ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED<br />
(A <strong>Govt</strong>. <strong>of</strong> <strong>Orissa</strong> Undertaking)<br />
Panthanivas (Old Block): Lewis Road: Bhubaneswar-14<br />
(BUILDING PROJECT DIVISION)-II<br />
DETAILED TENDER CALL NOTICE<br />
Name <strong>of</strong> Work:<strong>Development</strong> <strong>of</strong> Brahmapura under Bramhapura-Nuagarh-<br />
Kuadoli-Nandinia-Jhanjibandha as a Tourist Destination In<br />
<strong>Orissa</strong>.<br />
This will be a percentage rate tender (Clause-6)<br />
“Quality is never an accident, it is always the result <strong>of</strong> high<br />
intention, sincere effort, intelligent direction and skillful execution“.<br />
Let us achieve it……….<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
2<br />
ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED<br />
(A <strong>Govt</strong>. <strong>of</strong> <strong>Orissa</strong> Undertaking)<br />
Panthanivas, (Old Block), Lewis Road, Bhubaneswar-14<br />
No. BP- 12/11 Date: 15.01.2010<br />
DETAILED TENDER CALL NOTICE<br />
Sealed tenders in conformity with DTCN eventually to be drawn in P. W.D.<br />
F-2 form are invited from the registered contractors <strong>of</strong> state PWD/<br />
Irrigation/ CPWD/MES/Railway and other Government organization for the<br />
following works.<br />
Name <strong>of</strong> the work<br />
<strong>Development</strong> <strong>of</strong><br />
Bramhapura under<br />
Brahamapura-<br />
Nuagarh-Kuadoli-<br />
Nandinia-<br />
Jhanjibandha as a<br />
Tourist Destination<br />
In <strong>Orissa</strong>.<br />
Value <strong>of</strong> work<br />
46,72,500.00<br />
Cost <strong>of</strong> tender<br />
documents<br />
(Non<br />
refundable)<br />
Rs.6,000.00<br />
+ VAT 4%<br />
E.M.D1%<br />
Rs.47,000/-<br />
Class <strong>of</strong><br />
Contractor<br />
‘B” & “A”<br />
Period <strong>of</strong><br />
completion<br />
9 (Nine)<br />
calendar<br />
months<br />
The details <strong>of</strong> tender documents can be had from our Web site:<br />
www.panthanivas.com / www.otdc.in . The Tender paper will be received up to 3<br />
P.M <strong>of</strong> 2.02.2011 at O.T.D.C. Head <strong>of</strong>fice by speed post/registered post and will<br />
be opened on the same day at 4.00 P. M. O.T.D.C. <strong>Ltd</strong>. will not be held<br />
responsible for postal delay.<br />
The Authority reserves the right to reject any or all the tenders without<br />
assigning any reason there <strong>of</strong>.<br />
The sealed covers should be superscribed “Tender for……………………………”.<br />
The Tenders shall be addressed to the Sr. Divisional Manager (Building Project)-II,<br />
<strong>Orissa</strong> <strong>Tourism</strong> <strong>Development</strong> <strong>Corporation</strong> <strong>Ltd</strong>., Panthanivas (Old Block), Lewis Road,<br />
Bhubaneswar – 751 014. Tenders will be received through Speed Post / Regd. Post<br />
only. OTDC will not be responsible for any postal delay. Hand delivery will not be<br />
accepted.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
3<br />
TERMS & CONDITIONS<br />
1. The following requirements must be met with along with the tender document failing<br />
which tender shall be liable for rejection.<br />
a) Cost <strong>of</strong> tender paper + 4% VAT in shape <strong>of</strong> Bank Draft in favour <strong>of</strong> Managing<br />
Director, OTDC <strong>Ltd</strong> .<br />
b) 1% EMD in shape <strong>of</strong> Bank Draft in favour <strong>of</strong> the Managing Director, O.T.D.C.<br />
<strong>Ltd</strong>. payable at any Nationalized bank, Bhubaneswar.<br />
c) VAT Clearance Certficate / TIN No.<br />
d) Upto date PAN CARD<br />
e) Valid E.P.F. Registration<br />
f) Valid contractor’s registration<br />
2. QUALITY CONTROL REQUIREMENTS:<br />
a) All bills should be supported with photographs <strong>of</strong> progress made.<br />
The normal period <strong>of</strong> rectification beyond the completion period<br />
shall be 2 years from the date <strong>of</strong> completion <strong>of</strong> the project. 5%<br />
security will be kept with-held in shape <strong>of</strong> bank guarantee or NSC<br />
after the normal expiry period <strong>of</strong> 6months till 2years from the date <strong>of</strong><br />
completion ; during this period the contractor is supposed to rectify<br />
all the defects noticed , failing which the same shall be taken up by<br />
the department and will be recovered from the security so withheld.<br />
3. (a) The Plan and Specification for the work can be seen at the Office <strong>of</strong><br />
the Sr. Divisional Manager (BP)-II, O.T.D.C.<strong>Ltd</strong>, during working hours and<br />
days. Complaints at a future date that the plan and specification have<br />
not been seen will not be entertained.<br />
(b) All other information can be had from <strong>of</strong>fice <strong>of</strong> the Sr. Divisional<br />
Manager, (BP)-II, O.T.D.C. LTD. Contact Person: Sri S Mahala, A.E , Mob:<br />
9437306326<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
4<br />
4. EARNEST MONEY DEPOSIT AND INITIAL SECURITY DEPOSIT<br />
The tenderers whose tender is selected for acceptance shall within a<br />
period <strong>of</strong> seven days upon written intimation being given to him <strong>of</strong><br />
acceptance <strong>of</strong> his tender make an initial security deposit <strong>of</strong> 1% (one percent)<br />
<strong>of</strong> the tendered amount so that the earnest money and initial security<br />
deposit will be 2% <strong>of</strong> the tendered amount and sign the agreement in the<br />
Office <strong>of</strong> O.T.D.C. <strong>Ltd</strong>, failing which, the tender will be rejected with<br />
forfeiture <strong>of</strong> E.M.D.<br />
This security deposit, together with the earnest money and the<br />
amount withheld if any shall be retained as security deposit for the due<br />
fulfillment <strong>of</strong> this contract. Failure to enter into the required agreement<br />
and to make the security deposit, as above shall entail forfeiture <strong>of</strong> the<br />
Earnest Money. No tender shall be finally accepted until the required<br />
amount <strong>of</strong> security deposit (money) is deposited. The written agreement to<br />
be entered into between the contractor and the <strong>Corporation</strong> shall be the<br />
foundation <strong>of</strong> the right <strong>of</strong> both the parties and the contract shall deem to<br />
be incomplete until the agreement has first been signed by the contractor<br />
and then by the Sr. Divisional Manager (BP)-II, O.T.D.C. <strong>Ltd</strong>.<br />
5. Additional performance security shall be deposited by the bidders when the<br />
bid amount is seriously unbalanced i.e less than the estimated cost by more<br />
than 10%. In such an event the bidder will deposit the additional<br />
performance security to the extent <strong>of</strong> the differential cost <strong>of</strong> the bid<br />
amount and 90% <strong>of</strong> the estimated cost in shape <strong>of</strong> Post Office Savings Bank<br />
Account/National Savings Certificate/Post Office Time Deposit<br />
account/Kissan Vikash Patra/Deposit receipt <strong>of</strong> schedule Bank at the time <strong>of</strong><br />
sanction <strong>of</strong> tender without which the tender will be liable for rejection.<br />
6. PERCENTAGE RATE TENDER :<br />
The tender will be on percentage rate over the estimated cost and not on<br />
item rate basis as per Works Department letter no Codes-5/07-17190 dt.<br />
9.10.07. The percentage rate over the estimated cost should be quoted both<br />
in words and figures. In case <strong>of</strong> discrepancy between words and figures,<br />
the words shall prevail.<br />
7. The contractors will be responsible for payment <strong>of</strong> all royalties or other<br />
charges for quarrying materials. All local taxes inclusive <strong>of</strong> State Sales Tax<br />
and Income Tax, Octroi charges, Ferry and Tollage charges are to be paid by<br />
the Contractor.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
5<br />
8. I.T.C.C/PAN and S.T.C.C./VAT C.C :<br />
The tender may not, at the discretion <strong>of</strong> the competent authority, be<br />
considered unless accompanied with attested true copy <strong>of</strong> the PAN card and<br />
VAT clearance certificate as the case may be and the original certificate to<br />
be produced at the time <strong>of</strong> opening <strong>of</strong> tenders.<br />
9. If the contractor removes any materials or stock so supplied to him from<br />
the site <strong>of</strong> work with a view to disposing <strong>of</strong>f the same dishonestly, he should<br />
in addition to any other liabilities Civil or Criminal arising out <strong>of</strong> the contract<br />
be liable to pay a penalty equivalent to five times the price <strong>of</strong> the materials<br />
on stock according to the stipulated rates and the penalty so imposed shall<br />
be recovered from any sum that may then or at any time thereafter become<br />
due to the contractor or from his security.<br />
10. The contractor should be fully liable to indemnify the <strong>Corporation</strong> for<br />
payment <strong>of</strong> any compensation under Workmen's Compensation Act-V-III <strong>of</strong><br />
1923 on account <strong>of</strong> the workmen being employed by him and the full amount<br />
<strong>of</strong> compensation paid will be recovered from the contractor.<br />
11. Every tenderer must examine the detailed specification <strong>of</strong> <strong>Orissa</strong> before<br />
submitting his tender. The right is reserved without impairing the contract<br />
to make such increase or decrease in the quantities or items <strong>of</strong> work<br />
mentioned in the schedule attached to the tender notice as may be<br />
considered necessary to complete the work fully and satisfactorily. Such<br />
increase shall in no case invalidate the contract rates. It shall be definitely<br />
understood that the <strong>Corporation</strong> does not accept any responsibility for the<br />
correctness or completeness <strong>of</strong> the quantities shown in the schedule. The<br />
schedule is liable to alteration by omissions or additions or deductions and<br />
such omissions/ deductions shall in no case invalidate the contract and no<br />
extra monetary compensation will be entertained.<br />
12. The agency should produce valid labour license for the said work before<br />
signing the agreement.<br />
13. The agency should use all building materials such as reinforcement, sand etc.<br />
free from corrosion/corrosive materials etc. No extra payment will be made<br />
for such purpose by O.T.D.C. <strong>Ltd</strong>.<br />
14. <strong>Orissa</strong> Detailed Standard Specification will be followed during execution <strong>of</strong><br />
work.<br />
15. All materials including those issued direct to the work will be received by the<br />
contractor from the respective Store <strong>of</strong> the <strong>Corporation</strong> in the sizes as per<br />
availability <strong>of</strong> stock. After issue, it will be the contractor's responsibility<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
6<br />
for transportation, storage, handling, safe custody and proper upkeepment<br />
<strong>of</strong> materials. The rate <strong>of</strong> the contractor should include the entire incidental<br />
charges required after the issue <strong>of</strong> material from <strong>Corporation</strong> store till its<br />
utilisation in the work and return <strong>of</strong> surplus and good materials at the issuing<br />
store.<br />
16. The contractor will have to bear the cost <strong>of</strong> straightening, cutting,<br />
jointing, welding etc. <strong>of</strong> all steel reinforcement and structural and no cut<br />
pieces less than 1(one) meter length will be accepted. After completion <strong>of</strong><br />
the work the contractor has to return all surplus and good materials at the<br />
issuing store at his own cost failing which the cost <strong>of</strong> the unutilized balance<br />
<strong>Corporation</strong> materials and such other damaged materials not receptacle to<br />
the <strong>Corporation</strong> would be recovered from him at 5 (five) times the stock<br />
issue rates.<br />
17. All reinforced cement concrete work should conform to <strong>Orissa</strong> Detailed<br />
Standard Specification and should be <strong>of</strong> grade M-150/200 with 12mm. Size<br />
black hard crusher broken granite stone chips (20mm. Size not to exceed<br />
25%) having a minimum compressive strength (in work test)<br />
150kg/200kg/cm 2 in 15 cm. cubes at 28 days after mixing and tests<br />
conducted in accordance with IS 456 and IS 516.<br />
18. Shuttering and centering shall be with seasoned Sal wood planks the inside<br />
<strong>of</strong> which shall be lined with suitable sheeting and made leak-pro<strong>of</strong> and water<br />
tight or alternatively steel shuttering and centering may be used.<br />
19. The selected contractor may take delivery <strong>of</strong> supply <strong>of</strong> materials according<br />
to his need for the work issued by the Engineer-in-charge <strong>of</strong> the work. The<br />
contractor shall make all arrangements for proper storage <strong>of</strong> materials. But<br />
no cost for raising shed for the storage <strong>of</strong> materials and pay <strong>of</strong> watchmen<br />
etc. will be borne by the <strong>Corporation</strong>. These are all to be borne by the<br />
Contractor. The <strong>Corporation</strong> is not responsible for considering the theft <strong>of</strong><br />
materials at site. It is contractor's risk. Under any such plea if the<br />
contractor stops the work he shall have to pay the penalty as per the clauses<br />
<strong>of</strong> the contract.<br />
20. For the purpose <strong>of</strong> jurisdiction in the event <strong>of</strong> dispute if any contract should<br />
be deemed to have entered into within the State <strong>of</strong> <strong>Orissa</strong> and it is agreed<br />
that, neither party to the contract nor the agreement will be competent to<br />
bring a suit in regard to the matters covered by this contract at any place<br />
outside the State <strong>of</strong> <strong>Orissa</strong>.<br />
21. After the work is finished, all surplus materials and debris are to be<br />
