1<br />

ODISHA TOURISM DEVELOPMENT CORPORATION LIMITED<br />

(A <strong>Govt</strong>. <strong>of</strong> <strong>Odisha</strong> <strong>Undertaking</strong>)<br />

Panthanivas (Old Block): Lewis Road: Bhubaneswar-14<br />

(BUILDING PROJECT DIVISION)-I<br />

DETAILED TENDER CALL NOTICE<br />

NAME OF WORK:- Construction <strong>of</strong> Tourist Reception Centre,<br />

Pathway, Parking, & Landscaping etc at<br />

Ghatagaon in Keonjhar Dist.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


2<br />

ODISHA TOURISM DEVELOPMENT CORPORATION LIMITED<br />

(A <strong>Govt</strong>. <strong>of</strong> <strong>Odisha</strong> <strong>Undertaking</strong>)<br />

Panthanivas, (Old Block), Lewis Road, Bhubaneswar-14<br />

No. BP-I/18/2012-13 Date 11.02.2013<br />

DETAILED TENDER CALL NOTICE<br />

Sealed tenders in conformity with DTCN eventually to be drawn in<br />

P.W.D.F-2 are invited percent basis in Double Cover System (Cover-I:-<br />

TECHNICAL BID & Cover-II:- PRICE BID) from registered contractors <strong>of</strong><br />

State PWD/ Irrigation/ CPWD/ MES/ Railway and other Government<br />

Organization for the work as detailed below<br />

Name <strong>of</strong> the work<br />

Construction <strong>of</strong><br />

Tourist Reception<br />

Centre, Pathway,<br />

Parking, &<br />

Landscaping etc<br />

at Ghatagaon in<br />

Keonjhar Dist.<br />

Estimated<br />

amount<br />

(Rs. in lacs)<br />

Rs 95.43<br />

Cost <strong>of</strong> tender<br />

documents<br />

(Non<br />

refundable)<br />

Rs10,000+5%<br />

VAT.<br />

1% <strong>of</strong><br />

Estimated<br />

Cost<br />

Class <strong>of</strong><br />

Contractor<br />

Period <strong>of</strong><br />

completion<br />

Rs.95,430.00 “B‘’ & “A” 9(Nine)<br />

Calendar<br />

Months.<br />

The Detailed Tender documents can be had from our Web site:<br />

www.panthanivas.com. The Tender paper will be received upto 3.00 P.M on<br />

06.03.2013 at O.T.D.C. Head <strong>of</strong>fice by speed post/registered post/courier<br />

and Technical bid will be opened same day on 06.03.2013 at 4.00P.M.<br />

O.T.D.C. Ltd. will not be held responsible for postal delay. Financial bid will<br />

be opened after finalization <strong>of</strong> technical bid and on intimation.<br />

The Authority reserves the right to reject any or all the tenders<br />

without assigning any reason there<strong>of</strong>.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


3<br />

TERMS & CONDITIONS<br />

1. Cost <strong>of</strong> Tender Paper : The Bidders have to pay the cost <strong>of</strong> bid documents<br />

<strong>of</strong> Rs.10,000.00. + 5% VAT (Non-refundable) in shape <strong>of</strong> Demand Draft in<br />

favour <strong>of</strong> Managing Director OTDC Ltd. & Payable at any Schedule Bank,<br />

Bhubaneswar.<br />

2. EMD : 1% ( one percent) <strong>of</strong> estimated cost put to tender (as above) in shape<br />

<strong>of</strong> P.O.S.B./P.O.T.D./N.S.C./K.V.P./Deposit Receipt <strong>of</strong> schedule Bank etc.<br />

duly pledged in favour <strong>of</strong> Managing Director OTDC Ltd. Bhubaneswar.<br />

3. Last Date <strong>of</strong> Receipt <strong>of</strong> Tender Paper : Tenderer should furnish their<br />

tender in the separate sealed covers, the first sealed cover should contain all<br />

the information’s relating to his eligibility in addition to the special condition<br />

if any. On the top <strong>of</strong> the cover, it should be clearly mentioned in bold letters<br />

“COVER-I (TECHNICAL BID).” The second sealed cover should contain the<br />

“PRICE BID” and on top <strong>of</strong> the cover it should be mentioned in bold letters<br />

“COVERI-II (PRICE BID).” should be kept inside one sealed packet super<br />

scribing on the top tender for Construction <strong>of</strong> Tourist Reception Centre,<br />

Pathway, Parking, & Landscaping etc at Ghatagaon in Keonjhar Dist. and will be<br />

received up to 3.00 P.M. on dt.06.03.2013 at OTDC head <strong>of</strong>fice.<br />

4. a) Date and Time <strong>of</strong> Opening <strong>of</strong> Tender Paper Cover-I: Cover-I shall be<br />

opened at 4.00 P.M. on dt.06.03.2013 by the undersigned/ <strong>of</strong> his<br />

authorized Asst. Engg. at O.T.D.C. head <strong>of</strong>fice Bhubaneswar in presence <strong>of</strong><br />

the Tenderers or their authorized representatives.<br />

b) Date and Time <strong>of</strong> Opening <strong>of</strong> Tender Paper : Cover-II- Opening <strong>of</strong> Cover<br />

– II containing Price Bid shall be intimated separately to those tenderers<br />

who will be found eligible as per eligibility criteria mentioned here under.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


4<br />

5. ELIGIBILITY CRITERIA FOR QUALIFYING TECHNICAL BID<br />

For consideration for qualifying the Technical Bid, the followings<br />

are to be submitted in COVER-I.<br />

(A) Cost <strong>of</strong> Tender Paper : Rs.10,000.00+5% VAT<br />

(non-refundable)<br />

(B) EMD : Rs. Rs.95,430.00<br />

(C)<br />

(D)<br />

(E)<br />

(F)<br />

(G)<br />

Attested copy <strong>of</strong> License Registration Certificate.<br />

Attested copy <strong>of</strong> VAT Clearance Certificate in Form <strong>of</strong> VAT-<br />

612/STCC/TIN.<br />

Attested copy <strong>of</strong> PAN CARD.<br />

No Relation/ Relation Certificate : Tenderers should furnish<br />

the required certificate as per the OPWD Code Volume-II,<br />

Appendix-IX, Para-7.<br />

The Tenderers shall have to furnish pro<strong>of</strong> <strong>of</strong> ownership <strong>of</strong> the<br />

following required machineries in their possession and / or<br />

furnish negotiation certificate in the form <strong>of</strong> affidavit for<br />

hiring <strong>of</strong> such machineries from the rightful owners. In case<br />

<strong>of</strong> hiring <strong>of</strong> machineries, documentary evidence <strong>of</strong> ownership<br />

shall have to be furnished along with negotiation certificate.<br />

Tenderers are required to produce original documents within<br />

three working days <strong>of</strong> opening <strong>of</strong> Cover-I, failing which<br />

tenders will be invalid.<br />

List <strong>of</strong> Machineries & T & P<br />

a) Concrete Mixer.<br />

b) Plate compactor/ Needle vibrator<br />

c) Steels Centering Materials<br />

(H)<br />

Contractor/ Firm should furnish list <strong>of</strong> similar works<br />

executed during last five years stating the Agreement No.,<br />

date <strong>of</strong> commencement and completion, actual date <strong>of</strong><br />

completion duly certified by the employer. The applicant<br />

should have completed at least one work <strong>of</strong> similar nature <strong>of</strong><br />

worth 40% <strong>of</strong> the value <strong>of</strong> work put to tender in last five<br />

years. The certificate to that effect has to be obtained from<br />

an <strong>of</strong>ficer not below the rank <strong>of</strong> Executive Engineer<br />

concerned with the work under report.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


5<br />

(I)<br />

(J)<br />

(K)<br />

(L)<br />

Contractor/ Firm should have annual financial turnover <strong>of</strong><br />

not less than 40% <strong>of</strong> the value <strong>of</strong> work put to tender in any<br />

one year in civil construction works during last five years<br />

and the Turn over need to be certified by a registered<br />

Chartered Accountant<br />

The tenderers are required to furnish the documentary<br />

evidence in support <strong>of</strong> required technical personnel employed<br />

under him.<br />

Tenderers have to furnish an affidavit in support <strong>of</strong> nonrescission<br />

<strong>of</strong> any contract due to abandonment/negligence <strong>of</strong><br />

any work by the firm in last 5 years.<br />

‘Bids from joint ventures are not acceptable’.<br />

(M)<br />

(N)<br />

Tenderers have to furnish an affidavit stating that the<br />

information furnished is correct. In case at any stage if any<br />

information are found wrong his tender will be liable for<br />

rejection along with taking up <strong>of</strong> legal action against him as<br />

deemed proper.<br />

The bidder shall possess electrical license from ELBO, <strong>Odisha</strong><br />

or obtain a certificate from such license holder to provide<br />

service to him during execution electrical works<br />

6. If the <strong>of</strong>fice happens to be closed due to subsequent declaration as<br />

holiday in <strong>Govt</strong>. or Local Authority to the last date <strong>of</strong> receipt <strong>of</strong><br />

tenders and date <strong>of</strong> opening as specified above then the date <strong>of</strong><br />

receipt <strong>of</strong> tenders and the date <strong>of</strong> opening will be on the immediate<br />

next working day at same specified time and venue respectively.<br />

7. The authority reserves the right rejects any or all the tender papers<br />

without assigning any reason there<strong>of</strong>.<br />

8. The tender documents should be sealed with wax properly with own<br />

seal.<br />

9. The sealed envelope containing the tender should be super scribed with<br />

the name <strong>of</strong> the work and should be addressed to the Sr.Divisional<br />

Manager (B.P.-I), OTDC Ltd. Bhubaneswar and should contain two<br />

separate sealed envelopes (COVER-I for Technical Bid & COVER-II for<br />

Financial Bid).<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


6<br />

10. IMPORTANT GUIDELINES ON SITE MANAGEMENT, QUALITY,<br />

PAYMENT & RECTIFICATION<br />

a) The contractor shall submit all his running bills through his technical<br />

personnel supported by stage photographs, quality control test reports <strong>of</strong><br />

all materials used and works executed as per standard norms from<br />

<strong>Govt</strong>./<strong>Govt</strong>. approved laboratories and no extra payment shall be given<br />

towards these.<br />

b) The contractor shall erect and maintain the transparency pillar at his<br />

own cost.<br />

c) The contractor shall keep all required survey equipments at site.<br />

d) The period <strong>of</strong> rectification beyond the completion period shall be 1(one)<br />

year from the date <strong>of</strong> completion <strong>of</strong> the project. Security deposit will be<br />

kept withheld for the above period.<br />

11 . (a) The Plan and Specification for the work can be seen at the Office <strong>of</strong><br />

the Sr. Divisional Manager (B.P.-I), O.T.D.C.Ltd, during working hours<br />

and days. Complaints at a future date that the plan and specification<br />

have not been seen will not be entertained.<br />

(b) All other information can be had from <strong>of</strong>fice <strong>of</strong> the Sr. Divisional<br />

Manager, (B.P.-I), O.T.D.C. LTD.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


7<br />

12. EARNEST MONEY DEPOSIT AND INITIAL SECURITY DEPOSIT<br />

The tenderers whose tender is selected for acceptance shall within<br />

a period <strong>of</strong> seven days upon written intimation being given to him <strong>of</strong><br />

acceptance <strong>of</strong> his tender make an initial security deposit <strong>of</strong> 1% (one<br />

percent) <strong>of</strong> the tendered amount so that the earnest money and initial<br />

security deposit will be 2% <strong>of</strong> the tendered amount and sign the<br />

agreement in the Office <strong>of</strong> O.T.D.C. Ltd, failing which, the tender will be<br />

rejected with forfeiture <strong>of</strong> E.M.D.<br />

This security deposit, together with the earnest money and the<br />

amount withheld if any shall be retained as security deposit for the due<br />

fulfillment <strong>of</strong> this contract. Failure to enter into the required agreement<br />

and to make the security deposit, as above shall entail forfeiture <strong>of</strong> the<br />

Earnest Money. No tender shall be finally accepted until the required<br />

amount <strong>of</strong> security deposit (money) is deposited. The written agreement<br />

to be entered into between the contractor and the Corporation shall be<br />

the foundation <strong>of</strong> the right <strong>of</strong> both the parties and the contract shall<br />

deem to be incomplete until the agreement has first been signed by the<br />

contractor and then by the Sr. Divisional Manager (B.P.-I), O.T.D.C. Ltd.<br />

13. Additional performance security shall be deposited by the bidders<br />

when the bid amount is seriously unbalanced i.e less than the<br />

estimated cost by more than 10%. In such an event the bidder will<br />

deposit the additional performance security to the extent <strong>of</strong> the<br />

differential cost <strong>of</strong> the bid amount and 90% <strong>of</strong> the estimated cost in<br />

shape <strong>of</strong> Post Office Savings Bank Account/National Savings<br />

Certificate/Post Office Time Deposit account/Kissan Vikash<br />

Patra/Deposit receipt <strong>of</strong> schedule Bank at the time <strong>of</strong> sanction <strong>of</strong><br />

tender without which the tender will be liable for rejection.<br />

14. (a) The tender will be on percentage rate. The rates be quoted both in<br />

words and figures. In case <strong>of</strong> discrepancy between words and figures,<br />

the words shall prevail.<br />

15. The contractors will be responsible for payment <strong>of</strong> all royalties or other<br />

charges for quarrying materials. All local taxes inclusive <strong>of</strong> State Sales Tax<br />

and Income Tax, Octroi charges, Ferry and Tollage charges are to be paid by<br />

the Contractor.<br />

16. I.T.C.C/PAN and S.T.C.C./VAT C.C :<br />

The tender may not, at the discretion <strong>of</strong> the competent authority, be<br />

considered unless accompanied with attested true copy <strong>of</strong> the PAN card<br />

and VAT clearance certificate as the case may be and the original<br />

certificate to be produced at the time <strong>of</strong> opening <strong>of</strong> tenders.<br />

17. If the contractor removes any materials or stock so supplied to him from<br />

the site <strong>of</strong> work with a view to disposing <strong>of</strong>f the same dishonestly, he<br />

should in addition to any other liabilities Civil or Criminal arising out <strong>of</strong><br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


8<br />

the contract be liable to pay a penalty equivalent to five times the price <strong>of</strong><br />

the materials on stock according to the stipulated rates and the penalty<br />

so imposed shall be recovered from any sum that may then or at any<br />

time thereafter become due to the contractor or from his security.<br />

18. The contractor should be fully liable to indemnify the Corporation for<br />

payment <strong>of</strong> any compensation under Workmen’s Compensation Act-V-III<br />

<strong>of</strong> 1923 on account <strong>of</strong> the workmen being employed by him and the full<br />

amount <strong>of</strong> compensation paid will be recovered from the contractor.<br />

19. Every tenderer must examine the detailed specification <strong>of</strong> <strong>Odisha</strong> before<br />

submitting his tender. The right is reserved without impairing the<br />

contract to make such increase or decrease in the quantities or items <strong>of</strong><br />

work mentioned in the schedule attached to the tender notice as may be<br />

considered necessary to complete the work fully and satisfactorily. Such<br />

increase shall in no case invalidate the contract rates. It shall be<br />

definitely understood that the Corporation does not accept any<br />

responsibility for the correctness or completeness <strong>of</strong> the quantities shown<br />

in the schedule. The schedule is liable to alteration by omissions or<br />

additions or deductions and such omissions/ deductions shall in no case<br />

invalidate the contract and no extra monetary compensation will be<br />

entertained.<br />

20. Engineer contractors desirous to avail the facility <strong>of</strong> exemption <strong>of</strong> EMD<br />

are required to submit affidavit to the effect that he/she has not yet<br />

availed this facility for more than two works during the current financial<br />

year. The name <strong>of</strong> work for which and the authority to whom the tenders<br />

have been submitted, must be mentioned in the affidavit failing which<br />

the tender will be rejected. Exemption <strong>of</strong> EMD will be entered in the<br />

original Registration Certificate <strong>of</strong> the Engineer Contractor at the time <strong>of</strong><br />

participating in the tender. Hence the Engineer Contractor or his<br />

authorized representative has to produce the original license for<br />

necessary entry within 2 days <strong>of</strong> opening <strong>of</strong> the tender<br />

21. (a) If during the progress <strong>of</strong> the work the price <strong>of</strong> any material<br />

incorporated in the work (not being materials supplied from the<br />

Engineer-in-charge’s store in accordance with clause…….there<strong>of</strong>)<br />

Increases or decreases as a result <strong>of</strong> increase or decrease in the<br />

Average Wholesale Price index (all commodities), and the contractor<br />

thereupon accessorily and properly pays in respect <strong>of</strong> that material<br />

(incorporated in the work) such increased or decreased price, then he<br />

shall be entitled to reimbursement or liable to refund, quarterly, as the<br />

case may be, such an amount, as shall be equivalent to the plus or<br />

minus difference <strong>of</strong> 75% in between the Average wholesale price index<br />

(all commodities) which is operating for the quarter under<br />

consideration and that operated for the quarter in which the tender<br />

was opened, as per the formula indicated below, provided that the<br />

work has been carried out within the stipulated time or extension<br />

there as are not attributable to him.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


9<br />

(b) Similarly, if during the progress <strong>of</strong> work, the wages <strong>of</strong> labour<br />

increase or decrease as a result <strong>of</strong> increase or decrease in the average<br />

co summers price index for industrial workers (wholesale price), and<br />

the contractor thereupon necessarily and properly pays in respect <strong>of</strong><br />

labour engaged on execution <strong>of</strong> the work such increased or decreased<br />

wages, then heshallbe entitled to reimbursement or liable to refund<br />

quarterly as the case may besuch an amount, as shall be equivalent to<br />

the plus or minus difference in between the Average Consumer’s Price<br />

Index for industrial workers (wholesale price) which is operating for<br />

the quarter under consideration and that operated for the quarter in<br />

which the tender was opened as per the formula indicated below,<br />

provided that the work has been carried out within the stipulated time<br />

or extension there<strong>of</strong> as are not attributable to him.<br />

(c) Similarly, if during the progress <strong>of</strong> work, the price <strong>of</strong> Petrol, oil and<br />

Lubricants (Diesel oil being the representative item for price<br />

adjustment increases or decreases as a result <strong>of</strong> the price fixed<br />

therefore by the Government <strong>of</strong> India and the Contractor thereupon<br />

necessarily and properly payssuch increasedor decreased price<br />

towards Petrol, oil and Lubricants used on execution <strong>of</strong> work, then he<br />

shall be entitled to reimbursement or liable to refund, quarterly, as<br />

the case may be such an amount, as shall be equivalent to the plus or<br />

minus difference in between that price <strong>of</strong> P.O.L. which is operating for<br />

the quarter under consideration and that operated for the quarter in<br />

which the tender was opened as per the formula indicated bewlow;<br />

provided that the work has been carried out within the stipulated time<br />

or extension there<strong>of</strong> as are not attributable to him.<br />

(i) Formula to calculate the increase or decrease in the price <strong>of</strong><br />

materials.<br />

VM=0.75<br />

x<br />

Pm (1 10)<br />

x R<br />

100 I0<br />

VM = Increase or decrease in the cost <strong>of</strong> work during the quarter<br />

under consideration due to changes in the price <strong>of</strong> materials.<br />

R = The value <strong>of</strong> the work done in Rupees during the quarter under<br />

consideration.<br />

i0 = The average wholesale price index (all commodities for the quarter<br />

in which the tenders were opened (as published in R.B.I. Bulletin from<br />

time to time).<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


10<br />

L = The average wholesale price index (all commodities ) in the quarter<br />

under consideration.<br />

Pm = Percentage <strong>of</strong> materials component as per sub-clause <strong>of</strong> this<br />

clause.<br />

(ii) Formula to calculate the increase or decrease in the cost <strong>of</strong> labour :<br />

VI=0.75 x PL (1-10)<br />

x R<br />

100 I0<br />

VI. Increase or decrease in the cost <strong>of</strong> work during the quarter under<br />

consideration due to changes in rates <strong>of</strong> labour<br />

R = The value <strong>of</strong> the work done in Rupees during the quarter under<br />

consideration<br />

I0 = The Average Consumers price Index for Industrial Workers<br />

(Wholesale price) for the quarter in which the tender was opened (as<br />

published in R.B.I. Bulletin from time to time).<br />

I = The average Consumer’s Price Index for Industrial Workers<br />

(wholesale price) for the quarter under consideration.<br />

PL = Percentage <strong>of</strong> labour component as per sub-clause <strong>of</strong> this clause.<br />

iii) Formula to calculate the increase or decrease in the price <strong>of</strong> P.O.I.<br />

KI=0.75 x K2 (D2-D1)<br />

xµ<br />

100 D1<br />

Kl = Increase or decrease in the cost <strong>of</strong> work during the quarter under<br />

consideration due to change in the price <strong>of</strong> P.O.L.<br />

R = The value <strong>of</strong> work done in Rupees during the quarter under<br />

consideration.<br />

D1 = Average price per litre <strong>of</strong> diesel oil which was fixed by the<br />

Government <strong>of</strong> India during the quarter in which the tender was<br />

opened.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


11<br />

D2 = Average price per litre <strong>of</strong> diesel oil which is fixed during the<br />

quarter under consideration.<br />

K2= Percentage <strong>of</strong> P.O.L. component as per Sub-clause <strong>of</strong> this clause<br />

(a) The following shall be the percentage <strong>of</strong> material,labour and P.O.L.<br />

component for reimbursement / refund on variation in price <strong>of</strong><br />

material, labor and P.O.L. as per sub-clauses (a) (b) and (c) <strong>of</strong> this<br />

clause.<br />

Category <strong>of</strong><br />

work<br />

Irrigation Works<br />

:<br />

a) Structural<br />

works<br />

b) Earth work,<br />

Canal work<br />

Embankment<br />

Contractor’s Supply<br />

% <strong>of</strong><br />

Labour<br />

% <strong>of</strong><br />

materials<br />

% <strong>of</strong><br />

P.O.L.<br />

20% 30% 5% 45%<br />

20% 60% 5% 15%<br />

work etc<br />

(R & B works)<br />

a) Bridge work 20% 30% 5% 45%<br />

b) Road work 45% 40% 5% 10%<br />

c) Building<br />

work<br />

30% 30% 5% 35%<br />

Departmental<br />

supply <strong>of</strong><br />

materials<br />

(Where brick is supplied by the Department. If should be 20% instead<br />

<strong>of</strong> 30%)<br />

(e) Reimbursement / refund on variation in price <strong>of</strong> materials,<br />

labour and P.O.L. as per sub-clauses (a) (b) and (c) <strong>of</strong> this clause shall<br />

be applicable only in respect <strong>of</strong> contract <strong>of</strong> one year or more provided<br />

that the work has been carried out within the stipulated time or<br />

extension there<strong>of</strong> as are not attributable to contractor. However,<br />

where the original contractual period is less than one year but<br />

subsequently it has been validly extend and the period becomes one<br />

year or more, escalation clause shall be applicable one for the balance<br />

portion <strong>of</strong> work to be executed beyond one year provided the delay is<br />

not attributable to the contractor.<br />

(f) The contractor shall for the purpose <strong>of</strong> this condition keep such<br />

books <strong>of</strong> accounts and other documents as are necessary to show that<br />

the amount <strong>of</strong> increase claimed or reduction available and shall allow<br />

inspection <strong>of</strong> the same by a duly authorized representative <strong>of</strong><br />

Government and further shall at the Engineer-in-charge may require<br />

any document kept and such other information as the Engineer-incharge<br />

may require.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


12<br />

The Contractor shall within a reasonable time <strong>of</strong> his becoming aware<br />

<strong>of</strong> any alteration in the price <strong>of</strong> such materials and/or wages <strong>of</strong> labour<br />

give notice there<strong>of</strong> to the Engineer-in-charge may require any<br />

documents kept and such other information relating thereto which he<br />

may be in a position to supply<br />

22. The agency should produce valid labour license for the said work before<br />

signing the agreement.<br />

23. The agency should use all building materials such as reinforcement,<br />

sand etc. free from corrosion/corrosive materials etc. No extra payment<br />

will be made for such purpose by O.T.D.C. Ltd.<br />

24. <strong>Odisha</strong> Detailed Standard Specification will be followed during execution<br />

<strong>of</strong> work.<br />

25. All materials including those issued direct to the work will be received by<br />

the contractor from the respective Store <strong>of</strong> the Corporation in the sizes as<br />

per availability <strong>of</strong> stock. After issue, it will be the contractor’s<br />

responsibility for transportation, storage, handling, safe custody and<br />

proper upkeepment <strong>of</strong> materials. The rate <strong>of</strong> the contractor should<br />

include the entire incidental charges required after the issue <strong>of</strong> material<br />

from Corporation store till its lasticized in the work and return <strong>of</strong><br />

surplus and good materials at the issuing store.<br />

26. The contractor will have to bear the cost <strong>of</strong> straightening, cutting,<br />

jointing, welding etc. <strong>of</strong> all steel reinforcement and structural and no cut<br />

pieces less than 1(one) meter length will be accepted. After completion <strong>of</strong><br />

the work the contractor has to return all surplus and good materials at<br />

the issuing store at his own cost failing which the cost <strong>of</strong> the unutilized<br />

balance Corporation materials and such other damaged materials not<br />

receptacle to the Corporation would be recovered from him at 5 (five)<br />

times the stock issue rates.<br />

27. All reinforced cement concrete work should conform to <strong>Odisha</strong> Detailed<br />

Standard Specification and should be <strong>of</strong> grade M-150/200 with 12mm.<br />

