supplying all materials, labours, T&P and<br />
cutting holes through existing brickwork<br />
including making good the damages in<br />
cement mortar (1:4) for taking GI pipes<br />
and fittings/PVC pipes and fittings etc all<br />
complete as per PH specification and<br />
direction <strong>of</strong> Engineer-in-charge. 8 Each No 28.60 228.80<br />
73 Earthwork in excavation <strong>of</strong> foundation<br />
trenches in ordinary soil including moorum<br />
stoney earth and earth mixed with<br />
boulders except sheet rock and boulders<br />
requiring blasting including dressing <strong>of</strong><br />
sides and leveling the bed up to the<br />
required depth and depositing the<br />
excavated materials away from the work<br />
site with all leads and lifts, including<br />
shoring, shuttering and dewatering (if<br />
required) with cost <strong>of</strong> labour, hire &<br />
running charges <strong>of</strong> water pumps sundries &<br />
T&P required for the work complete as 12.82 Each cum 87.60 1123.03<br />
60<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
directed by the Engineer-in-charge.<br />
74 Supplying and filling in foundation trenches<br />
and plinth, ditches with sand well watered<br />
and rammed in layers not exceeding 23 cm.<br />
In depth with all lead and lift including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
(Measurement will be taken on<br />
finished compacted section only). 2.99 Each cum 463.50 1385.87<br />
75 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:3:6) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 4 cm. Size black hard crusher broken<br />
granite stone metal and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and<br />
cleaned including hoisting, lowering, laying<br />
concrete, ramming, watering and curing<br />
etc. complete to required levels laid in<br />
layers not exceeding 15 cm thick in each<br />
layer including cost, conveyance, loading,<br />
unloading, royalties and taxes all materials<br />
and cost all labours, sundries, T & P<br />
required for the work including shoring,<br />
shuttering and dewatering if required<br />
including hire & running charges <strong>of</strong> water<br />
pump complete as per specification and<br />
direction <strong>of</strong> Engineer-in-charge. 0.68 Each cum 3701.20 2516.82<br />
76 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:2:4) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 12 mm. Size black hard crusher<br />
broken granite stone metal and screened<br />
and washed sharp sand for mortar <strong>of</strong><br />
approved quality from approved quarry,<br />
washed and cleaned including hoisting,<br />
lowering, laying concrete, ramming,<br />
watering and curing etc. complete to<br />
required levels laid in layers not exceeding<br />
15 cm thick in each layer including cost,<br />
conveyance, loading, unloading, royalties<br />
and taxes all materials and cost all labours,<br />
sundries, T & P required for the work 1.56 Each cum 4854.20 7572.55<br />
61<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
including shoring, shuttering and<br />
dewatering if required including hire &<br />
running charges <strong>of</strong> water pump complete as<br />
per specification and direction <strong>of</strong><br />
Engineer-in-charge.<br />
77 First class K.B. brick work in cement<br />
mortar (1:6) with best quality bricks having<br />
crushing strength from 75kg/cm 2 to<br />
99kg/cm 2 , immersing the bricks in water<br />
for not less than 6 hours before use (the<br />
bricks shall be well burnt, free from<br />
cracks, well shaped, uniform in size and<br />
shall produce a clear metallic ringing sound<br />
when struck) includes moulding,<br />
chamfering, corbelling etc. complete as per<br />
drawing, design and specification, watering<br />
and curing for 7 days including cost,<br />
conveyance, royalty and taxes <strong>of</strong> all<br />
materials, labour, T&P etc. and as per<br />
direction <strong>of</strong> Engineer-in-charge, for the<br />
foundation and plinth. 5.76 Each cum 3340.60 19241.86<br />
78 Providing, lifting, hoisting and laying<br />
Reinforced cement concrete <strong>of</strong> M-200<br />
grade in Ro<strong>of</strong> Slab as per approved<br />
designs and drawings having a minimum<br />
compressive strength (in work test) 200<br />
Kg. / Square cm. in 15 cm. cubes at 28 days<br />
after mixing and test conducted in<br />
accordance with I.S. 516 using 12 mm. to<br />
20 mm. size black hard crushed broken<br />
granite stone chips and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and<br />
cleaned ( 20mm. size chips not to exceeds<br />
25 % ) to be mixed in concrete mixture<br />
with Portland slag cement (PSC) including<br />
hoisting, lowering, laying and compaction<br />
concrete by using vibrators, watering and<br />
curing for 28 days, centering and<br />
shuttering then after dismantling and<br />
removing debris from the work site and<br />
finishing the exposed surface smooth<br />
providing grooves or beads wherever<br />
necessary including cost, conveyance,<br />
loading, unloading, royalties and taxes <strong>of</strong> all<br />
materials and cost <strong>of</strong> all labours, sundries, 0.61 Each cum 7327.00 4469.47<br />
62<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
T & P required <strong>of</strong> the work etc. complete in<br />
all respect as directed by the Engineer-in-<br />
Charge. But excluding cost and conveyance<br />
<strong>of</strong> M.S. rods or Tor steel and binding wires<br />
and labour charges for straightening,<br />
cutting, bending etc. <strong>of</strong> M.S. rods or tor<br />
steel tying the grills and placing in proper<br />
position.<br />
79 Providing 12mm. thick cement plaster with<br />
cement mortar <strong>of</strong> mix (1:6) in all floors<br />
with Portland slag cement (PSC) with neat<br />
cement punning complete including<br />
watering and curing along with the cost,<br />
conveyance, loading and unloading, royalties<br />
and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />
labours, sundries, T&P and scaffolding<br />
required for the work etc. complete in all<br />
respect as directed by the Engineer–in-<br />
Charge. 16.17 Each Sqm 84.70 1369.60<br />
80 Providing 16mm thick cement plaster in all<br />
floors at all height with cement mortar <strong>of</strong><br />
mix (1:6) with Portland slag cement (PSC)<br />
and with screened and washed sharp sand<br />
for mortar and finished smooth to the<br />
rough surface <strong>of</strong> brick masonry walls after<br />
racking out joints including watering and<br />
curing rounding <strong>of</strong> corners etc. complete<br />
with cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, T&P, sundries and scaffolding<br />
required for the work etc. with providing<br />
grooves as directed by the Engineer-in-<br />
Charge 23.13 Each Sqm 115.90 2680.77<br />
81 Providing 50mm thick baffle wall in RCC<br />
M-20 as per design and drawing including<br />
required reinforcement and centering and<br />
shuttering complete including cost<br />
conveyance, taxes <strong>of</strong> all materials, labour,<br />
T & P, loading and unloading etc. complete<br />
as per specification and direction <strong>of</strong><br />
Engineer-in-charge 2.00 Each Sqm 210.00 420.00<br />
82 Providing 20mm OMS step iron as per<br />
design and drawing complete including cost<br />
conveyance, taxes <strong>of</strong> all materials, labour,<br />
T & P, loading and unloading etc. complete<br />
as per specification and direction <strong>of</strong> 5 Each No 91.00 455.00<br />
63<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Engineer-in-charge.<br />