removed by the contractor and preliminary works such as vats, mixing<br />
platforms, etc. are to be dismantled and all the materials are to be removed<br />
from the site. No extra payment will be made to the contractor on this<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
7<br />
account. The rate quoted should be inclusive <strong>of</strong> all these items. The ground<br />
upto 15 meter shall be cleared and rough dressed.<br />
22. The contractor shall not interfere with the execution <strong>of</strong> water supply or<br />
electrical fittings arrangements and any other works entrusted to any other<br />
agency by the <strong>Corporation</strong> at any time during the progress <strong>of</strong> work.<br />
23. The <strong>Corporation</strong> will have the right to inspect the scaffolding and centering<br />
made for the work and can reject partly or fully such structures if found<br />
defective in their opinion.<br />
24. The Contractor will have to arrange for water supply for all works and made<br />
sanitary arrangements at his own cost for his Labour camps. The contractor<br />
has to arrange adequate lighting arrangements for night works whenever<br />
necessary at his own cost.<br />
25. Bailing out water from the foundation either rain water or sub-soil water if<br />
necessary should be borne by the contractor. No payment will be made for<br />
benchmarks, level pillars pr<strong>of</strong>iles and benching and leveling ground where<br />
required. The rates quoted should be for finished items <strong>of</strong> work inclusive <strong>of</strong><br />
these incidental items <strong>of</strong> work.<br />
26. Cement concrete in ro<strong>of</strong> slabs, beams and wherever prescribed by the<br />
Engineer-in-charge shall be machine mixed and vibrated, and the contractor<br />
should arrange his own concrete mixers, vibrators, and pumps etc. for the<br />
purpose.<br />
27. It should be understood clearly that no claims whatsoever will be<br />
entertained.<br />
28. The tenderer shall have to abide by the C.P.W. Safety Code introduced by<br />
the <strong>Govt</strong>. <strong>of</strong> India, Ministry <strong>of</strong> Works, Housing and Supply in their standing<br />
orders No.44250 dt.25.11.57.<br />
29. The contractor will abide by the Fair Wages clause as introduced by the<br />
Government.<br />
30. The <strong>Corporation</strong> have the right to supply at any time in the interest <strong>of</strong> work<br />
any <strong>Corporation</strong> materials to be used in the work in addition to those<br />
mentioned in the clause 13 and the contractor shall use such materials<br />
without any controversy or dispute on that account. The rates <strong>of</strong> the<br />
materials will be at the stock issue rates fixed by the <strong>Corporation</strong> or market<br />
rates whichever is higher.<br />
31. The contractor will be responsible for the loss or damage if any <strong>of</strong><br />
<strong>Corporation</strong> materials supplied to him under clauses 13 and 30 during<br />
execution <strong>of</strong> the work due to reasons whatsoever and the cost <strong>of</strong> such<br />
materials will be recovered from him at the prevailing stock issue rates or<br />
market rates whichever is higher.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
8<br />
31. CONTRACTOR'S TOOLS & PLANT AND SUPPLY OF<br />
DEPARTMENTAL TOOLS & PLAT TO CONTRACTORS.<br />
The contractor should arrange at his own cost necessary tools and plant such<br />
as Pumps, Vibrator, Concrete mixer etc. required for the efficient execution<br />
<strong>of</strong> the work and rates quoted should be inclusive <strong>of</strong> the running charges <strong>of</strong><br />
such plant and cost <strong>of</strong> consumables.<br />
32. The contractor will have to submit to the Sr. Divisional Manager (BP)-II,<br />
O.T.D.C. <strong>Ltd</strong>. monthly return <strong>of</strong> labour both skilled & un-skilled employed by<br />
him on the work.<br />
33. The tenderers are required to go through each clause <strong>of</strong> <strong>Corporation</strong><br />
contract form carefully in addition to clauses mentioned herewith before<br />
tendering.<br />
34. No part <strong>of</strong> the contract shall be sublet without written permission <strong>of</strong> the Sr.<br />
Divisional Manager (BP)-II, O.T.D.C. <strong>Ltd</strong>., Bhubaneswar or transfer be made<br />
by power <strong>of</strong> attorney authorising others to receive payment on the<br />
contractor's behalf.<br />
35. If any further necessary information is required, Sr. Divisional Manager<br />
(BP)-II, O.T.D.C. <strong>Ltd</strong>., Bhubaneswar will furnish such but it must be clearly<br />
understood that tenders must be received in order and according to the<br />
instructions.<br />
36. No contractor will be permitted to furnish their tender in their own<br />
manuscript papers.<br />
37. SAMPLE OF MATERIALS:<br />
Every tenderer is expected before quoting his rates to inspect the site <strong>of</strong><br />
proposed work. He should also inspect the quarries and satisfy himself about<br />
the quality, availability <strong>of</strong> materials, medical aids, labour and foodstuffs etc.<br />
and the rates may be inclusive <strong>of</strong> all these items <strong>of</strong> work. In every case the<br />
materials must comply with the relevant specification.<br />
38. O.T.D.C. <strong>Ltd</strong>. Will not however, after acceptance <strong>of</strong> contract rate, pay any<br />
extra charges for lead or for any other reason in case the contractor is<br />
found later on to have mis-judged the materials available.<br />
39. EXTRANEOUS CONDITION:<br />
The tenders containing extraneous conditions not covered by the tender call<br />
notice are liable for rejection.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
9<br />
40. VALIDITY<br />
All tenders received will remain valid for a period <strong>of</strong> ninety days from the<br />
date <strong>of</strong> receipt <strong>of</strong> tenders and validity <strong>of</strong> tender can also be extended if<br />
agreed to by the contractor and the <strong>Corporation</strong>.<br />
41. Quality control tests are to be carried out as per standard norms by the<br />
contractor through a <strong>Govt</strong>. laboratory or any authorized <strong>Govt</strong>. laboratory. No<br />
extra payment will be made for these tests. The department may conduct<br />
separate tests as when felt necessary, the cost <strong>of</strong> which will be borne by the<br />
department.<br />
42. LIST OF WORKS IN HAND, T & P & WORK EXECUTED:<br />
Tenderers are required to submit, (i) list <strong>of</strong> works in the hand in the following<br />
prescribed pr<strong>of</strong>orma 'A', (ii) list <strong>of</strong> works executed in the prescribed<br />
pr<strong>of</strong>orma 'B' and (iii) the list <strong>of</strong> T & P in the prescribed pr<strong>of</strong>orma 'C' along<br />
with the tenders.<br />
43. All reinforced cement concrete works should be finished smooth, Extra<br />
charges for plastering if required to any R.C.C. structures like columns,<br />
beams, chajjas etc. shall not be paid.<br />
44. Income tax, Sales tax and workers welfare cess will be deducted as per<br />
prevailing <strong>Govt</strong>. orders from time to time.<br />
45. The tenderer shall bear cost <strong>of</strong> various incidental sundries and contingencies<br />
necessitated by the works falling within the following or similar category.<br />
(a)<br />
(b)<br />
Rent, royalties and other charges <strong>of</strong> materials, Octroi duty, all other taxes<br />
including sales tax, ferry tolls, conveyance charges and other costs on<br />
account <strong>of</strong> land and buildings including temporary buildings required by the<br />
tenderer for collection <strong>of</strong> materials, storage, housing <strong>of</strong> staff or other<br />
purpose <strong>of</strong> the work. No rent however be payable to <strong>Corporation</strong> for<br />
temporary occupation <strong>of</strong> land owned by the <strong>Corporation</strong> at the site <strong>of</strong> the<br />
work.<br />
Labour camps and huts necessary to a suitable scale including conservancy<br />
and sanitary arrangements thereon to the satisfaction <strong>of</strong> the local health<br />
authorities.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
10<br />
(c)<br />
Suitable water supply including pipe water supply wherever available for the<br />
staff and labourers for the works.<br />
(d)<br />
Fees and dues hired by Municipal, Canal and water supply authorities.<br />
(e)<br />
Suitable equipments and wearing apparatus for the labourers engaged in<br />
risky operation.<br />
(f)<br />
Suitable fencing barriers, signal including paraffin and electrical signal<br />
where necessary at works and approaches in order to protect the public and<br />
employees from accidents.<br />
(g)<br />
Compensation including cost <strong>of</strong> any suit for injury to person or property due<br />
to neglect <strong>of</strong> any major precautions also sums which may become payable due<br />
to operation <strong>of</strong> workmen's Compensation Act.<br />
(h)<br />
The contractor has to arrange adequate lighting arrangement for night<br />
works wherever necessary at his own cost.<br />
(i)<br />
The contractor has to arrange all the building materials including the<br />
equipments required for under reamed pile foundation for starting the work.<br />
46. INTEREST:<br />
Under no circumstances interest is chargeable for the dues or additional<br />
dues if any payable for the work.<br />
a) Special class contractor shall employ under him one Graduate Engineer and<br />
two Diploma Holders belonging to the State <strong>of</strong> <strong>Orissa</strong>, like wise 'A' class<br />
contractor shall employ under him one Graduate Engineer or two Diploma<br />
Holder belonging to the State <strong>of</strong> <strong>Orissa</strong>. The employment <strong>of</strong> such Graduate<br />
Engineer and Diploma Holders under the contractor shall be full-time and<br />
continuous and they shall not be superannuated, retired, dismissed or<br />
removed personnel from any state <strong>Govt</strong>. or Central <strong>Govt</strong>. service/Public<br />
Sector undertaking/Private companies and firms or be ineligible for<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
11<br />
appointment to <strong>Govt</strong>. service. The contractor shall pay them monthly<br />
emoluments, which shall not be less than the emoluments <strong>of</strong> the personnel <strong>of</strong><br />
equivalent qualification employed under the State <strong>Govt</strong>. <strong>of</strong> <strong>Orissa</strong>. The Sr.<br />
Divisional Manager, Building Project-II may however assist the contractor<br />
with names <strong>of</strong> such un-employed Graduate Engineers and Diploma Holders if<br />
such help is sought for by the Contractor. The name <strong>of</strong> such Engineer<br />
personnel appointed by the Contractor should be intimated to the tender<br />
receiving authority along with each tender, as to who would be supervising<br />
the work. Each bill <strong>of</strong> the Special Class or 'A' class contractor shall be<br />
accompanied by an Employment Roll <strong>of</strong> the Engineering personnel together<br />
with a certificate <strong>of</strong> the Graduate Engineer or Diploma Holder so employed<br />
by the contractor to the effect that the work executed as per the bill has<br />
been supervised by him. A prescribed pr<strong>of</strong>orma is enclosed herewith for<br />
furnishing the required certificate there in under this clause.<br />
47. The sealed cover should be super-scribed with the material <strong>of</strong> contents.<br />
48. The quantity/volume <strong>of</strong> item may alter during construction as per field<br />
condition.<br />
49. Wherever there is ambiguity or missing data, the work shall be done as per<br />
the direction <strong>of</strong> the Engineer-in-charge.<br />
50. The interested bidders may visit the site and should be acquainted<br />
themselves with the field activities to be experienced during construction.<br />
51. The delay if any due to other departments such as digging on road etc. shall<br />
be the responsibility <strong>of</strong> the successful bidder.<br />
52. The bidder shall possess electrical license from ELBO, <strong>Orissa</strong>.<br />
53. Statutory clearance if any from electrical inspector shall be the<br />
responsibility <strong>of</strong> the successful bidder.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
12<br />
QUALITY CONTROL REQUIREMENTS<br />
1.0 Earth work<br />
1.1. Density requirements for embankments and sub-grade materials. MoRTH Specification (4 th<br />
Revision).<br />
Sl.<br />
No.<br />
Type <strong>of</strong> work<br />
Maximum dry density at OMC<br />
(IS:2720 Part-8)<br />
1. Embankment upto 3m height not subjected to extensive flooding Minimum 15.2kN/m 3<br />
2. Embankment exceeding 3m height or embankment subjected or<br />
embankment subjected to long periods <strong>of</strong> inundation.<br />
Minimum 16kN/m 3<br />
3. Subgrade and earthen shoulder and back fill. Minimum 17.5kN/m 3<br />
1.2. Compaction requirement for embankment and sub-grade.<br />
Sl.<br />
No.<br />
Type <strong>of</strong> work<br />
Percentage <strong>of</strong> Compaction at<br />
OMC<br />
1. Sub-grade and shoulder Minimum 97%<br />
2. Embankment Minimum 95%<br />
3. Expansive clay<br />
a. Sub-grade Not allowed<br />
b. Remaining portion Minimum 90%<br />
1.3. Criteria for small embankment (dams) (IS : 12169)<br />
The general guidelines for embankment sections are furnished in Table No.-1.<br />
TABLE-4<br />
(GENERAL GUIDELINES FOR EMBANKMENT SECTIONS)<br />
SL.<br />
NO.<br />
DESCRIPTION HEIGHT UPTO 5m HT. ABOVE 5M AND<br />
UPTO 10m<br />
1. Type <strong>of</strong> section Homogeneous<br />
Modified<br />
homogeneous section<br />
Ii Slopes U/S U/S<br />
a. Coarse grained soil (GW,<br />
GP, SW, SP)<br />
b. Coarse grained soil<br />
(GW,GP, SW, SP)<br />
c. Fine grained soil (Cl, ML,<br />
Cl, Ml)<br />
(H:V)<br />
(H:V)<br />
Zoned section/<br />
Modified homogeneous<br />
section/ homogeneous<br />
section<br />
U/S<br />
(H:V)<br />
D/S<br />
(H:V)<br />
HT. ABOVE 10M AND UPTO<br />
15m<br />
Zoned section/ modified<br />
homogeneous section/<br />
homogenous section<br />
U/S<br />