Size black hard crusher broken granite stone chips (20mm. Size not to<br />

exceed 25%) having a minimum compressive strength (in work test)<br />

150kg/200kg/cm 2 in 15 cm. cubes at 28 days after mixing and tests<br />

conducted in accordance with IS 456 and IS 516.<br />

28. Shuttering and centering shall be with steel shuttering and centering .<br />

29. The selected contractor may take delivery <strong>of</strong> supply <strong>of</strong> materials<br />

according to his need for the work issued by the Engineer-in-charge <strong>of</strong><br />

the work. The contractor shall make all arrangements for proper storage<br />

<strong>of</strong> materials. But no cost for raising shed for the storage <strong>of</strong> materials and<br />

pay <strong>of</strong> watchmen etc. will be borne by the Corporation. These are all to<br />

be borne by the Contractor. The Corporation is not responsible for<br />

considering the theft <strong>of</strong> materials at site. It is contractor’s risk. Under<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


13<br />

any such plea if the contractor stops the work he shall have to pay the<br />

penalty as per the clauses <strong>of</strong> the contract.<br />

30. For the purpose <strong>of</strong> jurisdiction in the event <strong>of</strong> dispute if any contract<br />

should be deemed to have entered into within the State <strong>of</strong> <strong>Odisha</strong> and it<br />

is agreed that, neither party to the contract nor the agreement will be<br />

competent to bring a suit in regard to the matters covered by this<br />

contract at any place outside the State <strong>of</strong> <strong>Odisha</strong>.<br />

31. After the work is finished, all surplus materials and debris are to be<br />

removed by the contractor and preliminary works such as vats, mixing<br />

platforms, etc. are to be dismantled and all the materials are to be<br />

removed from the site. No extra payment will be made to the contractor<br />

on this account. The rate quoted should be inclusive <strong>of</strong> all these items.<br />

The ground upto 15 meter shall be cleared and rough dressed.<br />

32. The contractor shall not interfere with the execution <strong>of</strong> water supply or<br />

electrical fittings arrangements and any other works entrusted to any<br />

other agency by the Corporation at any time during the progress <strong>of</strong> work.<br />

33. The Corporation will have the right to inspect the scaffolding and<br />

centering made for the work and can reject partly or fully such structures<br />

if found defective in their opinion.<br />

34. The Contractor will have to arrange for water supply for all works and<br />

made sanitary arrangements at his own cost for his Labour camps. The<br />

contractor has to arrange adequate lighting arrangements for night works<br />

whenever necessary at his own cost.<br />

35. Bailing out water from the foundation either rain water or sub-soil water<br />

if necessary should be borne by the contractor. No payment will be made<br />

for benchmarks, level pillars pr<strong>of</strong>iles and benching and leveling ground<br />

where required. The rates quoted should be for finished items <strong>of</strong> work<br />

inclusive <strong>of</strong> these incidental items <strong>of</strong> work<br />

36. All the quantities mentioned in the schedule are combined for ground<br />

floor and multi-floors in case <strong>of</strong> multistoried building and the rates<br />

should be through for the same.<br />

37. Cement concrete in ro<strong>of</strong> slabs, beams and wherever prescribed by the<br />

Engineer-in-charge shall be machine mixed and vibrated, and the<br />

contractor should arrange his own concrete mixers, vibrators, and<br />

pumps etc. for the purpose.<br />

38. It should be understood clearly that no claims whatsoever will be<br />

entertained.<br />

39. The tenderer shall have to abide by the C.P.W. Safety Code introduced by<br />

the <strong>Govt</strong>. <strong>of</strong> India, Ministry <strong>of</strong> Works, Housing and Supply in their<br />

standing orders No.44250 dt.25.11.57.<br />

40. The contractor will abide by the Fair Wages clause as introduced by the<br />

Government.<br />

41. The Corporation have the right to supply at any time in the interest <strong>of</strong><br />

work any Corporation materials to be used in the work in addition to<br />

those mentioned in the clause 13 and the contractor shall use such<br />

materials without any controversy or dispute on that account. The rates<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


14<br />

<strong>of</strong> the materials will be at the stock issue rates fixed by the Corporation<br />

or market rates whichever is higher.<br />

42. The contractor will be responsible for the loss or damage if any <strong>of</strong><br />

Corporation materials supplied to him under clauses 13 and 30 during<br />

execution <strong>of</strong> the work due to reasons whatsoever and the cost <strong>of</strong> such<br />

materials will be recovered from him at the prevailing stock issue rates or<br />

market rates whichever is higher.<br />

43. CONTRACTOR’S TOOLS & PLANT AND SUPPLY OF DEPARTMENTAL<br />

TOOLS & PLAT TO CONTRACTORS.<br />

The contractor should arrange at his own cost necessary tools and plant<br />

such as Pumps, Vibrator, Concrete mixer etc. required for the efficient<br />

execution <strong>of</strong> the work and rates quoted should be inclusive <strong>of</strong> the<br />

running charges <strong>of</strong> such plant and cost <strong>of</strong> consumables.<br />

44. The contractor will have to submit to the Sr. Divisional Manager (B.P.-I),<br />

O.T.D.C. Ltd. monthly return <strong>of</strong> labour both skilled & un-skilled<br />

employed by him on the work.<br />

45. The tenderers are required to go through each clause <strong>of</strong> Corporation<br />

contract form carefully in addition to clauses mentioned herewith before<br />

tendering.<br />

46. No part <strong>of</strong> the contract shall be sublet without written permission <strong>of</strong> the<br />

Sr. Divisional Manager (B.P.-I), O.T.D.C. Ltd., Bhubaneswar or transfer<br />

be made by power <strong>of</strong> attorney , authorize others to receive payment on<br />

the contractor’s behalf.<br />

47. If any further necessary information is required, Sr. Divisional Manager<br />

(B.P.-I), O.T.D.C. Ltd., Bhubaneswar will furnish such but it must be<br />

clearly understood that tenders must be received in order and according<br />

to the instructions.<br />

48. No contractor will be permitted to furnish their tender in their own<br />

manuscript papers.<br />

49. SAMPLE OF MATERIALS:<br />

Every tenderer is expected before quoting his rates to inspect the site <strong>of</strong><br />

proposed work. He should also inspect the quarries and satisfy himself<br />

about the quality, availability <strong>of</strong> materials, medical aids, labour and<br />

foodstuffs etc. and the rates may be inclusive <strong>of</strong> all these items <strong>of</strong> work.<br />

In every case the materials must comply with the relevant specification.<br />

50. O.T.D.C. Ltd. will not however, after acceptance <strong>of</strong> contract rate, pay any<br />

extra charges for lead or for any other reason in case the contractor is<br />

found later on to have mis-judged the materials available.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


15<br />

51. EXTRANEOUS CONDITION:<br />

The tenders containing extraneous conditions not covered by the tender<br />

call notice are liable for rejection.<br />

52. VALIDITY<br />

All tenders received will remain valid for a period <strong>of</strong> ninety days from<br />

the date <strong>of</strong> receipt <strong>of</strong> tenders and validity <strong>of</strong> tender can also be<br />

extended if agreed to by the contractor and the Corporation<br />

53. After completion <strong>of</strong> the work the contractor shall arrange at his own cost all<br />

requisite equipments for testing building if found necessary and bear the<br />

entire cost <strong>of</strong> such test.<br />

54. Quality control tests are to be carried out as per standard norms by the<br />

contractor through a <strong>Govt</strong>. laboratory or any authorized <strong>Govt</strong>. laboratory.<br />

No extra payment will be made for these tests. The department may<br />

conduct separate tests as when felt necessary, the cost <strong>of</strong> which will be<br />

borne by the department.<br />

55. LIST OF WORKS IN HAND, T & P & WORK EXECUTED:<br />

Tenderers are required to submit, (i) list <strong>of</strong> works in the hand in<br />

the following prescribed pr<strong>of</strong>orma ‘A’, (ii) list <strong>of</strong> works executed in the<br />

prescribed pr<strong>of</strong>orma ‘B’ and (iii) the list <strong>of</strong> T & P in the prescribed<br />

pr<strong>of</strong>orma ‘C’ along with the tenders.<br />

56. All reinforced cement concrete works should be finished smooth, Extra<br />

charges for plastering if required to any R.C.C. structures like columns,<br />

beams, chajjas etc. shall not be paid.<br />

57. Income tax, Sales tax and workers welfare cess will be deducted as per<br />

prevailing <strong>Govt</strong>. orders from time to time.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


16<br />

PROFORMA-'C'<br />

CERTIFICATE OF TOOLS AND PLANTS<br />

I/We hereby certify that the following tools and plants, machineries and<br />

vehicles are in my/our possession in working orders.<br />

i.<br />

ii.<br />

iii.<br />

iv.<br />

v.<br />

I/We also note that, non-submission <strong>of</strong> this certificate will render my/our<br />

tender liable for rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date_______________<br />

58. The tenderer shall bear cost <strong>of</strong> various incidental sundries and<br />

contingencies necessitated by the works falling within the following or<br />

similar category.<br />

(a)<br />

(b)<br />

Rent, royalties and other charges <strong>of</strong> materials, Octroi duty, all other taxes<br />

including sales tax, ferry tolls, conveyance charges and other costs on<br />

account <strong>of</strong> land and buildings including temporary buildings required by<br />

the tenderer for collection <strong>of</strong> materials, storage, housing <strong>of</strong> staff or other<br />

purpose <strong>of</strong> the work. No rent however be payable to Corporation for<br />

temporary occupation <strong>of</strong> land owned by the Corporation at the site <strong>of</strong> the<br />

work.<br />

Labour camps and huts necessary to a suitable scale including<br />

conservancy and sanitary arrangements thereon to the satisfaction <strong>of</strong> the<br />

local health authorities.<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

Suitable water supply including pipe water supply wherever available for<br />

the staff and labourers for the works.<br />

Fees and dues hired by Municipal, Canal and water supply authorities.<br />

Suitable equipments and wearing apparatus for the labourers engaged in<br />

risky operation.<br />

Suitable fencing barriers, signal including paraffin and electrical signal<br />

where necessary at works and approaches in order to protect the public<br />

and employees from accidents.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


17<br />

(g)<br />

Compensation including cost <strong>of</strong> any suit for injury to person or property<br />

due to neglect <strong>of</strong> any major precautions also sums which may become<br />

payable due to operation <strong>of</strong> workmen’s Compensation Act.<br />

(h)<br />

The contractor has to arrange adequate lighting arrangement for night<br />

works wherever necessary at his own cost.<br />

(i)<br />

The contractor has to arrange all the building materials including the<br />

equipments required for under reamed pile foundation for starting the<br />

work.<br />

59. INTEREST:<br />

Under no circumstances interest is chargeable for the dues or additional<br />

dues if any payable for the work.<br />

60. Special class contractor shall employ under him one Graduate Engineer<br />

and two Diploma Holders belonging to the State <strong>of</strong> <strong>Odisha</strong>, like wise ‘A’<br />

class contractor shall employ under him one Graduate Engineer or two<br />

Diploma Holder belonging to the State <strong>of</strong> <strong>Odisha</strong>. The employment <strong>of</strong><br />

such Graduate Engineer and Diploma Holders under the contractor shall<br />

be full-time and continuous and they shall not be superannuated,<br />

retired, dismissed or removed personnel from any state <strong>Govt</strong>. or Central<br />

<strong>Govt</strong>. service/Public Sector undertaking/Private companies and firms or<br />

be ineligible for appointment to <strong>Govt</strong>. service. The contractor shall pay<br />

them monthly emoluments, which shall not be less than the emoluments<br />

<strong>of</strong> the personnel <strong>of</strong> equivalent qualification employed under the State<br />

<strong>Govt</strong>. <strong>of</strong> <strong>Odisha</strong>. The name <strong>of</strong> such Engineer personnel appointed by the<br />

Contractor should be intimated to the tender receiving authority along<br />

with each tender, as to who would be supervising the work. Each bill <strong>of</strong><br />

the Special Class or ‘A’ class contractor shall be accompanied by an<br />

Employment Roll <strong>of</strong> the Engineering personnel together with a certificate<br />

<strong>of</strong> the Graduate Engineer or Diploma Holder so employed by the<br />

contractor to the effect that the work executed as per the bill has been<br />

supervised by him. A prescribed pr<strong>of</strong>orma is enclosed herewith for<br />

furnishing the required certificate there in under this clause.<br />

61. The quantity/volume <strong>of</strong> item may alter during construction as per field<br />

condition<br />

62. Wherever there is ambiguity or missing data, the work shall be done as<br />

per the direction <strong>of</strong> the Engineer-in-charge.<br />

63. The interested bidders may visit the site and should acquaint themselves<br />

with the field activities to be experienced during construction.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


18<br />

64. The delay if any due to other departments such as digging on road etc.<br />

shall be the responsibility <strong>of</strong> the successful bidder.<br />

65. Statutory clearance if any from electrical inspector shall be the<br />

responsibility <strong>of</strong> the successful bidder.<br />

66. The contractor is to submit running bills supported by photographs <strong>of</strong><br />

works done and quality control test certificates from <strong>Govt</strong>. or <strong>Govt</strong><br />

approved laboratories <strong>of</strong> all materials used, cube test and other reports<br />

etc. as per norm and standard <strong>of</strong> works performed for which no extra<br />

payment shall be made.<br />

67. The contractor must keep Level instrument, theodolite and compass etc<br />

at site at his own cost.<br />

68. The contractor must construct transparency pillar either in masonry or<br />

steel depicting the brief details <strong>of</strong> contract and source <strong>of</strong> funding at his<br />

own cost and maintain the same till completion <strong>of</strong> work.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


19<br />

QUALITY CONTROL REQUIREMENTS<br />

1.0 Earth work<br />

1.1. Density requirements for embankments and sub-grade materials. MoRTH Specification (4 th<br />

Revision).<br />

Sl.<br />

No.<br />

Type <strong>of</strong> work<br />

Maximum dry density at OMC<br />

(IS:2720 Part-8)<br />

1. Embankment upto 3m height not subjected to extensive<br />

flooding<br />

2. Embankment exceeding 3m height or embankment subjected<br />

or embankment subjected to long periods <strong>of</strong> inundation.<br />

Minimum 15.2kN/m 3<br />

Minimum 16kN/m 3<br />

3. Subgrade and earthen shoulder and back fill. Minimum 17.5kN/m 3<br />

1.2. Compaction requirement for embankment and sub-grade.<br />

Sl.<br />

No.<br />

Type <strong>of</strong> work<br />

Percentage <strong>of</strong> Compaction at<br />

OMC<br />

1. Sub-grade and shoulder Minimum 97%<br />

2. Embankment Minimum 95%<br />

3. Expansive clay<br />

a. Sub-grade Not allowed<br />

b. Remaining portion Minimum 90%<br />

1.3. Criteria for small embankment (dams) (IS : 12169)<br />

The general guidelines for embankment sections are furnished in Table No.-1.<br />

TABLE-4<br />

(GENERAL GUIDELINES FOR EMBANKMENT SECTIONS)<br />

SL.<br />

NO.<br />

DESCRIPTION HEIGHT UPTO 5m HT. ABOVE 5M AND<br />

UPTO 10m<br />

1. Type <strong>of</strong> section Homogeneous<br />

Modified<br />

homogeneous<br />

section<br />

Ii Slopes U/S U/S<br />

(H:V) (H:V)<br />

a. Coarse grained soil (GW,<br />

GP, SW, SP)<br />

b. Coarse grained soil<br />

(GW,GP, SW, SP)<br />

c. Fine grained soil (Cl, ML,<br />

Cl, Ml)<br />

d. Fine grained Soil (CH,<br />

MH)<br />

Zoned section/<br />

Modified<br />

homogeneous<br />

section/<br />

homogeneous section<br />

U/S<br />

(H:V)<br />

D/S<br />

(H:V)<br />

HT. ABOVE 10M AND UPTO<br />

15m<br />

Zoned section/ modified<br />

homogeneous section/<br />

homogenous section<br />

U/S<br />

D/S<br />

Not suitable Not suitable Not suitable for core. Suitable<br />

for casing zone.<br />

2:1 2:1 2:1 2:1 Section to be decided based<br />

upon the stability analysis in<br />

accordance with IS: 7894-<br />

1975.<br />

2:1 2:1 25:1 2251:1 -do-<br />

2:1 2:1 3.75:1 25:1 may<br />

be provided<br />

a. Top width -- 3m 3m<br />

Necessary<br />

b. Top level -- 0.5m above MWL 0.5m above MWL<br />

Iv Rock toe height Not necessary upto Necessary H/5, where Necessary H/5, where H is<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


20<br />

3m above 3m ht,<br />

1m, ht <strong>of</strong> rock toe<br />

may be provided<br />

H is the height <strong>of</strong> the<br />

embankment.<br />

the height <strong>of</strong> the embkt.<br />

v. Berms Not necessary Not necessary The berm may be provided as<br />

per design. The min. berm<br />

width shall be 3m. The berm<br />

may be provided also on the<br />

D/S slope for facilities during<br />

maintenance.<br />

1.4. Criteria for small embankments (dams) : (IS : 12169)<br />

The general guidelines regarding suitability <strong>of</strong> soil for construction <strong>of</strong> dams are furnished in table No.<br />

2.<br />

Table – 2<br />

Suitability <strong>of</strong> soil for construction <strong>of</strong> dams.<br />

Relative<br />

suitability<br />

Homogeneous<br />

Dykes<br />

Zone dam<br />

Impervious cure<br />

Pervisou casing<br />

Very GC GC SW,GW GC<br />

Suitable<br />

Suitable CL, Cl Cl, Cl GM CL,Cl<br />

Impervious<br />

blanket<br />

Fairly suitable SP, SM, CH GM, GC, SM, SC, CH SP, GP CH, SM, SC, GC<br />

Poor<br />

Not suitable<br />

1.5. Frequency <strong>of</strong> test<br />

Sl.<br />

No.<br />

Test Designation<br />

Ml, Ml, MH<br />

OLOl, OH, Pt<br />

Table-3<br />

Frequency <strong>of</strong> test as per<br />

MoRTH<br />

Frequency <strong>of</strong> test <strong>of</strong> ODR & VR as<br />

recommended by IRC-SP-20<br />

1. Mechanical analysis <strong>of</strong> soil 2 tests/3000m 3<br />

2. Plastic <strong>of</strong> soil 2 tests/3000m 3<br />

3. Density test <strong>of</strong> soil 2 tests/3000m 3<br />

4. Deleterious content As & when required<br />

5. Moisture content <strong>of</strong> soil 1 tests/250m 3 2-3 tests per 250m 3 <strong>of</strong> loose soil<br />

6. CBR test <strong>of</strong> soil 1 tests/3000m 3 or more<br />

7. Compaction test <strong>of</strong> soil for 5-10 tests/1000m 3 5-10 tests per 1000m 3<br />

each layer<br />

Note : CBR <strong>of</strong> sub-grade should not be less than 2%<br />

MoRTH- Ministry <strong>of</strong> road transport and highways<br />

Table-7<br />

E.W. COMPACTION : The information given should be taken only as an approximate guide<br />

Material Major Division Sub-groups Suitable<br />

type <strong>of</strong><br />

compacting<br />

equipment<br />

No. <strong>of</strong><br />

passes for<br />

satisfactor<br />

y<br />

compactio<br />

n (Min.)<br />

Thickness<br />

<strong>of</strong> loose<br />

layer<br />

(Actual<br />

thickness<br />

depends<br />

on plant<br />

used),<br />

Max cm.<br />

Remarks<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


21<br />

1 2 3 4 5 6 7<br />

Coarse<br />

grained<br />

soil and<br />

other<br />

materials<br />

Fine<br />

grained<br />

soils<br />

Gravel and<br />

gravelly soils<br />

Soils having<br />

low<br />

compressibility<br />

Soils having<br />

high<br />

compressibility<br />

Fibrous<br />

organic soils<br />

with very high<br />

compressibility<br />

Well-graded<br />

gravel, gravels<br />

and mixtures,<br />

little or no fines<br />

Well-graded<br />

gravel sand<br />

mixtures with<br />

excellent clay<br />

blinder uniform<br />

gravel with little<br />

or no fines poorly<br />

graded gravel and<br />

gravel sand<br />

mixtures little or<br />

no fines<br />

Gravel with fines.<br />

Silty gravel,<br />

clayey gravel,<br />

poorly-graded<br />

gravel-sand-clay<br />

mixtures<br />

Well grained<br />

sands and<br />

gravelly sands,<br />

little or no fines<br />

Well-graded sand<br />

with excellent<br />

clay-binder<br />

Uniform sands<br />

with little or no<br />

fines silts<br />

(inorganic) and<br />

very fine sands,<br />

rock flour, silty or<br />

clayey fine sands,<br />

with slight<br />

plasticity. Silty<br />

and sandy clays<br />

(inorganic or<br />

medium<br />

plasticity. Clays<br />

(inorganic) or<br />

medium<br />

plasticity.<br />

Micaceous or<br />

distomaccous<br />

fine sandy and<br />

silty soils, elastic<br />

silts<br />

Clays (inorganic)<br />

or high plasticity,<br />

fat clays<br />

Organic clays <strong>of</strong><br />

high plasticity<br />

pest and other<br />

highly organic<br />

swamp soils.<br />

Smoothwheel<br />

roller<br />

pneumatictyred<br />

roller<br />

vibrating<br />

smooth<br />

wheel roller<br />

heavy<br />

bivrating<br />

plate frogrammer<br />

powerrammer<br />

Smooth<br />

wheel roller<br />

pneumatic<br />

tyred roller<br />

track laying<br />

tractor sheep<br />

foot roller<br />

frog rammer<br />

power<br />

rammer.<br />

6<br />

6<br />

6<br />

2*<br />

3**<br />

4<br />

--<br />

10<br />

30<br />

2*<br />

2*<br />

20<br />

20<br />

20<br />

37.5<br />

37.5<br />

20<br />

20<br />

--<br />

15<br />

15<br />

37.5<br />

20<br />

Vibrating rollers or<br />

vibrators will be<br />

very satisfactory if<br />

the moisture conent<br />

<strong>of</strong> the soil is low,<br />

but may be<br />

uneconomical close<br />

moisture content<br />

control is essential<br />

when the moisture<br />

content is relatively<br />

high it is preferably<br />

to use a pneumatic<br />

tyred roller<br />

--<br />

--<br />

These soils are<br />

considered very<br />

undesirable for use<br />

in earthwork and<br />

should not be<br />

employed if they<br />

are highly<br />

compressible it is<br />

advisable to<br />

compact these soils<br />

at the moisture<br />

content at which no<br />

change will occur<br />

subsequently<br />

As for micaceious or<br />

distomaceous fine<br />

sandy and silty soils<br />

these soils are<br />

entirely unsuitable<br />

for earthwork<br />

construction.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


22<br />

5. Materials for cement concrete :<br />

This includes the I.S. specification <strong>of</strong> the materials such as cement, coarse and fine aggregate,<br />

water, and reinforcement. For details respective I.S. specification may be referred to.<br />