83 Providing fitting and fixing 100mm (4") dia<br />
HCI vent pipe <strong>of</strong> 1.0mt length with cowl<br />
complete including cost conveyance, taxes<br />
<strong>of</strong> all materials, labour, T & P, loading and<br />
unloading etc. Complete as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
1 Each No 217.60 217.60<br />
84 Providing, fixing and placing <strong>of</strong> MS bars/<br />
Tor steel (HYSD) Fe-500 for RCC work in<br />
all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />
quality with straightening, Cutting,<br />
bending, binding welding or jointing if<br />
necessary, bending, binding, tying the grills<br />
as required for R.C.C. works, providing fan<br />
hooks where necessary and hoisting,<br />
lowering and placing in proper position<br />
according to approved designs and<br />
drawings including cost, conveyance,<br />
loading, unloading, taxes <strong>of</strong> M.S. rods or<br />
Tor steel and binding wires <strong>of</strong> 18 to 20<br />
gauge required for the work and cost <strong>of</strong> all<br />
labour, sundries, T & P and scaffolding<br />
complete in all respect as directed by the<br />
Engineer-in-Charge ( payment will be made<br />
according to the actual weight <strong>of</strong> M.S rod<br />
/Tor steel consumed in the work and no<br />
separate payment will be made towards<br />
weight <strong>of</strong> binding wires which is to be<br />
borne by the contractor at his own cost 0.49 Each qtl 6031.10 2955.24<br />
E.I WORKS<br />
85 Recessed wiring to light/Wall fan point /<br />
Exhaust fan point with 1.5 sq.mm FR PVC<br />
insulated single core multistrand copper<br />
conductor <strong>of</strong> ISI marked with 20 mm dia<br />
non-metallic PVC flexible conduit with S.P.<br />
5 / 6 amps, one way modular switch, ISI<br />
marked type switch, Modular base & cover<br />
for 1 module, Modular G.I. box for 2<br />
module 18 SWG ISI marked and ceiling<br />
rose ISI marked mounted on MS box<br />
having front Bakelite cover <strong>of</strong> suitable size<br />
, MS box with 1.5 sq.mm FR PVC insulated<br />
single core multistrand copper conductor<br />
as earth wire including all accessories and<br />
connection as per direction <strong>of</strong> Engineer in<br />
64<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Charge. ( Make <strong>of</strong> wire Finolex/ L&T /<br />
Anchor / Havels / V Guard )<br />
Group - A 20 Each No 497.56 9951.20<br />
Group - B 10 Each No 621.72 6217.20<br />
Group - C 10 Each No 802.70 8027.00<br />
86 Recessed wiring to ceiling fan point point<br />
with 1.5 sq.mm FR PVC insulated single core<br />
multistrand copper conductor <strong>of</strong> ISI<br />
marked with 20 mm dia non-metallic PVC<br />
flexible conduit with S.P. 5 / 6 amps, one<br />
way modular switch, ISI marked type<br />
switch, Modular base & cover for 1 module,<br />
Modular G.I. box for 2 module 18 SWG ISI<br />
marked and ceiling rose ISI marked<br />
mounted on MS box having front Bakelite<br />
cover <strong>of</strong> suitable size , MS box with 1.5<br />
sq.mm FR PVC insulated single core<br />
multistrand copper conductor as earth wire<br />
including all accessories and connection as<br />
per direction <strong>of</strong> Engineer in Charge. ( Make<br />
<strong>of</strong> wire Finolex/ L&T / Anchor / Havels / V<br />
Guard )<br />
Group - B 20 Each No 951.50 19030.00<br />
87 Point wiring for 5 / 6 amp modular socket<br />
outlet with 2 x 1.5 sq.mm FR PVC insulated<br />
single core multistrand copper conductor<br />
<strong>of</strong> ISI marked in recess 20 mm dia nonmetallic<br />
PVC flexible conduit with modular<br />
type switch ,phenolic laminated sheet<br />
suitable size ISI marked MS box and<br />
earthing point with 1 x 1.5 sq.mm FR PVC<br />
insulated single core multistrand copper<br />
conductor for loop earthing etc. as<br />
required. (Make <strong>of</strong> wire Finolex /L&T /<br />
Anchor / Havels / V Guard ) 10 Each No 689.70 6897.00<br />
88 Supplying and fixing <strong>of</strong> 5A plug in Madular<br />
type box ,cover, Switch & Socket etc as<br />
required. (Make Finolex /L&T / Anchor /<br />
Havels / V Guard ) 10 Each No 484.00 4840.00<br />
89 Supplying and fixing <strong>of</strong> metal box <strong>of</strong> power<br />
point on surface or in recess with suitable<br />
size <strong>of</strong> phenolic laminated sheet cover in<br />
front including providing and fixing 3pin 15<br />
/ 16 amps socket outlet and 15 / 16 amps<br />
modulr type switch, connection, painting<br />
etc as required. (Make Finolex /L&T / 6 Each No 653.00 3918.00<br />
65<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Anchor / Havels / V Guard )<br />
90 Supplying and fixing <strong>of</strong> 3 pin 15 / 16 amps<br />
modular socket on surface or in recess<br />
with 2 Madul Modular metal box with cover<br />
in front including providing and fixing ,<br />
connection etc as required (Make Finolex<br />
/L&T / Anchor / Havels / V Guard ) 10 Each No 435.40 4354.00<br />
91 Supplying and fixing <strong>of</strong> 32 A D.P modular<br />
switch on surface or in recess with 2<br />
Madul Madular metal box with cover in<br />
front including providing and fixing ,<br />
connection etc as required(Make Finolex<br />
/L&T / Anchor / Havels / V Guard ) 10 Each No 481.89 4818.90<br />
92 Supplying and fixing <strong>of</strong> Foot lamp with 4<br />
Madul Madular metal box with cover in<br />
front including providing and fixing ,<br />
connection etc as required(Make Finolex<br />
/L&T / Anchor / Havels / V Guard ) 4 Each No 647.30 2589.20<br />
93 Supplying and fixing <strong>of</strong> modular Buzzer<br />
switch on surface or in recess with 2<br />
Madul Modular metal box with cover in<br />
front including providing and fixing ,<br />
connection etc as required(Make Finolex<br />
/L&T / Anchor / Havels / V Guard ) 4 Each No 358.35 1433.40<br />
94 Supplying and fixing <strong>of</strong> Tv socket out let<br />
with 2 Madul Modular metal box with cover<br />
<strong>of</strong> including providing and fixing<br />
connection, etc as required. (Make Finolex<br />
/L&T / Anchor / Havels / V Guard ) 4 Each No 324.35 1297.40<br />
95 Supplying and fixing <strong>of</strong> Telephone socket<br />
out let with 2 Madul Madular metal box<br />
with cover <strong>of</strong> including providing and<br />
fixing connection, etc as required. (Make<br />
Finolex /L&T / Anchor / Havels / V Guard ) 4 Each No 324.35 1297.40<br />
96 Supplying and fixing <strong>of</strong> Return bell make<br />
Max with Indicating Lamp including<br />
providing and fixing connection, etc as<br />
required. (Make Finolex /L&T / Anchor /<br />
Havels / V Guard ) 10 Each No 260.00 2600.00<br />
97 Recessed wiring to call bell point with<br />
1.5 sq.mm FR PVC insulated single core<br />
multistrand copper conductor <strong>of</strong> ISI<br />
marked with 20 mm dia non-metallic PVC<br />
flexible conduit with S.P. 5 / 6 amps, one<br />
way modular switch, ISI marked type<br />
switch, Modular base & cover for 1 module, 6 Each No 652.00 3912.00<br />
66<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Modular G.I. box for 2 module 18 SWG ISI<br />
marked and ceiling rose ISI marked<br />
mounted on MS box having front<br />
bakelitecover <strong>of</strong> suitable size , MS box<br />
with 1.5 sq.mm FR PVC insulated single core<br />
multistrand copper conductor asearth wire<br />
including all accesories and connection as<br />
per direction <strong>of</strong> Engineer in Charge. ( Make<br />
<strong>of</strong> wire Finolex/ L&T / Anchor / Havels / V<br />
Guard )FOR-GROUP-B<br />
98 Recessed wiring to sub-main with 2 x 2.5 +1<br />