D/S<br />
Not suitable Not suitable Not suitable for core. Suitable<br />
for casing zone.<br />
2:1 2:1 2:1 2:1 Section to be decided based<br />
upon the stability analysis in<br />
accordance with IS: 7894-<br />
1975.<br />
2:1 2:1 25:1 2251:1 -do-<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
13<br />
d. Fine grained Soil (CH,<br />
MH)<br />
2:1 2:1 3.75:1 25:1 may be<br />
provided<br />
a. Top width -- 3m 3m<br />
Necessary<br />
b. Top level -- 0.5m above MWL 0.5m above MWL<br />
Iv Rock toe height Not necessary upto<br />
3m above 3m ht, 1m,<br />
ht <strong>of</strong> rock toe may be<br />
provided<br />
Necessary H/5, where<br />
H is the height <strong>of</strong> the<br />
embankment.<br />
Necessary H/5, where H is the<br />
height <strong>of</strong> the embkt.<br />
v. Berms Not necessary Not necessary The berm may be provided as<br />
per design. The min. berm<br />
width shall be 3m. The berm<br />
may be provided also on the<br />
D/S slope for facilities during<br />
maintenance.<br />
1.4. Criteria for small embankments (dams) : (IS : 12169)<br />
The general guidelines regarding suitability <strong>of</strong> soil for construction <strong>of</strong> dams are furnished in table No. 2.<br />
Table – 2<br />
Suitability <strong>of</strong> soil for construction <strong>of</strong> dams.<br />
Relative<br />
suitability<br />
Homogeneous<br />
Dykes<br />
Zone dam<br />
Impervious cure<br />
Pervisou casing<br />
Very GC GC SW,GW GC<br />
Suitable<br />
Suitable CL, Cl Cl, Cl GM CL,Cl<br />
Impervious blanket<br />
Fairly suitable SP, SM, CH GM, GC, SM, SC, CH SP, GP CH, SM, SC, GC<br />
Poor<br />
Not suitable<br />
Ml, Ml, MH<br />
OLOl, OH, Pt<br />
1.5. Frequency <strong>of</strong> test<br />
Table-3<br />
Sl.<br />
No.<br />
Test Designation<br />
Frequency <strong>of</strong> test as per<br />
MoRTH<br />
1. Mechanical analysis <strong>of</strong> soil 2 tests/3000m 3<br />
2. Plastic <strong>of</strong> soil 2 tests/3000m 3<br />
3. Density test <strong>of</strong> soil 2 tests/3000m 3<br />
4. Deleterious content As & when required<br />
Frequency <strong>of</strong> test <strong>of</strong> ODR & VR as<br />
recommended by IRC-SP-20<br />
5. Moisture content <strong>of</strong> soil 1 tests/250m 3 2-3 tests per 250m 3 <strong>of</strong> loose soil<br />
6. CBR test <strong>of</strong> soil 1 tests/3000m 3 or more<br />
7. Compaction test <strong>of</strong> soil for<br />
each layer<br />
Note : CBR <strong>of</strong> sub-grade should not be less than 2%<br />
MoRTH- Ministry <strong>of</strong> road transport and highways<br />
5-10 tests/1000m 3 5-10 tests per 1000m 3<br />
Table-7<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
14<br />
E.W. COMPACTION : The information given should be taken only as an approximate guide<br />
Material Major Division Sub-groups Suitable<br />
type <strong>of</strong><br />
compacting<br />
equipment<br />
No. <strong>of</strong><br />
passes for<br />
satisfactory<br />
compaction<br />
(Min.)<br />
Thickness<br />
<strong>of</strong> loose<br />
layer<br />
(Actual<br />
thickness<br />
depends on<br />
plant<br />
used),<br />
Max cm.<br />
1 2 3 4 5 6 7<br />
Coarse<br />
grained<br />
soil and<br />
other<br />
materials<br />
Fine<br />
grained<br />
soils<br />
Gravel and<br />
gravelly soils<br />
Soils having low<br />
compressibility<br />
Well-graded<br />
gravel, gravels and<br />
mixtures, little or<br />
no fines<br />
Well-graded<br />
gravel sand<br />
mixtures with<br />
excellent clay<br />
blinder uniform<br />
gravel with little<br />
or no fines poorly<br />
graded gravel and<br />
gravel sand<br />
mixtures little or<br />
no fines<br />
Gravel with fines.<br />
Silty gravel,<br />
clayey gravel,<br />
poorly-graded<br />
gravel-sand-clay<br />
mixtures<br />
Well grained sands<br />
and gravelly sands,<br />
little or no fines<br />
Well-graded sand<br />
with excellent<br />
clay-binder<br />
Uniform sands<br />
with little or no<br />
fines silts<br />
(inorganic) and<br />
very fine sands,<br />
rock flour, silty or<br />
clayey fine sands,<br />
with slight<br />
plasticity. Silty<br />
and sandy clays<br />
(inorganic or<br />
medium plasticity.<br />
Smoothwheel<br />
roller<br />
pneumatictyred<br />
roller<br />
vibrating<br />
smooth wheel<br />
roller heavy<br />
bivrating<br />
plate frogrammer<br />
powerrammer<br />
Smooth<br />
wheel roller<br />
pneumatic<br />
tyred roller<br />
track laying<br />
tractor sheep<br />
foot roller<br />
frog rammer<br />
power<br />
rammer.<br />
6<br />
6<br />
6<br />
2*<br />
3**<br />
4<br />
--<br />
10<br />
30<br />
2*<br />
2*<br />
20<br />
20<br />
20<br />
37.5<br />
37.5<br />
20<br />
20<br />
--<br />
15<br />
15<br />
37.5<br />
20<br />
Remarks<br />
Vibrating rollers or<br />
vibrators will be very<br />
satisfactory if the<br />
moisture conent <strong>of</strong><br />
the soil is low, but<br />
may be uneconomical<br />
close moisture<br />
content control is<br />
essential when the<br />
moisture content is<br />
relatively high it is<br />
preferably to use a<br />
pneumatic tyred<br />
roller<br />
--<br />
--<br />
These soils are<br />
considered very<br />
undesirable for use in<br />
earthwork and should<br />
not be employed if<br />
they are highly<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
15<br />
Soils having<br />
high<br />
compressibility<br />
Fibrous organic<br />
soils with very<br />
high<br />
compressibility<br />
Clays (inorganic)<br />
or medium<br />
plasticity.<br />
Micaceous or<br />
distomaccous fine<br />
sandy and silty<br />
soils, elastic silts<br />
Clays (inorganic)<br />
or high plasticity,<br />
fat clays<br />
Organic clays <strong>of</strong><br />
high plasticity<br />
pest and other<br />
highly organic<br />
swamp soils.<br />
compressible it is<br />
advisable to compact<br />
these soils at the<br />
moisture content at<br />
which no change will<br />
occur subsequently<br />
As for micaceious or<br />
distomaceous fine<br />
sandy and silty soils<br />
these soils are<br />
entirely unsuitable<br />
for earthwork<br />
construction.<br />
5. Materials for cement concrete :<br />
This includes the I.S. specification <strong>of</strong> the materials such as cement, coarse and fine aggregate,<br />
water, and reinforcement. For details respective I.S. specification may be referred to.<br />
5.1. Fine aggregate : IS 383<br />
5.1.1. Zoning: The fine aggregates suitable for concrete shall be in zone-I, II or III. Fine aggregate in<br />
zone-IV are not suitable for concrete. The zone can be decided by grain size analysis by<br />
sieving as follows.<br />
Table-21 (IS-383-Table No.-4)<br />
IS Sieve<br />
Designation<br />
Percentage passing for<br />
Grading Zone-I Grading Zone-II Grading Zone-III Grading Zone-IV<br />
10m. 100 100 100 100<br />
4.75mm 90-100 90-100 90-100 95-100<br />
2.36mm 60-95 75-100 85-100 95-100<br />
1.18mm 30-70 55-90 75-100 90-100<br />
600 micron 15-34 35-59 60-79 80-100<br />
300 micron 5-20 8-30 12-40 15-50<br />
150 micron 0-10 0-10 0-10 0-15<br />
5.1.2. Bulkage :- Maximum buklage shall be limited to 20%<br />
5.2. Quality <strong>of</strong> coarse aggregates:<br />
5.2.1. Crushing value Permissible Value Method <strong>of</strong> test<br />
a. All concrete woks except<br />
wearing surface.<br />
Maximum 45% IS 2386-1963 part –IV<br />
b For wearing surface -do- 30% -do-<br />
5.2.2. Impact value Permissible Limit Method <strong>of</strong> test<br />
a. All concrete woks except<br />
wearing surface.<br />
Maximum 45% IS 2386-1963 part –IV<br />
b For wearing surface -do- 30% -do-<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
16<br />
5.2.3. Abrasion value<br />
a. All concrete woks except<br />
wearing surface.<br />
Maximum 50% -do-<br />
b For wearing surface -do- 30% -do-<br />
5.2.4. Deleterious materials : Maximum percentage shall be 5%.<br />
5.2.5. Alkali aggregate reaction:- It is harmful for concrete. The test shall be conducted and use <strong>of</strong><br />
pozzolanic cement or pozzolanic admixture shall be studied.<br />
5.2.6. Gradation <strong>of</strong> coarse aggregate <strong>of</strong> nominal size:<br />
Table-22<br />
IS Sieve (mm)<br />
Percentage passing for graded aggregates <strong>of</strong> nominal size<br />
40 20 15 12.5<br />
80 100 -- -- --<br />
40 95-100 100 -- --<br />
20 30-70 95-100 100 100<br />
16 -- -- 90-100 --<br />
12.5 -- -- -- 90-100<br />
10 10.35 25.55 30.70 40-85<br />
4.75 0-5 0-10 0-10 0-10<br />
2.36 -- -- -- --<br />
5.3. Cement : The normal type <strong>of</strong> cement used are :<br />
1. Ordinary Portland cement 33 grade, 43 grade, 53 grade conforming to IS: 269, IS:8112 &<br />
IS:12269 respectively.<br />
2. Port land slag cement IS: 544<br />
3. Port land pozzolana cement I.S : 1489<br />
5.3.1. Standard <strong>of</strong> physical test <strong>of</strong> cement<br />
a. Initial setting time - minimum 30 minutes<br />
b. Final setting time - Maximum 10 hrs.<br />
c. Fineness - (i) 225 (m 2 /kg) for OPC & PSC<br />
(ii) 300 (m 2 /kg) for PPC<br />
d. Soundness - a. 10mm maximum (Lechat expansion)<br />
b. Maximum 0.8% in Autoclave<br />
e. Compressive Strength :<br />
Time<br />
33 grade OPC, PSC,<br />
PPC<br />
43 grade OPC 53 grade OPC<br />
a. 72 hrs. 16MP 2 23MP 2 27MP 2<br />
b. 7 days 22MP 2 33MP 2 37MP 2<br />
c. 28 days 33MP 2 43MP 2 53MP 2<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
17<br />
5.3.2. Standards for chemical test :<br />
Table – 23<br />
Types <strong>of</strong> cement<br />
Percentage by mass (Max.)<br />
OPC<br />
PPC PSC Remarks<br />
33 43 53<br />
1. Magnesia 6 6 6 6 8<br />
2. Insoluble residue 4 2 2 x+4(100-x)<br />
100<br />
4 Where x=% <strong>of</strong> pozollana in<br />
cement<br />
3. Sulphur trioxide 2.5d 2.5d 2.5d 3 3 Where d-3% when C,A>5%<br />
4. Sulphur as sulphide -- -- -- -- 1.5<br />
5. Loss on ignition 5 5 4 5 5<br />
6. Chloride 0.5 0.05 0.05 -- -- Maximum for pre-stressed<br />
and long span structures<br />
5.4. Water :<br />
Normal potable water shall be used for concrete. The pH value shall be not less than 6. Permissible<br />
limits <strong>of</strong> solids – I.S. :3025.<br />
Organic - 2000mg/litre<br />
Chloride - 2000mg/litre<br />
Inorganic - 3000mg/litre<br />
Sulphate - 400 mg/litre<br />
Suspended matter -<br />
2000mg/litre<br />
5.5. Reinforcement steel :<br />
The normal reinforcement steel bars may be mild and medium tensile steel bars or high strength<br />
deformed steel bars conforming to I.S.-432 and IS:1786 respectively. The limits <strong>of</strong> physical and<br />
chemicals properties <strong>of</strong> deformed bar.<br />
a. Mechanical properties<br />
Sl.<br />
No.<br />
Table – 24 (IS : 1786, Table No.-3)<br />
Property F 3 415 Grade F c 500 F e 550<br />
1 2 3 4 5<br />
1 0.2% pro<strong>of</strong> stress/yield stress, Min,<br />
N.mm 2 415.0 500.0 550.0<br />
2. Elongation, percent, Min, on gauge<br />
length 5.56 v(A), where A is the<br />
cross sectional area <strong>of</strong> the test piece.<br />
3. Tensile strength, Min 10%more than the actual<br />
0.2% pro<strong>of</strong> stress but not<br />
less than 485.0 N/mm 2<br />
14.5 12.0 8.0<br />
8% more than the actual<br />
0.2% pro<strong>of</strong> stress but not<br />
less than 545.0 N/mm 2<br />
6% more than the actual<br />
0.2% pro<strong>of</strong> stress but not<br />
less than 585.0 N/mm 2<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
18<br />
b. Chemical properties :<br />
Table – 24 (IS : 1786)<br />
Constituent<br />
Percent, maximum<br />
F e 415 F e 500 F e 550<br />
Carbon 0.30 0.30 0.30<br />
Sulphur 0.060 0.055 0.055<br />
Phosphorous 0.060 0.055 0.050<br />
Sulphur and phosphorous 0.11 0.105 0.10<br />
c. Frequency <strong>of</strong> test (IS : 1786)<br />
One test <strong>of</strong> each type <strong>of</strong> MS rod to be used in each structure.<br />
d. Pull out test : As per IS:2770<br />
e. Bend and rebend test : IS : 1786.<br />
f. Mass and cross sectional area (IS : 1786).<br />
Nominal size (mm) Sectional area (mm 2 ) Mass per meter (kg)<br />
6 28.3 0.222<br />
8 50.3 0.395<br />
10 78.6 0.617<br />
12 113.1 0.888<br />
16 201.2 1.580<br />
20 314.3 2.47<br />
25 491.1 3.85<br />
28 616.0 4.83<br />
32 804.6 6.31<br />
5.6. Construction joints :<br />
The concreting shall be done up to construction joints, but while commencing the work on the<br />
cold joints, the aggregates shall be exposed with high pressure water jet or any other method. It is<br />
preferable to expose the aggregates previously i.e. just after the closer <strong>of</strong> the work by wire<br />
brushing and cleaning. Cleaning may be done be by air water jetting or any other method.<br />
6. Concrete works.<br />
6.1. Grade <strong>of</strong> concrete<br />
The grade designation shall be as follows.<br />
a. Ordinary concrete M10, M15 & M20<br />
b. Standard concrete M25, M30, M35, M40, M45, M50 & M55<br />
c. High strength concrete M60, M65, M70, M75 & M80<br />
d. Concrete exposed to seawater shall be at least M20 & M30 for P.C.C. & R.C.C. respectively.<br />
The use <strong>of</strong> slag or pozzolana cement is advantageous under such conditions.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
19<br />
6.2. Workability <strong>of</strong> concrete<br />
Table –26<br />
Placing conditions<br />
Binding concrete; shallow sections; pavements using<br />
lavers;<br />
Mass concrete; lightly reinforced sections in slabs,<br />
beams, walls, columns; floors; hand placed pavements;<br />
canal lining; strip footings.<br />
Heavily reinforced sections in slabs, beams, walls,<br />
columns; slipfonn work; pumped concrete<br />
Trench fill;<br />
In-situ pilling<br />
Degree <strong>of</strong><br />
workability<br />
Slump (mm)<br />
1 2 3<br />
Very low Compacting factor from 0.75<br />
to 0.8 is suggested<br />
Low 25-75<br />
Medium 50-100<br />
75-10<br />
High 100-150<br />
Tremie concrete; Very high Refer IS :9103<br />
Note : For most <strong>of</strong> the placing conditions, internal vibrators (neddle vibrators) are suitable. The<br />
diameter <strong>of</strong> the needle shall be determined based on the density and spacing <strong>of</strong> reinforcement bars and<br />
thickness <strong>of</strong> sections. For tremie concrete, vibrators are not required to be used.<br />
6.3. Mild : Concrete surfaces protected against weather or aggressive conditions except those<br />
situated in coastal area.<br />
6.3.2. Moderate : Concrete surfaces sheltered from severe rain or freezing whilst wet.<br />