5.1. Fine aggregate : IS 383<br />

O.T.D. . Zoning: The fine aggregates suitable for concrete shall be in zone-I, II or III. Fine<br />

aggregate in zone-IV are not suitable for concrete. The zone can be decided by grain size<br />

analysis by sieving as follows.<br />

Table-21 (IS-383-Table No.-4)<br />

IS Sieve<br />

Percentage passing for<br />

Designation<br />

Grading Zone-I Grading Zone-II Grading Zone-III Grading Zone-IV<br />

10m. 100 100 100 100<br />

4.75mm 90-100 90-100 90-100 95-100<br />

2.36mm 60-95 75-100 85-100 95-100<br />

1.18mm 30-70 55-90 75-100 90-100<br />

600 micron 15-34 35-59 60-79 80-100<br />

300 micron 5-20 8-30 12-40 15-50<br />

150 micron 0-10 0-10 0-10 0-15<br />

5.1.2. Bulkage :- Maximum buklage shall be limited to 20%<br />

5.2. Quality <strong>of</strong> coarse aggregates:<br />

5.2.1. Crushing value Permissible Value Method <strong>of</strong> test<br />

a. All concrete woks except<br />

wearing surface.<br />

Maximum 45% IS 2386-1963 part –IV<br />

b For wearing surface -do- 30% -do-<br />

5.2.2. Impact value Permissible Limit Method <strong>of</strong> test<br />

a. All concrete woks except<br />

wearing surface.<br />

Maximum 45% IS 2386-1963 part –IV<br />

b For wearing surface -do- 30% -do-<br />

5.2.3. Abrasion value<br />

a. All concrete woks except<br />

wearing surface.<br />

Maximum 50% -do-<br />

b For wearing surface -do- 30% -do-<br />

O.T.D. . Deleterious materials : Maximum percentage shall be 5%.<br />

5.2.5. Alkali aggregate reaction:- It is harmful for concrete. The test shall be conducted and use <strong>of</strong><br />

pozzolanic cement or pozzolanic admixture shall be studied.<br />

5.2.6. Gradation <strong>of</strong> coarse aggregate <strong>of</strong> nominal size:<br />

Table-22<br />

IS Sieve (mm)<br />

Percentage passing for graded aggregates <strong>of</strong> nominal size<br />

40 20 15 12.5<br />

80 100 -- -- --<br />

40 95-100 100 -- --<br />

20 30-70 95-100 100 100<br />

16 -- -- 90-100 --<br />

12.5 -- -- -- 90-100<br />

10 10.35 25.55 30.70 40-85<br />

4.75 0-5 0-10 0-10 0-10<br />

2.36 -- -- -- --<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


23<br />

5.3. Cement : The normal type <strong>of</strong> cement used are :<br />

1. Ordinary Portland cement 33 grade, 43 grade, 53 grade conforming to IS: 269, IS:8112 &<br />

IS:12269 respectively.<br />

2. Port land slag cement IS: 544<br />

3. Port land pozzolana cement I.S : 1489<br />

5.3.1. Standard <strong>of</strong> physical test <strong>of</strong> cement<br />

a. Initial setting time - minimum 30 minutes<br />

b. Final setting time - Maximum 10 hrs.<br />

c. Fineness - (i) 225 (m 2 /kg) for OPC & PSC<br />

(ii) 300 (m 2 /kg) for PPC<br />

d. Soundness - a. 10mm maximum (Lechat expansion)<br />

b. Maximum 0.8% in Autoclave<br />

e. Compressive Strength :<br />

Time<br />

33 grade OPC, PSC,<br />

PPC<br />

43 grade OPC 53 grade OPC<br />

a. 72 hrs. 16MP2 23MP2 27MP2<br />

b. 7 days 22MP2 33MP2 37MP2<br />

c. 28 days 33MP2 43MP2 53MP2<br />

O.T.D. . Standards for chemical test :<br />

Table – 23<br />

Percentage by mass (Max.)<br />

Types <strong>of</strong> cement OPC PPC PSC Remarks<br />

33 43 53<br />

1. Magnesia 6 6 6 6 8<br />

2. Insoluble residue 4 2 2 x+4(100-x)<br />

100<br />

4 Where x=% <strong>of</strong> pozollana<br />

in cement<br />

3. Sulphur trioxide 2.5d 2.5d 2.5d 3 3 Where d-3% when<br />

C,A>5%<br />

4. Sulphur as sulphide -- -- -- -- 1.5<br />

5. Loss on ignition 5 5 4 5 5<br />

6. Chloride 0.5 0.05 0.05 -- -- Maximum for prestressed<br />

and long span<br />

structures<br />

5.4. Water :<br />

Normal potable water shall be used for concrete. The pH value shall be not less than 6.<br />

Permissible limits <strong>of</strong> solids – I.S. :3025.<br />

Organic - 2000mg/litre<br />

Chloride - 2000mg/litre<br />

Inorganic - 3000mg/litre<br />

Sulphate - 400 mg/litre<br />

Suspended matter - 2000mg/litre<br />

5.5. Reinforcement steel :<br />

The normal reinforcement steel bars may be mild and medium tensile steel bars or high<br />

strength deformed steel bars conforming to I.S.-432 and IS:1786 respectively. The limits <strong>of</strong><br />

physical and chemicals properties <strong>of</strong> deformed bar.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


24<br />

O....<br />

Mechanical properties<br />

Sl.<br />

No.<br />

Table – 24 (IS : 1786, Table No.-3)<br />

Property F3415 Grade Fc500 Fe550<br />

1 2 3 4 5<br />

1 0.2% pro<strong>of</strong> stress/yield stress,<br />

Min, N.mm 2<br />

2. Elongation, percent, Min, on<br />

gauge length 5.56 v(A), where<br />

A is the cross sectional area <strong>of</strong><br />

the test piece.<br />

3. Tensile strength, Min 10%more than the<br />

actual 0.2% pro<strong>of</strong><br />

stress but not less<br />

than 485.0 N/mm 2<br />

415.0 500.0 550.0<br />

14.5 12.0 8.0<br />

8% more than the<br />

actual 0.2% pro<strong>of</strong><br />

stress but not less<br />

than 545.0 N/mm 2<br />

6% more than the<br />

actual 0.2% pro<strong>of</strong><br />

stress but not less<br />

than 585.0 N/mm 2<br />

b. Chemical properties :<br />

Table – 24 (IS : 1786)<br />

Constituent<br />

Percent, maximum<br />

Fe415 Fe500 Fe550<br />

Carbon 0.30 0.30 0.30<br />

Sulphur 0.060 0.055 0.055<br />

Phosphorous 0.060 0.055 0.050<br />

Sulphur and phosphorous 0.11 0.105 0.10<br />

c. Frequency <strong>of</strong> test (IS : 1786)<br />

One test <strong>of</strong> each type <strong>of</strong> MS rod to be used in each structure.<br />

d. Pull out test : As per IS:2770<br />

e. Bend and rebend test : IS : 1786.<br />

f. Mass and cross sectional area (IS : 1786).<br />

Nominal size (mm) Sectional area (mm 2 ) Mass per meter (kg)<br />

6 28.3 0.222<br />

8 50.3 0.395<br />

10 78.6 0.617<br />

12 113.1 0.888<br />

16 201.2 1.580<br />

20 314.3 2.47<br />

25 491.1 3.85<br />

28 616.0 4.83<br />

32 804.6 6.31<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


25<br />

O.T. . . Construction joints :<br />

The concreting shall be done up to construction joints, but while commencing the<br />

work on the cold joints, the aggregates shall be exposed with high pressure water jet or any<br />

other method. It is preferable to expose the aggregates previously i.e. just after the closer <strong>of</strong><br />

the work by wire brushing and cleaning. Cleaning may be done by air water jetting or any<br />

other method.<br />

6. Concrete works.<br />

6.1. Grade <strong>of</strong> concrete<br />

The grade designation shall be as follows.<br />

a. Ordinary concrete M10, M15 & M20<br />

b. Standard concrete M25, M30, M35, M40, M45, M50 & M55<br />

c. High strength concrete M60, M65, M70, M75 & M80<br />

d. Concrete exposed to seawater shall be at least M20 & M30 for P.C.C. & R.C.C.<br />

respectively. The use <strong>of</strong> slag or pozzolana cement is advantageous under such conditions.<br />

6.2. Workability <strong>of</strong> concrete<br />

Table –26<br />

Placing conditions<br />

Binding concrete; shallow sections; pavements using<br />

lavers;<br />

Mass concrete; lightly reinforced sections in slabs,<br />

beams, walls, columns; floors; hand placed<br />

pavements; canal lining; strip footings.<br />

Heavily reinforced sections in slabs, beams, walls,<br />

columns; slipfonn work; pumped concrete<br />

Trench fill;<br />

In-situ pilling<br />

Degree <strong>of</strong><br />

workability<br />

Slump (mm)<br />

1 2 3<br />

Very low Compacting factor from 0.75<br />

to 0.8 is suggested<br />

Low 25-75<br />

Medium 50-100<br />

75-10<br />

High 100-150<br />

Tremie concrete; Very high Refer IS :9103<br />

Note : For most <strong>of</strong> the placing conditions, internal vibrators (neddle vibrators) are suitable.<br />

The diameter <strong>of</strong> the needle shall be determined based on the density and spacing <strong>of</strong> reinforcement<br />

bars and thickness <strong>of</strong> sections. For tremie concrete, vibrators are not required to be used.<br />

6.3. Mild : Concrete surfaces protected against weather or aggressive conditions except those<br />

situated in coastal area.<br />

O.T.D. . Moderate : Concrete surfaces sheltered from severe rain or freezing whilst wet.<br />

Concrete exposed to condensation and rain.<br />

Concrete continuously under water.<br />

Concrete in contact <strong>of</strong> buried under non-aggressive soils/ ground water.<br />

Concrete surfaces sheltered from saturated salt air in coastal area.<br />

6.3.3. Severe : Concrete surfaces exposed to severe rain, alternate wetting and drying or occasional<br />

freezing whilst wet or severe condensation. Concrete lasticize immersed in sea water<br />

concrete expose to coastal environment.<br />

6.3.4. Very severe : Concrete surfaces exposed to sea water spray, corrosive fumes or severe freezing<br />

conditions whiles wet.<br />

Concrete incontact with or buried under aggressive sub-soil/ ground water.<br />

6.3.5. Extreme : Surface <strong>of</strong> members in tidal zone.<br />

Members indirect contact with liquid / solid aggressive chemicals.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


26<br />

Exposure a.PCC<br />

Minimum W/C grade<br />

Cement<br />

ratio<br />

Content<br />

maximum<br />

Kg/(m 3 )<br />

Mild 220 0.6 --<br />

Moderate 240 0.6 M15<br />

Severe 250 0.50 M20<br />

Very severe 260 0.45 M20<br />

Extreme 280 0.40 M25<br />

b.PCC<br />

Mild 300 0.55 M20<br />

Moderate 300 0.50 M25<br />

Severe 320 0.45 M30<br />

Very severe 340 0.45 M35<br />

Extreme 360 0.40 M40<br />

6.4. Nominal mix concrete<br />

The nominal mix concrete may be used for concrete <strong>of</strong> M20 grade and lower as per the table<br />

below:<br />

Table – 27<br />

Grade <strong>of</strong> concrete<br />

Total qty. <strong>of</strong> dry<br />

aggregate for 50kg <strong>of</strong><br />

cement in kg<br />

Proportion <strong>of</strong> fine to<br />

coarse aggregate by<br />

mass<br />

Max. qty. <strong>of</strong> water<br />

per 50kg <strong>of</strong> cement<br />

in litre<br />

M5 800 Generally 60<br />

M 7.5 625 1:2 45<br />

M10 480 -- 34<br />

M15 330 -- 32<br />

M20 250 -- 30<br />

6.5. Design Mix : Ref. IS : 10262<br />

6.6. Placing : The concrete shall be placed and compacted before initial setting time <strong>of</strong> cement.<br />

6.7. Curing : The period for moisture curing shall be minimum 10 days. It may be extended upto<br />

28 days.<br />

6.8. Stripping time : Following stripping time may followed.<br />

Type <strong>of</strong> form work<br />

a. Vertical 16-25 h<br />

b. S<strong>of</strong>fit form work to slab 3 days<br />

c. S<strong>of</strong>fit form work to beam 7 days<br />

d. Props to slab<br />

(i) Spanning upto 4.5m<br />

(ii) Spanning over 4.5m<br />

O.T. . . Nominal cover:<br />

Minimum period before striking form work.<br />

7 days<br />

14 days<br />

Cover to be provided depending on exposure condition.<br />

Exposure<br />

Cover in mm<br />

Mild 20<br />

Moderate 30<br />

Sever 45<br />

6.9. Frequency <strong>of</strong> sampling : Depending on quantity <strong>of</strong> work, number <strong>of</strong> samples are to be taken.<br />

Qty. in m 3 No. <strong>of</strong> samples<br />

1-5 1 Set<br />

6-15 2 Set<br />

16-30 3 Set<br />

31-50 4 Set<br />

51 to above 4 plus one additional<br />

set for each 50m 3 or part.<br />

(one set= 6 Nos. <strong>of</strong> samples)<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


27<br />

6.10. Concrete works :<br />

Table – 28<br />

Sl.<br />

No.<br />

A. Coarse aggregate<br />

Test<br />

Frequency as per MoRTH<br />

1. Sieve analysis flakiness and elongation index One test for every 150m 3 or less<br />

2. Specific gravity, bulk density, moisture content<br />

and absorption.<br />

-do-<br />

3. Soundness -do-<br />

4. Abrasion, impact, aggregate crushing value -do-<br />

5. Organic impurities value<br />

6. Alkali-aggregate reactivity Twice in one season<br />

7. Petro-graphic test -do-<br />

B. Fine Aggregates<br />

1. Sieve analysis One test for every 1.50m 3 <strong>of</strong> sand<br />

2. Organic impurities -do-<br />

3. Soundness -do-<br />

4. Sp. Gravity, moisture contents and absorption -do-<br />

C. Cement<br />

1. Fineness One test for each brand and batch <strong>of</strong> cement<br />

2. Setting time -do-<br />

3. Compressive strength<br />

D. Finished concrete<br />

1. Slump test One test for each shift both at mixer and at placement<br />

site. As frequently as possible.<br />

2. Compressive strength -do-<br />

3. Cement content One test every 3 months<br />

6.12 Aceptance criteria for concrete (IS : 456-2000, clause-16):<br />

The concrete shall be deemed to comply with the strength requirements when both the<br />

following conditions are met.<br />

a. The mean strength determined from any group <strong>of</strong> four consecutive tests results shall<br />

satisfy the following conditions.<br />

(i) Mean strength :<br />

a. For M13 grade : fa + 0.825 x established standard deviation<br />

(rounded to 0.5) N/mm 2<br />

OR<br />

Fa + 3N/mm 2 (which ever is greater).<br />

b. For M20 grade : Mean strengthfa + 0.825 standard<br />

or above deviation (rounded to nearest 0.5) N/mm 2<br />

OR<br />

Fa + 4N/mm 2 (which ever is greater).<br />

In absence <strong>of</strong> data for SD, the SD may be taken 3.5 for M10 and M15 grade, 4 for M20 and M25 grade<br />

and 5 for M30 to M50 grade.<br />

b. Individual test results :<br />

For M13 grade<br />

Strength fck – 3N/mm 2<br />

For M20 grade or above<br />

Strength fck – 4N/mm 2<br />

(Where fck is the characteristic strength <strong>of</strong> concrete)<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


28<br />

7. Common Burnt clay bricks :<br />

7.1. Brick classification : (IS : 1077 & IS : 2180)<br />

Class<br />

Average compressive strength<br />

(M/mm 2 )<br />

100 100<br />

75 75<br />

35 35<br />

30 30<br />

25 25<br />

20 20<br />

17.5 17.5<br />

15 15<br />

12.5 12.5<br />

10 10<br />

7.5 7.5<br />

5 5<br />

3.5<br />

7.2. Dimension : (IS : 1077)<br />

a. Modular<br />

Length (mm) Width (mm) Height (mm)<br />

190 90 90<br />

190 90 90<br />

b. Non-modular<br />

Length (mm) Width (mm) Height (mm)<br />

230 110 70<br />

230 110 30<br />

N. B. : Tolerance for 20 bricks <strong>of</strong> modular and non-modular are 80 mm &<br />

40mm for different heights.<br />

7.3. Water absorption : (IS : 3495).<br />

After immersion in cold water for 24 hours<br />

a. Upto class 12.5 : Maximum 20%<br />

b. Higher pressure : Maximum 15%<br />

7.4. Frequency <strong>of</strong> tests :<br />

20 bricks shall be tested out <strong>of</strong> 50,000 & 1,00,000 bricks in class 100 & 75.<br />

7.5. Grading <strong>of</strong> sand for plaster (IS : 1542).<br />

IS sieve designation (mm)<br />

Percentage passing by weight<br />

10 100<br />

4.75 95.100<br />

2.236 95-100<br />

1.18 90-100<br />

600 micron 80-100<br />

300 micron 20-65<br />

150 micron 0-50<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


29<br />

8. Pipes, pipe fitting valves and specials:<br />

WATER SUPPLY<br />

Pipes <strong>of</strong> different types and classes, pipe fittings, valves and specials used for pipe laying work should be<br />

manufacturer and factory tested hy7drostatically as per the relevant I.S. specifications as given below. The CI and<br />

DI pipes on DGS&D contract are to be tested by the agency authorized by DGS&D/EPM and PVC pipes and fittings<br />

are to be tested by CIPET (Central Institute <strong>of</strong> Plastic Engineering and technology).<br />

8.1. Pipe<br />

O.T... Reference to I.S. code :<br />

IS : 1536 Specification for centrifugally cast spun iron pressure pipe for water, gas & lasti.<br />

IS : 8329 Specification for centrifugally cast (spun) ductile iron pressure pipe for water, gas & lasti.<br />

IS : 3589<br />

IS : 4985<br />

Specification for electrically welded steel pipe (first revision)<br />

Specification for electrically welded steel pipes (first revision)<br />

IS : 4958 Un lasticized PVC pipes for potable water supplies.<br />

IS : 10221<br />

Code <strong>of</strong> practice for coating and wrapping under ground steel pipes.<br />

IS : 11906<br />

Recommendation for cement master lining <strong>of</strong> cast iron milk steel and ductile Iron pipes<br />

and fitting for transport <strong>of</strong><br />

water.<br />

8.2. Pipe fittings and jointing materials.<br />

8.2.1. Reference to code :<br />

IS : 1538 Specification for cast iron fitting for pressure pipe (para 1 to 24) for water, gas & sewge<br />

IS : 10124 Febricated PVC fitting for potable water samples(para 1 to 13)<br />

IS : 782<br />

IS : 5383<br />

O.T...<br />

Specification for caulking lead<br />

Rubber gaskets for double iron pipes.<br />

Valves and specials<br />

IS : 780<br />

IS : 2906<br />

IS : 2685<br />

IS : 5312<br />

Specification for sluice valves for water works purpose (50mm to 300mm)<br />

Specification for sluice valves for water works purpose (350mm to 1200mm)<br />

Code <strong>of</strong> practice for selection installation and maintenance <strong>of</strong> sluice values.<br />

Specification for swing check type reflux (Non-return valves) for water works<br />

purpose.<br />

8.3. Inspection <strong>of</strong> pipes before final acceptance.<br />

Each pipe shall have cast, stamped or indelibly painted the trade mark <strong>of</strong> manufacturer, the nominal dia,<br />

class weight, batch number, last two digits <strong>of</strong> the year <strong>of</strong> manufacturer and also with ISI certificate mark. The<br />

pipes should bear the stamping <strong>of</strong> testing agency like DGS & D in case <strong>of</strong> CI & DI pipes CIPET in case <strong>of</strong> PVC pipes<br />

etc.<br />

8.3.1. Pipe laying<br />

8.3.2. Laying <strong>of</strong> cast iron pipes :<br />

Inspection <strong>of</strong> pipes before laying :<br />

Before laying the pipes and fittings shall be inspected for defects and be rung with a light hammer,<br />

preferably while suspended, to detect cracks. Smearing the outside with chalk dust helps in the location <strong>of</strong> cracks.<br />

If doubt persists further confirmation may be obtained by pouring a little kerosene on the inside <strong>of</strong> the pipe at the<br />

suspected spot. If crack is present, the kerosene seeps thorough and shows on the outer surface. Any pipe found<br />

unsuitable after inspection before laying shall be rejected.<br />

Laying should be done as per IS code <strong>of</strong> practice 3114 (Third Revision).<br />

a) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be less than 900mm measured from the top <strong>of</strong><br />

pipe to the surface <strong>of</strong> ground and not less than 750mm else where.<br />

b) Width <strong>of</strong> Trench : The width <strong>of</strong> trench should be 200 mm more on either side <strong>of</strong> the external dia<br />

<strong>of</strong> pipe (i.e. External dia <strong>of</strong> pipe + 2 x 200mm). Additional width shall be provided at position <strong>of</strong><br />

sockets and flanges for jointing.<br />

c) Cover over the pipe- Minimum cover <strong>of</strong> 1M in recommended under road way and may be<br />

modified to meet the local condition.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


30<br />

8.3.3. Laying and jointing <strong>of</strong> ductile iron pipes :<br />

The pipes should be laid as per the specification laid down in IS : 12288.<br />

a) Width <strong>of</strong> Trench :- The width <strong>of</strong> trench at bottom shall provide not less than 200mm clearance on<br />

both sides <strong>of</strong> pipe (i.e. external dia <strong>of</strong> pipe + 2x 200mm)<br />

b) Cover over the pipe – In agricultural land the depth should be sufficient to provide cover not less<br />

than 900mm and under a roadway the cover should be minimum 1.0M.<br />

8.3.4. Laying <strong>of</strong> welded steel pipes :<br />

The laying should be done as per IS – 5822 (First revision).<br />

a) Width <strong>of</strong> Trench – The width at the bottom below in the faces should not be less than 200 mm<br />

clearance on either side <strong>of</strong> the pipes.<br />

b) Cover over the pipe – When the pipeline is under a roadway, a minimum cover <strong>of</strong> 1.0 Meter should<br />

be provided and can be modified to suit the local condition by taking necessary precaution.<br />

c) Pipe welding :- In case <strong>of</strong> welding the pipe in the trench, additional excavation <strong>of</strong> not more than 600<br />

mm in depth 900mm in length should be provided all round the pipe at the position <strong>of</strong> the joints for<br />

facility <strong>of</strong> welding.<br />

d) Coating and wrapping <strong>of</strong> pipes :- Against internal corrosion, steel pipes are given epoxy lining or hot<br />

applied coal tar/asphalt lining or rich cement mortar lining at works or the field by centrifugal<br />

process. The outer coating for under ground pipeline may be in cement sand gunniting or hot applied<br />

coal tar asphalt enamel reinforced with fiber glass fabric yarn. Coating and wrapping should be done<br />

as per IS 10221.<br />

8.3.5. Laying <strong>of</strong> PVC pipes :<br />

Laying and joining <strong>of</strong> PVC pipes should be done as per IS: 7634 (part – III).<br />

a) Width <strong>of</strong> trench :- The trench should be as narrow as practicable. As a normal practice this may be kept<br />

from 0.30M over the outside dia or pipe (i..e external dia <strong>of</strong> pipe + 30 cum.).<br />

b) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be 1.00M from the ground level.<br />

c) The trench bottom where it is rocky and un-even a layer <strong>of</strong> sand or alluvial earth <strong>of</strong> 100mm depth should<br />

be provided under the pipe.<br />

d) Jointing <strong>of</strong> pipes : Solvent welding technique <strong>of</strong>fers as easy and ample type <strong>of</strong> joint in PVC pipe used<br />

spigot and socket type joints. The cement solvent to be used for jointing should be as per the<br />

recommendations <strong>of</strong> the pipe manufacturer.<br />

8.4. Testing <strong>of</strong> pipe line after laying (field test pressure).<br />

After laying and jointing, the mains shall be slowly and carefully charged with water, so that all air is<br />

expelled from the main by providing a25mm inlet with a stop cock, allowed to stand full <strong>of</strong> water for a few days if<br />

time permits, and then tested with pressure.<br />

The field test pressure to be imposed should be not less than the maximum <strong>of</strong> the following.<br />

a) 1.5times the maximum sustained operating pressure.<br />

b) 1.5 times the maximum pipeline static pressure.<br />

c) Sum <strong>of</strong> the maximum sustained operating pressure and the maximum surge pressure.<br />

d) Sum <strong>of</strong> the maximum pipe line static pressure and the maximum equal to the work test pressure for any<br />

pipe fitting in corporate.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


31<br />

9.0. Production wells (large dia tube wells):<br />

9.1. Materials for constructions :<br />

1. Casting pipes should be mild steel or UPVC pipes. Mild steel pipes should conform to IS :4270<br />

and ASTM-DN-1785. The UPVC pipes should be <strong>of</strong> ASTM quality (Sch-40, Sch-80 or Sch-120<br />

depending on site condition) and should also confirm to IS:2818.<br />

2. Well screens and slotted pipes should conform to IS : 8110. The well screens may be monometal,<br />

bimetal, stainless steel or PVC.<br />

Sufficient opening should be provided for screens and slotted pipes so that 70% or more <strong>of</strong> sand grains in<br />

the natural aquifer where uniformity co-efficient should range between 2.0 to 2.50. For soils with uniformly<br />

coefficient less than 1.5, pea gravel pack should be used.<br />

The total area <strong>of</strong> opening should be such s to maintain on entrance velocity less than necessary to carry<br />

the finest particle <strong>of</strong> sand that is to be excluded by the screen. In general, it should be 4 to 6 cm/sec. With the<br />

gravel shrouding.<br />

The opening should preferably be ‘V’ shaped.<br />

O.... Gravel to be used for shrouding (packing around the casing pipe) should confirm to IS : 4099.<br />

The gravel wall provided may vary in thickness to suit the size and depth <strong>of</strong> boring and may vary<br />

from 10cm to 25cm but usually 10cm.<br />

9.2. Construction <strong>of</strong> tube well :<br />

The drilling operation should be taken up with rotary drilling rig. Down the whole Hammer Rig or<br />

Combination Rig depending on type <strong>of</strong> strata and conforming to IS :2800 (Part-I).<br />