x 1 sq.mm FR PVC insulated single core<br />
multistrand copper conductor <strong>of</strong> ISI<br />
marked run inside 20 mm dia non-metallic<br />
PVC flexible conduit as required. ( Make <strong>of</strong><br />
wire Finolex/ L&T / Anchor / Havels / V<br />
Guard ) 280.00 Each Mtr 122.70 34356.00<br />
99 Recessed wiring to submain with 2 x 4 +1 x<br />
1.5 sq.mm FR PVC insulated single core<br />
multistrand copper conductor <strong>of</strong> ISI<br />
marked run inside 20 mm dia non-metalic<br />
PVC flexible conduit as required. ( Make <strong>of</strong><br />
wire Finolex/ L&T / Anchor / Havels / V<br />
Guard ) 250.00 Each Mtr 134.25 33562.50<br />
100 Recessed wiring to submain with 2 x 6 +1 x<br />
2.5 sq.mm FR PVC insulated single core<br />
multistrand copper conductor <strong>of</strong> ISI<br />
marked run inside 20 mm dia non-metalic<br />
PVC flexible conduit as required. ( Make <strong>of</strong><br />
wire Finolex/ L&T / Anchor / Havels / V<br />
Guard ) 120.00 Each Mtr 170.15 20418.00<br />
101 Recessed wiring to submain with 4 x 6<br />
+1x2.5 sq.mm FR PVC insulated single core<br />
multistrand copper conductor <strong>of</strong> ISI<br />
marked run inside 32 mm dia non-metalic<br />
PVC flexible conduit as required. ( Make <strong>of</strong><br />
wire Finolex/ L&T / Anchor / Havels / V<br />
Guard ) 80.00 Each Mtr 270.24 21619.20<br />
102 Supply, Installation, Testing, and<br />
Commissioning <strong>of</strong> 400 mm swing wall fan<br />
etc complete.(Havells Platina) 2 Each No 2520.00 5040.00<br />
103 Supply and installation <strong>of</strong> ceiling fan<br />
Fusion metallic 1200mm <strong>of</strong> Havells make<br />
including providing and fixing connection,<br />
etc as required. 15 Each No 2601.00 39015.00<br />
104 Supply and installation <strong>of</strong> plastic Body 6 Each No 1793.75 10762.50<br />
67<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
exhaust fan Ventil air - DX 250mm <strong>of</strong><br />
Havells make including providing and fixing<br />
connection, etc as required<br />
105 Supplying, fitting & fixing <strong>of</strong> 23 W. CFL<br />
including cost <strong>of</strong> all material, labour, T&P,<br />
etc complete. (Make : Phillips / equivalent) 20 Each No 264.00 5280.00<br />
106 Supplying, installation, testing &<br />
commissioning <strong>of</strong> Decorative Mirror light<br />
fixture including cost <strong>of</strong> all material,<br />
labour, T&P, etc complete.(Make : Phillips /<br />
equivalent). 20 Each No 744.54 14890.80<br />
107 Recessed Mounted vertical down-lighter<br />
retr<strong>of</strong>it suitable for 1x18W CFL (Havells)<br />
including providing and fixing connection,<br />
etc as required. 10 Each No 808.00 8080.00<br />
108 Supplying and fixing <strong>of</strong> Call Bell / Buzzer<br />
ISI marked suitable for DC /AC single<br />
phase 230 volts complete as required.<br />
including cost <strong>of</strong> all material, labour, T&P,<br />
etc complete (Make : Phillips / equivalent). 2 Each No 105.00 210.00<br />
109 Supply & Fixing <strong>of</strong> 1 x 28 watt T5 4' long<br />
fluorescent tube light fitting on wall<br />
surface complete with 1 no <strong>of</strong> 28 watt T5<br />
tube <strong>of</strong> approved make complete with all<br />
other necessary fixing materials including<br />
termination and labour (Make : Phillips /<br />
equivalent) 10 Each No 778.53 7785.30<br />
110 Supply and installation <strong>of</strong> TV cable RG-6<br />
grade, 0.7 mm solid copper conductor PE<br />
insulated shielded with fine tined copper<br />
braid and protected with FR PVC sheath<br />
run inside the existing conduits including<br />
cost, conveyance, loading, unloading, and<br />
taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour<br />
and T & P etc. required for the work etc.<br />
complete as per specification and direction<br />
<strong>of</strong>Engineering-in-charge/Consultant.<br />
(Make : Phillips / equivalent) 120.00 Each Mtr 21.55 2586.00<br />
111 Supplying and drawing 2 pair, 0.5 sq.mm FR<br />
PVC insulated copper conductor, unarmored<br />
telephone cable in existing surface /<br />
recessed steel / PVC conduit as required<br />
including cost, conveyance, loading,<br />
unloading, and taxes <strong>of</strong> all materials, cost<br />
<strong>of</strong> all labour and T & P etc. required for<br />
the work etc. complete as per specification 120.00 Each Mtr 20.28 2433.60<br />
68<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
and direction <strong>of</strong> Engineering-incharge/Consultant.(<br />
Make <strong>of</strong> wire Finolex/<br />
L&T / Anchor / Havels / V Guard .)<br />
112 Supplying and fixing <strong>of</strong> 20 mm dia flexible<br />
PVC conduit sizes <strong>of</strong> PVC conduit along with<br />
accessories in recessed wiring including<br />
cutting the wall and making good the same<br />
in case <strong>of</strong> recessed conduit as required<br />
including cost, conveyance, loading,<br />
unloading, and taxes <strong>of</strong> all materials, cost<br />
<strong>of</strong> all labour and T & P etc. required for<br />
the work etc. complete as per specification<br />
and direction <strong>of</strong> Engineering-incharge/Consultant<br />
( Make <strong>of</strong> wire Finolex/<br />
L&T / Anchor / Havels / V Guard ) 120.00 Each Mtr 40.00 4800.00<br />
113 Supply, delivery, installation, testing &<br />
commissioning <strong>of</strong> indoor wall mounted type<br />
telephone distribution box having following<br />
number <strong>of</strong> junctions made out <strong>of</strong> 1.6mm<br />
thick CR sheet steel duly primered &<br />
painted with enamel paint having hinged<br />
front door, testing facility having provision<br />
for cable / conduit entry complete as per<br />
direction <strong>of</strong> Engineer-in-charge.<br />
Junction box suitable for 20 pair<br />
telephone cable termination <strong>of</strong> approved<br />
quality. 1 Each No 354.00 354.00<br />
114 Supply, delivery, laying and testing <strong>of</strong><br />
following sizes <strong>of</strong> PVC insulated jelly filled<br />
armoured telephone cable <strong>of</strong> approved<br />
quality laid on surface <strong>of</strong> wall/ column/<br />
ro<strong>of</strong>/ partitions <strong>of</strong> the building or inside<br />
prelaid conduit/ hume pipes/ GI pipes, as<br />
the case may be, complete as required and<br />
as per direction <strong>of</strong> Engineer-in-charge.<br />
20/0.5 Pair 30.00 Each Rm 105.00 3150.00<br />
115 Supply and laying <strong>of</strong> following size rigid<br />
PVC conduit pipe (medium ) approved<br />
quality through floor / wall / partition with<br />
GI spacer clamps or as directed. Rate to<br />
include for accessories - bends, sockets<br />
Tee's etc.<br />
25 mm dia 80.00 Each Rm 42.00 3360.00<br />
116 Supply and fixing <strong>of</strong> 4way TPN double door<br />
Distribution box with 63A TPN MCB 1nos<br />
10/25/32 A SP MCB - 12 No etc complete 1 Each No . 5750.00 5750.00<br />
69<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Supply and fixing <strong>of</strong> 6 way TPN double<br />
door Distribution box with 100A TPN MCB<br />
1nos 10/25/32 A SP MCB - 15 No etc(all<br />
materials are to be used <strong>of</strong> approved<br />
quality) complete as directed by Engg-incharge.<br />
1 Each No . 8163.00 8163.00<br />
117 Providing and making earth pits including<br />
the cost <strong>of</strong> 2mm thick 2.5 mtr. long 50 mm<br />
dia pipe, CI funnel with wire mesh charcoal,<br />
salt, all earth work, masonry enclosure with<br />
CI frame & 300 mm x 300 mm cover plate<br />
having locking arrangement complete as per<br />