Concrete exposed to condensation and rain.<br />
Concrete continuously under water.<br />
Concrete in contact <strong>of</strong> buried under non-aggressive soils/ ground water.<br />
Concrete surfaces sheltered from saturated salt air in coastal area.<br />
6.3.3. Severe : Concrete surfaces exposed to severe rain, alternate wetting and drying or occasional<br />
freezing whilst wet or severe condensation. Concrete complitely immersed in sea water concrete<br />
expose to coastal environment.<br />
6.3.4. Very severe : Concrete surfaces exposed to sea water spray, corrosive fumes or severe freezing<br />
conditions whiles wet.<br />
Concrete incontact with or buried under aggressive sub-soil/ ground water.<br />
6.3.5. Extreme : Surface <strong>of</strong> members in tidal zone.<br />
Members indirect contact with liquid / solid aggressive chemicals.<br />
Exposure a.PCC<br />
Minimum W/C grade<br />
Cement ratio<br />
Content maximum<br />
Kg/(m 3 )<br />
Mild 220 0.6 --<br />
Moderate 240 0.6 M15<br />
Severe 250 0.50 M20<br />
Very severe 260 0.45 M20<br />
Extreme 280 0.40 M25<br />
b.PCC<br />
Mild 300 0.55 M20<br />
Moderate 300 0.50 M25<br />
Severe 320 0.45 M30<br />
Very severe 340 0.45 M35<br />
Extreme 360 0.40 M40<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
20<br />
6.4. Nominal mix concrete<br />
Table – 27<br />
The nominal mix concrete may be used for concrete <strong>of</strong> M20 grade and lower as per the table below:<br />
Grade <strong>of</strong> concrete<br />
Total qty. <strong>of</strong> dry<br />
aggregate for 50kg <strong>of</strong><br />
cement in kg<br />
Proportion <strong>of</strong> fine to<br />
coarse aggregate by<br />
mass<br />
Max. qty. <strong>of</strong> water<br />
per 50kg <strong>of</strong> cement in<br />
litre<br />
M5 800 Generally 60<br />
M 7.5 625 1:2 45<br />
M10 480 -- 34<br />
M15 330 -- 32<br />
M20 250 -- 30<br />
6.5. Design Mix : Ref. IS : 10262<br />
6.6. Placing : The concrete shall be placed and compacted before initial setting time <strong>of</strong> cement.<br />
6.7. Curing : The period for moisture curing shall be minimum 10 days. It may be extended upto 28<br />
days.<br />
6.8. Stripping time : Following stripping time may followed.<br />
Type <strong>of</strong> form work<br />
Minimum period before striking form work.<br />
a. Vertical 16-25 h<br />
b. S<strong>of</strong>fit form work to slab 3 days<br />
c. S<strong>of</strong>fit form work to beam 7 days<br />
d. Props to slab<br />
(i) Spanning upto 4.5m<br />
7 days<br />
(ii) Spanning over 4.5m<br />
14 days<br />
6.9 Nominal cover:<br />
Cover to be provided depending on exposure condition.<br />
Exposure<br />
Cover in mm<br />
Mild 20<br />
Moderate 30<br />
Sever 45<br />
6.9. Frequency <strong>of</strong> sampling : Depending on quantity <strong>of</strong> work, number <strong>of</strong> samples are to be taken.<br />
Qty. in m 3 No. <strong>of</strong> samples<br />
1-5 1 Set<br />
6-15 2 Set<br />
16-30 3 Set<br />
31-50 4 Set<br />
51 to above 4 plus one additional<br />
set for each 50m 3 or part.<br />
(one set= 6 Nos. <strong>of</strong> samples)<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
21<br />
6.10. Concrete works :<br />
Table – 28<br />
Sl.<br />
No.<br />
Test<br />
Frequency as per MoRTH<br />
A. Coarse aggregate<br />
1. Sieve analysis flakiness and elongation index One test for every 150m 3 or less<br />
2. Specific gravity, bulk density, moisture content and<br />
absorption.<br />
-do-<br />
3. Soundness -do-<br />
4. Abrasion, impact, aggregate crushing value -do-<br />
5. Organic impurities value<br />
6. Alkali-aggregate reactivity Twice in one season<br />
7. Petro-graphic test -do-<br />
B. Fine Aggregates<br />
1. Sieve analysis One test for every 1.50m 3 <strong>of</strong> sand<br />
2. Organic impurities -do-<br />
3. Soundness -do-<br />
4. Sp. Gravity, moisture contents and absorption -do-<br />
C. Cement<br />
1. Fineness One test for each brand and batch <strong>of</strong> cement<br />
2. Setting time -do-<br />
3. Compressive strength<br />
D. Finished concrete<br />
1. Slump test One test for each shift both at mixer and at placement<br />
site. As frequently as possible.<br />
2. Compressive strength -do-<br />
3. Cement content One test every 3 months<br />
6.12 Aceptance criteria for concrete (IS : 456-2000, clause-16):<br />
The concrete shall be deemed to comply with the strength requirements when both the following<br />
conditions are met.<br />
a. The mean strength determined from any group <strong>of</strong> four consecutive tests results shall<br />
satisfy the following conditions.<br />
(i) Mean strength :<br />
a. For M 13 grade : f a + 0.825 x established standard deviation<br />
(rounded to 0.5) N/mm 2<br />
OR<br />
Fa + 3N/mm 2 (which ever is greater).<br />
b. For M 20 grade : Mean strengthf a + 0.825 standard<br />
or above deviation (rounded to nearest 0.5) N/mm 2<br />
OR<br />
F a + 4N/mm 2 (which ever is greater).<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
22<br />
In absence <strong>of</strong> data for SD, the SD may be taken 3.5 for M 10 and M 15 grade, 4 for M 20 and M 25 grade and 5<br />
for M 30 to M 50 grade.<br />
b. Individual test results :<br />
For M 13 grade<br />
Strength f ck – 3N/mm 2<br />
For M 20 grade or above<br />
Strength f ck – 4N/mm 2<br />
(Where f ck is the characteristic strength <strong>of</strong> concrete)<br />
7. Common Burnt clay bricks :<br />
7.1. Brick classification : (IS : 1077 & IS : 2180)<br />
Class<br />
Average compressive strength<br />
(M/mm 2 )<br />
100 100<br />
75 75<br />
35 35<br />
30 30<br />
25 25<br />
20 20<br />
17.5 17.5<br />
15 15<br />
12.5 12.5<br />
10 10<br />
7.5 7.5<br />
5 5<br />
3.5<br />
7.2. Dimension : (IS : 1077)<br />
a. Modular<br />
Length (mm) Width (mm) Height (mm)<br />
190 90 90<br />
190 90 90<br />
b. Non-modular<br />
Length (mm) Width (mm) Height (mm)<br />
230 110 70<br />
230 110 30<br />
N. B. : Tolerance for 20 bricks <strong>of</strong> modular and non-modular are 80 mm &<br />
40mm for different heights.<br />
7.3. Water absorption : (IS : 3495).<br />
After immersion in cold water for 24 hours<br />
a. Upto class 12.5 : Maximum 20%<br />
b. Higher pressure : Maximum 15%<br />
7.4. Frequency <strong>of</strong> tests :<br />
20 bricks shall be tested out <strong>of</strong> 50,000 & 1,00,000 bricks in class 100 & 75.<br />
7.5. Grading <strong>of</strong> sand for plaster (IS : 1542).<br />
IS sieve designation (mm)<br />
Percentage passing by weight<br />
10 100<br />
4.75 95.100<br />
2.236 95-100<br />
1.18 90-100<br />
600 micron 80-100<br />
300 micron 20-65<br />
150 micron 0-50<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
23<br />
8. Pipes, pipe fitting valves and specials:<br />
WATER SUPPLY<br />
Pipes <strong>of</strong> different types and classes, pipe fittings, valves and specials used for pipe laying work should be manufacturer and<br />
factory tested hy7drostatically as per the relevant I.S. specifications as given below. The CI and DI pipes on DGS&D contract are to be<br />
tested by the agency authorized by DGS&D/EPM and PVC pipes and fittings are to be tested by CIPET (Central Institute <strong>of</strong> Plastic<br />
Engineering and technology).<br />
8.1. Pipe<br />
8.11. Reference to I.S. code :<br />
IS : 1536<br />
IS : 8329<br />
IS : 3589<br />
IS : 4985<br />
Specification for centrifugally cast spun iron pressure pipe for water, gas & sewege.<br />
Specification for centrifugally cast (spun) ductile iron pressure pipe for water, gas & sewege.<br />
Specification for electrically welded steel pipe (first revision)<br />
Specification for electrically welded steel pipes (first revision)<br />
IS : 4958<br />
IS : 10221<br />
IS : 11906<br />
Un plasticised PVC pipes for potable water supplies.<br />
Code <strong>of</strong> practice for coating and wrapping under ground steel pipes.<br />
Recommendation for cement master lining <strong>of</strong> cast iron milk steel and ductile Iron pipes and fitting for transport <strong>of</strong><br />
water.<br />
8.2. Pipe fittings and jointing materials.<br />
8.2.1. Reference to code :<br />
IS : 1538 Specification for cast iron fitting for pressure pipe (para 1 to 24) for water, gas & sewge<br />
IS : 10124 Febricated PVC fitting for potable water samples(para 1 to 13)<br />
IS : 782<br />
IS : 5383<br />
8.3. Valves and specials<br />
IS : 780<br />
IS : 2906<br />
IS : 2685<br />
IS : 5312<br />
Specification for caulking lead<br />
Rubber gaskets for double iron pipes.<br />
Specification for sluice valves for water works purpose (50mm to 300mm)<br />
Specification for sluice valves for water works purpose (350mm to 1200mm)<br />
Code <strong>of</strong> practice for selection installation and maintenance <strong>of</strong> sluice values.<br />
Specification for swing check type reflux (Non-return valves) for water works purpose.<br />
8.3. Inspection <strong>of</strong> pipes before final acceptance.<br />
Each pipe shall have cast, stamped or indelibly painted the trade mark <strong>of</strong> manufacturer, the nominal dia, class weight, batch<br />
number, last two digits <strong>of</strong> the year <strong>of</strong> manufacturer and also with ISI certificate mark. The pipes should bear the stamping <strong>of</strong> testing agency<br />
like DGS & D in case <strong>of</strong> CI & DI pipes CIPET in case <strong>of</strong> PVC pipes etc.<br />
8.3.1. Pipe laying<br />
8.3.2. Laying <strong>of</strong> cast iron pipes :<br />
Inspection <strong>of</strong> pipes before laying :<br />
Before laying the pipes and fittings shall be inspected for defects and be rung with a light hammer, preferably while suspended,<br />
to detect cracks. Smearing the outside with chalk dust helps in the location <strong>of</strong> cracks. If doubt persists further confirmation may be obtained<br />
by pouring a little kerosene on the inside <strong>of</strong> the pipe at the suspected spot. If crack is present, the kerosene seeps thorough and shows on the<br />
outer surface. Any pipe found unsuitable after inspection before laying shall be rejected.<br />
Laying should be done as per IS code <strong>of</strong> practice 3114 (Third Revision).<br />
a) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be less than 900mm measured from the top <strong>of</strong> pipe to the surface <strong>of</strong><br />
ground and not less than 750mm else where.<br />
b) Width <strong>of</strong> Trench : The width <strong>of</strong> trench should be 200 mm more on either side <strong>of</strong> the external dia <strong>of</strong> pipe (i.e. External<br />
dia <strong>of</strong> pipe + 2 x 200mm). Additional width shall be provided at position <strong>of</strong> sockets and flanges for jointing.<br />
c) Cover over the pipe- Minimum cover <strong>of</strong> 1M in recommended under road way and may be modified to meet the local<br />
condition.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
24<br />
8.3.3. Laying and jointing <strong>of</strong> ductile iron pipes :<br />
The pipes should be laid as per the specification laid down in IS : 12288.<br />
a) Width <strong>of</strong> Trench :- The width <strong>of</strong> trench at bottom shall provide not less than 200mm clearance on both sides <strong>of</strong> pipe (i.e.<br />
external dia <strong>of</strong> pipe + 2x 200mm)<br />
b) Cover over the pipe – In agricultural land the depth should be sufficient to provide cover not less than 900mm and under a<br />
roadway the cover should be minimum 1.0M.<br />
8.3.4. Laying <strong>of</strong> welded steel pipes :<br />
The laying should be done as per IS – 5822 (First revision).<br />
a) Width <strong>of</strong> Trench – The width at the bottom below in the faces should not be less than 200 mm clearance on either side <strong>of</strong><br />
the pipes.<br />
b) Cover over the pipe – When the pipeline is under a roadway, a minimum cover <strong>of</strong> 1.0 Meter should be provided and can be<br />
modified to suit the local condition by taking necessary precaution.<br />
c) Pipe welding :- In case <strong>of</strong> welding the pipe in the trench, additional excavation <strong>of</strong> not more than 600 mm in depth 900mm<br />
in length should be provided all round the pipe at the position <strong>of</strong> the joints for facility <strong>of</strong> welding.<br />
d) Coating and wrapping <strong>of</strong> pipes :- Against internal corrosion, steel pipes are given epoxy lining or hot applied coal<br />
tar/asphalt lining or rich cement mortar lining at works or the field by centrifugal process. The outer coating for under<br />
ground pipeline may be in cement sand gunniting or hot applied coal tar asphalt enamel reinforced with fiber glass fabric<br />
yarn. Coating and wrapping should be done as per IS 10221.<br />
8.3.5. Laying <strong>of</strong> PVC pipes :<br />
Laying and joining <strong>of</strong> PVC pipes should be done as per IS: 7634 (part – III).<br />
a) Width <strong>of</strong> trench :- The trench should be as narrow as practicable. As a normal practice this may be kept from 0.30M over the<br />
outside dia or pipe (i..e external dia <strong>of</strong> pipe + 30 cum.).<br />
b) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be 1.00M from the ground level.<br />
c) The trench bottom where it is rocky and un-even a layer <strong>of</strong> sand or alluvial earth <strong>of</strong> 100mm depth should be provided under the<br />
pipe.<br />
d) Jointing <strong>of</strong> pipes : Solvent welding technique <strong>of</strong>fers as easy and ample type <strong>of</strong> joint in PVC pipe used spigot and socket type<br />
joints. The cement solvent to be used for jointing should be as per the recommendations <strong>of</strong> the pipe manufacturer.<br />
8.4. Testing <strong>of</strong> pipe line after laying (field test pressure).<br />
After laying and jointing, the mains shall be slowly and carefully charged with water, so that all air is expelled from the main by<br />
providing a25mm inlet with a stop cock, allowed to stand full <strong>of</strong> water for a few days if time permits, and then tested with pressure.<br />
The field test pressure to be imposed should be not less than the maximum <strong>of</strong> the following.<br />
a) 1.5times the maximum sustained operating pressure.<br />
b) 1.5 times the maximum pipeline static pressure.<br />
c) Sum <strong>of</strong> the maximum sustained operating pressure and the maximum surge pressure.<br />