For drilling with rotary drilling rig in s<strong>of</strong>t formations, bentonite powder should be used in place <strong>of</strong> local<br />

mud as sealing compound to facilitate drilling operation. The casing pipe and well strainer should be lowered<br />

perfectly vertically and well screen should be properly placed against the aquifers. The casing pipe should be<br />

extended to at least 60 cm above the ground level.<br />

The annular space between the bore and the housing pipe (casing pipe) should be cement grouted upto at<br />

least 5m below ground level to provide a sanitary sealing.<br />

9.3. Testing and development <strong>of</strong> tube well :<br />

9.3.1. The testing <strong>of</strong> tube well should be conducted as per IS : 2800 (part-II).<br />

Tube wells are to be tested for plumbness and alignment normally after completion <strong>of</strong> drilling but<br />

immediately after the housing pipes are installed and prior to commencement <strong>of</strong> gravel fitting in the case <strong>of</strong> gravel<br />

shrouded tube well. For wells encased with pipes less than 350mm dia meter, the verticality <strong>of</strong> tube well shall have<br />

a deviation not exceeding 10cm per 30 m depth <strong>of</strong> the tube well and the deviation shall be in one direction and in<br />

one place only.<br />

In the case gravel shrouded tube well, if the pipe assembly is found included in a start position. It should<br />

be pulled in a desired directions to rectify the stantness and bringing the pipe assembly into permissible limit <strong>of</strong><br />

verticality.<br />

9.3.2. <strong>Development</strong> <strong>of</strong> tubewell :<br />

into service.<br />

The object <strong>of</strong> well development is the removal <strong>of</strong> silt, fine sand and other such materials form a zone<br />

immediately around the well, screen, there by creating larger passage in the formation through which<br />

water can flow more freely towards the wells.<br />

Well development includes the operation <strong>of</strong> flushing, testing and equipping the wells before they are put<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


32<br />

The development should be carried on with an air compressor <strong>of</strong> suitable capacity (to develop 7kg to<br />

10kg/Cm 2 and airflow <strong>of</strong> 2m 3 /min) In accordance with IS : 11189, and the process should be continued<br />

until the stabilization <strong>of</strong> sand gravel pack and discharge <strong>of</strong> clear water is fully assured.<br />

10. Pumping sets :<br />

10.1. Reference & code<br />

The pumping sets and accessories should conform to following IS specification:<br />

IS 1520 Horizontal centrifugal pumps for clear cold fresh water (2 nd revision)<br />

IS 6595<br />

IS 9684<br />

IS 1710<br />

IS 8034<br />

IS 10825<br />

IS 325/19758<br />

IS 7538<br />

Horizontal centrifugal pumps for clear cold fresh water for Agricultural purpose (first revision).<br />

Selection, installation, operation and maintenance <strong>of</strong> Horizontal centrifugal pumps for<br />

agricultural purpose.<br />

Vertical turbine pumps for clear. Cold fresh water (1 st revision).<br />

Submersible pump sets for clear, cold, fresh water.<br />

Foot valve, Reflex value or non return valve and bore valves to be used in suction line <strong>of</strong><br />

agriculture pumping sets. (first revision).<br />

Three phase induction motors.<br />

Motors for submersible pumps<br />

10.2. Inspection <strong>of</strong> pumps before final acceptance.<br />

1. The name plates <strong>of</strong> the pump and motor with details like Sl. No.- Head, Discharge, rpm, HP/KW<br />

<strong>of</strong> motor etc engraved on the name plate should be clearly verified to confirm within the<br />

pumping set is as per the supply order.<br />

2. Manufacturer’s test report along with laboratory hydrostatic test reports <strong>of</strong> the pumps should be<br />

verified to know the duty <strong>of</strong> pump.<br />

3. The supplier should give at lest one copy <strong>of</strong> specific installation and operation manual <strong>of</strong> the<br />

pumping sets supplied by them.<br />

4. The field test for pumps should be conducted to confirm the duty <strong>of</strong> pumps after ins installation.<br />

10.3. Pump installation<br />

The installation <strong>of</strong> centrifugal pumps should proceed through five stages in the following order.<br />

1. Preparing the foundation and locate the foundation bolts.<br />

2. Locating the pump on the foundation bolts, however resting on leveling wedges, which permit not only<br />

easy leveling but also space for fitting the grunt later on.<br />

3. Levelling<br />

4. Grouting<br />

5. Alignment<br />

The foundation should be sufficiently substantial to absorb vibrating and to form a permanent, rigid<br />

support for the base plate.<br />

Alignment <strong>of</strong> the pump sets should be checked even if they are received aligned by the<br />

manufacturer. The alignment should be proper both for parallelism (by filler gauge) and for coasiablity<br />

(by straight edge or by dial gauge).<br />

During all alignment- checks both the shafts should be pressed hard, over to one side while<br />

talking the readings alignment should also be checked after fastening the piping and there after<br />

periodically during operation.<br />

Submersible pumps with wet type motors should be fitted with water and the opening should<br />

be properly plugged after filling water.<br />

Pumps kept in storage for a long time should be thoroughly cleaned before installation.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


33<br />

10.4. Testing <strong>of</strong> pumps :<br />

There are two types <strong>of</strong> pumps testing.<br />

1. in the shop or laboratory at the manufacturer works.<br />

2. Testing in the field after installation<br />

(i)<br />

(ii)<br />

(iii)<br />

Every pump must be tested before it is finally accepted. It is necessary for comparision <strong>of</strong><br />

specified, predicated and actual performance after installation, relating to head, discharge<br />

power, efficiency and suction requirements centrifugal pumps should be listed as per IS-9137<br />

(Class ‘C’ code <strong>of</strong> testing) and IS-11346.<br />

The scheme <strong>of</strong> testing includes taking readings, doing calculation and plotting <strong>of</strong><br />

The H-Q characteristics<br />

11. Water Quality<br />

The P-Q characteristics.<br />

The efficiency versus Q characteristics<br />

11.1. Recommended guidelines for physical and chemical parameter:<br />

Sl.<br />

No.<br />

Characteristics *Acceptable **Cause for<br />

1. Turbidity (NTU) 1 10<br />

2. Colour (Units on Platinum Cobalt scale) 5 25<br />

3. Teste and Odour Unobjectionable Objectionable<br />

4. PH 7.0 to 8.5 9.0<br />

5. Total dissolved solids (mg/I) 500 2000<br />

6. Chlorides (as CI) (mg/I) 20 600<br />

7. Chlorides (as CI) (mg/I) 200 1000<br />

8. Sulphates (as SO4 (mg/I) 200 400<br />

9. Fluorides (as F) (mg/I) 1.0 1.5<br />

10. Nitrates (as NO3 (mg/I) 45 45<br />

11. Calcium (as Ca) (mg/I) 75 200<br />

12. Magnesium (as Mg) (mg/I) 30 150<br />

If there are 250 mg/I <strong>of</strong> sulphates, Mg content can be increased to maximum <strong>of</strong><br />

125mg/I with the reduction <strong>of</strong> sulphates at the rate <strong>of</strong> I unit per every 2.5 units <strong>of</strong> sulphates.<br />

Sl.<br />

No.<br />

Characteristics *Acceptable **Cause for<br />

13. Iron (as Fe) mg/I 0.1 1.0<br />

14. Manganese (as Mn) mg/I 0.05 0.5<br />

15. Copper (as Cu) (mg/I) 0.05 1.5<br />

16. Aluminium (as AI) (mg/I) 0.03 0.2<br />

17. Residual Chloride (mg/I) 0.2 >1.0<br />

18. Zinc (as Zn) (mg/I) 5.0 15.0<br />

19. Phenolic compounds (as Phenol) (mg/I) 0.001 0.002<br />

20. Anionic detergents (mg/I) (as MBAS) 0.2 1.0<br />

21. Mineral Oil (mg/I) 0.01 0.03<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


34<br />

TOXIC MATERIALS<br />

22. Arsenic (as As) (mg/I) 0.01 0.05<br />

23. Cadmium (as CD) (mg/I) 0.01 0.01<br />

24. Chromium<br />

(as hexavalent Cr) (mg/I) 0.05 0.05<br />

25. Cyanides (as CN) (mg/I) 0.05 0.05<br />

26. Lead (as Pb) (mg/I) 0.05 0.05<br />

27. Selenium (as SC) (mg/I) 0.01 0.01<br />

28. Mercury (total as Hg)<br />

(mg/I) 0.001 0.001<br />

29. Polynuclear aromatic 0.2 0.2<br />

Hydrocarbons (PAH) (ug/I)<br />

Pesticides (total, mg/I) Absent Refer to WHO<br />

guidelines for drinking<br />

water quality Vol.-I-<br />

1993<br />

RADIO ACTIVITY<br />

30. Gross Alpha activity (Bq/I) 0.1 0.1<br />

31. Gross Beta activity (Bq/I) 0.1 1.0<br />

The figures indicated under the column ‘Acceptable’ are the limits upto which water is<br />

generally acceptable to the consumers.<br />

Figures in excess <strong>of</strong> those mentioned under ‘Acceptable’ render the water not<br />

acceptable, but still may be tolerated in the absence <strong>of</strong> an alternative and better source but<br />

upto the limits indicated under column “Cause for Rejection” above which the sources will<br />

have to be rejected.<br />

It is possible that some mine and spring waters may exceed these radio activity limits and in<br />

such cases it is necessary to analyses the individual radio-nuclide order to assess the acceptability or<br />

otherwise for public consumption.<br />

<br />

Sr. Divisional Manager<br />

(Building Project)-I<br />

O.T.D.C. Ltd.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


PROFORMA-‘A’<br />

35<br />

past.<br />

CERTIFICATE OF LIST OF WORKS IN HAND (Clause No.49 (i) <strong>of</strong> DTCN)<br />

I/We do hereby certify that the following works have been executed by me/us in the<br />

Approximate<br />

value <strong>of</strong> work<br />

Particulars <strong>of</strong><br />

Sl.<br />

Amount <strong>of</strong><br />

Period which the done against Deptt. Under<br />

works now in<br />

No.<br />

each work<br />

work is stipulated to each work on the which the work is<br />

hand<br />

be completed<br />

date <strong>of</strong><br />

being taken up.<br />

Remarks<br />

(in month)<br />

submission <strong>of</strong><br />

Tender<br />

1 2 3 4 5 6 7<br />

I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date________________<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


CERTIFICATE OF EMPLOYMENT OF UN-EMPLOYED GRADUATE ENGINEERS/DIPLOMA HOLDERS<br />

(For Special Class and ‘A’ Class Contractors only)<br />

I/We do hereby certify that at present the following Engineering personnel are working with<br />

me/in our firm/company and their bio-data are furnished below:<br />

Sl.<br />

No.<br />

Name <strong>of</strong><br />

Engineering<br />

personnel<br />

appointed for<br />

supervising<br />

contractor’s<br />

works with<br />

address<br />

Qualificatio<br />

n<br />

Date <strong>of</strong><br />

appointme<br />

nt<br />

Monthly<br />

emolumen<br />

t<br />

Whether<br />

full time<br />

engagemen<br />

t and<br />

continuous<br />

If they are<br />

Superannuated/<br />

Retired/ dismissed or<br />

removed personnel<br />

from State <strong>Govt</strong>./<br />

Central <strong>Govt</strong>./ Public<br />

sector undertakings/<br />

Private companies<br />

and firms or any one<br />

ineligible for <strong>Govt</strong>.<br />

service.<br />

1 2 3 4 5 6 7<br />

36<br />

I/We also note that non-submission <strong>of</strong> this certificate will render my/our tenders liable for<br />

rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date________________<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


PROFORMA-‘B’<br />

37<br />

V<br />

Sl.<br />

No.<br />

Particulars<br />

<strong>of</strong> works<br />

already<br />

executed<br />

CERTIFICATE OF LIST OF WORKS EXECUTED (Clause<br />

No.49(ii) <strong>of</strong> DTCN)<br />

I/We do hereby certify that the following works have been<br />

executed by me/us in last five(5) years.<br />

Approxi<br />

mate<br />

amount<br />

<strong>of</strong> each<br />

work<br />

Name <strong>of</strong><br />

Deptt.<br />

under<br />

which the<br />

works were<br />

executed<br />

Period <strong>of</strong><br />

commence<br />

ment and<br />

period <strong>of</strong><br />

completion<br />

Whether the<br />

works were<br />

completed in<br />

stipulated<br />

period<br />

1 2 3 4 5 6 7<br />

Remark<br />

s<br />

I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for<br />

rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date_______________<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


38<br />

WORK PROGRAMME<br />

Name <strong>of</strong> the Work: - Construction <strong>of</strong><br />

Tourist Reception Centre, Pathway,<br />

Parking, & Landscaping etc at Ghatagaon in Keonjhar Dist.<br />

Time<br />

Description <strong>of</strong> work<br />

1 st Month…………………………………………………………………………………………………<br />

2 nd Month………………………..…………………………………………………………………………<br />

3 rd Month………………………………………………………………………………………………<br />

4 th Month…………………………………………………………………………………………………<br />

5 th Month…………………………………………………………………………………………………<br />

6 th Month…………………………………………………………………………………………………<br />

7 th Month…………………………………………………………………………………………………<br />

8 th Month…………………………………………………………………………………………………<br />

9 th Month…………………………………………………………………………………………………<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


FINANCIAL BID (COVER –II)<br />

DETAILED TENDER SCHEDULE FOR THE WORK:- “Construction <strong>of</strong><br />

Tourist Reception Centre, Pathway,Parking, & Landscaping etc at<br />

Ghatagaon in Keonjhar Dist”<br />

39<br />

SL DESCRIPTION QTY UNIT RATE AMOUNT<br />

NO<br />

TOURIST RECEPTION CENTRE CUM<br />

PUBLIC CONVENIENCE<br />

1 Earthwork in excavation in foundation in<br />

Hard soil/gravelly soil including dressing <strong>of</strong><br />

sides and leveling the bed up to the<br />

required depth and depositing the<br />

excavated materials away from the work<br />

site with all leads and lifts, including<br />

shoring, shuttering and dewatering (if<br />

required) with cost <strong>of</strong> labour, hire &<br />

running charges <strong>of</strong> water pumps sundries &<br />

T&P required for the work complete as<br />

directed by the Engineer-in-charge. 158.09 Each cum 87.60 13848.68<br />

2 Filling foundation trenches and plinth with<br />

excavated earth including laying the earth<br />

in layers not exceeding 23.5cm (9”) thick<br />

ramming and watering with all leads and<br />

lifts including cost <strong>of</strong> all labour, T&P etc.<br />

complete as directed by the Engineer-incharge.<br />

52.70 Each cum 48.60 2561.22<br />

3 Supplying and filling in foundation trenches<br />

and plinth, ditches with sand well watered<br />

and rammed in layers not exceeding 23 cm.<br />

In depth with all lead and lift including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

(Measurement will be taken on<br />

finished compacted section only). 162.29 Each cum 463.50 75221.42<br />

4 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:4:8) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 4 cm. Size black hard crusher broken<br />

granite stone metal and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and 71.02 Each cum 3250.20 230829.20<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


cleaned including hoisting, lowering, laying<br />

concrete, ramming, watering and curing<br />

etc. complete to required levels laid in<br />

layers not exceeding 15 cm thick in each<br />

layer including cost, conveyance, loading,<br />

unloading, royalties and taxes all materials<br />

and cost all labours, sundries, T & P<br />

required for the work including shoring,<br />

shuttering and dewatering if required<br />

including hire & running charges <strong>of</strong> water<br />

pump complete as per specification and<br />

direction <strong>of</strong> Engineer-in-charge.<br />

5 Supplying, Diluting & Spreading<br />

Chemical Emulsion like CHLORPYRIPHOS<br />

OR Other Chemical approved by the<br />

Central Insecticides Board as directed by<br />

the manufacturer and spraying the mixture<br />

uniformly by the sprayer as preconstructional<br />

anti-termite treatment and<br />

creating a chemical barrier under and<br />

around the column pits, wall trenches,<br />

basement excavation, top surface <strong>of</strong><br />

plinth filling, junction <strong>of</strong> walls and floors<br />

along with external perimeter <strong>of</strong> the<br />

building, expansion joints, surrounding the<br />

pipes and conduits etc. complete at the<br />

rate <strong>of</strong> 7.5 liters (or as directed by the<br />

manufacturer) per sqm on vertical and 5.0<br />

liters per sqm on horizontal surfaces, 50%<br />

<strong>of</strong> the emulsion to be filled in center to<br />

center etc. complete as per the holes made<br />

in trenches at 150m.m IS:6313/1981(Part-<br />

II) complete including cost, conveyance,<br />

loading, unloading and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, T&P, sundries<br />

and scaffolding where required for the<br />

work etc. as directed by the Engineer -in -<br />

charge. ( The payment shall be made on the<br />

basis <strong>of</strong> the actual measurement <strong>of</strong> the<br />

plinth area <strong>of</strong> the building at Ground Floor<br />

and vertical faces will not be measured for<br />

payment) 218.64 Each cum 90.90 19874.38<br />

6 First class kiln burnt brick masonry using<br />

K.B. bricks <strong>of</strong> size 25cm x 12 cm x 8 cm<br />

having crushing strength not less than 75<br />

kg. Per Sqr. Cm. In cement mortar <strong>of</strong> 16.96 Each cum 3340.60 56656.58<br />

40<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


mix(1:6) with Portland slag cement (PSC)<br />

and screened and washed sharp sand for<br />

mortar after immersing the bricks for 6<br />

(six) hours in water before use in<br />

foundation, plinth, basement and for<br />

ornamental flower beds, plinth moulding<br />

and similar such type <strong>of</strong> works with all<br />

necessary projections, splays cutting,<br />

circular moulding, corbelling, chamfering,<br />

watering and curing etc. including cost,<br />

conveyance, loading unloading, royalties and<br />

taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />

labour, sundries, T & P required for the<br />

works etc. complete in all respect as<br />

directed by the Engineer-in-Charge.<br />

7 First class kiln burnt brick masonry using<br />

K.B. bricks <strong>of</strong> size 25 cm. x 12 cm. x 8 cm.<br />

having crushing strength not less than 75<br />

kg. Per. Sqr. Cm. in cement mortar <strong>of</strong> mix(<br />

1:6) with ordinary Portland slag<br />

cement(PSC) and screened & washed sand<br />

for mortar after immersing the bricks for<br />

6 (Six) hours in water before use in<br />

superstructure including splays cutting,<br />

circular moulding, corbelling, chamfering<br />

and similar such type <strong>of</strong> works, watering<br />

and curing etc. including cost, conveyance,<br />

loading, unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, scaffolding,<br />

sundries, T&P required for the works etc.<br />

complete in all respect as directed by the<br />

Engineer-in-Charge.<br />

i)Ground floor 36.74 Each cum 3374.00 123960.76<br />

ii)First floor 24.43 Each cum 3493.20 85338.88<br />

8 First class kiln burnt brick masonry using<br />

K.B. bricks <strong>of</strong> size 25cm x 12 cm x 8 cm<br />

having crushing strength not less than 75<br />

kg. Per Sqr. Cm. In cement mortar <strong>of</strong><br />

mix(1:4) with Portland slag cement (PSC)<br />

and screened and washed sharp sand for<br />

mortar after immersing the bricks for 6<br />

(six) hours in water before use in<br />

superstructure, with all necessary<br />

projections, splays cutting, circular<br />

moulding, corbelling, chamfering, watering<br />

and curing etc. including cost, conveyance,<br />

41<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


loading unloading, royalties and taxes <strong>of</strong> all<br />

materials and cost <strong>of</strong> all labour, sundries, T<br />

& P required for the works etc. complete in<br />

all respect as directed by the Engineer-in-<br />

Charge.<br />

i)Ground floor 5.50 Each cum 3633.50 19984.25<br />

ii)First floor 9.22 Each cum 3752.70 34599.89<br />

9 Providing, lifting, hoisting and laying<br />

Reinforced cement concrete <strong>of</strong> M-200<br />

grade as per approved designs and<br />

drawings having a minimum compressive<br />

strength (in work test) 200 Kg. / Square<br />

cm. in 15 cm. cubes at 28 days after mixing<br />

and test conducted in accordance with I.S.<br />

516 using 12 mm. to 20 mm. size black hard<br />

crushed broken granite stone chips and<br />

screened and washed sharp sand for<br />

mortar <strong>of</strong> approved quality from approved<br />

quarry, washed and cleaned ( 20mm. size<br />

chips not to exceeds 25 % ) to be mixed in<br />

concrete mixture with Portland slag<br />

cement (PSC) including hoisting, lowering,<br />

laying and compaction concrete by using<br />

vibrators, watering and curing for 28 days,<br />

centering and shuttering then after<br />

dismantling and removing debris from the<br />

work site and finishing the exposed<br />

surface smooth providing grooves or beads<br />

wherever necessary including cost,<br />

conveyance, loading, unloading, royalties<br />

and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />

labours, sundries, T & P required <strong>of</strong> the<br />

work etc. complete in all respect as<br />

directed by the Engineer-in-Charge. But<br />

excluding cost and conveyance <strong>of</strong> M.S. rods<br />

or Tor steel and binding wires and labour<br />

charges for straightening, cutting, bending<br />

etc. <strong>of</strong> M.S. rods or tor steel tying the<br />

grills and placing in proper position.<br />

a) Column base 30.61 Each cum 4690.90 143588.45<br />

b) Column<br />

i)Ground floor 7.48 Each cum 7866.30 58839.92<br />

ii)First floor 3.88 Each cum 8562.24 33221.49<br />

c) Plinth band/ Grade beam<br />

i)Ground floor 7.36 Each cum 4956.60 36480.58<br />

d) Lintel<br />

42<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


i)Ground floor 1.55 Each cum 7134.70 11058.79<br />

ii)First floor 0.97 Each cum 7684.30 7453.77<br />

e) Beam<br />

i)Ground floor 12.19 Each cum 7866.30 95890.20<br />

ii)First floor 6.45 Each cum 8562.24 55226.45<br />

f) Ro<strong>of</strong> slab<br />

i)Ground floor 28.08 Each cum 7327.00 205742.16<br />

ii)First floor 12.29 Each cum 7915.10 97276.58<br />

g) Staircase<br />

i)Ground floor 1.32 Each cum 7543.50 9957.42<br />

ii)First floor 1.32 Each cum 8174.90 10790.87<br />

h) Chajja<br />

i)Ground floor 1.33 Each cum 600.00 798.00<br />

ii)First floor 0.45 Each cum 663.00 298.35<br />

i) Cornice<br />

i)Ground floor 1.90 Each cum 7327.00 13921.30<br />

ii)First floor 0.54 Each cum 7915.10 4274.15<br />

10 Providing, lifting, hoisting and laying<br />

Reinforced cement concrete <strong>of</strong> M-15<br />

Grade in different works with 12mm to<br />

20mm size black hard crusher broken<br />

granite chips <strong>of</strong> approved quality from<br />

approved quarry including mixing and<br />

compacting to proper shape and size, level<br />

and plumbs and finishing the exposed<br />

surfaces smooth including cost <strong>of</strong><br />

scaffolding, watering and curing for the<br />

required period including cost <strong>of</strong> all<br />

materials with taxes, royalties<br />

transportation, loading and unloading, all<br />

labour, sundries, T&P including hire &<br />

running charges <strong>of</strong> concrete mixer and<br />

vibrator etc completed as per the<br />

direction <strong>of</strong> the Engineer-in-charge but<br />

excluding the cost <strong>of</strong> materials and labour<br />

for reinforcement bars & including the<br />

cost <strong>of</strong> centering and shuttering for the<br />

works.<br />

Kitchen slab 1.87 Each cum 6794.20 12705.15<br />

11 Providing, fixing and placing <strong>of</strong> MS bars/<br />

Tor steel (HYSD) Fe-500 for RCC work in<br />

all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />

quality with straightening, Cutting,<br />

bending, binding welding or jointing if<br />

necessary, bending, binding, tying the grills<br />

as required for R.C.C. works, providing fan<br />

43<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


hooks where necessary and hoisting,<br />

lowering and placing in proper position<br />

according to approved designs and<br />

drawings including cost, conveyance,<br />

loading, unloading, taxes <strong>of</strong> M.S. rods or<br />

Tor steel and binding wires <strong>of</strong> 18 to 20<br />

gauge required for the work and cost <strong>of</strong> all<br />

labour, sundries, T & P and scaffolding<br />

complete in all respect as directed by the<br />

Engineer-in-Charge ( payment will be made<br />

according to the actual weight <strong>of</strong> M.S rod<br />

/Tor steel consumed in the work and no<br />

separate payment will be made towards<br />

weight <strong>of</strong> binding wires which is to be<br />

borne by the contractor at his own cost<br />

i)Ground floor 136.39 Each Qntl 6031.10 822581.73<br />

ii)First floor 32.20 Each Qntl 6041.60 194539.52<br />

12 Providing 12mm. thick cement plaster with<br />

cement mortar <strong>of</strong> mix (1:6) in all floors<br />

with Portland slag cement (PSC) with neat<br />

cement punning and two coats <strong>of</strong> bitumen<br />

painting over top <strong>of</strong> the walls complete<br />

including watering and curing along with<br />

the cost, conveyance, loading and unloading,<br />

royalties and taxes <strong>of</strong> all materials and<br />

cost <strong>of</strong> all labours, sundries, T&P and<br />

scaffolding required for the work etc.<br />

complete in all respect as directed by the<br />

Engineer–in-Charge.<br />

i)Ground floor 763.10 Each Sqm 84.70 64634.57<br />

ii)First floor 310.54 Each Sqm 87.10 27048.03<br />

13 Providing 16mm thick cement plaster in all<br />

floors at all height with cement mortar <strong>of</strong><br />

mix (1:6) with Portland slag cement (PSC)<br />

and with screened and washed sharp sand<br />

for mortar and finished smooth to the<br />

rough surface <strong>of</strong> brick masonry walls after<br />

racking out joints including watering and<br />

curing rounding <strong>of</strong> corners etc. complete<br />

with cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, T&P, sundries and scaffolding<br />

required for the work etc. with providing<br />

grooves as directed by the Engineer-in-<br />

Charge<br />

i)Ground floor 265.95 Each Sqm 115.90 30823.61<br />

44<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


ii)First floor 137.54 Each Sqm 118.10 16243.47<br />

14 Providing 6 mm. thick cement plaster with<br />

cement mortar <strong>of</strong> mix (1:4) in all floors at<br />

all height with screened and washed sharp<br />

sand for mortar to ceiling plaster <strong>of</strong> ro<strong>of</strong><br />

slab, staircase, landings, chajja and shelves<br />

etc. including roughening, scraping,<br />

chiseling, cleaning to all R.C.C surface<br />

including cost, conveyance, loading,<br />

unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, sundries, T&P<br />

, scaffolding, watering and curing etc.<br />

complete in all respect as per specification<br />

and direction <strong>of</strong> Engineer-in-charge.<br />

i)Ground floor 278.67 Each Sqm 74.40 20733.05<br />

ii)First floor 68.29 Each Sqm 75.90 5183.21<br />

15 Providing Ornamental Cement Plaster (as<br />

per approved Design & Approved Drawing)<br />

using good quality <strong>of</strong> Sand & Cement with<br />

cost, conveyance, loading, unloading and<br />

taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour,<br />

sundries, T & P, scaffolding, watering and<br />

curing etc. complete as directed by the<br />

Engineer-in-charge & Architect.<br />

Ground floor 8.53 Each Sqm 500.00 4265.00<br />

16 Providing 25mm thick grading concrete in<br />

C.C. (1:2:2) laid in proper slope over<br />

terrace ro<strong>of</strong> slab by using two part <strong>of</strong><br />

sand, one part <strong>of</strong> cement and two parts <strong>of</strong><br />