IS 3043:1987 for LT Panel. 2 Each No 3000.00 6000.00<br />
118 Supplying and laying <strong>of</strong> the following<br />
earthing clamped to wall with suitable<br />
clamps saddles and fixing bolts/ in ground<br />
including the cost <strong>of</strong> digging and back<br />
filling with sand and brick protection as<br />
required and complete as required to<br />
comply with IS 3043:1987<br />
19 mm x 3 mm GI strip 40.00 Each Mtr 79.50 3180.00<br />
119 Supply and laying <strong>of</strong> 3.5core 35 sqmm<br />
armoured aluminum cable <strong>of</strong> approved<br />
quality etc complete as directed by Enggin-<br />
charge. 60.00 Each Mtr 351.30 21078.00<br />
120 Supply and laying <strong>of</strong> 2core 10 sqmm<br />
armored alluminium cable etc complete as<br />
directed by Engg-in- charge. 60.00 Each Mtr 202.00 12120.00<br />
121 Supply , Installation, testing &<br />
commissioning <strong>of</strong> the following indoor wall<br />
mounted type L.T Distribution panel board<br />
<strong>of</strong> 415V , 50Hz. Power supply made out <strong>of</strong><br />
1.6mm thick CRCA steel duly de rusted &<br />
painted with two coats <strong>of</strong> light grey &<br />
enamel paint <strong>of</strong> approved shade over a coat<br />
<strong>of</strong> primer, dust, damp & vermin pro<strong>of</strong>,<br />
cubicle fixed on M.S angle channel base,<br />
having compartmental arrangement for<br />
each equipment and suitable size <strong>of</strong><br />
Aluminium bus bar having provision for<br />
cable entry at bottom, providing Earthing<br />
point to terminate 19mm x 3mm G.I flat,<br />
Nomenclature plate, Enameled danger<br />
board, earthing studs as per specification<br />
mentioned below duly factory wired<br />
confirming to the relevant ISS.<br />
70<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
One no <strong>of</strong> 125 Amp 25kA 4P MCCB.<br />
1 set <strong>of</strong> 3 ph. 25 x 6 mm size cu. Bus bar<br />
(200A)<br />
One no <strong>of</strong> 63Amp 4P Change over.<br />
1 set <strong>of</strong> 3 ph. 25 x 6 mm size cu. Bus bar<br />
(100A)<br />
3 nos. <strong>of</strong> 100 Amp TPN SDF.<br />
3 nos. <strong>of</strong> 40 Amp TPN SDF.<br />
4 nos. <strong>of</strong> 32 Amp DP MCB.<br />
The panel board should contain Toggle<br />
switch, 3 ph.(R,Y,B) Indicator, Voltmeter<br />
(0-500v), Ammeter (0-100A) with Selector<br />
Switch & 3 nos. <strong>of</strong> 100/5 A CT <strong>of</strong><br />
approved make should be fixed in wall at a<br />
suitable place along with other necessary<br />
materials and labour. 1 Each No 45000.00 45000.00<br />
PATH WAY<br />
122 Earthwork in excavation in Hard soil or<br />
Gravelly soil including dressing <strong>of</strong> sides and<br />
leveling the bed up to the required depth<br />
and depositing the excavated materials<br />
away from the work site with all leads and<br />
lifts, including shoring, shuttering and<br />
dewatering (if required) with cost <strong>of</strong><br />
labour, hire & running charges <strong>of</strong> water<br />
pumps sundries & T&P required for the<br />
work complete as directed by the<br />
Engineer-in-charge. 50.99 Each cum 87.60 4466.72<br />
123 Supplying and filling in foundation trenches<br />
and plinth, ditches with sand well watered<br />
and rammed in layers not exceeding 23 cm.<br />
In depth with all lead and lift including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
(Measurement will be taken on<br />
finished compacted section only). 25.11 Each cum 463.50 11638.49<br />
124 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:4:8) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 4 cm. Size black hard crusher broken<br />
granite stone metal and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and 21.50 Each cum 3250.20 69879.30<br />
71<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
cleaned including hoisting, lowering, laying<br />
concrete, ramming, watering and curing<br />
etc. complete to required levels laid in<br />
layers not exceeding 15 cm thick in each<br />
layer including cost, conveyance, loading,<br />
unloading, royalties and taxes all materials<br />
and cost all labours, sundries, T & P<br />
required for the work including shoring,<br />
shuttering and dewatering if required<br />
including hire & running charges <strong>of</strong> water<br />
pump complete as per specification and<br />
direction <strong>of</strong> Engineer-in-charge.<br />
125 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:2:4) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 12 mm Size black hard crusher broken<br />
granite stone chips and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and<br />
cleaned including hoisting, lowering, laying<br />
concrete, ramming, watering and curing<br />
etc. complete to required levels laid in<br />
layers not exceeding 15 cm thick in each<br />
layer including cost, conveyance, loading,<br />
unloading, royalties and taxes all materials<br />
and cost all labours, sundries, T & P<br />
required for the work including shoring,<br />
shuttering and dewatering if required<br />
including hire & running charges <strong>of</strong> water<br />
pump complete as per specification and<br />
direction <strong>of</strong> Engineer-in-charge. 7.45 Each cum 4854.20 36163.79<br />
126 Supplying ,fitting and fixing Ebro Floor tile<br />
<strong>of</strong> size 102mmx102mm in floor <strong>of</strong><br />
approved make confirming to IS:13755 laid<br />
on 20mm thick cement mortar (1:1) and<br />
filling joints with white cement <strong>of</strong><br />
approved quality including cost <strong>of</strong> all<br />
materials ,labour ,T & P etc required for<br />
the work all complete as per direction <strong>of</strong><br />
E-I-C. (MAKE: EUROCON<br />
TILES,Ebro_Colour code SGY/DGY) 201.72 Each Sqm 892.30 179994.76<br />
127 Supplying, fitting and fixing <strong>of</strong> monolithic<br />
stone benches made <strong>of</strong> up Khandolite<br />
Stone as per approved drawing & design<br />
which is fully furnished & shaped at all<br />
heights as per the design including cost, 8 Each No 65200.00 521600.00<br />
72<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
conveyance, loading and unloading, royalty<br />
and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />
labour, sundries and T&P, etc. required for<br />
the work complete as per direction <strong>of</strong><br />
Engineer-in-charge.<br />
PARKING<br />
128 Earthwork in excavation in Hard soil<br />
Gravelly soil including dressing <strong>of</strong> sides and<br />
leveling the bed up to the required depth<br />
and depositing the excavated materials<br />
away from the work site with all leads and<br />
lifts, including shoring, shuttering and<br />
dewatering (if required) with cost <strong>of</strong><br />
labour, hire & running charges <strong>of</strong> water<br />
pumps sundries & T&P required for the<br />
work complete as directed by the<br />
Engineer-in-charge. 212.14 Each cum 87.60 18583.46<br />
129 Supplying and filling in foundation trenches<br />
and plinth, ditches with sand well watered<br />
and rammed in layers not exceeding 23 cm.<br />
In depth with all lead and lift including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
(Measurement will be taken on<br />
finished compacted section only). 93.60 Each cum 463.50 43383.60<br />
130 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:3:6) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 4 cm. Size black hard crusher broken<br />
granite stone metal and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and<br />
cleaned including hoisting, lowering, laying<br />