d) Sum <strong>of</strong> the maximum pipe line static pressure and the maximum equal to the work test pressure for any pipe fitting in corporate.<br />
9.0. Production wells (large dia tube wells):<br />
9.1. Materials for constructions :<br />
1. Casting pipes should be mild steel or UPVC pipes. Mild steel pipes should conform to IS :4270 and ASTM-DN-1785.<br />
The UPVC pipes should be <strong>of</strong> ASTM quality (Sch-40, Sch-80 or Sch-120 depending on site condition) and should<br />
also confirm to IS:2818.<br />
2. Well screens and slotted pipes should conform to IS : 8110. The well screens may be monometal, bimetal, stainless<br />
steel or PVC.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
25<br />
Sufficient opening should be provided for screens and slotted pipes so that 70% or more <strong>of</strong> sand grains in the natural aquifer<br />
where uniformity co-efficient should range between 2.0 to 2.50. For soils with uniformly coefficient less than 1.5, pea gravel pack should be<br />
used.<br />
The total area <strong>of</strong> opening should be such s to maintain on entrance velocity less than necessary to carry the finest particle <strong>of</strong> sand<br />
that is to be excluded by the screen. In general, it should be 4 to 6 cm/sec. With the gravel shrouding.<br />
The opening should preferably be ‘V’ shaped.<br />
3. Gravel to be used for shrouding (packing around the casing pipe) should confirm to IS : 4099. The gravel wall provided may vary<br />
in thickness to suit the size and depth <strong>of</strong> boring and may vary from 10cm to 25cm but usually 10cm.<br />
9.2. Construction <strong>of</strong> tube well :<br />
The drilling operation should be taken up with rotary drilling rig. Down the whole Hammer Rig or Combination Rig depending<br />
on type <strong>of</strong> strata and conforming to IS :2800 (Part-I).<br />
For drilling with rotary drilling rig in s<strong>of</strong>t formations, bentonite powder should be used in place <strong>of</strong> local mud as sealing<br />
compound to facilitate drilling operation. The casing pipe and well strainer should be lowered perfectly vertically and well screen should be<br />
properly placed against the aquifers. The casing pipe should be extended to at least 60 cm above the ground level.<br />
The annular space between the bore and the housing pipe (casing pipe) should be cement grouted upto at least 5m below ground<br />
level to provide a sanitary sealing.<br />
9.3. Testing and development <strong>of</strong> tube well :<br />
9.3.1. The testing <strong>of</strong> tube well should be conducted as per IS : 2800 (part-II).<br />
Tube wells are to be tested for plumbness and alignment normally after completion <strong>of</strong> drilling but immediately after the housing<br />
pipes are installed and prior to commencement <strong>of</strong> gravel fitting in the case <strong>of</strong> gravel shrouded tube well. For wells encased with pipes less<br />
than 350mm dia meter, the verticality <strong>of</strong> tube well shall have a deviation not exceeding 10cm per 30 m depth <strong>of</strong> the tube well and the<br />
deviation shall be in one direction and in one place only.<br />
In the case gravel shrouded tube well, if the pipe assembly is found included in a start position. It should be pulled in a desired<br />
directions to rectify the stantness and bringing the pipe assembly into permissible limit <strong>of</strong> verticality.<br />
9.3.2. <strong>Development</strong> <strong>of</strong> tubewell :<br />
The object <strong>of</strong> well development is the removal <strong>of</strong> silt, fine sand and other such materials form a zone immediately around the<br />
well, screen, there by creating larger passage in the formation through which water can flow more freely towards the wells.<br />
Well development includes the operation <strong>of</strong> flushing, testing and equipping the wells before they are put into service.<br />
The development should be carried on with an air compressor <strong>of</strong> suitable capacity (to develop 7kg to 10kg/Cm 2 and airflow <strong>of</strong><br />
2m 3 /min) In accordance with IS : 11189, and the process should be continued until the stabilization <strong>of</strong> sand gravel pack and<br />
discharge <strong>of</strong> clear water is fully assured.<br />
10. Pumping sets :<br />
10.1. Reference & code<br />
IS 1520<br />
IS 6595<br />
IS 9684<br />
IS 1710<br />
IS 8034<br />
IS 10825<br />
IS 325/19758<br />
IS 7538<br />
The pumping sets and accessories should conform to following IS specification:<br />
Horizontal centrifugal pumps for clear cold fresh water (2 nd revision)<br />
Horizontal centrifugal pumps for clear cold fresh water for Agricultural purpose (first revision).<br />
Selection, installation, operation and maintenance <strong>of</strong> Horizontal centrifugal pumps for agricultural purpose.<br />
Vertical turbine pumps for clear. Cold fresh water (1 st revision).<br />
Submersible pump sets for clear, cold, fresh water.<br />
Foot valve, Reflex value or non return valve and bore valves to be used in suction line <strong>of</strong> agriculture pumping sets.<br />
(first revision).<br />
Three phase induction motors.<br />
Motors for submersible pumps<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
26<br />
10.2. Inspection <strong>of</strong> pumps before final acceptance.<br />
1. The name plates <strong>of</strong> the pump and motor with details like Sl. No.- Head, Discharge, rpm, HP/KW <strong>of</strong> motor etc<br />
engraved on the name plate should be clearly verified to confirm within the pumping set is as per the supply order.<br />
2. Manufacturer’s test report along with laboratory hydrostatic test reports <strong>of</strong> the pumps should be verified to know the<br />
duty <strong>of</strong> pump.<br />
3. The supplier should give at lest one copy <strong>of</strong> specific installation and operation manual <strong>of</strong> the pumping sets supplied<br />
by them.<br />
4. The field test for pumps should be conducted to confirm the duty <strong>of</strong> pumps after ins installation.<br />
10.3. Pump installation<br />
The installation <strong>of</strong> centrifugal pumps should proceed through five stages in the following order.<br />
1. Preparing the foundation and locate the foundation bolts.<br />
2. Locating the pump on the foundation bolts, however resting on leveling wedges, which permit not only easy leveling but also<br />
space for fitting the grunt later on.<br />
3. Levelling<br />
4. Grouting<br />
5. Alignment<br />
The foundation should be sufficiently substantial to absorb vibrating and to form a permanent, rigid support for the base plate.<br />
Alignment <strong>of</strong> the pump sets should be checked even if they are received aligned by the<br />
manufacturer. The alignment should be proper both for parallelism (by filler gauge) and for coasiablity (by<br />
straight edge or by dial gauge).<br />
During all alignment- checks both the shafts should be pressed hard, over to one side while talking<br />
the readings alignment should also be checked after fastening the piping and there after periodically<br />
during operation.<br />
Submersible pumps with wet type motors should be fitted with water and the opening should be<br />
properly plugged after filling water.<br />
Pumps kept in storage for a long time should be thoroughly cleaned before installation.<br />
10.4. Testing <strong>of</strong> pumps :<br />
There are two types <strong>of</strong> pumps testing.<br />
1. Testing in the shop or laboratory at the manufacturer works.<br />
2. Testing in the field after installation<br />
(i)<br />
(ii)<br />
(iii)<br />
Every pump must be tested before it is finally accepted. It is necessary for comparision <strong>of</strong><br />
specified, predicated and actual performance after installation, relating to head, discharge power,<br />
efficiency and suction requirements centrifugal pumps should be listed as per IS-9137 (Class ‘C’<br />
code <strong>of</strong> testing) and IS-11346.<br />
The scheme <strong>of</strong> testing includes taking readings, doing calculation and plotting <strong>of</strong><br />
The H-Q characteristics<br />
The P-Q characteristics.<br />
The efficiency versus Q characteristics<br />
11. Water Quality<br />
11.1. Recommended guidelines for physical and chemical parameter:<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
27<br />
Sl.<br />
No.<br />
Characteristics *Acceptable **Cause for<br />
1. Turbidity (NTU) 1 10<br />
2. Colour (Units on Platinum Cobalt scale) 5 25<br />
3. Teste and Odour Unobjectionable Objectionable<br />
4. PH 7.0 to 8.5 9.0<br />
5. Total dissolved solids (mg/I) 500 2000<br />
6. Chlorides (as CI) (mg/I) 20 600<br />
7. Chlorides (as CI) (mg/I) 200 1000<br />
8. Sulphates (as SO 4 (mg/I) 200 400<br />
9. Fluorides (as F) (mg/I) 1.0 1.5<br />
10. Nitrates (as NO 3 (mg/I) 45 45<br />
11. Calcium (as Ca) (mg/I) 75 200<br />
12. Magnesium (as Mg) (mg/I) 30 150<br />
If there are 250 mg/I <strong>of</strong> sulphates, Mg content can be increased to a amximum <strong>of</strong> 125mg/I<br />
with the reduction <strong>of</strong> sulphates at the rate <strong>of</strong> I unit per every 2.5 units <strong>of</strong> sulphates.<br />
Sl.<br />
No.<br />
Characteristics *Acceptable **Cause for<br />
13. Iron (as Fe) mg/I 0.1 1.0<br />
14. Manganese (as Mn) mg/I 0.05 0.5<br />
15. Copper (as Cu) (mg/I) 0.05 1.5<br />
16. Aluminium (as AI) (mg/I) 0.03 0.2<br />
17. Residual Chloride (mg/I) 0.2 >1.0<br />
18. Zinc (as Zn) (mg/I) 5.0 15.0<br />
19. Phenolic compounds (as Phenol) (mg/I) 0.001 0.002<br />
20. Anionic detergents (mg/I) (as MBAS) 0.2 1.0<br />
21. Mineral Oil (mg/I) 0.01 0.03<br />
TOXIC MATERIALS<br />
22. Arsenic (as As) (mg/I) 0.01 0.05<br />
23. Cadmium (as CD) (mg/I) 0.01 0.01<br />
24. Chromium<br />
(as hexavalent Cr) (mg/I) 0.05 0.05<br />
25. Cyanides (as CN) (mg/I) 0.05 0.05<br />
26. Lead (as Pb) (mg/I) 0.05 0.05<br />
27. Selenium (as SC) (mg/I) 0.01 0.01<br />
28. Mercury (total as Hg)<br />
(mg/I) 0.001 0.001<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
28<br />
29. Polynuclear aromatic 0.2 0.2<br />
Hydrocarbons (PAH) (ug/I)<br />
Pesticides (total, mg/I) Absent Refer to WHO<br />
guidelines for drinking<br />
water quality Vol.-I-<br />
1993<br />
RADIO ACTIVITY<br />
30. Gross Alpha activity (Bq/I) 0.1 0.1<br />
31. Gross Beta activity (Bq/I) 0.1 1.0<br />
The figures indicated under the column ‘Acceptable’ are the limits upto which water is generally<br />
acceptable to the consumers.<br />
Figures in excess <strong>of</strong> those mentioned under ‘Acceptable’ render the water not acceptable,<br />
but still may be tolerated in the absence <strong>of</strong> an alternative and better source but upto the limits<br />
indicated under column “Cause for Rejection” above which the sources will have to be rejected.<br />
It is possible that some mine and spring waters may exceed these radio activity limits and in such<br />
cases it is necessary to analyses the individual radio-nuclide order to assess the acceptability or otherwise<br />
for public consumption.<br />
<br />
Sr. Divisional Manager<br />
(Building Project)-II<br />
O.T.D.C. <strong>Ltd</strong>.<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
29<br />
PROFORMA-'A'<br />
CERTIFICATE OF LIST OF WORKS IN HAND (Clause No.49 (i) <strong>of</strong> DTCN)<br />
I/We do hereby certify that the following works have been executed by me/us in<br />
the past.<br />
Sl.<br />
No.<br />
Particulars <strong>of</strong><br />
works now in<br />
hand<br />
Amount <strong>of</strong><br />
each work<br />
Period which the work<br />
is stipulated to be<br />
completed<br />
(in month)<br />
Approximate value<br />
<strong>of</strong> work done<br />
against each work<br />
on the date <strong>of</strong><br />
submission <strong>of</strong><br />
Tender<br />
Deptt. Under which<br />
the work is being<br />
taken up.<br />
1 2 3 4 5 6 7<br />
Remarks<br />
I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date________________<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
CERTIFICATE OF EMPLOYMENT OF UN-EMPLOYED GRADUATE ENGINEERS/DIPLOMA HOLDERS<br />
(For Special Class and 'A' Class Contractors only)<br />
I/We do hereby certify that at present the following Engineering personnel are working with<br />
me/in our firm/company and their bio-data are furnished below:<br />
Sl.<br />
No.<br />
Name <strong>of</strong><br />
Engineering<br />
personnel<br />
appointed for<br />
supervising<br />
contractor's<br />
works with<br />
address<br />
Qualification<br />
Date <strong>of</strong><br />
appointment<br />
Monthly<br />
emolument<br />
Whether<br />
full time<br />
engagement<br />
and<br />
continuous<br />
30<br />
If they are<br />
Superannuated/<br />
Retired/ dismissed or<br />
removed personnel from<br />
State <strong>Govt</strong>./ Central<br />
<strong>Govt</strong>./ Public sector<br />
undertakings/ Private<br />
companies and firms or<br />
any one ineligible for<br />
<strong>Govt</strong>. service.<br />
1 2 3 4 5 6 7<br />
I/We also note that non-submission <strong>of</strong> this certificate will render my/our tenders liable for<br />
rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date________________<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
31<br />
PROFORMA-'B'<br />
CERTIFICATE OF LIST OF WORKS EXECUTED (Clause<br />
No.49(ii) <strong>of</strong> DTCN)<br />
I/We do hereby certify that the following works have<br />
been executed by me/us in the past.<br />
Sl.<br />
No.<br />
Particulars <strong>of</strong><br />
works already<br />
executed<br />
Approxim<br />
ate<br />
amount<br />
<strong>of</strong> each<br />
work<br />
Name <strong>of</strong><br />
Deptt.<br />
under which<br />
the works<br />
were<br />
executed<br />
Period <strong>of</strong><br />
commencem<br />
ent and<br />
period <strong>of</strong><br />
completion<br />
Whether the<br />
works were<br />
completed in<br />
stipulated<br />
period<br />
1 2 3 4 5 6 7<br />
Remarks<br />
I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for<br />
rejection.<br />
Signature <strong>of</strong> the tenderer<br />
Date________________<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
WORK PROGRAMME<br />
32<br />
Name <strong>of</strong> the Work:“<strong>Development</strong> <strong>of</strong> Brahmapura under Brahamapura-Nuagarh-Kuadoli-<br />