6mm size black hard crusher broken<br />

granite chips with addition <strong>of</strong> water<br />

pro<strong>of</strong>ing compound <strong>of</strong> approved quality to<br />

be mixed with specified ratio including<br />

watering, curing, cost, conveyance,<br />

royalties, taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />

labour, T&P etc. complete as required for<br />

the finished item <strong>of</strong> work as directed by<br />

the Engineer-in-charge. 232.99 Each Sqm 201.90 47040.68<br />

17 Providing and painting two coats with<br />

plastic emulsion paint <strong>of</strong> approved quality<br />

and approved shade manufactured by<br />

reputed manufacture like NEROLAC<br />

/ASIAN /BERGER /DULOX or equivalent<br />

to make in all floors at all height by making<br />

the surface to the interior plastered<br />

surface <strong>of</strong> wall smooth with a coat <strong>of</strong><br />

45<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Acrylic Putty and primer <strong>of</strong> approved<br />

quality including cost, conveyance, loading<br />

and unloading and taxes <strong>of</strong> all materials,<br />

cost <strong>of</strong> all labour, sundries, T & P,<br />

scaffolding etc. required for the work and<br />

complete in all respect as per specification<br />

and direction <strong>of</strong> Engineer-in-charge.<br />

i)Ground floor 1041.77 Each Sqm 128.70 134075.80<br />

ii)First floor 378.83 Each Sqm 130.00 49247.90<br />

18 Wall painting two coats with 100% Acrylic<br />

emulsion paint (1 st quality) exterior grade<br />

(weather coat) <strong>of</strong> approved make & shade<br />

manufactured by reputed manufacture like<br />

NEROLAC /ASIAN /BERGER /DULOX or<br />

equivalent to make an even finished<br />

surface over a coat <strong>of</strong> primer with water<br />

bond cement primer in all heights with all<br />

scaffolding and staging charges including<br />

cost, conveyance, taxes <strong>of</strong> all materials,<br />

cost <strong>of</strong> all labour, etc. complete as per<br />

specification and direction <strong>of</strong> Engineer-in-<br />

Charge.<br />

i)Ground floor 265.95 Each Sqm 76.70 20398.37<br />

ii)First floor 137.54 Each Sqm 78.00 10728.12<br />

19 Providing and painting two coats with<br />

synthetic enamel paint <strong>of</strong> approved quality<br />

and approved shade confirming to ISI on<br />

iron work to give an even shade over a coat<br />

<strong>of</strong> primer <strong>of</strong> approved quality and shade<br />

including sand papering and making the<br />

surface smooth in all floors at all height<br />

with cost, conveyance, loading, unloading<br />

and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />

labour, sundries, T& P scaffolding and<br />

taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour,<br />

sundries, T & P scaffolding etc. required<br />

for the work and complete in all respect<br />

as directed by the Engineer-in-charge. 23.00 Each Sqm 98.90 2274.70<br />

20 Providing and painting two coats with<br />

synthetic enamel paint <strong>of</strong> approved quality<br />

and approved shade confirming to ISI on<br />

wood work to give an even shade over a<br />

coat <strong>of</strong> primer <strong>of</strong> approved quality and<br />

shade including sand papering and making<br />

the surface smooth in all floors at all<br />

height with cost, conveyance, loading, 18.22 Each Sqm 102.20 1862.08<br />

46<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


unloading and taxes <strong>of</strong> all materials, cost<br />

<strong>of</strong> all labour, sundries, T& P scaffolding<br />

and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />

labour, sundries, T & P scaffolding etc.<br />

required for the work and complete in all<br />

respect as directed by the Engineer-incharge.<br />

21 Providing vitrified tile flooring using<br />

vitrified tiles <strong>of</strong> premium grade having<br />

thick <strong>of</strong> 8mm to 10mm conforming to IS<br />

13756 <strong>of</strong> 600mmx600mm coloured /<br />

printed series(homogeneous)<strong>of</strong> approved<br />

quality, colour in floors, treads on steps<br />

and landings in all floors at all height on<br />

25mm thick bed <strong>of</strong> cement mortar <strong>of</strong> mix<br />

(1:4) laid in proper slope and gradient with<br />

screened and washed sharp sand for<br />

mortar and grouted with neat white<br />

cement slurry jointing the tile with neat<br />

white cement slurry mixed with required<br />

quantities <strong>of</strong> pigments <strong>of</strong> approved marks<br />

to match the shades <strong>of</strong> the vitrified tile if<br />

required watering and curing for 21 days,<br />

including cost, conveyance, loading,<br />

unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, sundries, T&P<br />

required for the work including rubbing<br />

mechanically and wax polishing etc.<br />

complete in all respect as per specification<br />

and direction <strong>of</strong> Engineer-incharge.(Make:-JONSON/NITCO)<br />

i)Ground floor 156.63 Each Sqm 894.30 140074.21<br />

ii)First floor 44.75 Each Sqm 902.40 40382.40<br />

22 Providing vitrified tile flooring using<br />

vitrified tiles <strong>of</strong> premium grade having<br />

thick <strong>of</strong> 8mm to 10mm conforming to IS<br />

13756 <strong>of</strong> 600mmx600mm coloured /<br />

printed series(homogeneous)<strong>of</strong> approved<br />

quality, colour on 12mmm thick cement<br />

plaster (1:3) with screened and washed<br />

sharp sand for mortar and grouted with<br />

neat white cement slurry joining the tile<br />

with neat white cement slurry mixed with<br />

required quantities <strong>of</strong> pigments <strong>of</strong><br />

approved marks to match the shades <strong>of</strong><br />

the vitrified tile if required watering and<br />

47<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


curing for 21 days, including cost,<br />

conveyance, loading, unloading, royalties<br />

and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />

labour, sundries, T&P required for the<br />

work including rubbing mechanically and<br />

wax polishing etc. complete in all respect<br />

as per specification and direction <strong>of</strong><br />

Engineer-in-charge.<br />

i)Ground floor 17.98 Each Sqm 873.00 15696.54<br />

ii)First floor 5.12 Each Sqm 879.40 4502.53<br />

23 Providing 10mm thick granite tile flooring<br />

(above 0.1 Sqm. Up to 0.4 sqm) <strong>of</strong> approved<br />

quality, colour and size in floors, treads on<br />

steps and landings in all floors at all height<br />

on 25mm thick bed <strong>of</strong> cement mortar <strong>of</strong><br />

mix (1:1) laid in proper slope and gradient<br />

with screened and washed sharp sand for<br />

mortar and grouted with neat white<br />

cement slurry joining the tile with neat<br />

white cement slurry mixed with required<br />

quantities <strong>of</strong> pigments <strong>of</strong> approved marks<br />

to match the shades <strong>of</strong> the granite tile if<br />

required watering and curing for 21 days,<br />

including cost, conveyance, loading,<br />

unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, sundries, T&P<br />

required for the work including rubbing<br />

mechanically and wax polishing etc.<br />

complete in all respect as per specification<br />

and direction <strong>of</strong> Engineer-in-charge.<br />

i)Ground floor 15.42 Each Sqm 1441.90 22234.10<br />

ii)First floor 7.48 Each Sqm 1446.10 10816.83<br />

24 Providing 30cmx30cm/40cmx40cm special<br />

plain/printed series ceramic floor tiles <strong>of</strong><br />

premium grade having thickness 7mm to<br />

8mm conforming IS13755 for ceramic tile<br />

flooring <strong>of</strong> approved quality, colour and<br />

size in floors, treads on steps and landings<br />

in all floors at all height on 10mm thick bed<br />

<strong>of</strong> cement mortar <strong>of</strong> mix (1:1) laid in proper<br />

slope and gradiant with screened and<br />

washed sharp sand for mortar and with<br />

ordinary Portland slag cement (PSC)<br />

grouted with neat white cement slurry<br />

joining the tile with neat white cement<br />

slurry mixed with required quantities <strong>of</strong><br />

48<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


pigments <strong>of</strong> approved marks to match the<br />

shades <strong>of</strong> the ceramic tile if required ,<br />

watering and curing for 21 days, including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work including rubbing mechanically and<br />

wax polishing etc. complete in all respect<br />

as directed by the Engineer-in-charge.<br />

i)Ground floor 25.06 Each Sqm 687.00 17216.22<br />

ii)First floor 24.54 Each Sqm 693.70 17023.40<br />

25 Providing 20cmx30cm/20cmx20cm size<br />

special plain/printed series ceramic<br />

glazed wall tiles <strong>of</strong> premium grade having<br />

thickness 6.5mm to 6.7mm conforming to<br />

IS 13753 <strong>of</strong> approved make & shade in<br />

Dadoes over 12mm thick cement plaster 1:3<br />

(1 Cement: 3 Coarse sand) finished with<br />

modular pointing in white cement & pigment<br />

to match the shade <strong>of</strong> the tiles including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour curing sundries and T & P etc.<br />

required for the work etc. complete as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

i)Ground floor 111.77 Each Sqm 590.20 65966.65<br />

ii)First floor 33.48 Each Sqm 596.60 19974.17<br />

26 Providing ,fitting and fixing <strong>of</strong> flush door<br />

<strong>of</strong> 32 mm thick (Green /National<br />

/Equivalent make) using 32mm single<br />

leaf/double leaf <strong>of</strong> solid core <strong>of</strong><br />

blockboard type bonded with 1mm thick<br />

lamination board (Royal touch/ Merino or<br />

equivalent) pasted on both sides with<br />

8mm thick teak wood external leaping . The<br />

shutter shall be shop prepared for taking<br />

mortice lock & latches suitable block <strong>of</strong><br />

wood may be provided for fixing the<br />

hardware.The size <strong>of</strong> block, shall pefectly<br />

correspond to the maximum size <strong>of</strong> lock.<br />

All the four edges <strong>of</strong> the door shutter<br />

shall be square . The shutter shall be free<br />

from twist or warp in its plane and <strong>of</strong><br />

required size etc complete as directed<br />

including fixing <strong>of</strong> Dorma Ball bearing 37.19 Each Sqm 8458.30 314564.18<br />

49<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


hinges 5knuckle 2ball bearing butt hinges<br />

BB 3090F with metal screws 100mm X<br />

75mm X 3mm grade SS304, 3200-2<br />

Surface Mounted Tower bolt <strong>of</strong> Length 8"<br />

in Satin chrome finish, Dorma pull Handle<br />

TGDI-D 150mm back to back with<br />

adjustable fixing for glass, wood and<br />

metal doors in satin stainless steel. The<br />

pull handles should have supporting washer<br />

with raised bevelling on the outer surface.<br />

Length =150mm, 19mm dia, -SS304<br />

Dorma ZS 8100 set for fire door type 1<br />

with lock 281 and strike plate epc 60mm<br />

Dorma TS 71 door closer with std arm EN<br />

3/4 max door width 1100mm Melamine<br />

polish as per the specification complete<br />

with all materials , as per instruction <strong>of</strong><br />

Engineer-in-Charge.<br />

27 Supplying, fitting and fixing well dressed<br />

and well seasoned sal wood choukaths <strong>of</strong><br />

different length and 6.35cm. x 12.70cm.<br />

sizes in all floors in proper position<br />

including two coats coats <strong>of</strong> coaltaring to<br />

wall and lintel side faces <strong>of</strong> choukaths<br />

including cost <strong>of</strong> coaltar and labour for<br />

coaltaring and fixing required nos. <strong>of</strong> W.I.<br />

clamps to the choukaths with approved<br />

qualities <strong>of</strong> screws including cost,<br />

conveyance, loading, sundries, T&P required<br />

for the work etc. complete in all respect as<br />

directed by the Engineer-in-charge 0.94 Each cum 43434.30 40828.24<br />

28 Providing and fixing rolling shutters <strong>of</strong><br />

approved make,made <strong>of</strong> 80x1.25mm laths<br />

interlocked together through their entire<br />

length and jointed at the by end locks<br />

mounted on specially designed pipe shaft<br />

with brackets, side guides and<br />

arrangements for inside and outside<br />

locking with push and pull operation<br />

complete including the cost <strong>of</strong> providing<br />

and fixing necessary 27.5 cm long wire<br />

springs grade no 2. and M.S. top cover<br />

1.25mm thick for rolling shutter. Item<br />

include providing and fixing 2 nos ball<br />

bearings <strong>of</strong> approved make in rolling<br />

shutter. Item also include painting <strong>of</strong> 4.89 Each Sqm 2467.90 12068.03<br />

50<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


shutter with 2 coats <strong>of</strong> synthetic enamel<br />

paint over a coat <strong>of</strong> metal primer <strong>of</strong><br />

approved make & shade and fixing <strong>of</strong><br />

shutter with lugs <strong>of</strong> 15x 6mm in<br />

15cmx10cmx10cm cement concrete blocks<br />

<strong>of</strong> 1:2:4 (1cement:2 coarse sand:4 graded<br />

stone aggregate). The rate should include<br />

cost <strong>of</strong> all materials, labour etc.<br />

29 Providing and fixing factory made UPVC<br />

frame with shutter for windows made <strong>of</strong><br />

UPVC extruded section having an overall<br />

dimension,as below (tolerence ± 1mm) with<br />

all thickness 2mm ± 0.2mm .Corners <strong>of</strong> the<br />

door frame to be jointed with galvanized<br />

brackets and stainless steel screws,jointed<br />

and mitred and plastic wilded.The hinge<br />

side vertical <strong>of</strong> the frame reinforced by<br />

galvanised M.S tube <strong>of</strong> size 19mmx19mm<br />

and 1mm ± 0.1mm wall thickness and 3 nos<br />

stainless stell hinges fixed to the frame<br />

with 5mm clear glass complete as per<br />

manufacture specification and direction <strong>of</strong><br />

Engineer in charge.(Extruded section<br />

pr<strong>of</strong>ile HS3 WHITE :MAKE : FENESTA). 27.72 Each Sqm 7531.40 208770.41<br />

30 Providing & fittiing up <strong>of</strong> fixed ventilator<br />

using OEL aluminum anodized section<br />

No.9210 &9207 as single groov and double<br />

groov respectively as horizontal &vertical<br />

member and OEL section 4660 as Tapered<br />

clip for fixing up <strong>of</strong> 5mm thick black glass<br />

and jointing angle No.1855 etc completye<br />

as per direction <strong>of</strong> Engg. in charge. 20.62 One Kg 378.30 7800.55<br />

31 Providing, fittiing & placing <strong>of</strong> 5mm thick<br />

glass in fixed ventilator including cost,<br />

royalties and taxes <strong>of</strong> all Materials, cost <strong>of</strong><br />

all Labour, T&P, etc. required for the work<br />

complete as directed by the Engineer-incharge.<br />

4.03 Each Sqm 676.90 2727.91<br />

32 Supplying ,fitting and fixing <strong>of</strong> Karakum<br />

Brick tile <strong>of</strong> Eurocon make <strong>of</strong> size<br />

102mmx102mm in exterior walls <strong>of</strong><br />

approved make c<strong>of</strong>irming to IS:13755 laid<br />

on 12mm thick cement mortar (1:3) and<br />

filling joints with white cement <strong>of</strong><br />

approved quality including cost <strong>of</strong> all<br />

materials ,labour ,T & P etc required for<br />

51<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


the work all complete as per direction <strong>of</strong><br />

E-I-C. (MAKE: EUROCON TILES:Karakum)<br />

i)Ground floor 265.95 Each Sqm 1013.50 269540.33<br />

ii)First floor 137.54 Each Sqm 1019.90 140277.05<br />

33 Supplying ,fitting and fixing Cordoba tile<br />

<strong>of</strong> Eurocon make <strong>of</strong> size 152mmx152mm on<br />

planter box wall <strong>of</strong> approved make for<br />

decorative purpose c<strong>of</strong>irming to IS:13755<br />

laid on 12mm thick cement mortar (1:3) and<br />

filling joints with white cement <strong>of</strong><br />

approved quality including cost <strong>of</strong> all<br />

materials ,labour ,T & P etc required for<br />

the work all complete as per direction <strong>of</strong><br />

E-I-C. (MAKE: EUROCON TILES:Cordoba) 1.96 Each Sqm 828.40 1623.66<br />

34 Providing 25mm thick Eurocon make<br />

AVANTE floor tile on ro<strong>of</strong> terrace <strong>of</strong><br />

approved quality, colour and size in in all<br />

floors at all height on 25mm thick bed <strong>of</strong><br />

cement mortar <strong>of</strong> mix (1:1) laid in proper<br />

slope and gradient with screened and<br />

washed sharp sand for mortar and grouted<br />

with neat white cement slurry joining the<br />

tile with neat white cement slurry mixed<br />

with required quantities <strong>of</strong> pigments <strong>of</strong><br />

approved marks to match the shades <strong>of</strong><br />

the tile if required watering and curing<br />

for 21 days, including cost, conveyance,<br />

loading, unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, sundries, T&P<br />

required for the work including rubbing<br />

mechanically and wax polishing etc.<br />

complete in all respect as per specification<br />

and direction <strong>of</strong> Engineer-in-charge. 85.11 Each Sqm 892.30 75943.65<br />

35 Supplying, fitting and fixing <strong>of</strong> M.S grills,<br />

grill gates with top and bottom rails, steel<br />

windows, steel doors, steel frames for<br />

doors and windows, staircase and parapet<br />

railing ( as per I.S. specification and as per<br />

approved drawings ) in proper position in all<br />

floors and at all height including making<br />

holes to brick walls/ R.C.C structure/wood<br />

work etc. and making good to the damaged<br />

walls/ structures with cement concrete<br />

(1:2:4) with black hard crusher broken<br />

granite stone chips <strong>of</strong> 12mm to 20mm size<br />

( 20mm size not to exceeds 25% ) including 618.75 One Kg 59.87 37044.56<br />

52<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


watering and curing etc. complete in all<br />

respect as directed by the Engineer in<br />

charge ( W.I. / M.S. windows grills, grill<br />

gates, collapsible gates with top and<br />

bottom rails, steel windows, steel doors,<br />

steel frames for doors and windows,<br />

staircase and parapet railings square bar<br />

along with required nos. <strong>of</strong> nails and screws<br />

and other required materials <strong>of</strong> approved<br />

quality and approved size shall be supplied<br />

by the contractor at his own cost.)<br />

36 Labour charges for fitting fixing <strong>of</strong> MS<br />

grill in position including all cost <strong>of</strong><br />

material all taxes as per direction <strong>of</strong> the<br />

Engineer-in-charge. 23.00 Each Sqm 70.10 1612.30<br />

37 Supplying, fitting and fixing <strong>of</strong> ,surface<br />

Polished Granite Slab for resting wash<br />

basin along with kitchen slab which is<br />

durable and made <strong>of</strong> environmentally safe<br />

material by using four sided piece <strong>of</strong><br />

granite stone as a broad and<br />

thick.Resistant to corrosion, scratches,<br />

and heat,having designed size which is<br />

much larger than a tile etc. over RCC slab<br />

for the work all complete as per direction<br />

<strong>of</strong> Engineer-in-Charge. 9.12 Each Sqm 1441.90 13150.13<br />

38 Supplying, fitting and fixing <strong>of</strong> Stainless<br />

steel <strong>of</strong> 304 grade in hand railing using<br />

50mm dia <strong>of</strong> 2mm thick circular pipe with<br />

balustrade <strong>of</strong> size 32mm x 32mm x 2mm @<br />

0.90mtr. C/C and stainless square pipe<br />

bracing <strong>of</strong> size 32mm x 32mm x 2mm in 3<br />

rows in stair case as per approved design<br />

and specification, buffing, polishing etc.<br />

with cost, conveyance, taxes <strong>of</strong> all<br />

materials, T & P etc. required for the<br />

complete in all respect as directed by the<br />

Engineer-in-charge. 93.09 One Kg 306.60 28541.39<br />

39 Dismantling and removing doors, windows &<br />

ventilators including stacking the useful<br />

materials for reuse and removing the<br />

derrises with all lead and lift complete as<br />

per direction <strong>of</strong> Engineer-in-charge. 12.74 Each Sqm 145.80 1857.49<br />

40 Dismantling and removing cement plaster<br />

from walls including racking out joints<br />

12mm deep including stacking the useful 494.32 Each Sqm 18.20 8996.62<br />

53<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


materials for reuse and removing the<br />

debris within 50m lead including cost <strong>of</strong> all<br />

labour, T & P, sundries, scaffolding<br />

required for the work etc. complete in all<br />

respect as directed by the Engineer-incharge.<br />

41 Dismantling and removing marble chips<br />

flooring including stacking the useful<br />

materials for reuse and removing the<br />

debris within 50m lead including cost <strong>of</strong> all<br />

labour, T & P, sundries, scaffolding<br />

required for the work etc. complete in all<br />

respect as directed by the Engineer-incharge.<br />

107.91 Each Sqm 41.10 4435.10<br />

PH<br />

42 Providing and installing vitreous China<br />

<strong>Orissa</strong> Pattern water closet pan <strong>of</strong> size<br />

580x440mm <strong>of</strong> Hindware make catalouge<br />

no 20076 with integral type foot rest and<br />

100 mm PVC P trap, with 10 lit capasity low<br />

level flushing cistern <strong>of</strong> hindware catalouge<br />

no 21001 or equivalent <strong>of</strong> Parryware /<br />

Jaquar make, MS brackets, 450mm long<br />

connection pipe having cat no ALD 803B or<br />

equivalent <strong>of</strong> Parryware / Hindware make,<br />

32 mm diameter flush pipe with fittings<br />

and clamps, overflow arrangements with<br />

specials and mosquitoes coupling <strong>of</strong><br />

apprived municipal design including<br />

painting <strong>of</strong> fittings and brackets,cuttings<br />

and making good the walls and floors<br />

whereever required etc complete as per<br />

direction <strong>of</strong> Engineer-in-charge. 6 Each No 4881.20 29287.20<br />

43 Supplying all materials,labours,T&P and<br />

fixing the extended wall mounted vitreous<br />

china wash down European one piece water<br />

closet with P/S trap <strong>of</strong> Hindware make<br />

having cat no 20058 <strong>of</strong> Studio or<br />

equivalent <strong>of</strong> Parryware / Jaquar make and<br />

cistern <strong>of</strong> cat no 21028 or equivalent <strong>of</strong><br />

Parryware / Jaquar make and 450mm long<br />

connection pipe having cat no ALD 803B or<br />

equivalent <strong>of</strong> Parryware / Hindware make<br />

to the floor with wooden plug and<br />

chromium plated pedestal screws including<br />

jointing the trap with soil pipe in cement 8 Each No 9231.90 73855.20<br />

54<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


mortar (1:1) fixing plastic seat and cover<br />

for wash down water closet with chromium<br />

plated brass hinges and rubber buffers<br />

including polishing etc all complete as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