concrete, ramming, watering and curing<br />
etc. complete to required levels laid in<br />
layers not exceeding 15 cm thick in each<br />
layer including cost, conveyance, loading,<br />
unloading, royalties and taxes all materials<br />
and cost all labours, sundries, T & P<br />
required for the work including shoring,<br />
shuttering and dewatering if required<br />
including hire & running charges <strong>of</strong> water<br />
pump complete as per specification and 1.26 Each cum 3701.20 4663.51<br />
73<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
direction <strong>of</strong> Engineer-in-charge.<br />
131 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:2:4) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 12 mm. Size black hard crusher<br />
broken granite stone metal and screened<br />
and washed sharp sand for mortar <strong>of</strong><br />
approved quality from approved quarry,<br />
washed and cleaned including hoisting,<br />
lowering, laying concrete, ramming,<br />
watering and curing etc. complete to<br />
required levels laid in layers not exceeding<br />
15 cm thick in each layer including cost,<br />
conveyance, loading, unloading, royalties<br />
and taxes all materials and cost all labours,<br />
sundries, T & P required for the work<br />
including shoring, shuttering and<br />
dewatering if required including hire &<br />
running charges <strong>of</strong> water pump complete as<br />
per specification and direction <strong>of</strong><br />
Engineer-in-charge. 77.11 Each cum 4854.20 374307.36<br />
132 Construction <strong>of</strong> granular sub-base by<br />
providing Close graded Granular subbase<br />
Grading-III material as per table 400-1,<br />
spreading in uniform layers with motor<br />
grader on prepared surface, mixing by mix<br />
in place method with rotavator at OMC,<br />
and compacting with vibratory roller to<br />
achieve the desired density complete as<br />
per Clause 401 <strong>of</strong> MoSRT&H Specifications<br />
for Road & Bridge works (4th Revision) 111.03 Each cum 1005.20 111607.36<br />
133 Providing, conveying from stacks and<br />
spreading IRC Grade-II metal conforming<br />
to sieve analysis as per MORTH<br />
specification uniform for a compacted<br />
thickness <strong>of</strong> 0.075m and hand packing to<br />
proper camber and slope , filling the<br />
intersection properly with approved quality<br />
<strong>of</strong> quarry dust <strong>of</strong> approved P.I. value by<br />
spreading the same (to the specified<br />
quantity 25% over each layer) over the<br />
surface proper watering and consolidation<br />
with PRR including hire and running charges<br />
<strong>of</strong> PRR along with the cost and conveyance<br />
<strong>of</strong> required water including the cost<br />
conveyance, royalities and taxes <strong>of</strong> all 55.52 Each cum 1391.70 77267.18<br />
74<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
materials, cost <strong>of</strong> labour, sundries T & P<br />
etc. required for the work to complete in<br />
all respect as per specification and<br />
direction <strong>of</strong> the Engineer-in-charge.<br />
134 Providing, conveying from stacks and<br />
spreading IRC Grade-III metal<br />
conforming to sieve analysis as per MORTH<br />
specification uniform for a compacted<br />
thickness <strong>of</strong> 0.075m and hand packing to<br />
proper camber and slope , filling the<br />
intersection properly with approved quality<br />
<strong>of</strong> quarry dust <strong>of</strong> approved P.I. value by<br />
spreading the same (to the specified<br />
quantity 25% over each layer) over the<br />
surface proper watering and consolidation<br />
with PRR including hire and running charges<br />
<strong>of</strong> PRR along with the cost and conveyance<br />
<strong>of</strong> required water including the cost<br />
conveyance, royalities and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> labour, sundries T & P<br />
etc. required for the work to complete in<br />
all respect as per specification and<br />
direction <strong>of</strong> the Engineer-in-charge. 55.52 Each cum 1508.60 83757.47<br />
135 Providing floor tile <strong>of</strong> approved quality,<br />
colour and size on 25mm thick bed <strong>of</strong><br />
cement mortar <strong>of</strong> mix (1:1) laid in proper<br />
slope and gradient with screened and<br />
washed sharp sand for mortar and grouted<br />
with neat white cement slurry joining the<br />
tile with neat white cement slurry mixed<br />
with required quantities <strong>of</strong> pigments <strong>of</strong><br />
approved marks to match the shades <strong>of</strong><br />
the tile if required watering and curing<br />
for 21 days, including cost, conveyance,<br />
loading, unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, sundries, T&P<br />
required for the work and wax polishing<br />
etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge..<br />
(MAKE:<br />
EUROCON TILES,Salamanca_Colour code<br />
MGN/DGN) 752.37 Each Sqm 904.60 680593.90<br />
136 Providing 16mm thick cement plaster in all<br />
floors at all height with cement mortar <strong>of</strong><br />
mix (1:6) with Portland slag cement (PSC)<br />
and with screened and washed sharp sand 44.25 Each Sqm 115.90 5128.58<br />
75<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
for mortar and finished smooth to the<br />
rough surface <strong>of</strong> brick masonry walls after<br />
racking out joints including watering and<br />
curing rounding <strong>of</strong> corners etc. complete<br />
with cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, T&P, sundries and scaffolding<br />
required for the work etc. with providing<br />
grooves as directed by the Engineer-in-<br />
Charge<br />
137 Wall painting two coats with 100% Acrylic<br />
emulsion paint (1 st quality) exterior grade<br />
(weather coat) <strong>of</strong> approved make & shade<br />
manufactured by reputed manufacture like<br />
NEROLAC /ASIAN /BERGER /DULOX or<br />
equivalent to make an even finished<br />
surface over a coat <strong>of</strong> primer with water<br />
bond cement primer in all heights with all<br />
scaffolding and staging charges including<br />
cost, conveyance, taxes <strong>of</strong> all materials,<br />
cost <strong>of</strong> all labour, etc. complete as per<br />
specification and direction <strong>of</strong> Engineer-in-<br />
Charge. 44.25 Each Sqm 76.70 3393.98<br />
FOOT BRIDGE<br />
138 Earthwork in excavation in Hard soil<br />
/Gravelly soil including dressing <strong>of</strong> sides<br />
and leveling the bed up to the required<br />
depth and depositing the excavated<br />
materials away from the work site with all<br />
leads and lifts, including shoring,<br />
shuttering and dewatering (if required)<br />
with cost <strong>of</strong> labour, hire & running charges<br />
<strong>of</strong> water pumps sundries & T&P required<br />
for the work complete as directed by the<br />
Engineer-in-charge. 44.78 Each cum 87.60 3922.73<br />
139 Supplying and filling in foundation trenches<br />
and plinth, ditches with sand well watered<br />
and rammed in layers not exceeding 23 cm.<br />
In depth with all lead and lift including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
(Measurement will be taken on<br />
finished compacted section only). 7.45 Each cum 463.50 3453.08<br />
76<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Providing, lifting, hoisting and laying<br />
Reinforced cement concrete <strong>of</strong> M-20<br />
Grade in different works with 12mm to<br />
20mm size black hard crusher broken<br />
granite chips <strong>of</strong> approved quality from<br />