Nandinia-Jhanjibandha as a Tourist Destination In <strong>Orissa</strong>.”.<br />
Time<br />
Description <strong>of</strong> work<br />
1 st Month ………………………………………………………………………………………………………………………..<br />
2 nd Month ………………………..………………………………………………………………………………………………<br />
3 rd Month ……………………………………………………………………………………………………………………….<br />
4 th Month …………………………………………………………………………………………………………………………<br />
5 th Month ………………………………………………………………………………………………………………………..<br />
6 th Month ………………………………………………………………………………………………………………………..<br />
7 th Month …………………………………………………………………………………………………………….<br />
8 th Month …………………………………………………………………………………………………………….<br />
9 th Month …………………………………………………………………………………………………………….<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
33<br />
TENDER SCHEDULE FOR DEVELOPMENT OF BRAHAMAPURA UNDER<br />
BARHAMAPURA-HINDOL-NUAGARH-KUADOLI-NANDINIA-JHANJIBANDHA<br />
AS A TOURIST DESTINATION IN ORISSA<br />
Estimated cost: - Rs.46.72lakhs<br />
E.M.D:- 1 % <strong>of</strong> Estimated amount<br />
Sl.<br />
CIVIL WORK<br />
No.<br />
Unit Qnty Rate Amount<br />
Civil work<br />
1 Earth work excavation<br />
Earth work in excavation <strong>of</strong> foundation trenches and<br />
column foundation and pits in Hard soil/ Gravelly soil<br />
and depositing materials within 50m initial lead and<br />
1.5m initial lift including rough dressing as per<br />
direction and specification <strong>of</strong> the department<br />
including stacking the useful materials separately as<br />
ordered as per direction <strong>of</strong> Engineer-in-charge<br />
including cost <strong>of</strong> all labour, sundries, Tools & plants<br />
etc. complete. Cum 438.05 52.00 22778.60<br />
2. Earthwork (open well)<br />
Earth work excavation in hard rock(other than<br />
granite and disintigration) removed by chiselling<br />
dressing and levelling the bed not exceeding 1.5 mt<br />
depth depositing the soil within initial lead <strong>of</strong> 50mt<br />
and as per specification for 1st depth <strong>of</strong> 1.5m (up to<br />
5') cum 75.09 377.00 28308.93<br />
2nd depth <strong>of</strong> 1.5m (up to 10') cum 44.43 571.70 25400.63<br />
3rd depth <strong>of</strong> 1.5m (up to 15') cum 44.43 764.33 33959.18<br />
4th depth <strong>of</strong> 1.5m (up to 20') cum 44.43 956.96 42517.73<br />
5th depth <strong>of</strong> 1.5m (up to 25') cum 44.43 1149.60 51076.73<br />
3 Back filling<br />
Filling foundation trenches and plinth with<br />
excavated materials in layers not exceeding 0.3mtr.<br />
in depth including watering, ramming and dressing<br />
and levelling the top to proper level or gadient,<br />
including cost <strong>of</strong> all labour,sundries, T&P etc.,<br />
complete as per direction <strong>of</strong> the Engineer-in-charge. Cum 88.52 34.67 3068.99<br />
4 Sand filling<br />
Filling foundation trenches and plinth with sweet<br />
river sand, well watered and compacted in layers <strong>of</strong><br />
0.225 mtr, top surface dressed and levelled to<br />
proper gradient including cost <strong>of</strong> all materials,<br />
conveyance, all taxes and royalties, loading and<br />
unloading, including cost <strong>of</strong> all labour, T&P, sundries<br />
etc. complete in all respect as per direction <strong>of</strong> the<br />
Engineer-in-charge. Cum 159.79 305.20 48767.91<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
5 P.C.C - (1:4:8)<br />
Providing and laying plain cement concrete (1:4:8) in<br />
foundation and bottom layers <strong>of</strong> flooring etc. using<br />
40mm size black hard crusher broken granite metal<br />
<strong>of</strong> approved quality from approved quarry including<br />
mixing, lowering laying and compacting to proper<br />
thickness, watering and curing for the required<br />
period as per direction <strong>of</strong> the Engineer-in-charge,<br />
including cost <strong>of</strong> all materials with all taxes and<br />
royalities, loading and unloading conveyance, all<br />
labour, all sundries and T&P etc. complete. Cum 77.92 2525.00 196750.53<br />
6 C.C(1:2:4)<br />
Cement Concrete (1:2:4) using 12mm size broken<br />
granite chips <strong>of</strong> approved quality from approved<br />
quarry including mixing, lowering laying and<br />
compacting to proper thickness, watering and curing<br />
for the required period as per direction <strong>of</strong> the<br />
Engineer-in-charge, including cost <strong>of</strong> all materials<br />
with all taxes and royalities, loading and unloading<br />
conveyance, all labour, all sundries and T&P etc.<br />
complete. etc. complete. Cum 22.27 3823.20 85142.66<br />
7 Laterite (1:6 F & P )<br />
Laterite masonry in cement mortar (1:6) after<br />
spraying water over the Laterite to clean it from<br />
the dust/ mud particles before use in foundation<br />
& plinth as per drawings. including cost,<br />
conveyance, all taxes, royalties, loading and<br />
unloading <strong>of</strong> all materials, including cost <strong>of</strong> all<br />
labour, scaffolding, watering and curing, sundries,<br />
T&P etc. complete as per the direction <strong>of</strong> the<br />
Engineer-in-charge. Cum 92.81 1902.90 176608.15<br />
8 Laterite (1:6 F & P )(open well)<br />
Laterite stone masonary in cement mortar (1:6) in<br />
Foundation and Plinth including watering and curing<br />
for seven days with cost, conveyance, royality,<br />
taxes <strong>of</strong> all materials, labour and T&P required for<br />
the work etc complete and as per direction <strong>of</strong><br />
Engineer-in-charge. cum 49.05 1974.60 96854.13<br />
9 Laterite (1:6 Superstructure )<br />
Laterite masonry in cement mortar (1:6) after<br />
spraying water over the Laterite to clean it from<br />
the dust/ mud particles before use Superstructure<br />
as per drawings. including cost, conveyance, all<br />
taxes, royalties, loading and unloading <strong>of</strong> all<br />
materials, including cost <strong>of</strong> all labour, scaffolding,<br />
watering and curing, sundries, T&P etc. complete Cum 162.68 1944.84 316386.57<br />
34<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
as per the direction <strong>of</strong> the Engineer-in-charge.<br />
10 C.B Bricks (1:6 F & P)<br />
Providing 1st class clamp burnt bricks masonry work<br />
using C.B.bricks having crushing strength not<br />
less than 35Kg/Sqcm in cement mortar (1:6) after<br />
immersing the bricks for minimum 6 hours in<br />
water before use in Foundation Plinth as per<br />
drawings. including cost, conveyance, all taxes,<br />
royalties, loading and unloading <strong>of</strong> all materials,<br />
including cost <strong>of</strong> all labour, scaffolding, watering<br />
and curing, sundries, T&P etc. complete as per the<br />
direction <strong>of</strong> the Engineer-in-charge. Cum 20.61 2159.30 44492.38<br />
11 C.B Bricks (1:6 Superstructure)<br />
Providing 1st class clamp burnt bricks masonry work<br />
using C.B.bricks having crushing strength not<br />
less than 35Kg/Sqcm in cement mortar (1:6) after<br />
immersing the bricks for minimum 6 hours in<br />
water before use in Superstructure as per<br />
drawings. including cost, conveyance, all taxes,<br />
royalties, loading and unloading <strong>of</strong> all materials,<br />
including cost <strong>of</strong> all labour, scaffolding, watering<br />
and curing, sundries, T&P etc. complete as per the<br />
direction <strong>of</strong> the Engineer-in-charge. Cum 14.39 2192.30 31547.20<br />
12 C.B Bricks (1:4 Superstructure)<br />
Providing 1st class clamp burnt bricks masonry work<br />
using C.B.bricks having crushing strength not<br />
less than 35Kg/Sqcm in cement mortar (1:4) after<br />
immersing the bricks for minimum 6 hours in<br />
water before use in Superstructure and using<br />
cost <strong>of</strong> 6mm dia. Rod as per drawings. including cost,<br />
conveyance, all taxes, royalties, loading and<br />
unloading <strong>of</strong> all materials, including cost <strong>of</strong> all<br />
labour, scaffolding, watering and curing, sundries,<br />
T&P etc. complete as per the direction <strong>of</strong> the<br />
Engineer-in-charge. Cum 6.69 2959.60 19799.72<br />
13 R.C.C- M20<br />
Providing, lifting, hoisting and laying Reinforced<br />
cement concrete <strong>of</strong> M-20 Grade in footing, Lintels,<br />
Chajja,Ro<strong>of</strong> slabs, Column, Beam etc. with 12mm to<br />
20mm size black hard crusher broken granite chips<br />
<strong>of</strong> approved quality from approved quarry including<br />
mixing and compacting to proper shape and size,<br />
level and plumbs and finishing the exposed surfaces<br />
smooth including cost <strong>of</strong> scaffolding, watering and<br />
curing for the required period including cost <strong>of</strong> all<br />
materials with taxes, royalties transportation, Cum 87.02 3750.80 326394.62<br />
35<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
loading and unloading, all labour, sundries, T&P<br />
including hire & running charges <strong>of</strong> concrete mixer<br />
and vibrator etc completed as per the direction <strong>of</strong><br />
the Engineer-in-charge but excluding the cost <strong>of</strong><br />
materials and labour for reinforcement bars ,<br />
centering and shuttering for the work.<br />
14 Centering and shuttering<br />
Providing strong, rigid, leveled and plumbed<br />
centering and shuttering to required shape and size<br />
for all kinds <strong>of</strong> R.C.C. works in the items mentioned<br />
below with wooden or steel centering materials with<br />
all necessary bracing, ties and supports with level<br />
centering covered with bituminous paper including<br />
provision <strong>of</strong> necessary holes and pockets, electrical<br />
conduit pipe, P.H. pipes, fan hooks or boxes, switch<br />
and board insert plates, clamps and extension bars<br />
etc. as per the direction <strong>of</strong> the Engineer-in-charge<br />
and dismantling and removing the shuttering after<br />
the required interval from the date <strong>of</strong> casting,<br />
including cost <strong>of</strong> all materials with transportation,<br />
taxes, loading and unloading etc. and all labour,<br />
sundries, T&P scaffolding etc. complete.<br />
a) Foundation & plinth beam Sqm 27.93 67.20 1876.90<br />
b) Column foundation Sqm 53.34 67.20 3584.45<br />
c) Lintel Sqm 20.86 155.10 3235.39<br />
d) Ro<strong>of</strong> slab(flat) Sqm 178.40 225.10 40157.84<br />
e) Slab(slope) Sqm 88.10 262.00 23082.20<br />
f) Chajja Sqm 7.70 225.10 1733.27<br />
g) Beam & Column Sqm 276.60 305.70 84556.62<br />
h) fin & concrete wall Sqm 33.60 259.40 8715.84<br />
15 Reinforcement (TOR Fe-415)<br />
Providing & fixing TOR Fe-415 reinforcement bars<br />
for RCC work <strong>of</strong> required diameter <strong>of</strong> approved<br />
quality with straightening, cutting, bending, binding<br />
welding and joining (if necessary) and tying the grills<br />
and placing in position as required for R.C.C. work<br />
and providing fan hooks, hoisting, lowering and laying<br />
including cost, conveyance and taxes <strong>of</strong> M.S. Rods or<br />
tor steel and binding wires <strong>of</strong> 18 to 20 gauge and<br />
labour required for the work for bending, binding<br />
and tying the grills in all heights as per the<br />
specification & direction <strong>of</strong> E-I-C. (Linear<br />
measurements will be taken & quantity will be<br />
calculated on standard weight. Weight <strong>of</strong> binding<br />
wire will not be considered for measurement.) Qtl. 85.45 4932.00 421439.40<br />
16 16mm thick Plaster<br />
36<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
Providing 16mm thick cement plaster to the inside<br />
surface <strong>of</strong> C.B Brick masonary wall with cement<br />
mortar (1:6) including racking out joints, scraping<br />
and cleaning the surface and finishing the plaster<br />
surface smooth using wooden floats only to proper<br />
plumbs and level as per drawings including cost <strong>of</strong> all<br />
materials, conveyance, loading and unloading, all<br />
taxes and royalties, all labour, scaffolding, watering<br />
and curing, sundries and T&P etc. complete as per<br />
direction <strong>of</strong> the Engineer-in-charge Sqm 170.50 76.40 13026.20<br />
17 12mm thick Plaster<br />
Providing 12mm thick cement plaster to the outside<br />
surface <strong>of</strong> C.B Brick Masonary wall with cement<br />
mortar (1:6) including racking out joints, scraping<br />
and cleaning the surface and finishing the plaster<br />
surface smooth using wooden floats only to proper<br />
plumbs and level as per drawings including cost <strong>of</strong> all<br />
materials, conveyance, loading and unloading, all<br />
taxes and royalties, all labour, scaffolding, watering<br />
and curing, sundries and T&P etc. complete as per<br />
direction <strong>of</strong> the Engineer-in-charge Sqm 98.76 56.60 5589.82<br />
18 6 mm thick Plaster<br />
Providing 6mm thick ceiling plaster (1:4) in all floors<br />
finished smooth to inside rough surface <strong>of</strong> ceiling<br />
after chiping & ceiling properly including watering<br />
and curing with cost, conveyance, royalties and<br />
taxes <strong>of</strong> all materials and cost <strong>of</strong> all labour with T &<br />
P required for the work etc. complete.as per<br />
direction <strong>of</strong> Engineer-in-charge. Sqm 444.47 60.20 26757.09<br />
19 Flush Pointing (1:3)<br />
Cement Flush pointing to the stone masonry in<br />
cement mortar(1:3) after raking out the joints<br />
watering, curing etc. complete including cost <strong>of</strong><br />
conveyance , royalities, taxes and cost <strong>of</strong> all<br />
materials, T&P etc. complete in all respect. Sqm 1157.97 60.30 69825.591<br />
20 Providing 12mm thick cement plaster with cement<br />
mortar <strong>of</strong> (1:4) including neat cement punning,<br />
finished smooth to proper level with bitumen<br />
painting over top <strong>of</strong> walls as bearing plaster<br />
including cost <strong>of</strong> all materials, conveyance, loading<br />
and unloading, all taxes and royalties, all labour,<br />
scaffolding, watering and curing , sundries and T&P<br />
etc. complete as per direction <strong>of</strong> the Engineer-incharge.<br />
Sqm 10.90 68.20 743.38<br />
21 Decorative cement plaster<br />
20mm thick Decorative cement plaster including<br />
37<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
colour mixing if required as per the drawing., Data<br />