44 Providing and fixing 49cm dia counter top<br />

wash hand basin <strong>of</strong> Hind Ware make having<br />

cat no 10052 <strong>of</strong> Round starlet or equivalent<br />

<strong>of</strong> Parryware / Jaquar make with a pair <strong>of</strong><br />

CI bracket, 32mm dia CP bottle trap <strong>of</strong><br />

Jaquar cat no ALD 769, connection pipe<br />

with CP nut 450mm long <strong>of</strong> cat no ALD<br />

803B, 15mm dia pillar cock Jaquar make<br />

having cat no-KUB-35001 or equivalent <strong>of</strong><br />

Parryware / Hindware including cutting<br />

walls and making good the damages in CC<br />

(1:2:4) as per specification all complete<br />

including cost <strong>of</strong> all materials as per PH<br />

specification and direction <strong>of</strong> the<br />

Engineer-in-charge. 11 Each No 5731.10 63042.10<br />

45 Supply <strong>of</strong> all materials, labour, T&P , fitting<br />

and fixing in all floors fixed type beveled<br />

plate glass mirror <strong>of</strong> size 600mm x<br />

450mm size thick best Indian make ,supply<br />

<strong>of</strong> 13mm thick asbestos backing and CP<br />

Brass screw including cost conveyance,<br />

taxes <strong>of</strong> all materials complete as per<br />

specification and direction <strong>of</strong> Engineer-incharge(Make<br />

Parryware C8613 reflextion<br />

type) 11 Each No 1839.80 20237.80<br />

46 Providing and fixing C.P. Glass shelf<br />

Continental Cat. No.-1171N(JAQUAR make<br />

) with Glass <strong>of</strong> size 22” x 5” fixed to wall<br />

including cutting the wall and making good<br />

the damages, including cost <strong>of</strong> all materials<br />

complete as per PH specification and<br />

direction <strong>of</strong> Engineering-in-charge. 11 Each No 1227.60 13503.60<br />

47 Supplying all materials, labour, T&P and<br />

fixing standard sized CP towel rail -Single<br />

Towel Rail 600mm Long (JAQUAR ,Cat.No<br />

ACN-1121N)complete including cutting the<br />

wall and making good the damages,<br />

including cost <strong>of</strong> all materials complete as<br />

per PH specification and direction <strong>of</strong><br />

Engineering-in-charge. 11 Each No 916.50 10081.50<br />

55<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


1 Supplying all materials, labour, T&P and<br />

fixing standard sized CP Soap dispenser<br />

Glass Bottle (JAQUAR Cat. AKB<br />

No.:35735) complete including cutting the<br />

wall and making good the damages,<br />

including cost <strong>of</strong> all materials complete as<br />

per PH specification and direction <strong>of</strong><br />

Engineering-in-charge. 11 Each No 1218.70 13405.70<br />

48 Supplying all materials, labour, T&P and<br />

fixing standard sized CP Soap holder<br />

(Jaquar(AKB-35731)) complete including<br />

cutting the wall and making good the<br />

damages, including cost <strong>of</strong> all materials<br />

complete as per PH specification and<br />

direction <strong>of</strong> Engineering-in-charge. 7 Each No 941.00 6587.00<br />

49 Supplying all materials, labour, T&P and<br />

fixing standard sized CP Shower<br />

(JAQUAR Cat. No.1999) complete including<br />

cutting the wall and making good the<br />

damages, including cost <strong>of</strong> all materials<br />

complete as per PH specification and<br />

direction <strong>of</strong> Engineering-in-charge. 8 Each No 1847.70 14781.60<br />

50 Supplying all materials, labour, T&P and<br />

fixing standard sized grab bar (JAQUAR<br />

Cat. No.15101) complete including cutting<br />

the wall and making good the damages,<br />

including cost <strong>of</strong> all materials complete as<br />

per PH specification and direction <strong>of</strong><br />

Engineering-in-charge. 4 Each No 753.80 3015.20<br />

51 Supplying all materials, labour, T&P and<br />

fixing standard sized Toilet Roll Holder<br />

with Flap (JAQUAR ,Continental, Cat.No-<br />

ACN1155N) complete including cutting the<br />

wall and making good the damages,<br />

including cost <strong>of</strong> all materials complete as<br />

per PH specification and direction <strong>of</strong><br />

Engineering-in-charge. 5 Each No 486.50 2432.50<br />

52 Supplying all materials, labour, T&P and<br />

fitting and fixing 110mm dia U-PVC SWR<br />

soil waste ventilating pipes and fittings to<br />

walls with nails, bobbins and wooden plugs<br />

or laying in trenches including earthwork in<br />

excavation in all kinds <strong>of</strong> soil and refilling<br />

<strong>of</strong> trenches as per specification and<br />

direction <strong>of</strong> the engineer in charge 5.00 Each Rm 278.40 1392.00<br />

53 Providing and fixing 110mm dia PVC door 10 Each No 149.75 1497.50<br />

56<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


end <strong>of</strong> required degree with access door,<br />

insertion rubber washer 3mm thick, bolts<br />

and nuts complete as per specification and<br />

direction <strong>of</strong> the engineer in charge<br />

54 Providing and fixing 110mm dia PVC plain<br />

bend <strong>of</strong> required degree with access door,<br />

insertion rubber washer 3mm thick, bolts<br />

and nuts complete as per specification and<br />

direction <strong>of</strong> the engineer in charge 10 Each No 119.40 1194.00<br />

55 Providing & fixing 110mm dia PVC heel rest<br />

sanitary bends: 5 Each No 106.10 530.50<br />

56 Providing & fixing 110mm dia PVC SWR<br />

Door tee 10 Each No 194.45 1944.50<br />

57 Providing & fixing 110mm dia PVC SWR<br />

cross tee 5 Each No 247.30 1236.50<br />

58 Providing & fixing 110mm dia PVC SWR cowl 5 Each No 28.15 140.75<br />

59 Providing and fixing circular type stainless<br />

steel jalli (grating) with hole for floor<br />

/nahani trap etc complete as per<br />

specification and direction <strong>of</strong> the engineer<br />

in charge 14 Each No 104.00 1456.00<br />

60 Providing & fixing sand cast iron trap <strong>of</strong><br />

110mm dia inlet and 110mm dia outlet <strong>of</strong><br />

self cleaning design with sand cast iron<br />

screwed down or hinged grating with or<br />

without vent arm complete, including cost<br />

<strong>of</strong> cutting and making good the walls and<br />

floors etc complete as per direction <strong>of</strong><br />

Engineer-in-charge. 4 Each No 207.10 828.40<br />

61 Supplying all materials,labours,T&P and<br />

providing and fixing to wall or ceiling and<br />

floor PVC pipes conforming to ASTM-D-<br />

1785/89 (Sch-80) and pipe fittings <strong>of</strong> the<br />

following nominal bore with clamps<br />

including making good the wall,ceiling and<br />

floor all complete as per specification and<br />

direction <strong>of</strong> the Engineer-in-charge.<br />

a)15 mm dia PVC ASTM pipe (sch-80) 25.00 Each Rm 88.40 2210.00<br />

b)20 mm dia PVC ASTM pipe (sch-80) 35.00 Each Rm 111.40 3899.00<br />

c)25 mm dia PVC ASTM pipe (sch-80) 45.00 Each Rm 148.20 6669.00<br />

d)75 mm dia PVC ASTM pipe (sch-80) 40.00 Each Rm 168.90 6756.00<br />

62 Supplying all materials, labour, T&P and<br />

fixing standard sized 15mm CP Long body<br />

Bib cock(JAQUAR ,LYR Cat. No. - 38037)<br />

complete including cutting the wall and<br />

making good the damages, including cost <strong>of</strong> 9 Each No 1226.20 11035.80<br />

57<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


all materials complete as per PH<br />

specification and direction <strong>of</strong> Engineeringin-charge.<br />

63 Supplying all materials, labour, T&P and<br />

fixing standard sized in all basins 15mm CP<br />

pillar cock with extension body (JAQUAR<br />

,LYR Cat. No. - ARI-39011) complete<br />

including cutting the wall and making good<br />

the damages, including cost <strong>of</strong> all materials<br />

complete as per PH specification and<br />

direction <strong>of</strong> Engineering-in-charge. 11 Each No 1276.74 14044.14<br />

64 Supplying all materials, labour, T&P and<br />

fixing standard sized 15mm dia Angular<br />

Stop cock (JAQUAR,Cat. No.-051)<br />

complete including cutting the wall and<br />

making good the damages, including cost <strong>of</strong><br />

all materials complete as per PH<br />

specification and direction <strong>of</strong> Engineeringin-charge.<br />

6 Each No 923.20 5539.20<br />

65 Providing and fixing 25mm nominal bore<br />

brass fullyway valve with C.I. wheel <strong>of</strong><br />

approved quality (screwed end) with supply<br />

<strong>of</strong> all jointing materials complete as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

6 Each No 577.00 3462.00<br />

66 Supplying all materials <strong>of</strong> cubicle rest<br />

rooms <strong>of</strong> size 6'6"X6'6" / 4'0"X5'2" ,<br />

12mm thickness <strong>of</strong> compacted laminated<br />

board with 600mm door size and overall<br />

height <strong>of</strong> cubicles is 2003 mm (including a<br />

gap <strong>of</strong> 150 mm from the ground) Standard<br />

Besco Accessories Details (Per Cubicle<br />

Unit).Accessories: SS Top Rail (Epoxy<br />

Powder Coated Aluminium in SS mill finish),<br />

SS 304 Grade coat hook , SS Gravity<br />

Hinges (Stainless Steel Grade 304 with<br />

Satin Finish),SS Latch cum Occupancy<br />

Indicator (Stainless Steel Grade 304 with<br />

Satin Finish),6063 micron Aluminum “U”<br />

Channel,SS Palm Design Adjustable Foot<br />

(Stainless Steel Grade 304 with Satin<br />

Finish), SS Screws & Inserts (Stainless<br />

Steel Grade 304 with Satin Finish), Epoxy<br />

powder coated Aluminium door stopper<br />

channel as per site requirement and<br />

direction <strong>of</strong> Engineer-in-chrage. 6 Each No 28598.29 171589.74<br />

58<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


67 Supplying all materials,labour,T&P and<br />

fixing Rotational moulded polyethylene<br />

syndical vertical water storage tanks <strong>of</strong><br />

2000 ltr capacity confirming to IS:12701-<br />

1996 including cutting holes through the<br />

tank and fixing mild steel tubes and<br />

fittings and providing extra sockets and<br />

jam nuts, fixing ball valve etc, including<br />

hoisting up to a height <strong>of</strong> 5 mtr above<br />

ground level and placing the tank to the<br />

required position including conveyance <strong>of</strong><br />

all materials to worksite etc all complete<br />

as per specification and direction <strong>of</strong><br />

Engineer-in-charge. 1 Each No 13136.00 13136.00<br />

68 Providing, laying cement concrete 1:4:8 (1<br />

cement : 4 fine sand : 8 graded stone<br />

aggregate 40 mm nominal size) bedding for<br />

100mm dia PVC pipes and necessary<br />

formwork and curing complete as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

40.00 Each Rm 155.90 6236.00<br />

69 Supplying all materials, labours, T&P and<br />

constructing gully trap chamber <strong>of</strong><br />

250mmx250mm inside size with 8cm thick<br />

RCC precast cover slab in cement concrete<br />

(1:2:4) mix using 12mm size hg chips,<br />

foundation concrete (1:4:8) using 40mm<br />

size hard granite metal on bed and around<br />

trap, KB brickwork in cement mortar (1:6)<br />

in F&P and inside 12mm thick cement<br />

plaster in cement mortar (1:3) finished<br />

with a floating coat <strong>of</strong> neat cement<br />

including fixing 100mmx100mm size HCI<br />

gully trap,150mm x150mm size CI grating<br />

etc all complete as per approved drawing,<br />

PH specification and direction <strong>of</strong> Engineerin-charge.<br />

5 Each No 940.20 4701.00<br />

70 Supplying all materials, labours, T&P and<br />

constructing inspection chamber <strong>of</strong><br />

760mmx760mmx460mm inside size with<br />

cement concrete (1:3:6) mix using 40mm<br />

size hg metal on bed,1st class KB brickwork<br />

in cement mortar (1:6),moulding and<br />

shaping the channel inside and benching<br />

with cement concrete (1:2:4) using 12mm<br />

size hg chips,12mm thick cement plaster in 4 Each No 4807.10 19228.40<br />

59<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


cement mortar (1:3) with punning to inside,<br />

cement flush pointing (1:3) to outside, RCC<br />

cover slab in (1:2:4)using 12mm size hg<br />

chips with RCC man hole cover, earthwork<br />

in excavation in all kinds <strong>of</strong> soil and<br />

refilling the cavity around the chamber<br />

including watering curing conveyance <strong>of</strong> all<br />

materials to worksite, payment <strong>of</strong> royalty,<br />

taxes etc all complete as per approved<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

71 Supplying all materials, labours, T&P and<br />

constructing 1.22m dia and 2.1m depth soak<br />

way pit with precast RCC rings joined<br />

loose, gravel backing in the rear <strong>of</strong> well<br />

staining, precast RCC cover slab in cement<br />

concrete (1:2:4) using 12mm size hg chips<br />

fitted with iron lifting handles including<br />

cutting hole in the rings for inlet pipe,<br />

earthwork in open well excavation in all<br />

kinds <strong>of</strong> soil and refilling <strong>of</strong> cavity around<br />

the pit & painting the iron works, watering,<br />

curing, conveyance <strong>of</strong> all materials to<br />

worksite, payment <strong>of</strong> royalty, taxes etc all<br />

complete as per approved specification and<br />

direction <strong>of</strong> Engineer-in-charge. 1 Each No 8269.90 8269.90<br />

72 Supplying all materials, labours, T&P and<br />

cutting holes through existing brickwork<br />

including making good the damages in<br />

cement mortar (1:4) for taking GI pipes<br />

and fittings/PVC pipes and fittings etc all<br />

complete as per PH specification and<br />

direction <strong>of</strong> Engineer-in-charge. 8 Each No 28.60 228.80<br />

73 Earthwork in excavation <strong>of</strong> foundation<br />

trenches in ordinary soil including moorum<br />

stoney earth and earth mixed with<br />

boulders except sheet rock and boulders<br />

requiring blasting including dressing <strong>of</strong><br />

sides and leveling the bed up to the<br />

required depth and depositing the<br />

excavated materials away from the work<br />

site with all leads and lifts, including<br />

shoring, shuttering and dewatering (if<br />

required) with cost <strong>of</strong> labour, hire &<br />

running charges <strong>of</strong> water pumps sundries &<br />

T&P required for the work complete as 12.82 Each cum 87.60 1123.03<br />

60<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


directed by the Engineer-in-charge.<br />

74 Supplying and filling in foundation trenches<br />

and plinth, ditches with sand well watered<br />

and rammed in layers not exceeding 23 cm.<br />

In depth with all lead and lift including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

(Measurement will be taken on<br />

finished compacted section only). 2.99 Each cum 463.50 1385.87<br />

75 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:3:6) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 4 cm. Size black hard crusher broken<br />

granite stone metal and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and<br />

cleaned including hoisting, lowering, laying<br />

concrete, ramming, watering and curing<br />

etc. complete to required levels laid in<br />

layers not exceeding 15 cm thick in each<br />

layer including cost, conveyance, loading,<br />

unloading, royalties and taxes all materials<br />

and cost all labours, sundries, T & P<br />

required for the work including shoring,<br />

shuttering and dewatering if required<br />

including hire & running charges <strong>of</strong> water<br />

pump complete as per specification and<br />

direction <strong>of</strong> Engineer-in-charge. 0.68 Each cum 3701.20 2516.82<br />

76 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:2:4) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 12 mm. Size black hard crusher<br />

broken granite stone metal and screened<br />

and washed sharp sand for mortar <strong>of</strong><br />

approved quality from approved quarry,<br />

washed and cleaned including hoisting,<br />

lowering, laying concrete, ramming,<br />

watering and curing etc. complete to<br />

required levels laid in layers not exceeding<br />

15 cm thick in each layer including cost,<br />

conveyance, loading, unloading, royalties<br />

and taxes all materials and cost all labours,<br />

sundries, T & P required for the work 1.56 Each cum 4854.20 7572.55<br />

61<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


including shoring, shuttering and<br />

dewatering if required including hire &<br />

running charges <strong>of</strong> water pump complete as<br />

per specification and direction <strong>of</strong><br />

Engineer-in-charge.<br />

77 First class K.B. brick work in cement<br />

mortar (1:6) with best quality bricks having<br />

crushing strength from 75kg/cm 2 to<br />

99kg/cm 2 , immersing the bricks in water<br />

for not less than 6 hours before use (the<br />

bricks shall be well burnt, free from<br />

cracks, well shaped, uniform in size and<br />

shall produce a clear metallic ringing sound<br />

when struck) includes moulding,<br />

chamfering, corbelling etc. complete as per<br />

drawing, design and specification, watering<br />

and curing for 7 days including cost,<br />

conveyance, royalty and taxes <strong>of</strong> all<br />

materials, labour, T&P etc. and as per<br />

direction <strong>of</strong> Engineer-in-charge, for the<br />

foundation and plinth. 5.76 Each cum 3340.60 19241.86<br />

78 Providing, lifting, hoisting and laying<br />

Reinforced cement concrete <strong>of</strong> M-200<br />

grade in Ro<strong>of</strong> Slab as per approved<br />

designs and drawings having a minimum<br />

compressive strength (in work test) 200<br />

Kg. / Square cm. in 15 cm. cubes at 28 days<br />

after mixing and test conducted in<br />

accordance with I.S. 516 using 12 mm. to<br />

20 mm. size black hard crushed broken<br />

granite stone chips and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and<br />

cleaned ( 20mm. size chips not to exceeds<br />

25 % ) to be mixed in concrete mixture<br />

with Portland slag cement (PSC) including<br />

hoisting, lowering, laying and compaction<br />

concrete by using vibrators, watering and<br />

curing for 28 days, centering and<br />

shuttering then after dismantling and<br />

removing debris from the work site and<br />

finishing the exposed surface smooth<br />

providing grooves or beads wherever<br />

necessary including cost, conveyance,<br />

loading, unloading, royalties and taxes <strong>of</strong> all<br />

materials and cost <strong>of</strong> all labours, sundries, 0.61 Each cum 7327.00 4469.47<br />

62<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


T & P required <strong>of</strong> the work etc. complete in<br />

all respect as directed by the Engineer-in-<br />

Charge. But excluding cost and conveyance<br />

<strong>of</strong> M.S. rods or Tor steel and binding wires<br />

and labour charges for straightening,<br />

cutting, bending etc. <strong>of</strong> M.S. rods or tor<br />

steel tying the grills and placing in proper<br />

position.<br />

79 Providing 12mm. thick cement plaster with<br />

cement mortar <strong>of</strong> mix (1:6) in all floors<br />

with Portland slag cement (PSC) with neat<br />

cement punning complete including<br />

watering and curing along with the cost,<br />

conveyance, loading and unloading, royalties<br />

and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />

labours, sundries, T&P and scaffolding<br />

required for the work etc. complete in all<br />

respect as directed by the Engineer–in-<br />

Charge. 16.17 Each Sqm 84.70 1369.60<br />

80 Providing 16mm thick cement plaster in all<br />

floors at all height with cement mortar <strong>of</strong><br />

mix (1:6) with Portland slag cement (PSC)<br />

and with screened and washed sharp sand<br />

for mortar and finished smooth to the<br />

rough surface <strong>of</strong> brick masonry walls after<br />

racking out joints including watering and<br />

curing rounding <strong>of</strong> corners etc. complete<br />

with cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, T&P, sundries and scaffolding<br />

required for the work etc. with providing<br />

grooves as directed by the Engineer-in-<br />

Charge 23.13 Each Sqm 115.90 2680.77<br />

81 Providing 50mm thick baffle wall in RCC<br />

M-20 as per design and drawing including<br />

required reinforcement and centering and<br />

shuttering complete including cost<br />

conveyance, taxes <strong>of</strong> all materials, labour,<br />

T & P, loading and unloading etc. complete<br />

as per specification and direction <strong>of</strong><br />

Engineer-in-charge 2.00 Each Sqm 210.00 420.00<br />

82 Providing 20mm OMS step iron as per<br />

design and drawing complete including cost<br />

conveyance, taxes <strong>of</strong> all materials, labour,<br />

T & P, loading and unloading etc. complete<br />

as per specification and direction <strong>of</strong> 5 Each No 91.00 455.00<br />

63<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Engineer-in-charge.<br />

83 Providing fitting and fixing 100mm (4") dia<br />

HCI vent pipe <strong>of</strong> 1.0mt length with cowl<br />

complete including cost conveyance, taxes<br />

<strong>of</strong> all materials, labour, T & P, loading and<br />

unloading etc. Complete as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

1 Each No 217.60 217.60<br />

84 Providing, fixing and placing <strong>of</strong> MS bars/<br />

Tor steel (HYSD) Fe-500 for RCC work in<br />

all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />

quality with straightening, Cutting,<br />

bending, binding welding or jointing if<br />

necessary, bending, binding, tying the grills<br />

as required for R.C.C. works, providing fan<br />

hooks where necessary and hoisting,<br />

lowering and placing in proper position<br />

according to approved designs and<br />

drawings including cost, conveyance,<br />

loading, unloading, taxes <strong>of</strong> M.S. rods or<br />

Tor steel and binding wires <strong>of</strong> 18 to 20<br />

gauge required for the work and cost <strong>of</strong> all<br />

labour, sundries, T & P and scaffolding<br />

complete in all respect as directed by the<br />

Engineer-in-Charge ( payment will be made<br />

according to the actual weight <strong>of</strong> M.S rod<br />

/Tor steel consumed in the work and no<br />

separate payment will be made towards<br />

weight <strong>of</strong> binding wires which is to be<br />

borne by the contractor at his own cost 0.49 Each qtl 6031.10 2955.24<br />

E.I WORKS<br />

85 Recessed wiring to light/Wall fan point /<br />

Exhaust fan point with 1.5 sq.mm FR PVC<br />

insulated single core multistrand copper<br />

conductor <strong>of</strong> ISI marked with 20 mm dia<br />

non-metallic PVC flexible conduit with S.P.<br />

5 / 6 amps, one way modular switch, ISI<br />

marked type switch, Modular base & cover<br />

for 1 module, Modular G.I. box for 2<br />

module 18 SWG ISI marked and ceiling<br />

rose ISI marked mounted on MS box<br />

having front Bakelite cover <strong>of</strong> suitable size<br />

, MS box with 1.5 sq.mm FR PVC insulated<br />

single core multistrand copper conductor<br />

as earth wire including all accessories and<br />

connection as per direction <strong>of</strong> Engineer in<br />

64<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Charge. ( Make <strong>of</strong> wire Finolex/ L&T /<br />

Anchor / Havels / V Guard )<br />

Group - A 20 Each No 497.56 9951.20<br />

Group - B 10 Each No 621.72 6217.20<br />

Group - C 10 Each No 802.70 8027.00<br />

86 Recessed wiring to ceiling fan point point<br />

with 1.5 sq.mm FR PVC insulated single core<br />

multistrand copper conductor <strong>of</strong> ISI<br />

marked with 20 mm dia non-metallic PVC<br />

flexible conduit with S.P. 5 / 6 amps, one<br />

way modular switch, ISI marked type<br />

switch, Modular base & cover for 1 module,<br />

Modular G.I. box for 2 module 18 SWG ISI<br />

marked and ceiling rose ISI marked<br />

mounted on MS box having front Bakelite<br />

cover <strong>of</strong> suitable size , MS box with 1.5<br />

sq.mm FR PVC insulated single core<br />

multistrand copper conductor as earth wire<br />

including all accessories and connection as<br />

per direction <strong>of</strong> Engineer in Charge. ( Make<br />

<strong>of</strong> wire Finolex/ L&T / Anchor / Havels / V<br />

Guard )<br />

Group - B 20 Each No 951.50 19030.00<br />

87 Point wiring for 5 / 6 amp modular socket<br />

outlet with 2 x 1.5 sq.mm FR PVC insulated<br />

single core multistrand copper conductor<br />

<strong>of</strong> ISI marked in recess 20 mm dia nonmetallic<br />

PVC flexible conduit with modular<br />

type switch ,phenolic laminated sheet<br />

suitable size ISI marked MS box and<br />

earthing point with 1 x 1.5 sq.mm FR PVC<br />

insulated single core multistrand copper<br />

conductor for loop earthing etc. as<br />

required. (Make <strong>of</strong> wire Finolex /L&T /<br />

Anchor / Havels / V Guard ) 10 Each No 689.70 6897.00<br />

88 Supplying and fixing <strong>of</strong> 5A plug in Madular<br />

type box ,cover, Switch & Socket etc as<br />

required. (Make Finolex /L&T / Anchor /<br />

Havels / V Guard ) 10 Each No 484.00 4840.00<br />

89 Supplying and fixing <strong>of</strong> metal box <strong>of</strong> power<br />

point on surface or in recess with suitable<br />

size <strong>of</strong> phenolic laminated sheet cover in<br />

front including providing and fixing 3pin 15<br />

/ 16 amps socket outlet and 15 / 16 amps<br />

modulr type switch, connection, painting<br />

etc as required. (Make Finolex /L&T / 6 Each No 653.00 3918.00<br />

65<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Anchor / Havels / V Guard )<br />