approved quarry including mixing and<br />
compacting to proper shape and size, level<br />
and plumbs and finishing the exposed<br />
surfaces smooth including cost <strong>of</strong><br />
scaffolding, watering and curing for the<br />
required period including cost <strong>of</strong> all<br />
materials with taxes, royalties<br />
transportation, loading and unloading, all<br />
labour, sundries, T&P including hire &<br />
running charges <strong>of</strong> concrete mixer and<br />
vibrator etc completed as per the<br />
direction <strong>of</strong> the Engineer-in-charge but<br />
excluding the cost <strong>of</strong> materials and labour<br />
for reinforcement bars & including the<br />
cost <strong>of</strong> centering and shuttering for the<br />
works. 12.20 Each cum 4577.10 55840.62<br />
140 Providing, fixing and placing <strong>of</strong> MS bars/<br />
Tor steel (HYSD) Fe-500 for RCC work in<br />
all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />
quality with straightening, Cutting,<br />
bending, binding welding or jointing if<br />
necessary, bending, binding, tying the grills<br />
as required for R.C.C. works, providing fan<br />
hooks where necessary and hoisting,<br />
lowering and placing in proper position<br />
according to approved designs and<br />
drawings including cost, conveyance,<br />
loading, unloading, taxes <strong>of</strong> M.S. rods or<br />
Tor steel and binding wires <strong>of</strong> 18 to 20<br />
gauge required for the work and cost <strong>of</strong> all<br />
labour, sundries, T & P and scaffolding<br />
complete in all respect as directed by the<br />
Engineer-in-Charge ( payment will be made<br />
according to the actual weight <strong>of</strong> M.S rod<br />
/Tor steel consumed in the work and no<br />
separate payment will be made towards<br />
weight <strong>of</strong> binding wires which is to be<br />
borne by the contractor at his own cost 19.43 Each qtl 6031.10 117184.27<br />
141 Providing 16mm thick cement plaster in all<br />
floors at all height with cement mortar <strong>of</strong><br />
mix (1:6) with Portland slag cement (PSC) 56.28 Each Sqm 115.90 6522.85<br />
77<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
and with screened and washed sharp sand<br />
for mortar and finished smooth to the<br />
rough surface <strong>of</strong> brick masonry walls after<br />
racking out joints including watering and<br />
curing rounding <strong>of</strong> corners etc. complete<br />
with cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, T&P, sundries and scaffolding<br />
required for the work etc. with providing<br />
grooves as directed by the Engineer-in-<br />
Charge<br />
142 Providing 25mm thick Eurocon make<br />
AVANTE floor tile on ro<strong>of</strong> terrace <strong>of</strong><br />
approved quality, colour and size in in all<br />
floors at all height on 25mm thick bed <strong>of</strong><br />
cement mortar <strong>of</strong> mix (1:1) laid in proper<br />
slope and gradient with screened and<br />
washed sharp sand for mortar and grouted<br />
with neat white cement slurry joining the<br />
tile with neat white cement slurry mixed<br />
with required quantities <strong>of</strong> pigments <strong>of</strong><br />
approved marks to match the shades <strong>of</strong><br />
the tile if required watering and curing<br />
for 21 days, including cost, conveyance,<br />
loading, unloading, royalties and taxes <strong>of</strong> all<br />
materials, cost <strong>of</strong> all labour, sundries, T&P<br />
required for the work including rubbing<br />
mechanically and wax polishing etc.<br />
complete in all respect as per specification<br />
and direction <strong>of</strong> Engineer-in-charge. 22.30 Each Sqm 892.30 19898.29<br />
143 Supplying, fitting and fixing <strong>of</strong> Stainless<br />
steel <strong>of</strong> 304 grade in hand railing using<br />
50mm dia <strong>of</strong> 2mm thick circular pipe with<br />
balustrade <strong>of</strong> size 32mm x 32mm x 2mm @<br />
0.90mtr. C/C and stainless square pipe<br />
bracing <strong>of</strong> size 32mm x 32mm x 2mm in 3<br />
rows in stair case as per approved design<br />
and specification, buffing, polishing etc.<br />
with cost, conveyance, taxes <strong>of</strong> all<br />
materials, T & P etc. required for the<br />
complete in all respect as directed by the<br />
Engineer-in-charge. 253.26 One Kg 306.60 77649.52<br />
144 Supplying, laying and fixing <strong>of</strong> Pebble<br />
stones with mixed cement slurry to give a<br />
decorative touch to the cement surface<br />
including cost, conveyance, loading, 10.82 Each Sqm 684.40 7405.21<br />
78<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
unloading, stacking,royalties and taxes <strong>of</strong><br />
all Materials, cost <strong>of</strong> all Labour, T & P,<br />
Sundries required for the work complete in<br />
all respect as directed by the Engineer-in-<br />
Charge.<br />
RETAINING WALL<br />
145 Earthwork in excavation in Hard soil<br />
Gravelly soil including dressing <strong>of</strong> sides and<br />
leveling the bed up to the required depth<br />
and depositing the excavated materials<br />
away from the work site with all leads and<br />
lifts, including shoring, shuttering and<br />
dewatering (if required) with cost <strong>of</strong><br />
labour, hire & running charges <strong>of</strong> water<br />
pumps sundries & T&P required for the<br />
work complete as directed by the<br />
Engineer-in-charge. 90.54 Each cum 87.60 7931.30<br />
146 Supplying and filling in foundation trenches<br />
and plinth, ditches with sand well watered<br />
and rammed in layers not exceeding 23 cm.<br />
In depth with all lead and lift including<br />
cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, sundries, T&P required for the<br />
work etc. complete in all respect as per<br />
specification and direction <strong>of</strong> Engineer-incharge.<br />
(Measurement will be taken on<br />
finished compacted section only). 9.05 Each cum 463.50 4194.68<br />
147 Providing and lying plain cement concrete<br />
<strong>of</strong> proportion (1:4:8) in foundation and<br />
floors using Portland Slag Cement(PSC)<br />
with 4 cm. Size black hard crusher broken<br />
granite stone metal and screened and<br />
washed sharp sand for mortar <strong>of</strong> approved<br />
quality from approved quarry, washed and<br />
cleaned including hoisting, lowering, laying<br />
concrete, ramming, watering and curing<br />
etc. complete to required levels laid in<br />
layers not exceeding 15 cm thick in each<br />
layer including cost, conveyance, loading,<br />
unloading, royalties and taxes all materials<br />
and cost all labours, sundries, T & P<br />
required for the work including shoring,<br />
shuttering and dewatering if required<br />
including hire & running charges <strong>of</strong> water<br />
pump complete as per specification and 9.05 Each cum 3250.20 29414.31<br />
79<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
direction <strong>of</strong> Engineer-in-charge.<br />
148 Providing, lifting, hoisting and laying<br />
Reinforced cement concrete <strong>of</strong> M-200<br />
grade as per approved designs and<br />
drawings having a minimum compressive<br />
strength (in work test) 200 Kg. / Square<br />
cm. in 15 cm. cubes at 28 days after mixing<br />
and test conducted in accordance with I.S.<br />
516 using 12 mm. to 20 mm. size black hard<br />
crushed broken granite stone chips and<br />
screened and washed sharp sand for<br />
mortar <strong>of</strong> approved quality from approved<br />
quarry, washed and cleaned ( 20mm. size<br />
chips not to exceeds 25 % ) to be mixed in<br />