per sqm complete with all cost, convelance, royality,<br />
taxes <strong>of</strong> all materials, labour, T & P required for<br />
the work etc complete and as per direction <strong>of</strong><br />
Engineer-in-charge.<br />
PCC sqm 22.07 1345.50 29695.19<br />
22 Grading Concrete<br />
Providing 25mm Avg. thick grading concrete ( 1:2:2)<br />
over 2 coats <strong>of</strong> waterpro<strong>of</strong>ing treatment on ro<strong>of</strong><br />
slabs using 6 mm thick & down graded-chips after<br />
chipping, chiselling and cleaning the surface by wire<br />
brushing, watering and curing etc. complete<br />
including cost, conveyance, royalties and taxes <strong>of</strong> all<br />
materials and labour , T & P required for the work<br />
etc. complete in all floor as per direction <strong>of</strong><br />
Engineer-in-charge. Sqm 189.60 147.90 28383.12<br />
23(a)<br />
Flooring (Ceramic tiles)<br />
Providing & fixing premium quality( 300 x300 x<br />
7mm) thick ceramic tiles flooring <strong>of</strong> approved<br />
colour over 20mm thick bed in C.M. (1:1) and make<br />
(Johnson / Bell / KAJARIA or equivalent)<br />
confirming to IS specification in floors filling joints<br />
with epoxy grout <strong>of</strong> approved quality etc. complete<br />
in all respects as per direction <strong>of</strong> the Engineer-incharge.<br />
sqm 24.85 704.80 17514.28<br />
38<br />
(b) Fixing ceramic tile in dadoes skirting on 12mm thick<br />
cement plaster (1:3) jointed with neat cement slurry<br />
and ceramic tile <strong>of</strong> make (Johnson / Bell /<br />
KAJARIA or equivalent) confirming to IS<br />
specification in dadoos and skarting filling joints<br />
with epoxy grout <strong>of</strong> approved quality etc complete in<br />
all respects as per direction <strong>of</strong> the Engineer-incharge.<br />
Sqm 125.79 660.40 83071.72<br />
24 Kota Stone(1:1)<br />
Providing & fixing Kota stone <strong>of</strong> minimum 16mm<br />
thick (area above 0.10sqm) in floor using 25mm thick<br />
cement mortar (1:1) <strong>of</strong> approved quality, colour and<br />
filling joints with epoxy grout <strong>of</strong> approved quality<br />
etc. complete in all respects as per direction <strong>of</strong> the<br />
Engineer-in-charge.<br />
<strong>Development</strong> <strong>of</strong> park(stepped pathway) sqm 238.47 756.80 180474.10<br />
25 Flooring(Marble tiles)<br />
Providing & fixing marble tile minimum 16mm thick<br />
flooring (area above 0.10sqm to 0.40sqm) flooring<br />
over 25mm thick bed in C.M. (1:1) and confirming to Sqm 114.73 908.30 104209.26<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
IS specification in floors filling joints with epoxy<br />
grout <strong>of</strong> approved quality etc. complete in all<br />
respects as per direction <strong>of</strong> the Engineer-in-charge<br />
26 Artificial stone flooring<br />
25mm thick artificial stone flooring with cement<br />
concrete( 1:2:4) laid to a proper slope in two layers<br />
bottom layer being 20mm with min. 12mm size down<br />
graded hard granite stone chips and the top layer<br />
gmm thick down graded with 6mm chips <strong>of</strong> approved<br />
quality <strong>of</strong> stone from an approved quarry including<br />
rounding the corners, watering, curing, with all cost,<br />
conveyance, royalities, T&P etc. complete as per the<br />
directions <strong>of</strong> the EIC. Sqm 5.95 140.10 833.60<br />
27 Teracota tiles in ro<strong>of</strong> slab<br />
Fixing teracota tiles on ro<strong>of</strong> on 12 mm thick cement<br />
plaster (1:3) jointed with neat cement slurry mixed<br />
with pigments to match the shade <strong>of</strong> the tiles<br />
including rubbing and polishing complete. Sqm 38.55 522.73 20151.24<br />
28 Texture paint<br />
Providing texture paint to exterior surfaces<br />
including cost <strong>of</strong> all materials, labour, conveyance,<br />
taxes, royalities, scaffolding, watering, curing,<br />
sundries, tools and plants etc., as per the direction<br />
<strong>of</strong> the Engineer-in-charge. Sqm 1376.91 300.00 413073.00<br />
29 Plastic paint<br />
Providing and applying 2 coats <strong>of</strong> plastic paint<br />
approved quality over a coat <strong>of</strong> POP and shade, over<br />
a coat <strong>of</strong> cement primer <strong>of</strong> approved quality over<br />
the surface (interior) including preparation <strong>of</strong><br />
surface, B278 sand papering the intermediate coats,<br />
providing necessary putty work including cost <strong>of</strong> all<br />
materials, labour, conveyance, taxes, royalities,<br />
scaffolding, watering, curing, sundries, tools and<br />
plants etc., as per the direction <strong>of</strong> the Engineer-incharge.<br />
Sqm 474.85 69.90 33192.02<br />
30 Enamel Paints<br />
Painting two coats with synthetic enamel paint <strong>of</strong><br />
approved quality and approved shade confirming to<br />
ISI on steel/wood work to give an even shade over a<br />
coat <strong>of</strong> primer <strong>of</strong> approved quality and shade<br />
including sand papering and making the surface<br />
smooth in all floors at all heights including cost,<br />
conveyance, loading, unloading, taxes <strong>of</strong> all<br />
materials, labour, sundries, T& P scaffolding<br />
required for the work and complete in all respect as<br />
per specifications and directions <strong>of</strong> Engineer-in- Sqm 43.72 70.90 3099.75<br />
39<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
charge.<br />
31 Glazed Ventilator<br />
Glazed Ventilator <strong>of</strong> size 600mm x 600mm with<br />
teak wood frame <strong>of</strong> size 75mm x 37.5mm in crosssection.<br />
including all fitting including cost <strong>of</strong><br />
materials all taxes labour, T&P etc complete as per<br />
direction <strong>of</strong> engineer-in-charge. Sqm 3.62 3020.30 10933.49<br />
32 Sliding window<br />
Supplying fitting, fixing up window (sliding type)<br />
made up aluminum section 151-154, 151-155 as<br />
window frame section no 151-155,151-153 and 151-<br />
167 as shutter frame with 5mm thick black glass as<br />
panel fitted with rubber beading including locking<br />
arrangement including all fitting including cost <strong>of</strong><br />
materials all taxes labour, T&P etc complete as per<br />
direction <strong>of</strong> engineer-in-charge. Sqm 2.92 3133.30 9149.24<br />
33 Sal wood Choukaths<br />
Supplying, fitting and fixing in position well dressed,<br />
well seasoned sal wood work in choukaths size (75<br />
mm x125mm ) which should be free from serious<br />
defects such as dead knots, flows etc. in all floors<br />
including two coats <strong>of</strong> coaltarring to wall side faces,<br />
6 nos. <strong>of</strong> W.I. Clamps and required screws with<br />
approved quality including cost, conveyance,<br />
royalties and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />
labour with T & P required for the work and<br />
complete as per the direction <strong>of</strong> Engineer-incharge.<br />
Cum 0.09 34213.40 3079.21<br />
34 Providing fitting and fixing 25mm thick Piasal wood<br />
or local teak wood pannel shutter complete including<br />
mending and cutting sizes <strong>of</strong> grooves in chowkaths<br />
and for over lapping portion <strong>of</strong> the shutters where<br />
necessary supplying, fitting fixing wooden hinged<br />
cleats, sand blocks and fixing oxidised iron or<br />
chromium plated, iron/ steel aldrops, tower bolts,<br />
handles, iron hinges screws etc. complete as per<br />
requirement and any additional fittings as directed<br />
by the Engineer-in-charge in all floors . Sqm 3.13 3031.60 9488.91<br />
35 PVC Door<br />
Providing and fixing 30mm thick factory made PVC<br />
rigid foam paneled door shutters manufactured by<br />
M/s Rajshri or equivalent made from M.S. tube <strong>of</strong><br />
19 gauge thickness, size 19x19mm for styles and<br />
15x15mm for top and bottom rails, covered with<br />
heat moulded PVC “C” channel <strong>of</strong> 5mm thick sheet<br />
and 30x50mm wide to form styles and 5mm thick Sqm 8.45 2700.00 22815.00<br />
40<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
and 75mm wide PVC sheets for top rail, lock rail and<br />
bottom rail on other side and 5mm thick, 20mm wide<br />
cross PVC sheet as gap insert for top rail and<br />
bottom rail, paneling <strong>of</strong> 5mm thick PVC sheet fitted<br />
in the M.S. frame welded/sealed to the styles and<br />
rails with 5x30mm PVC sheet beading on either side<br />
and joined together with solvent cement adhesive<br />
etc., complete as per manufacturers specification<br />
including fixing frames with 4 Nos. M.S. powder<br />
coated butt hinges complete including one 10inch<br />
aluminium aldrop & two aluminium tower bolts <strong>of</strong><br />
10inch and 6inch and two aluminium handles cost <strong>of</strong><br />
all materials, conveyance, loading, unloading, and<br />
taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour, sundries,<br />
T&P required for the work as per direction <strong>of</strong> E-I-C<br />
36 Plinth protection<br />
Providing plinth protection 600mm wide having inner<br />
wall <strong>of</strong> 125x450mm in C.B. Bricks masonry in CM<br />
(1:6)over 100mm thick base PCC (1:4:8)100mm thick<br />
inside sand filling, 75mm thick flooring base in<br />
CC(1:4:8 ) 12mm thick C.P in C.M.1:4 complete with<br />
necessary slopes, dressing and leveling the earth all<br />
round the building including the cost <strong>of</strong> all<br />
materials, labour, all taxes, royalties,<br />
transportation, loading and unloading, watering and<br />
curing, sundries T&P etc.complete as directed by<br />
the <strong>of</strong> E-I-C. Sqm 25.41 240.86 6120.25<br />
37 Granite flooring<br />
Providing & fixing <strong>of</strong> granite slab20mm thick and<br />
above 0.4 sq.m in floor over 25mm thick cement<br />
mortar (1:1) to proper slope, line and level including<br />
cutting to required size and shape, fixing at corners<br />
and splays etc. including filling the joints with white<br />
cement and color pigment to match the color and<br />
shade <strong>of</strong> tiles and cleaning the surface complete as<br />
per the design & drawing with cost <strong>of</strong> all materials,<br />
labour, conveyance, taxes , T&P etc. complete as per<br />
the direction <strong>of</strong> Engineering-in-charge Sqm 84.23 1930.00 162563.90<br />
38 Stainless steel<br />
Supplying, fitting and fixing <strong>of</strong> stainless steel <strong>of</strong><br />
304 grade in hand railing using 50mm dia <strong>of</strong> 2mm<br />
thick circular pipe with Balustrade <strong>of</strong> size<br />
32mmx32mmx 2mm @ 0.90mtr c/c as per approved<br />
design and specification ,buffing,polishing etc with<br />
cost, conveyance, royality, taxes <strong>of</strong> all materials,<br />
labour and T&P required for the work etc complete Rmt 9.41 3137.70 29525.76<br />
41<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
and as per direction <strong>of</strong> Engineer-in-charge.<br />
39 RCC railing(M-20)<br />
Providing & fixing <strong>of</strong> decorative R.C.C railing (M-20),<br />
750mm height prefabricated with balustrade<br />
complete as per approved architectural drawings &<br />
including colouring cost, conveyance, royalties and<br />
taxes <strong>of</strong> all materials, labour, T&P, sundries etc.<br />
required for the work complete as per direction <strong>of</strong><br />
the E-I-C.<br />
<strong>Development</strong> <strong>of</strong> park (stepped pathway) RMT 187.15 1030.90 192932.94<br />
40 M. S Fan Hooks<br />
Providing fitting, fixing fan hook M.S. round rod <strong>of</strong><br />
16mm dia ( SAIL Steel) with all cost <strong>of</strong> material,<br />
labour, conveyance, T&P and complete as per the<br />
direction <strong>of</strong> Engineer-in-charge. Nos. 6.00 45.00 270.00<br />
41 M.S. grill<br />
Supplying, fitting and fixing <strong>of</strong> powder coated M.S.<br />
grill and gate made out <strong>of</strong> M.S. square bar / M.S.<br />
flats / M.S. angles as per approved drawing and<br />
design, cutting to required size and welding<br />
properly, finished smooth and sand papering,<br />
including cost, conveyance, taxes <strong>of</strong> all materials,<br />
required screws, cost <strong>of</strong> all labour, T&P etc. as<br />
required for the work complete as per direction <strong>of</strong><br />
the Engineer-in-charge in all floors. Kg 654.19 60.00 39251.40<br />
42 <strong>Development</strong> <strong>of</strong> site fencing and approach road to<br />
pump house site and including all cost <strong>of</strong> all material,<br />
labour, all taxes, royalties, transportation, loading<br />
and unloading, watering and curing, sundries T&P<br />
etc.complete as directed by the <strong>of</strong> E-I-C. Cum 11.32 367.20 4156.70<br />
43 Supplying, fitting and fixing <strong>of</strong> R,C.C POST with<br />
barbed wire using 3ply barbed wire in 6" c/c <strong>of</strong><br />
approved quality for fencing, fixing by means <strong>of</strong><br />
staples and straining hook tying with G:I wire<br />
including cos <strong>of</strong> barbed wire staples hooks and tying<br />
wire and cost <strong>of</strong> all material , labour, all taxes,<br />
royalties, transportation, loading and unloading,<br />
watering and curing, sundries T&P etc.complete as<br />
directed by the <strong>of</strong> E-I-C. Rft 120.00 250.51 30061.20<br />
INTERNAL ELECTRIFICATION<br />
44 Recessed wiring to light point and exhaust fan point<br />
in 20mm dia non-metallic fexible conduit pipe with<br />
1.5 sqmm single core copper wire & earth continuity<br />
in 1sqmm PVC insulated copper wire and modular<br />
type 6Amp. 1way plate type Modular switch,<br />
A CIVIL WORK TOTAL 3666942.93<br />
42<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
(Polycarbonate) and G.I box <strong>of</strong> adequate size<br />
including PVC bend, saddle, elbow, etc including cost<br />
<strong>of</strong> all materials, labours, transportation, T & P etc.<br />
complete as per direction <strong>of</strong> the Engineer-in-charge<br />
a) Short point Nos. 16.00 470.00 7520.00<br />
b) Medium point Nos. 18.00 701.00 12618.00<br />
c) Long point Nos. 6.00 1011.00 6066.00<br />
45 Recessed wiring to ceiling fan point in 20mm dia nonmetallic<br />
fexible conduit pipe with 1.5sqmm single<br />