90 Supplying and fixing <strong>of</strong> 3 pin 15 / 16 amps<br />

modular socket on surface or in recess<br />

with 2 Madul Modular metal box with cover<br />

in front including providing and fixing ,<br />

connection etc as required (Make Finolex<br />

/L&T / Anchor / Havels / V Guard ) 10 Each No 435.40 4354.00<br />

91 Supplying and fixing <strong>of</strong> 32 A D.P modular<br />

switch on surface or in recess with 2<br />

Madul Madular metal box with cover in<br />

front including providing and fixing ,<br />

connection etc as required(Make Finolex<br />

/L&T / Anchor / Havels / V Guard ) 10 Each No 481.89 4818.90<br />

92 Supplying and fixing <strong>of</strong> Foot lamp with 4<br />

Madul Madular metal box with cover in<br />

front including providing and fixing ,<br />

connection etc as required(Make Finolex<br />

/L&T / Anchor / Havels / V Guard ) 4 Each No 647.30 2589.20<br />

93 Supplying and fixing <strong>of</strong> modular Buzzer<br />

switch on surface or in recess with 2<br />

Madul Modular metal box with cover in<br />

front including providing and fixing ,<br />

connection etc as required(Make Finolex<br />

/L&T / Anchor / Havels / V Guard ) 4 Each No 358.35 1433.40<br />

94 Supplying and fixing <strong>of</strong> Tv socket out let<br />

with 2 Madul Modular metal box with cover<br />

<strong>of</strong> including providing and fixing<br />

connection, etc as required. (Make Finolex<br />

/L&T / Anchor / Havels / V Guard ) 4 Each No 324.35 1297.40<br />

95 Supplying and fixing <strong>of</strong> Telephone socket<br />

out let with 2 Madul Madular metal box<br />

with cover <strong>of</strong> including providing and<br />

fixing connection, etc as required. (Make<br />

Finolex /L&T / Anchor / Havels / V Guard ) 4 Each No 324.35 1297.40<br />

96 Supplying and fixing <strong>of</strong> Return bell make<br />

Max with Indicating Lamp including<br />

providing and fixing connection, etc as<br />

required. (Make Finolex /L&T / Anchor /<br />

Havels / V Guard ) 10 Each No 260.00 2600.00<br />

97 Recessed wiring to call bell point with<br />

1.5 sq.mm FR PVC insulated single core<br />

multistrand copper conductor <strong>of</strong> ISI<br />

marked with 20 mm dia non-metallic PVC<br />

flexible conduit with S.P. 5 / 6 amps, one<br />

way modular switch, ISI marked type<br />

switch, Modular base & cover for 1 module, 6 Each No 652.00 3912.00<br />

66<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Modular G.I. box for 2 module 18 SWG ISI<br />

marked and ceiling rose ISI marked<br />

mounted on MS box having front<br />

bakelitecover <strong>of</strong> suitable size , MS box<br />

with 1.5 sq.mm FR PVC insulated single core<br />

multistrand copper conductor asearth wire<br />

including all accesories and connection as<br />

per direction <strong>of</strong> Engineer in Charge. ( Make<br />

<strong>of</strong> wire Finolex/ L&T / Anchor / Havels / V<br />

Guard )FOR-GROUP-B<br />

98 Recessed wiring to sub-main with 2 x 2.5 +1<br />

x 1 sq.mm FR PVC insulated single core<br />

multistrand copper conductor <strong>of</strong> ISI<br />

marked run inside 20 mm dia non-metallic<br />

PVC flexible conduit as required. ( Make <strong>of</strong><br />

wire Finolex/ L&T / Anchor / Havels / V<br />

Guard ) 280.00 Each Mtr 122.70 34356.00<br />

99 Recessed wiring to submain with 2 x 4 +1 x<br />

1.5 sq.mm FR PVC insulated single core<br />

multistrand copper conductor <strong>of</strong> ISI<br />

marked run inside 20 mm dia non-metalic<br />

PVC flexible conduit as required. ( Make <strong>of</strong><br />

wire Finolex/ L&T / Anchor / Havels / V<br />

Guard ) 250.00 Each Mtr 134.25 33562.50<br />

100 Recessed wiring to submain with 2 x 6 +1 x<br />

2.5 sq.mm FR PVC insulated single core<br />

multistrand copper conductor <strong>of</strong> ISI<br />

marked run inside 20 mm dia non-metalic<br />

PVC flexible conduit as required. ( Make <strong>of</strong><br />

wire Finolex/ L&T / Anchor / Havels / V<br />

Guard ) 120.00 Each Mtr 170.15 20418.00<br />

101 Recessed wiring to submain with 4 x 6<br />

+1x2.5 sq.mm FR PVC insulated single core<br />

multistrand copper conductor <strong>of</strong> ISI<br />

marked run inside 32 mm dia non-metalic<br />

PVC flexible conduit as required. ( Make <strong>of</strong><br />

wire Finolex/ L&T / Anchor / Havels / V<br />

Guard ) 80.00 Each Mtr 270.24 21619.20<br />

102 Supply, Installation, Testing, and<br />

Commissioning <strong>of</strong> 400 mm swing wall fan<br />

etc complete.(Havells Platina) 2 Each No 2520.00 5040.00<br />

103 Supply and installation <strong>of</strong> ceiling fan<br />

Fusion metallic 1200mm <strong>of</strong> Havells make<br />

including providing and fixing connection,<br />

etc as required. 15 Each No 2601.00 39015.00<br />

104 Supply and installation <strong>of</strong> plastic Body 6 Each No 1793.75 10762.50<br />

67<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


exhaust fan Ventil air - DX 250mm <strong>of</strong><br />

Havells make including providing and fixing<br />

connection, etc as required<br />

105 Supplying, fitting & fixing <strong>of</strong> 23 W. CFL<br />

including cost <strong>of</strong> all material, labour, T&P,<br />

etc complete. (Make : Phillips / equivalent) 20 Each No 264.00 5280.00<br />

106 Supplying, installation, testing &<br />

commissioning <strong>of</strong> Decorative Mirror light<br />

fixture including cost <strong>of</strong> all material,<br />

labour, T&P, etc complete.(Make : Phillips /<br />

equivalent). 20 Each No 744.54 14890.80<br />

107 Recessed Mounted vertical down-lighter<br />

retr<strong>of</strong>it suitable for 1x18W CFL (Havells)<br />

including providing and fixing connection,<br />

etc as required. 10 Each No 808.00 8080.00<br />

108 Supplying and fixing <strong>of</strong> Call Bell / Buzzer<br />

ISI marked suitable for DC /AC single<br />

phase 230 volts complete as required.<br />

including cost <strong>of</strong> all material, labour, T&P,<br />

etc complete (Make : Phillips / equivalent). 2 Each No 105.00 210.00<br />

109 Supply & Fixing <strong>of</strong> 1 x 28 watt T5 4' long<br />

fluorescent tube light fitting on wall<br />

surface complete with 1 no <strong>of</strong> 28 watt T5<br />

tube <strong>of</strong> approved make complete with all<br />

other necessary fixing materials including<br />

termination and labour (Make : Phillips /<br />

equivalent) 10 Each No 778.53 7785.30<br />

110 Supply and installation <strong>of</strong> TV cable RG-6<br />

grade, 0.7 mm solid copper conductor PE<br />

insulated shielded with fine tined copper<br />

braid and protected with FR PVC sheath<br />

run inside the existing conduits including<br />

cost, conveyance, loading, unloading, and<br />

taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour<br />

and T & P etc. required for the work etc.<br />

complete as per specification and direction<br />

<strong>of</strong>Engineering-in-charge/Consultant.<br />

(Make : Phillips / equivalent) 120.00 Each Mtr 21.55 2586.00<br />

111 Supplying and drawing 2 pair, 0.5 sq.mm FR<br />

PVC insulated copper conductor, unarmored<br />

telephone cable in existing surface /<br />

recessed steel / PVC conduit as required<br />

including cost, conveyance, loading,<br />

unloading, and taxes <strong>of</strong> all materials, cost<br />

<strong>of</strong> all labour and T & P etc. required for<br />

the work etc. complete as per specification 120.00 Each Mtr 20.28 2433.60<br />

68<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


and direction <strong>of</strong> Engineering-incharge/Consultant.(<br />

Make <strong>of</strong> wire Finolex/<br />

L&T / Anchor / Havels / V Guard .)<br />

112 Supplying and fixing <strong>of</strong> 20 mm dia flexible<br />

PVC conduit sizes <strong>of</strong> PVC conduit along with<br />

accessories in recessed wiring including<br />

cutting the wall and making good the same<br />

in case <strong>of</strong> recessed conduit as required<br />

including cost, conveyance, loading,<br />

unloading, and taxes <strong>of</strong> all materials, cost<br />

<strong>of</strong> all labour and T & P etc. required for<br />

the work etc. complete as per specification<br />

and direction <strong>of</strong> Engineering-incharge/Consultant<br />

( Make <strong>of</strong> wire Finolex/<br />

L&T / Anchor / Havels / V Guard ) 120.00 Each Mtr 40.00 4800.00<br />

113 Supply, delivery, installation, testing &<br />

commissioning <strong>of</strong> indoor wall mounted type<br />

telephone distribution box having following<br />

number <strong>of</strong> junctions made out <strong>of</strong> 1.6mm<br />

thick CR sheet steel duly primered &<br />

painted with enamel paint having hinged<br />

front door, testing facility having provision<br />

for cable / conduit entry complete as per<br />

direction <strong>of</strong> Engineer-in-charge.<br />

Junction box suitable for 20 pair<br />

telephone cable termination <strong>of</strong> approved<br />

quality. 1 Each No 354.00 354.00<br />

114 Supply, delivery, laying and testing <strong>of</strong><br />

following sizes <strong>of</strong> PVC insulated jelly filled<br />

armoured telephone cable <strong>of</strong> approved<br />

quality laid on surface <strong>of</strong> wall/ column/<br />

ro<strong>of</strong>/ partitions <strong>of</strong> the building or inside<br />

prelaid conduit/ hume pipes/ GI pipes, as<br />

the case may be, complete as required and<br />

as per direction <strong>of</strong> Engineer-in-charge.<br />

20/0.5 Pair 30.00 Each Rm 105.00 3150.00<br />

115 Supply and laying <strong>of</strong> following size rigid<br />

PVC conduit pipe (medium ) approved<br />

quality through floor / wall / partition with<br />

GI spacer clamps or as directed. Rate to<br />

include for accessories - bends, sockets<br />

Tee's etc.<br />

25 mm dia 80.00 Each Rm 42.00 3360.00<br />

116 Supply and fixing <strong>of</strong> 4way TPN double door<br />

Distribution box with 63A TPN MCB 1nos<br />

10/25/32 A SP MCB - 12 No etc complete 1 Each No . 5750.00 5750.00<br />

69<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Supply and fixing <strong>of</strong> 6 way TPN double<br />

door Distribution box with 100A TPN MCB<br />

1nos 10/25/32 A SP MCB - 15 No etc(all<br />

materials are to be used <strong>of</strong> approved<br />

quality) complete as directed by Engg-incharge.<br />

1 Each No . 8163.00 8163.00<br />

117 Providing and making earth pits including<br />

the cost <strong>of</strong> 2mm thick 2.5 mtr. long 50 mm<br />

dia pipe, CI funnel with wire mesh charcoal,<br />

salt, all earth work, masonry enclosure with<br />

CI frame & 300 mm x 300 mm cover plate<br />

having locking arrangement complete as per<br />

IS 3043:1987 for LT Panel. 2 Each No 3000.00 6000.00<br />

118 Supplying and laying <strong>of</strong> the following<br />

earthing clamped to wall with suitable<br />

clamps saddles and fixing bolts/ in ground<br />

including the cost <strong>of</strong> digging and back<br />

filling with sand and brick protection as<br />

required and complete as required to<br />

comply with IS 3043:1987<br />

19 mm x 3 mm GI strip 40.00 Each Mtr 79.50 3180.00<br />

119 Supply and laying <strong>of</strong> 3.5core 35 sqmm<br />

armoured aluminum cable <strong>of</strong> approved<br />

quality etc complete as directed by Enggin-<br />

charge. 60.00 Each Mtr 351.30 21078.00<br />

120 Supply and laying <strong>of</strong> 2core 10 sqmm<br />

armored alluminium cable etc complete as<br />

directed by Engg-in- charge. 60.00 Each Mtr 202.00 12120.00<br />

121 Supply , Installation, testing &<br />

commissioning <strong>of</strong> the following indoor wall<br />

mounted type L.T Distribution panel board<br />

<strong>of</strong> 415V , 50Hz. Power supply made out <strong>of</strong><br />

1.6mm thick CRCA steel duly de rusted &<br />

painted with two coats <strong>of</strong> light grey &<br />

enamel paint <strong>of</strong> approved shade over a coat<br />

<strong>of</strong> primer, dust, damp & vermin pro<strong>of</strong>,<br />

cubicle fixed on M.S angle channel base,<br />

having compartmental arrangement for<br />

each equipment and suitable size <strong>of</strong><br />

Aluminium bus bar having provision for<br />

cable entry at bottom, providing Earthing<br />

point to terminate 19mm x 3mm G.I flat,<br />

Nomenclature plate, Enameled danger<br />

board, earthing studs as per specification<br />

mentioned below duly factory wired<br />

confirming to the relevant ISS.<br />

70<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


One no <strong>of</strong> 125 Amp 25kA 4P MCCB.<br />

1 set <strong>of</strong> 3 ph. 25 x 6 mm size cu. Bus bar<br />

(200A)<br />

One no <strong>of</strong> 63Amp 4P Change over.<br />

1 set <strong>of</strong> 3 ph. 25 x 6 mm size cu. Bus bar<br />

(100A)<br />

3 nos. <strong>of</strong> 100 Amp TPN SDF.<br />

3 nos. <strong>of</strong> 40 Amp TPN SDF.<br />

4 nos. <strong>of</strong> 32 Amp DP MCB.<br />

The panel board should contain Toggle<br />

switch, 3 ph.(R,Y,B) Indicator, Voltmeter<br />

(0-500v), Ammeter (0-100A) with Selector<br />

Switch & 3 nos. <strong>of</strong> 100/5 A CT <strong>of</strong><br />

approved make should be fixed in wall at a<br />

suitable place along with other necessary<br />

materials and labour. 1 Each No 45000.00 45000.00<br />

PATH WAY<br />

122 Earthwork in excavation in Hard soil or<br />

Gravelly soil including dressing <strong>of</strong> sides and<br />

leveling the bed up to the required depth<br />

and depositing the excavated materials<br />

away from the work site with all leads and<br />

lifts, including shoring, shuttering and<br />

dewatering (if required) with cost <strong>of</strong><br />

labour, hire & running charges <strong>of</strong> water<br />

pumps sundries & T&P required for the<br />

work complete as directed by the<br />

Engineer-in-charge. 50.99 Each cum 87.60 4466.72<br />

123 Supplying and filling in foundation trenches<br />

and plinth, ditches with sand well watered<br />

and rammed in layers not exceeding 23 cm.<br />

In depth with all lead and lift including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

(Measurement will be taken on<br />

finished compacted section only). 25.11 Each cum 463.50 11638.49<br />

124 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:4:8) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 4 cm. Size black hard crusher broken<br />

granite stone metal and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and 21.50 Each cum 3250.20 69879.30<br />

71<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


cleaned including hoisting, lowering, laying<br />

concrete, ramming, watering and curing<br />

etc. complete to required levels laid in<br />

layers not exceeding 15 cm thick in each<br />

layer including cost, conveyance, loading,<br />

unloading, royalties and taxes all materials<br />

and cost all labours, sundries, T & P<br />

required for the work including shoring,<br />

shuttering and dewatering if required<br />

including hire & running charges <strong>of</strong> water<br />

pump complete as per specification and<br />

direction <strong>of</strong> Engineer-in-charge.<br />

125 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:2:4) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 12 mm Size black hard crusher broken<br />

granite stone chips and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and<br />

cleaned including hoisting, lowering, laying<br />

concrete, ramming, watering and curing<br />

etc. complete to required levels laid in<br />

layers not exceeding 15 cm thick in each<br />

layer including cost, conveyance, loading,<br />

unloading, royalties and taxes all materials<br />

and cost all labours, sundries, T & P<br />

required for the work including shoring,<br />

shuttering and dewatering if required<br />

including hire & running charges <strong>of</strong> water<br />

pump complete as per specification and<br />

direction <strong>of</strong> Engineer-in-charge. 7.45 Each cum 4854.20 36163.79<br />

126 Supplying ,fitting and fixing Ebro Floor tile<br />

<strong>of</strong> size 102mmx102mm in floor <strong>of</strong><br />

approved make confirming to IS:13755 laid<br />

on 20mm thick cement mortar (1:1) and<br />

filling joints with white cement <strong>of</strong><br />

approved quality including cost <strong>of</strong> all<br />

materials ,labour ,T & P etc required for<br />

the work all complete as per direction <strong>of</strong><br />

E-I-C. (MAKE: EUROCON<br />

TILES,Ebro_Colour code SGY/DGY) 201.72 Each Sqm 892.30 179994.76<br />

127 Supplying, fitting and fixing <strong>of</strong> monolithic<br />

stone benches made <strong>of</strong> up Khandolite<br />

Stone as per approved drawing & design<br />

which is fully furnished & shaped at all<br />

heights as per the design including cost, 8 Each No 65200.00 521600.00<br />

72<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


conveyance, loading and unloading, royalty<br />

and taxes <strong>of</strong> all materials, cost <strong>of</strong> all<br />

labour, sundries and T&P, etc. required for<br />

the work complete as per direction <strong>of</strong><br />

Engineer-in-charge.<br />

PARKING<br />

128 Earthwork in excavation in Hard soil<br />

Gravelly soil including dressing <strong>of</strong> sides and<br />

leveling the bed up to the required depth<br />

and depositing the excavated materials<br />

away from the work site with all leads and<br />

lifts, including shoring, shuttering and<br />

dewatering (if required) with cost <strong>of</strong><br />

labour, hire & running charges <strong>of</strong> water<br />

pumps sundries & T&P required for the<br />

work complete as directed by the<br />

Engineer-in-charge. 212.14 Each cum 87.60 18583.46<br />

129 Supplying and filling in foundation trenches<br />

and plinth, ditches with sand well watered<br />

and rammed in layers not exceeding 23 cm.<br />

In depth with all lead and lift including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

(Measurement will be taken on<br />

finished compacted section only). 93.60 Each cum 463.50 43383.60<br />

130 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:3:6) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 4 cm. Size black hard crusher broken<br />

granite stone metal and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and<br />

cleaned including hoisting, lowering, laying<br />

concrete, ramming, watering and curing<br />

etc. complete to required levels laid in<br />

layers not exceeding 15 cm thick in each<br />

layer including cost, conveyance, loading,<br />

unloading, royalties and taxes all materials<br />

and cost all labours, sundries, T & P<br />

required for the work including shoring,<br />

shuttering and dewatering if required<br />

including hire & running charges <strong>of</strong> water<br />

pump complete as per specification and 1.26 Each cum 3701.20 4663.51<br />

73<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


direction <strong>of</strong> Engineer-in-charge.<br />

131 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:2:4) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 12 mm. Size black hard crusher<br />

broken granite stone metal and screened<br />

and washed sharp sand for mortar <strong>of</strong><br />

approved quality from approved quarry,<br />

washed and cleaned including hoisting,<br />

lowering, laying concrete, ramming,<br />

watering and curing etc. complete to<br />

required levels laid in layers not exceeding<br />

15 cm thick in each layer including cost,<br />

conveyance, loading, unloading, royalties<br />

and taxes all materials and cost all labours,<br />

sundries, T & P required for the work<br />

including shoring, shuttering and<br />

dewatering if required including hire &<br />

running charges <strong>of</strong> water pump complete as<br />

per specification and direction <strong>of</strong><br />

Engineer-in-charge. 77.11 Each cum 4854.20 374307.36<br />

132 Construction <strong>of</strong> granular sub-base by<br />

providing Close graded Granular subbase<br />

Grading-III material as per table 400-1,<br />

spreading in uniform layers with motor<br />

grader on prepared surface, mixing by mix<br />

in place method with rotavator at OMC,<br />

and compacting with vibratory roller to<br />

achieve the desired density complete as<br />

per Clause 401 <strong>of</strong> MoSRT&H Specifications<br />

for Road & Bridge works (4th Revision) 111.03 Each cum 1005.20 111607.36<br />

133 Providing, conveying from stacks and<br />

spreading IRC Grade-II metal conforming<br />

to sieve analysis as per MORTH<br />

specification uniform for a compacted<br />

thickness <strong>of</strong> 0.075m and hand packing to<br />

proper camber and slope , filling the<br />

intersection properly with approved quality<br />

<strong>of</strong> quarry dust <strong>of</strong> approved P.I. value by<br />

spreading the same (to the specified<br />

quantity 25% over each layer) over the<br />

surface proper watering and consolidation<br />

with PRR including hire and running charges<br />

<strong>of</strong> PRR along with the cost and conveyance<br />

<strong>of</strong> required water including the cost<br />

conveyance, royalities and taxes <strong>of</strong> all 55.52 Each cum 1391.70 77267.18<br />

74<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


materials, cost <strong>of</strong> labour, sundries T & P<br />

etc. required for the work to complete in<br />

all respect as per specification and<br />

direction <strong>of</strong> the Engineer-in-charge.<br />

134 Providing, conveying from stacks and<br />

spreading IRC Grade-III metal<br />

conforming to sieve analysis as per MORTH<br />

specification uniform for a compacted<br />

thickness <strong>of</strong> 0.075m and hand packing to<br />

proper camber and slope , filling the<br />

intersection properly with approved quality<br />

<strong>of</strong> quarry dust <strong>of</strong> approved P.I. value by<br />

spreading the same (to the specified<br />

quantity 25% over each layer) over the<br />

surface proper watering and consolidation<br />

with PRR including hire and running charges<br />

<strong>of</strong> PRR along with the cost and conveyance<br />

<strong>of</strong> required water including the cost<br />

conveyance, royalities and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> labour, sundries T & P<br />

etc. required for the work to complete in<br />

all respect as per specification and<br />

direction <strong>of</strong> the Engineer-in-charge. 55.52 Each cum 1508.60 83757.47<br />

135 Providing floor tile <strong>of</strong> approved quality,<br />

colour and size on 25mm thick bed <strong>of</strong><br />

cement mortar <strong>of</strong> mix (1:1) laid in proper<br />

slope and gradient with screened and<br />

washed sharp sand for mortar and grouted<br />

with neat white cement slurry joining the<br />

tile with neat white cement slurry mixed<br />

with required quantities <strong>of</strong> pigments <strong>of</strong><br />

approved marks to match the shades <strong>of</strong><br />

the tile if required watering and curing<br />

for 21 days, including cost, conveyance,<br />

loading, unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, sundries, T&P<br />

required for the work and wax polishing<br />

etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge..<br />

(MAKE:<br />

EUROCON TILES,Salamanca_Colour code<br />

MGN/DGN) 752.37 Each Sqm 904.60 680593.90<br />

136 Providing 16mm thick cement plaster in all<br />

floors at all height with cement mortar <strong>of</strong><br />

mix (1:6) with Portland slag cement (PSC)<br />

and with screened and washed sharp sand 44.25 Each Sqm 115.90 5128.58<br />

75<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


for mortar and finished smooth to the<br />

rough surface <strong>of</strong> brick masonry walls after<br />

racking out joints including watering and<br />

curing rounding <strong>of</strong> corners etc. complete<br />

with cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, T&P, sundries and scaffolding<br />

required for the work etc. with providing<br />

grooves as directed by the Engineer-in-<br />

Charge<br />

137 Wall painting two coats with 100% Acrylic<br />

emulsion paint (1 st quality) exterior grade<br />

(weather coat) <strong>of</strong> approved make & shade<br />

manufactured by reputed manufacture like<br />

NEROLAC /ASIAN /BERGER /DULOX or<br />

equivalent to make an even finished<br />

surface over a coat <strong>of</strong> primer with water<br />

bond cement primer in all heights with all<br />

scaffolding and staging charges including<br />

cost, conveyance, taxes <strong>of</strong> all materials,<br />

cost <strong>of</strong> all labour, etc. complete as per<br />

specification and direction <strong>of</strong> Engineer-in-<br />

Charge. 44.25 Each Sqm 76.70 3393.98<br />

FOOT BRIDGE<br />

138 Earthwork in excavation in Hard soil<br />

/Gravelly soil including dressing <strong>of</strong> sides<br />

and leveling the bed up to the required<br />

depth and depositing the excavated<br />

materials away from the work site with all<br />

leads and lifts, including shoring,<br />

shuttering and dewatering (if required)<br />

with cost <strong>of</strong> labour, hire & running charges<br />

<strong>of</strong> water pumps sundries & T&P required<br />

for the work complete as directed by the<br />

Engineer-in-charge. 44.78 Each cum 87.60 3922.73<br />

139 Supplying and filling in foundation trenches<br />

and plinth, ditches with sand well watered<br />

and rammed in layers not exceeding 23 cm.<br />

In depth with all lead and lift including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