concrete mixture with Portland slag<br />
cement (PSC) including hoisting, lowering,<br />
laying and compaction concrete by using<br />
vibrators, watering and curing for 28 days,<br />
centering and shuttering then after<br />
dismantling and removing debris from the<br />
work site and finishing the exposed<br />
surface smooth providing grooves or beads<br />
wherever necessary including cost,<br />
conveyance, loading, unloading, royalties<br />
and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />
labours, sundries, T & P required <strong>of</strong> the<br />
work etc. complete in all respect as<br />
directed by the Engineer-in-Charge. But<br />
excluding cost and conveyance <strong>of</strong> M.S. rods<br />
or Tor steel and binding wires and labour<br />
charges for straightening, cutting, bending<br />
etc. <strong>of</strong> M.S. rods or tor steel tying the<br />
grills and placing in proper position.<br />
a)Wall 23.82 Each cum 7040.20 167697.56<br />
b)Slab 21.51 Each cum 4690.90 100901.26<br />
149 Providing, fixing and placing <strong>of</strong> MS bars/<br />
Tor steel (HYSD) Fe-500 for RCC work in<br />
all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />
quality with straightening, Cutting,<br />
bending, binding welding or jointing if<br />
necessary, bending, binding, tying the grills<br />
as required for R.C.C. works, providing fan<br />
hooks where necessary and hoisting,<br />
lowering and placing in proper position<br />
according to approved designs and<br />
drawings including cost, conveyance, 38.00 Each qntl 6031.10 229181.80<br />
80<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
loading, unloading, taxes <strong>of</strong> M.S. rods or<br />
Tor steel and binding wires <strong>of</strong> 18 to 20<br />
gauge required for the work and cost <strong>of</strong> all<br />
labour, sundries, T & P and scaffolding<br />
complete in all respect as directed by the<br />
Engineer-in-Charge ( payment will be made<br />
according to the actual weight <strong>of</strong> M.S rod<br />
/Tor steel consumed in the work and no<br />
separate payment will be made towards<br />
weight <strong>of</strong> binding wires which is to be<br />
borne by the contractor at his own cost<br />
150 Providing 16mm thick cement plaster in all<br />
floors at all height with cement mortar <strong>of</strong><br />
mix (1:6) with Portland slag cement (PSC)<br />
and with screened and washed sharp sand<br />
for mortar and finished smooth to the<br />
rough surface <strong>of</strong> brick masonry walls after<br />
racking out joints including watering and<br />
curing rounding <strong>of</strong> corners etc. complete<br />
with cost, conveyance, loading, unloading,<br />
royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />
all labour, T&P, sundries and scaffolding<br />
required for the work etc. with providing<br />
grooves as directed by the Engineer-in-<br />
Charge 94.39 Each Sqm 115.90 10939.80<br />
151 Wall painting two coats with 100% Acrylic<br />
emulsion paint (1 st quality) exterior grade<br />
(weather coat) <strong>of</strong> approved make & shade<br />
manufactured by reputed manufacture like<br />
NEROLAC /ASIAN /BERGER /DULOX or<br />
equivalent to make an even finished<br />
surface over a coat <strong>of</strong> primer with water<br />
bond cement primer in all heights with all<br />
scaffolding and staging charges including<br />
cost, conveyance, taxes <strong>of</strong> all materials,<br />
cost <strong>of</strong> all labour, etc. complete as per<br />
specification and direction <strong>of</strong> Engineer-in-<br />
Charge. 94.39 EachSqm 76.70 7239.71<br />
LANDSCAPPING<br />
Planting and Maintaince for 3 years<br />
152 Planting.<br />
a)Clearing jungle growth including uprooting<br />
<strong>of</strong> rank vegetation, grass, brush wood, after<br />
marking the site with stakes, at required<br />
spacing.(Hill slopes) 820 Each No 3.00 2460.00<br />
b)Digging <strong>of</strong> pits <strong>of</strong> size 600 cm x 600 cm x 820 Each No 17.69 14505.80<br />
81<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
600cm in Hard Stony soil. 0.60 x 0.60 x<br />
0.60 = 0.216 Cum<br />
c)Filling up pits with fertile garden soil/silt<br />
including carriage (Pit size 600 cm x 600 cm<br />
x 600cm) 820 Each No 42.00 34440.00<br />
d)Application <strong>of</strong> organic manure (600 cm x<br />
600 cm x 600cm) per pit including cost,<br />
carriage and mixing with soil. 820 Each No 35.00 28700.00<br />
e)Application <strong>of</strong> basal doze <strong>of</strong> chemical<br />
fertilizer @ 100gm <strong>of</strong> NPK and insecticide<br />
@ 10gm per pit including cost and<br />
carriage.(600 cm x 600 cm x 600cm) 820 Each No 6.00 4920.00<br />
f)Cost <strong>of</strong> planting including staking with<br />
stakes in July/Aug.(a)Upto 2.0mt height 820 Each No 4.50 3690.00<br />
g)Contingent expenditure including, ropes,<br />
stakes implements etc. 820 Each No 2.00 1640.00<br />
153 Tending<br />
a)First weeding and soil working up to a<br />
diameter <strong>of</strong> 1.0mt. Around the plant and<br />
application <strong>of</strong> chemical fertilizers during<br />
Aug. & Sep. 820 Each No 6.00 4920.00<br />
b)Second soil working, weeding and mulching<br />
during Oct. & Nov. 820 Each No 6.00 4920.00<br />
154 Watering<br />
a)Watering once a week with about 20 litres<br />
<strong>of</strong> water from 1st November till 31st March<br />
(22 times) 820 Each No 73.00 59860.00<br />
b)Watering once in 3 days from 1st April till<br />
15 June (26 times) 820 Each No 87.00 71340.00<br />
155 2nd Year Maintaince<br />
a)Soil working and weeding upto 0.50 mt<br />
radius around the plant in July-Aug 820 Each No 5.00 4100.00<br />
b)Application <strong>of</strong> chemical fertilizer NPK<br />
@100gm per plant including cost 820 Each No 3.00 2460.00<br />
c)Soil working and mulching during Oct-Nov. 820 Each No 5.00 4100.00<br />
d)Watering from 1st Feb till 15 June once a<br />
week with about 20litres <strong>of</strong> water 20 times 820 Each No 67.00 54940.00<br />
Contingent, expenditure including baskets,<br />
drums, implements 820 Each No 2.00 1640.00<br />
156 3rd Year Maintaince<br />
a)Tree doctoring to give a aesthetic shape<br />
by pruning un wieldy branches 820 Each No 3.00 2460.00<br />
b)Weeding and mounding 820 Each No 5.00 4100.00<br />
157 Carriage <strong>of</strong> saplings 2.00m ht. within 50K.M<br />
lead 820 Each No 10.00 8200.00<br />
82<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
158 a)FOREST SPECIES ( Av. Height 2.0 Mtr<br />
)<br />
Casuarina (casuarina equisetifolia),<br />
Eucalyptus (Eucalyptushybrid), Teak<br />
(Tectona grandis) Sissoo<br />
(Dalbergia<br />
sissoo),<br />
Cassia (Cassia seamea), Chakunda (Samania<br />
saman),<br />
Gambhar (Gmelina arborea) 50 Each No 15.00 750.00<br />
b)FAST GROWING ORNAMENTAL<br />
SPECIES ( Av. Height 2.0 Mtr )<br />
Kadamba (anthocephalus cadamba), krushna<br />
chuda (Delonix regia) Radhachuda<br />
(pelt<strong>of</strong>errum ferrugenum), Chhatian<br />
(Alstonea Scholaris) Akash Malli (Melligtonia<br />
hortensis) 50 Each No 30.00 1500.00<br />
c)SLOW GROWING ORNAMENTAL ( Av.<br />
Height 2.0 Mtr )<br />
Ashok (Saraca ashoka) Nageswar ( Messua<br />
ferea), Patali (lagestromes floss reginae),<br />
Spathodea (Spathodea companulata),<br />
Putranjva rox burgii), Baula (Mimussops<br />
elengii), Bottle brush (Callistemin<br />
lanceolatum), Neem (Azadirchta indica),<br />
Karanj (plumerea alba/ rubra), Vishnuchnde<br />
(Jacaranda mimisfolia), Muchakunda<br />
(sterospermum acerifolium),Dolichandran<br />
(Dolichandran atrovirens),Tabebuea<br />
(Tabebuea wendlanda/ rasea), Ganga seuli (<br />
Nyctarethes arborstris) jamun (Syzygium<br />
cumuni) Cassia ( Cassia noduse) Siris (<br />
Albizzia lebbeck), Polash (Beaute<br />
monosperma), Debadaru (Polyathia<br />
longifolia), Aonla ( Embelica <strong>of</strong>ficinalis),<br />
Sunari (Cassia fistula), Kanchan (Bauhinia<br />
variegate), Bhendi (Thespesia populnea) etc. 100 Each No 45.00 4500.00<br />
d)UNCOMMON SPECIES(Av. Height 2.0<br />
Mtr )<br />
Kochila (Strychnos noxvomica), Sami (Acacia<br />
fernesiana), Sal (Shorea robusta), Mitukinia<br />
(Mitragyna parviflora), Chandan (Santalum<br />
album), akta chandan Pterocarpu santalinus)<br />
Bela (Aegla marmelos), Ritha (Sapindus<br />
imarginatus), Arjun (Terminalia arjuna),<br />
Harida (Tereminalia chebula), ara (ficus<br />
bengalengis), Aswastha (Ficusreligiosa), 100 Each No 60.00 6000.00<br />
83<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
Baruna (Cratava religiosa), Piasal<br />
(Pterocarpus marsupium), Mehegani<br />
(Swetenia mehogani), an (terminalia<br />
tomentosa), Phanphana (Oroxylum indicum),<br />
Beta (calamusrotang), Pine (Callistris<br />
intratropica), Ornamental Bamboes Patali<br />
(Sterospermum suaveolense), Ficus elastic,<br />
Ficusbenjamina, Ficus infectoria etc.<br />
e)SHRUB SPECIES ( 2 Years Old )<br />
Mandar (Hibiscus rosasinensis), Tagar<br />
(Tabarnae montana coronaria), Kaniar (<br />
Thevetia spp), karabira (Nerium oleander),<br />
kamini (Murray exotica) Godibana ( Caesal<br />
pinnea pulcherima), lxora (lxora coccinea) 100 Each No 40.00 4000.00<br />
f)Slow growing shrubs; Species grown<br />
from gooties/budding/ cutting etc.( 2<br />
Years Old )<br />
Sugandha raj (gardenia grandiflora), Tecoma<br />
stans), Almond (Almonda cathertica),<br />
Kagajphula (Bougain villea), Mandar hybris (<br />
Hibiscus rosasinensis, lxora (lxora<br />
singaporeansis), Broonfeltia spp.), Kunda<br />
(jasminum spp.), Thuja spp. Crotons, Sthala<br />
padma (Hibiscus spp.) TMC-Tagar, Malli (<br />
jasminum sambac), Calliandra ( calliandea<br />
hemata cephala), Malfiga ( Malifigea<br />
glabra), calliandra hostuni,calliandra<br />
brevipes,calliandra inoquilatera,calliandra<br />
alba, Brya ebenus, etc.<br />
100 Each No 60.00 6000.00<br />
g)UNCOMMON SPECIES(2 Years Old )<br />
i)Azalea, Chamelea, Anthurium, Hydrangea,<br />
Poinsettea hybrid, gloxinia, Adenum,<br />
Mussanda, Orchids, Ground orchid 120 Each No 150.00 18000.00<br />
ii)Silver OAK, washingtonia Robusta, Phoenix<br />
dactilifera, washingtonic Filifera 200 Each No 500.00 100000.00<br />
<strong>Development</strong> <strong>of</strong> Lawns<br />
159 Land Preparation<br />
a)Clearance <strong>of</strong> site, excavation <strong>of</strong> ground<br />
upto a depth <strong>of</strong> 30cm, removal <strong>of</strong> excavated<br />
materials to out side for dumping at suitable<br />
places. 1500.00 Each Sqm 30.00 45000.00<br />
b)Filling the site with good garden soil/ silt<br />
to a depth <strong>of</strong> 30cm including carriage and<br />
leveling the area. 1500.00 Each Sqm 45.00 67500.00<br />
c)Spreading <strong>of</strong> FYM @ 0.08m3, chemical 1500.00 Each Sqm 20.00 30000.00<br />
84<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
fertilizer NPK @ 250gms, termicide 50gms<br />
including cost <strong>of</strong> materials <strong>of</strong> carriage<br />
d) Final leveling after thorough mixing <strong>of</strong> all<br />
materials and compacting by hand roller. 1500.00 Each Sqm 1.00 1500.00<br />
e) Planting with grass <strong>of</strong> required species<br />
depending on site 1500.00 Each Sqm 15.00 22500.00<br />
f) Rolling and watering 1500.00 Each Sqm 1.00 1500.00<br />
160 Maintenance during planting year<br />
a)Watering for about 8 months leaving rainy<br />
days 1500.00 Each Sqm 10.00 15000.00<br />
b)First mowing after three months and<br />
there after every two<br />
months 1500.00 Each Sqm 10.00 15000.00<br />
c)Weeding through out the year 1500.00 Each Sqm 10.00 15000.00<br />
d)Top dressing with soil, FYM, chemical<br />
fertilizer twice a year<br />
after mowing, in June and November<br />
including<br />
antifungal<br />
treatment. 1500.00 Each Sqm 20.00 30000.00<br />
e)Contingent expenditure 1500.00 Each Sqm 3.00 4500.00<br />
161 LAWN MAINTENANCE DURING SECOND<br />
YEAR<br />
a)Watering for about 8 months leaving rainy<br />
days 1500.00 Each Sqm 10.00 15000.00<br />
b)Weeding through out the year 1500.00 Each Sqm 5.00 7500.00<br />
c)Mowing once in two months 1500.00 Each Sqm 15.00 22500.00<br />
d)Top dressing with soil, FYM, chemical<br />
fertilizer,<br />
germicide/<br />
fungicide twice a year after mowing in June<br />
and Nov. 1500.00 Each Sqm 25.00 37500.00<br />
162 Contingent expenditure 1500.00 Each Sqm 5.00 7500.00<br />
163 LAWN MAINTENANCE DURING THIRD<br />
YEAR<br />
b)Particulars for second year and also for<br />
subsequent years per annum. 1500.00 Each Sqm 60.00 90000.00<br />
164 Trenching in ordinary soil upto a depth <strong>of</strong> 60<br />
cm including removal and stacking <strong>of</strong><br />
serviceable materials and then disposing <strong>of</strong><br />
by spreading and neatly levelling within a<br />
lead <strong>of</strong> 50 m and making up the trenched<br />
area to proper levels by filling with earth or<br />
earth mixed with sludge <strong>of</strong> land manure<br />
before and after flooding trench with water<br />
(excluding the cost <strong>of</strong> imported earth,<br />
sludge or manure). 700.00 Each cum 12.80 8960.00<br />
165 Supplying, stacking & spreading <strong>of</strong> good 400.00 Each cum 209.30 83720.00<br />
85<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
earth at site (Earth measured in stacks will<br />
be reduced by 20% for payment) with all<br />
lead and lift as required for the work<br />
complete as directed by the Engineer-incharge.<br />
166 Supplying, stacking & spreading cow dung<br />
manure at site (cow dung manure measured<br />
in stacks will be reduced by 8% for<br />
payment) with all lead and lift as required<br />
for the work complete as directed by the<br />
Engineer-in-charge. 50.00 Each cum 700.00 35000.00<br />
167 Providing and fixing overhead type sprinkler<br />
system with self closing valve type 25mm X<br />
20mm with self closing spring made up <strong>of</strong><br />
aluminum alloy and brass fittings including<br />
cost <strong>of</strong> all materials, labour, T & P etc<br />
complete as per direction <strong>of</strong> Engineer-incharge.<br />
14 Each No 1000.00 14000.00<br />
168 Supplying all materials , labours , taxes and<br />
tools and plants for fitting and fixing <strong>of</strong><br />
20mm dia CPVC pipes <strong>of</strong> 100% lead free and<br />
conforming to ASTM F442 S pecific-2<br />
CPVC (Make -ASTRAL/ASHIRBAD<br />
/Equivalent) with good quality including<br />
fittings and laying as per the site<br />
requirement etc., all complete including<br />
testing as per the direction and<br />
specification <strong>of</strong> Engineer-in-charge. 250.00 Each Rm 104.90 26225.00<br />
Total 9543143.5<br />
Say 9543000.00<br />
168(One hundred sixty eight items only)<br />
(Rupees Ninety five lakh forty three thousand only)<br />
The tenderer is required to quote only the percentage excess or less over the estimated<br />
cost here-below both in words and figures :<br />
86<br />
___________________ ( _______________________________________ )<br />
(in figures)<br />
(in words)<br />
No. <strong>of</strong> Correction …………<br />
No. <strong>of</strong> Overwriting………..<br />
No. <strong>of</strong> Interpolation………<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I
87<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-I