(Measurement will be taken on<br />

finished compacted section only). 7.45 Each cum 463.50 3453.08<br />

76<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Providing, lifting, hoisting and laying<br />

Reinforced cement concrete <strong>of</strong> M-20<br />

Grade in different works with 12mm to<br />

20mm size black hard crusher broken<br />

granite chips <strong>of</strong> approved quality from<br />

approved quarry including mixing and<br />

compacting to proper shape and size, level<br />

and plumbs and finishing the exposed<br />

surfaces smooth including cost <strong>of</strong><br />

scaffolding, watering and curing for the<br />

required period including cost <strong>of</strong> all<br />

materials with taxes, royalties<br />

transportation, loading and unloading, all<br />

labour, sundries, T&P including hire &<br />

running charges <strong>of</strong> concrete mixer and<br />

vibrator etc completed as per the<br />

direction <strong>of</strong> the Engineer-in-charge but<br />

excluding the cost <strong>of</strong> materials and labour<br />

for reinforcement bars & including the<br />

cost <strong>of</strong> centering and shuttering for the<br />

works. 12.20 Each cum 4577.10 55840.62<br />

140 Providing, fixing and placing <strong>of</strong> MS bars/<br />

Tor steel (HYSD) Fe-500 for RCC work in<br />

all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />

quality with straightening, Cutting,<br />

bending, binding welding or jointing if<br />

necessary, bending, binding, tying the grills<br />

as required for R.C.C. works, providing fan<br />

hooks where necessary and hoisting,<br />

lowering and placing in proper position<br />

according to approved designs and<br />

drawings including cost, conveyance,<br />

loading, unloading, taxes <strong>of</strong> M.S. rods or<br />

Tor steel and binding wires <strong>of</strong> 18 to 20<br />

gauge required for the work and cost <strong>of</strong> all<br />

labour, sundries, T & P and scaffolding<br />

complete in all respect as directed by the<br />

Engineer-in-Charge ( payment will be made<br />

according to the actual weight <strong>of</strong> M.S rod<br />

/Tor steel consumed in the work and no<br />

separate payment will be made towards<br />

weight <strong>of</strong> binding wires which is to be<br />

borne by the contractor at his own cost 19.43 Each qtl 6031.10 117184.27<br />

141 Providing 16mm thick cement plaster in all<br />

floors at all height with cement mortar <strong>of</strong><br />

mix (1:6) with Portland slag cement (PSC) 56.28 Each Sqm 115.90 6522.85<br />

77<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


and with screened and washed sharp sand<br />

for mortar and finished smooth to the<br />

rough surface <strong>of</strong> brick masonry walls after<br />

racking out joints including watering and<br />

curing rounding <strong>of</strong> corners etc. complete<br />

with cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, T&P, sundries and scaffolding<br />

required for the work etc. with providing<br />

grooves as directed by the Engineer-in-<br />

Charge<br />

142 Providing 25mm thick Eurocon make<br />

AVANTE floor tile on ro<strong>of</strong> terrace <strong>of</strong><br />

approved quality, colour and size in in all<br />

floors at all height on 25mm thick bed <strong>of</strong><br />

cement mortar <strong>of</strong> mix (1:1) laid in proper<br />

slope and gradient with screened and<br />

washed sharp sand for mortar and grouted<br />

with neat white cement slurry joining the<br />

tile with neat white cement slurry mixed<br />

with required quantities <strong>of</strong> pigments <strong>of</strong><br />

approved marks to match the shades <strong>of</strong><br />

the tile if required watering and curing<br />

for 21 days, including cost, conveyance,<br />

loading, unloading, royalties and taxes <strong>of</strong> all<br />

materials, cost <strong>of</strong> all labour, sundries, T&P<br />

required for the work including rubbing<br />

mechanically and wax polishing etc.<br />

complete in all respect as per specification<br />

and direction <strong>of</strong> Engineer-in-charge. 22.30 Each Sqm 892.30 19898.29<br />

143 Supplying, fitting and fixing <strong>of</strong> Stainless<br />

steel <strong>of</strong> 304 grade in hand railing using<br />

50mm dia <strong>of</strong> 2mm thick circular pipe with<br />

balustrade <strong>of</strong> size 32mm x 32mm x 2mm @<br />

0.90mtr. C/C and stainless square pipe<br />

bracing <strong>of</strong> size 32mm x 32mm x 2mm in 3<br />

rows in stair case as per approved design<br />

and specification, buffing, polishing etc.<br />

with cost, conveyance, taxes <strong>of</strong> all<br />

materials, T & P etc. required for the<br />

complete in all respect as directed by the<br />

Engineer-in-charge. 253.26 One Kg 306.60 77649.52<br />

144 Supplying, laying and fixing <strong>of</strong> Pebble<br />

stones with mixed cement slurry to give a<br />

decorative touch to the cement surface<br />

including cost, conveyance, loading, 10.82 Each Sqm 684.40 7405.21<br />

78<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


unloading, stacking,royalties and taxes <strong>of</strong><br />

all Materials, cost <strong>of</strong> all Labour, T & P,<br />

Sundries required for the work complete in<br />

all respect as directed by the Engineer-in-<br />

Charge.<br />

RETAINING WALL<br />

145 Earthwork in excavation in Hard soil<br />

Gravelly soil including dressing <strong>of</strong> sides and<br />

leveling the bed up to the required depth<br />

and depositing the excavated materials<br />

away from the work site with all leads and<br />

lifts, including shoring, shuttering and<br />

dewatering (if required) with cost <strong>of</strong><br />

labour, hire & running charges <strong>of</strong> water<br />

pumps sundries & T&P required for the<br />

work complete as directed by the<br />

Engineer-in-charge. 90.54 Each cum 87.60 7931.30<br />

146 Supplying and filling in foundation trenches<br />

and plinth, ditches with sand well watered<br />

and rammed in layers not exceeding 23 cm.<br />

In depth with all lead and lift including<br />

cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, sundries, T&P required for the<br />

work etc. complete in all respect as per<br />

specification and direction <strong>of</strong> Engineer-incharge.<br />

(Measurement will be taken on<br />

finished compacted section only). 9.05 Each cum 463.50 4194.68<br />

147 Providing and lying plain cement concrete<br />

<strong>of</strong> proportion (1:4:8) in foundation and<br />

floors using Portland Slag Cement(PSC)<br />

with 4 cm. Size black hard crusher broken<br />

granite stone metal and screened and<br />

washed sharp sand for mortar <strong>of</strong> approved<br />

quality from approved quarry, washed and<br />

cleaned including hoisting, lowering, laying<br />

concrete, ramming, watering and curing<br />

etc. complete to required levels laid in<br />

layers not exceeding 15 cm thick in each<br />

layer including cost, conveyance, loading,<br />

unloading, royalties and taxes all materials<br />

and cost all labours, sundries, T & P<br />

required for the work including shoring,<br />

shuttering and dewatering if required<br />

including hire & running charges <strong>of</strong> water<br />

pump complete as per specification and 9.05 Each cum 3250.20 29414.31<br />

79<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


direction <strong>of</strong> Engineer-in-charge.<br />

148 Providing, lifting, hoisting and laying<br />

Reinforced cement concrete <strong>of</strong> M-200<br />

grade as per approved designs and<br />

drawings having a minimum compressive<br />

strength (in work test) 200 Kg. / Square<br />

cm. in 15 cm. cubes at 28 days after mixing<br />

and test conducted in accordance with I.S.<br />

516 using 12 mm. to 20 mm. size black hard<br />

crushed broken granite stone chips and<br />

screened and washed sharp sand for<br />

mortar <strong>of</strong> approved quality from approved<br />

quarry, washed and cleaned ( 20mm. size<br />

chips not to exceeds 25 % ) to be mixed in<br />

concrete mixture with Portland slag<br />

cement (PSC) including hoisting, lowering,<br />

laying and compaction concrete by using<br />

vibrators, watering and curing for 28 days,<br />

centering and shuttering then after<br />

dismantling and removing debris from the<br />

work site and finishing the exposed<br />

surface smooth providing grooves or beads<br />

wherever necessary including cost,<br />

conveyance, loading, unloading, royalties<br />

and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />

labours, sundries, T & P required <strong>of</strong> the<br />

work etc. complete in all respect as<br />

directed by the Engineer-in-Charge. But<br />

excluding cost and conveyance <strong>of</strong> M.S. rods<br />

or Tor steel and binding wires and labour<br />

charges for straightening, cutting, bending<br />

etc. <strong>of</strong> M.S. rods or tor steel tying the<br />

grills and placing in proper position.<br />

a)Wall 23.82 Each cum 7040.20 167697.56<br />

b)Slab 21.51 Each cum 4690.90 100901.26<br />

149 Providing, fixing and placing <strong>of</strong> MS bars/<br />

Tor steel (HYSD) Fe-500 for RCC work in<br />

all floors <strong>of</strong> required diameter <strong>of</strong> approved<br />

quality with straightening, Cutting,<br />

bending, binding welding or jointing if<br />

necessary, bending, binding, tying the grills<br />

as required for R.C.C. works, providing fan<br />

hooks where necessary and hoisting,<br />

lowering and placing in proper position<br />

according to approved designs and<br />

drawings including cost, conveyance, 38.00 Each qntl 6031.10 229181.80<br />

80<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


loading, unloading, taxes <strong>of</strong> M.S. rods or<br />

Tor steel and binding wires <strong>of</strong> 18 to 20<br />

gauge required for the work and cost <strong>of</strong> all<br />

labour, sundries, T & P and scaffolding<br />

complete in all respect as directed by the<br />

Engineer-in-Charge ( payment will be made<br />

according to the actual weight <strong>of</strong> M.S rod<br />

/Tor steel consumed in the work and no<br />

separate payment will be made towards<br />

weight <strong>of</strong> binding wires which is to be<br />

borne by the contractor at his own cost<br />

150 Providing 16mm thick cement plaster in all<br />

floors at all height with cement mortar <strong>of</strong><br />

mix (1:6) with Portland slag cement (PSC)<br />

and with screened and washed sharp sand<br />

for mortar and finished smooth to the<br />

rough surface <strong>of</strong> brick masonry walls after<br />

racking out joints including watering and<br />

curing rounding <strong>of</strong> corners etc. complete<br />

with cost, conveyance, loading, unloading,<br />

royalties and taxes <strong>of</strong> all materials, cost <strong>of</strong><br />

all labour, T&P, sundries and scaffolding<br />

required for the work etc. with providing<br />

grooves as directed by the Engineer-in-<br />

Charge 94.39 Each Sqm 115.90 10939.80<br />

151 Wall painting two coats with 100% Acrylic<br />

emulsion paint (1 st quality) exterior grade<br />

(weather coat) <strong>of</strong> approved make & shade<br />

manufactured by reputed manufacture like<br />

NEROLAC /ASIAN /BERGER /DULOX or<br />

equivalent to make an even finished<br />

surface over a coat <strong>of</strong> primer with water<br />

bond cement primer in all heights with all<br />

scaffolding and staging charges including<br />

cost, conveyance, taxes <strong>of</strong> all materials,<br />

cost <strong>of</strong> all labour, etc. complete as per<br />

specification and direction <strong>of</strong> Engineer-in-<br />

Charge. 94.39 EachSqm 76.70 7239.71<br />

LANDSCAPPING<br />

Planting and Maintaince for 3 years<br />

152 Planting.<br />

a)Clearing jungle growth including uprooting<br />

<strong>of</strong> rank vegetation, grass, brush wood, after<br />

marking the site with stakes, at required<br />

spacing.(Hill slopes) 820 Each No 3.00 2460.00<br />

b)Digging <strong>of</strong> pits <strong>of</strong> size 600 cm x 600 cm x 820 Each No 17.69 14505.80<br />

81<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


600cm in Hard Stony soil. 0.60 x 0.60 x<br />

0.60 = 0.216 Cum<br />

c)Filling up pits with fertile garden soil/silt<br />

including carriage (Pit size 600 cm x 600 cm<br />

x 600cm) 820 Each No 42.00 34440.00<br />

d)Application <strong>of</strong> organic manure (600 cm x<br />

600 cm x 600cm) per pit including cost,<br />

carriage and mixing with soil. 820 Each No 35.00 28700.00<br />

e)Application <strong>of</strong> basal doze <strong>of</strong> chemical<br />

fertilizer @ 100gm <strong>of</strong> NPK and insecticide<br />

@ 10gm per pit including cost and<br />

carriage.(600 cm x 600 cm x 600cm) 820 Each No 6.00 4920.00<br />

f)Cost <strong>of</strong> planting including staking with<br />

stakes in July/Aug.(a)Upto 2.0mt height 820 Each No 4.50 3690.00<br />

g)Contingent expenditure including, ropes,<br />

stakes implements etc. 820 Each No 2.00 1640.00<br />

153 Tending<br />

a)First weeding and soil working up to a<br />

diameter <strong>of</strong> 1.0mt. Around the plant and<br />

application <strong>of</strong> chemical fertilizers during<br />

Aug. & Sep. 820 Each No 6.00 4920.00<br />

b)Second soil working, weeding and mulching<br />

during Oct. & Nov. 820 Each No 6.00 4920.00<br />

154 Watering<br />

a)Watering once a week with about 20 litres<br />

<strong>of</strong> water from 1st November till 31st March<br />

(22 times) 820 Each No 73.00 59860.00<br />

b)Watering once in 3 days from 1st April till<br />

15 June (26 times) 820 Each No 87.00 71340.00<br />

155 2nd Year Maintaince<br />

a)Soil working and weeding upto 0.50 mt<br />

radius around the plant in July-Aug 820 Each No 5.00 4100.00<br />

b)Application <strong>of</strong> chemical fertilizer NPK<br />

@100gm per plant including cost 820 Each No 3.00 2460.00<br />

c)Soil working and mulching during Oct-Nov. 820 Each No 5.00 4100.00<br />

d)Watering from 1st Feb till 15 June once a<br />

week with about 20litres <strong>of</strong> water 20 times 820 Each No 67.00 54940.00<br />

Contingent, expenditure including baskets,<br />

drums, implements 820 Each No 2.00 1640.00<br />

156 3rd Year Maintaince<br />

a)Tree doctoring to give a aesthetic shape<br />

by pruning un wieldy branches 820 Each No 3.00 2460.00<br />

b)Weeding and mounding 820 Each No 5.00 4100.00<br />

157 Carriage <strong>of</strong> saplings 2.00m ht. within 50K.M<br />

lead 820 Each No 10.00 8200.00<br />

82<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


158 a)FOREST SPECIES ( Av. Height 2.0 Mtr<br />

)<br />

Casuarina (casuarina equisetifolia),<br />

Eucalyptus (Eucalyptushybrid), Teak<br />

(Tectona grandis) Sissoo<br />

(Dalbergia<br />

sissoo),<br />

Cassia (Cassia seamea), Chakunda (Samania<br />

saman),<br />

Gambhar (Gmelina arborea) 50 Each No 15.00 750.00<br />

b)FAST GROWING ORNAMENTAL<br />

SPECIES ( Av. Height 2.0 Mtr )<br />

Kadamba (anthocephalus cadamba), krushna<br />

chuda (Delonix regia) Radhachuda<br />

(pelt<strong>of</strong>errum ferrugenum), Chhatian<br />

(Alstonea Scholaris) Akash Malli (Melligtonia<br />

hortensis) 50 Each No 30.00 1500.00<br />

c)SLOW GROWING ORNAMENTAL ( Av.<br />

Height 2.0 Mtr )<br />

Ashok (Saraca ashoka) Nageswar ( Messua<br />

ferea), Patali (lagestromes floss reginae),<br />

Spathodea (Spathodea companulata),<br />

Putranjva rox burgii), Baula (Mimussops<br />

elengii), Bottle brush (Callistemin<br />

lanceolatum), Neem (Azadirchta indica),<br />

Karanj (plumerea alba/ rubra), Vishnuchnde<br />

(Jacaranda mimisfolia), Muchakunda<br />

(sterospermum acerifolium),Dolichandran<br />

(Dolichandran atrovirens),Tabebuea<br />

(Tabebuea wendlanda/ rasea), Ganga seuli (<br />

Nyctarethes arborstris) jamun (Syzygium<br />

cumuni) Cassia ( Cassia noduse) Siris (<br />

Albizzia lebbeck), Polash (Beaute<br />

monosperma), Debadaru (Polyathia<br />

longifolia), Aonla ( Embelica <strong>of</strong>ficinalis),<br />

Sunari (Cassia fistula), Kanchan (Bauhinia<br />

variegate), Bhendi (Thespesia populnea) etc. 100 Each No 45.00 4500.00<br />

d)UNCOMMON SPECIES(Av. Height 2.0<br />

Mtr )<br />

Kochila (Strychnos noxvomica), Sami (Acacia<br />

fernesiana), Sal (Shorea robusta), Mitukinia<br />

(Mitragyna parviflora), Chandan (Santalum<br />

album), akta chandan Pterocarpu santalinus)<br />

Bela (Aegla marmelos), Ritha (Sapindus<br />

imarginatus), Arjun (Terminalia arjuna),<br />

Harida (Tereminalia chebula), ara (ficus<br />

bengalengis), Aswastha (Ficusreligiosa), 100 Each No 60.00 6000.00<br />

83<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


Baruna (Cratava religiosa), Piasal<br />

(Pterocarpus marsupium), Mehegani<br />

(Swetenia mehogani), an (terminalia<br />

tomentosa), Phanphana (Oroxylum indicum),<br />

Beta (calamusrotang), Pine (Callistris<br />

intratropica), Ornamental Bamboes Patali<br />

(Sterospermum suaveolense), Ficus elastic,<br />

Ficusbenjamina, Ficus infectoria etc.<br />

e)SHRUB SPECIES ( 2 Years Old )<br />

Mandar (Hibiscus rosasinensis), Tagar<br />

(Tabarnae montana coronaria), Kaniar (<br />

Thevetia spp), karabira (Nerium oleander),<br />

kamini (Murray exotica) Godibana ( Caesal<br />

pinnea pulcherima), lxora (lxora coccinea) 100 Each No 40.00 4000.00<br />

f)Slow growing shrubs; Species grown<br />

from gooties/budding/ cutting etc.( 2<br />

Years Old )<br />

Sugandha raj (gardenia grandiflora), Tecoma<br />

stans), Almond (Almonda cathertica),<br />

Kagajphula (Bougain villea), Mandar hybris (<br />

Hibiscus rosasinensis, lxora (lxora<br />

singaporeansis), Broonfeltia spp.), Kunda<br />

(jasminum spp.), Thuja spp. Crotons, Sthala<br />

padma (Hibiscus spp.) TMC-Tagar, Malli (<br />

jasminum sambac), Calliandra ( calliandea<br />

hemata cephala), Malfiga ( Malifigea<br />

glabra), calliandra hostuni,calliandra<br />

brevipes,calliandra inoquilatera,calliandra<br />

alba, Brya ebenus, etc.<br />

100 Each No 60.00 6000.00<br />

g)UNCOMMON SPECIES(2 Years Old )<br />

i)Azalea, Chamelea, Anthurium, Hydrangea,<br />

Poinsettea hybrid, gloxinia, Adenum,<br />

Mussanda, Orchids, Ground orchid 120 Each No 150.00 18000.00<br />

ii)Silver OAK, washingtonia Robusta, Phoenix<br />

dactilifera, washingtonic Filifera 200 Each No 500.00 100000.00<br />

<strong>Development</strong> <strong>of</strong> Lawns<br />

159 Land Preparation<br />

a)Clearance <strong>of</strong> site, excavation <strong>of</strong> ground<br />

upto a depth <strong>of</strong> 30cm, removal <strong>of</strong> excavated<br />

materials to out side for dumping at suitable<br />

places. 1500.00 Each Sqm 30.00 45000.00<br />

b)Filling the site with good garden soil/ silt<br />

to a depth <strong>of</strong> 30cm including carriage and<br />

leveling the area. 1500.00 Each Sqm 45.00 67500.00<br />

c)Spreading <strong>of</strong> FYM @ 0.08m3, chemical 1500.00 Each Sqm 20.00 30000.00<br />

84<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


fertilizer NPK @ 250gms, termicide 50gms<br />

including cost <strong>of</strong> materials <strong>of</strong> carriage<br />

d) Final leveling after thorough mixing <strong>of</strong> all<br />

materials and compacting by hand roller. 1500.00 Each Sqm 1.00 1500.00<br />

e) Planting with grass <strong>of</strong> required species<br />

depending on site 1500.00 Each Sqm 15.00 22500.00<br />

f) Rolling and watering 1500.00 Each Sqm 1.00 1500.00<br />

160 Maintenance during planting year<br />

a)Watering for about 8 months leaving rainy<br />

days 1500.00 Each Sqm 10.00 15000.00<br />

b)First mowing after three months and<br />

there after every two<br />

months 1500.00 Each Sqm 10.00 15000.00<br />

c)Weeding through out the year 1500.00 Each Sqm 10.00 15000.00<br />

d)Top dressing with soil, FYM, chemical<br />

fertilizer twice a year<br />

after mowing, in June and November<br />

including<br />

antifungal<br />

treatment. 1500.00 Each Sqm 20.00 30000.00<br />

e)Contingent expenditure 1500.00 Each Sqm 3.00 4500.00<br />

161 LAWN MAINTENANCE DURING SECOND<br />

YEAR<br />

a)Watering for about 8 months leaving rainy<br />

days 1500.00 Each Sqm 10.00 15000.00<br />

b)Weeding through out the year 1500.00 Each Sqm 5.00 7500.00<br />

c)Mowing once in two months 1500.00 Each Sqm 15.00 22500.00<br />

d)Top dressing with soil, FYM, chemical<br />

fertilizer,<br />

germicide/<br />

fungicide twice a year after mowing in June<br />

and Nov. 1500.00 Each Sqm 25.00 37500.00<br />

162 Contingent expenditure 1500.00 Each Sqm 5.00 7500.00<br />

163 LAWN MAINTENANCE DURING THIRD<br />

YEAR<br />

b)Particulars for second year and also for<br />

subsequent years per annum. 1500.00 Each Sqm 60.00 90000.00<br />

164 Trenching in ordinary soil upto a depth <strong>of</strong> 60<br />

cm including removal and stacking <strong>of</strong><br />

serviceable materials and then disposing <strong>of</strong><br />

by spreading and neatly levelling within a<br />

lead <strong>of</strong> 50 m and making up the trenched<br />

area to proper levels by filling with earth or<br />

earth mixed with sludge <strong>of</strong> land manure<br />

before and after flooding trench with water<br />

(excluding the cost <strong>of</strong> imported earth,<br />

sludge or manure). 700.00 Each cum 12.80 8960.00<br />

165 Supplying, stacking & spreading <strong>of</strong> good 400.00 Each cum 209.30 83720.00<br />

85<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


earth at site (Earth measured in stacks will<br />

be reduced by 20% for payment) with all<br />

lead and lift as required for the work<br />

complete as directed by the Engineer-incharge.<br />

166 Supplying, stacking & spreading cow dung<br />

manure at site (cow dung manure measured<br />

in stacks will be reduced by 8% for<br />

payment) with all lead and lift as required<br />

for the work complete as directed by the<br />

Engineer-in-charge. 50.00 Each cum 700.00 35000.00<br />

167 Providing and fixing overhead type sprinkler<br />

system with self closing valve type 25mm X<br />

20mm with self closing spring made up <strong>of</strong><br />

aluminum alloy and brass fittings including<br />

cost <strong>of</strong> all materials, labour, T & P etc<br />

complete as per direction <strong>of</strong> Engineer-incharge.<br />

14 Each No 1000.00 14000.00<br />

168 Supplying all materials , labours , taxes and<br />

tools and plants for fitting and fixing <strong>of</strong><br />

20mm dia CPVC pipes <strong>of</strong> 100% lead free and<br />

conforming to ASTM F442 S pecific-2<br />

CPVC (Make -ASTRAL/ASHIRBAD<br />

/Equivalent) with good quality including<br />

fittings and laying as per the site<br />

requirement etc., all complete including<br />

testing as per the direction and<br />

specification <strong>of</strong> Engineer-in-charge. 250.00 Each Rm 104.90 26225.00<br />

Total 9543143.5<br />

Say 9543000.00<br />

168(One hundred sixty eight items only)<br />

(Rupees Ninety five lakh forty three thousand only)<br />

The tenderer is required to quote only the percentage excess or less over the estimated<br />

cost here-below both in words and figures :<br />

86<br />

___________________ ( _______________________________________ )<br />

(in figures)<br />

(in words)<br />

No. <strong>of</strong> Correction …………<br />

No. <strong>of</strong> Overwriting………..<br />

No. <strong>of</strong> Interpolation………<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I


87<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-I