core copper wire & earth continuity in 1sqmm PVC<br />
insulated copper wire and modular type box cover,<br />
step type regulator and switch etc. complete<br />
including cost <strong>of</strong> all materials, labours,<br />
transportation, T & P etc. complete as per direction<br />
<strong>of</strong> the Engineer-in-charge. Nos. 4.00 927.00 3708.00<br />
46 Recessed wiring to 6A plug point in 20mm dia nonmetallic<br />
flexible conduit pipe with 1.5sqmm single<br />
core copper wire & earth continuity in 1sqmm PVC<br />
insulated copper wire and modular type box cover,<br />
switch and socket etc. complete including cost <strong>of</strong> all<br />
materials, labours, transportation, T & P etc.<br />
complete as per direction <strong>of</strong> the Engineer-in-charge. Nos. 6.00 576.00 3456.00<br />
47 Supplying and fixing <strong>of</strong> 6A plug in modular type<br />
box cover, switch and socket G.I box <strong>of</strong> adequate<br />
size including PVC bend, saddle, elbow, etc and other<br />
necessary materials & labour etc. complete including<br />
cost <strong>of</strong> all materials, labours, transportation, T & P<br />
etc. complete as per direction <strong>of</strong> the Engineer-incharge.<br />
Nos. 4.00 355.00 1420.00<br />
48 Supplying, fixing <strong>of</strong> 20A plug in modular type box<br />
cover, switch and socket etc. complete G.I box <strong>of</strong><br />
adequate size including PVC bend, saddle, elbow,<br />
including cost <strong>of</strong> all materials, labours,<br />
transportation, T & P etc. complete as per direction<br />
<strong>of</strong> the Engineer-in-charge . Nos. 6.00 648.00 3888.00<br />
49 Recessed wiring to sub main with 2 x 2.5 + 1 x 1sqmm<br />
single core PVC insulated copper wire run inside<br />
20mm dia heavy duty polythene conduit with PVC<br />
bend, saddle, screw etc along with other necessary<br />
materials including cost <strong>of</strong> all materials, labours,<br />
transportation, T & P etc. complete as per direction<br />
<strong>of</strong> the Engineer-in-charge and labour. Mtr 216.00 106.00 22896.00<br />
50 Recessed wiring to sub main with 2 x 4 + 1 x 1.5sqmm<br />
single core PVC insulated copper wire run inside<br />
20mm dia heavy duty polythene conduit with PVC<br />
bend, saddle, screw etc along with other necessary Mtr 95.00 144.00 13680.00<br />
43<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
materials including cost <strong>of</strong> all materials, labours,<br />
transportation, T & P etc. complete as per direction<br />
<strong>of</strong> the Engineer-in-charge<br />
51 Supplying, fitting & fixing <strong>of</strong> 900mm ceiling fan<br />
(Bajaj-model elegance/ Havells –Fusion Metalic) or<br />
equivalent make including cost <strong>of</strong> GI pipe including<br />
cost <strong>of</strong> all materials, labours, transportation, T & P<br />
etc. complete as per direction <strong>of</strong> the Engineer-incharge<br />
Nos. 4.00 1933.00 7732.00<br />
52 Supply, fitting & fixing <strong>of</strong> exhaust fan (make<br />
Bajaj/Crompton greaves)including nut bolt & wire<br />
including cost <strong>of</strong> all materials, labours,<br />
transportation, T & P etc. complete as per direction<br />
<strong>of</strong> the Engineer-in-charge No. 6.00 1500.00 9000.00<br />
53 Supplying, fitting & fixing <strong>of</strong> 5 watt LED Bulb<br />
(Fortune Art/ Equivalent )Make including cost <strong>of</strong> all<br />
materials, labours, transportation, T & P etc.<br />
complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 15.00 3800.00 57000.00<br />
54 Supplying, fitting & fixing <strong>of</strong> 16 watt LED tube light<br />
(Fortune Art/ Equivalent)Make including cost <strong>of</strong> all<br />
materials, labours, transportation, T & P etc.<br />
complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 2.00 6552.00 13104.00<br />
55 Supplying, fitting & fixing <strong>of</strong> 10 watt LED street<br />
light (Fortune Art/ Equivalent )Make including cost<br />
<strong>of</strong> all materials, labours, transportation, T & P etc.<br />
complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 2.00 9801.00 19602.00<br />
56 Supplying, fitting & fixing <strong>of</strong> 8 way Double door<br />
distribution box with I/C -40 A DP MCB -1No , O/G<br />
- 6/10A sp MCB -6No including cost <strong>of</strong> all materials,<br />
labour, T &P etc. complete as per direction <strong>of</strong><br />
Engineer-in-charge Nos. 2.00 3200.00 6400.00<br />
57 Supplying, fitting & fixing <strong>of</strong> 12 watt LED par light<br />
(Fortune Art/ Equivalent )Make including cost <strong>of</strong> all<br />
materials, labours, transportation, T & P etc.<br />
complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 6.00 5784.00 34704.00<br />
58 Supplying <strong>of</strong> 3 phase 50 HZ submersible pump set<br />
suitable for with head <strong>of</strong> 55mt. & discharge <strong>of</strong> 4.5<br />
LPS (7.5H.P) complete ( Make -KSB/ TEXMO). Set 1.00 35900.00 35900.00<br />
59 Supplying ,fitting and fixing <strong>of</strong> 4sqmm 3core flat<br />
copper cable suitable for above pump set confirming<br />
to relevant IS specification with ISI mark.(Make-<br />
Finolex/BCH/Polycab) Mtr 160.00 130.00 20800.00<br />
60 Supplying ,fitting and fixing <strong>of</strong> 3phase star delta<br />
fully automatic control panel with Ampere meter<br />
,voltmeter, single phasing over load relay and<br />
indicator lamp etc Nos 1.00 9500.00 9500.00<br />
44<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
B Total 288994.00<br />
C.ILLUMINATION<br />
61 Supplying, installation, testing and commissioning <strong>of</strong><br />
stone lantern <strong>of</strong> Khandalite stone <strong>of</strong> height 3'<br />
having minimum 3'8" above ground level with<br />
required foundation etc. complete suitable for use<br />
with 5W LED Bulb (Fortune Art/ Equivalent Make)<br />
as per specification and direction <strong>of</strong> the Engineer in<br />
charge. Nos 20.00 13300.00 266000.00<br />
62 Supply <strong>of</strong> all required material and laying, testing,<br />
commissioning <strong>of</strong> following sizes1.1KV grade PVC<br />
insulated armored aluminium/copper power cable<br />
excavation <strong>of</strong> cable trench <strong>of</strong> 750 mm deep in all<br />
kinds <strong>of</strong> soil, 150 mm thick and filling, brick<br />
covering,<br />
a) 4 core x 16sqmm armored. AL cable. Mtrs 70.00 293.00 20510.00<br />
b) 2 core x 6sqmm Ar. Cu. cable. Mtrs 165.00 323.00 53295.00<br />
c) 2 core x 2.5sqmm Ar Cu. cable. Mtrs 250.00 218.00 54500.00<br />
63 Supply, delivery, installation, testing and<br />
commissioning <strong>of</strong> L.T. outdoor floor mounted ,Double<br />
door type main distribution boards made out <strong>of</strong> 2<br />
mm thick CR sheet metal duly acid treated with<br />
powder coated body as per specification and<br />
direction <strong>of</strong> the Engineer in charge.<br />
(a) Main panel :<br />
Incoming<br />
100 Amp 35 kA 415 V FP MCCB - 1 No.<br />
1 set <strong>of</strong> 3 phase150 Amp copper busbar<br />
0-500 V voltmeter - 1 No. with selector switch<br />
0-100 Amp Ampere Metre - 1 No. with selector<br />
switch<br />
PH indicater -6 nos.<br />
(b) 100/5 Amp CT coil - 3 nos.<br />
Out going :<br />
40 A F.P C/O - 1 Nos.<br />
40 Amp DP MCB - 4 Nos.<br />
25 Amp SP MCB - 4 Nos. Set 1.00 38000.00 38000.00<br />
64 EARTHING<br />
(i) Supply and installation including all connections <strong>of</strong><br />
earth electrode stations comprising <strong>of</strong> :<br />
40 mm dia class - 'B' G.I. Pipe 2.5 mt. long.<br />
(a) Digging <strong>of</strong> earth pit, placing <strong>of</strong> G.I. Pipe in the pit<br />
and filling up <strong>of</strong> the same with a mixture <strong>of</strong> 150 kg.<br />
Salt 50 kg. <strong>of</strong> charcoal and rest with good clay<br />
earth all firmly compact into the pit. Nos. 2.00 1500.00 3000.00<br />
(b) 30 cm. at the top portion at the pipe having a G.I. Mtr. 30.00 90.00 2700.00<br />
45<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
Hinges shall be enclosed in a brick work chamber<br />
built up to 10 cm below G.I. and upto 30 cm above<br />
G.I. Chamber which shall have 450 mm x 450 mm<br />
inside dimension will have a G.I. Hinge cover<br />
(c) Providing and fixing <strong>of</strong> No. 8 SWG copper wire on<br />
surface or recessed as required for connection etc.<br />
as per the direction <strong>of</strong> Engineer-in-charge/<br />
Consultant. Mtr. 30.00 70.00 2100.00<br />
C Total= 440105.00<br />
D. P.H & SANITARY<br />
P.H. (Internal )<br />
65 Supplying all materials, labour, T&P and providing<br />
and fixing to wall or ceiling and floor PVC pipes<br />
conforming to ASTM-D- 1785/89( Sch-8) & pipe<br />
fitting <strong>of</strong> the following nominal bore with clamps<br />
including making good the wall or ceiling etc. and<br />
complete as per the direction <strong>of</strong> E-I-C.<br />
a) 15mm dia Mtr. 10.00 87.36 873.60<br />
b) 20mm dia Mtr. 10.00 113.86 1138.60<br />
66 Supplying all material, labour , T&P & fitting ,fixing<br />
the following different water supply fittings <strong>of</strong><br />
brand AJAYA & ASTRA approved make with<br />
including supply <strong>of</strong> all necessary jointing materials<br />
etc. all complete as directed by the Engineer-incharge.<br />
CPVC ball valve.<br />
a) 20mm dia brass ball valve Each 6.00 217.83 1306.98<br />
67 Supplying all materials, labour, T&P and cutting the<br />
holes through the existing brick work including<br />
making good the damages in CM ( 1:4 ) for taking<br />
G.I/PVC/CPVC pipe and fitting etc. and complete as<br />
per the P.H. specification & direction <strong>of</strong> E-I-C.<br />
a) 250mm thick wall Each 4.00 16.56 66.24<br />
b) 375mm thick wall Each 2.00 24.84 49.68<br />
68 Supplying all materials, labour, T&P and providing<br />
and fixing brass / CP fittings <strong>of</strong> the following<br />
nominal bore with supply <strong>of</strong> all jointing materials<br />
complete as per the specification and direction <strong>of</strong><br />
E-I-C<br />
a) 15mm dia brass Bib Cock (JAQUAR , Cat, No - 037) Each 4.00 513.80 2055.20<br />
c) 15mm dia CP Pillar cock(JAQUAR.Cat. No.-011) Each 4.00 523.80 2095.20<br />
d) 15mm dia CP angular stop cock(JAQUAR, Cat. No.-<br />
051) Each 4.00 503.80 2015.20<br />
e) Soap Dish(Cat.no- 7731)(JAQUAR ,Continental,<br />
Cat.No-1133 ) Each 6.00 637.13 3822.78<br />
f) CP Grating (125mm) Each 6.00 50.00 300.00<br />
46<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
g) Connecting Pipe Each 6.00 90.00 540.00<br />
h) Towel ring (JAQUAR continental CAT.NO -1121 ) Each 6.00 680.73 4084.38<br />
i) Basin ( Parry wareCat. No-C0491) Each 3.00 1292.50 3877.50<br />
69 Supplying all materials, labour, T&P and fixing<br />
Mirror for superior glass mounted on 6mm thick<br />
A.C. sheet or ply wood sheet and fixed to wooden<br />
plugs with CP screws and washers , complete as per<br />
the P.H specification and direction <strong>of</strong> E-I-C.<br />
a) 600 x 450 mm ( Bevelled type) Each 3.00 561.9 1685.7<br />
70 Supplying all materials , labour & T&P and fixing<br />
Urinal Squatting 45 x 35 to the floor in cement<br />
mortar (1:1) etc., all complete as per specification<br />
and direction <strong>of</strong> the Engineer-in-charge. (Hindustan<br />
,Cat. No-60003) Each 3.00 1009.15 3027.45<br />
71 Supplying all materials , labour, T&P and fixing water<br />
closet, squatting pan(Indian type W.C pan/<strong>Orissa</strong><br />
pattern squatting pan) duly embedded in Cement<br />
concrete (1:3:6) using 12 mm size hard granite metal<br />
all complete as per specification and direction <strong>of</strong><br />
the Engineer-in-charge.(Hindustan Sanitary),Cat.<br />
No-20004 Each 2.00 1593.90 3187.80<br />
72 Supplying all materials , labour, T&P and fixing<br />
Cystern all complete as per specification and<br />
direction <strong>of</strong> the Engineer-in- charge.<br />
Cystern(Parryware:C8136) Each 1.00 6689.29 6689.29<br />
73 Supplying all materials , labour & T&P and fixing<br />
wash down water closet(European type W.C pan)<br />
with integral "S" or "P" trap to the floor with<br />
wooden plug and chromium plated screw including<br />
jointing the trap with soil pipe in cement mortar<br />
(1:1) etc., all complete as per specification and<br />
direction <strong>of</strong> the Engineer-in-charge.(Hindustan ,Cat.<br />
No-20061) Each 1.00 3515.65 3515.65<br />
INTERNAL SEWERAGE DISPOSSAL & SANITARY INSTALLATION<br />
74 Supplying all materials, labour, T&P and providing<br />
and fixing SWR PVC soil waste pipe and fittings<br />
<strong>of</strong> the following outside diameter confirming to<br />
the IS- 13592/1992 to walls with nails , bobbins<br />
and wooden pegs cemented by non heat application<br />
method as per manufacturer's specification<br />
testing, earth work in excavation in all kind <strong>of</strong> soil<br />
and refilling <strong>of</strong> trenches as per the specification<br />
and direction <strong>of</strong> E-I-C.<br />
a) 110mm dia ( ISI Marked ) Mtr. 15.00 226.92 3403.80<br />
b) 150mm dia ( ISI Marked) Mtr. 11.00 453.96 4993.56<br />
47<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
75 Supplying all materials, labour T&P for jointing <strong>of</strong><br />
48<br />
the UPVC SWR SEWER pipe fittings <strong>of</strong> standard<br />
make duly approved by the Engineer-in-charge with<br />
joining material etc. suitably required for fixing on<br />
100mm dia soil waste pipe complete with requisite<br />
testing as directed by Engineer-in-charge.<br />
a) "P" Trap Each 4.00 406.02 1624.08<br />
b) 110mm dia Bend Plain Each 4.00 115.75 463.00<br />
c) 110mm Door Bend Each 4.00 142.58 570.32<br />
d) 110mm dia. Floor trap Each 4.00 172.95 691.80<br />
76 Fixing <strong>of</strong> UPVC vent pipes Including labour & T&P<br />
all complete as directed by the Engineer-in-charge.<br />
b) 110mm Vent Cowl Nos 2.00 25.27 50.54<br />
77 Supplying all materials, labour, T&P for<br />
construction <strong>of</strong> 350mm x 350mm size Gulley trap<br />
chamber by K.B.Bricks masonry having crushing<br />
strength 75 to 99 Kg/sqcm with 250mm x 250mm<br />
CI grating including labour & material for fitting<br />
and fixing 100mm X 100mm sqare mouth SW gulley<br />
trap with supply <strong>of</strong> all jointing materials and<br />
encasing the gully trap with a block <strong>of</strong> C.C. 1:4:8<br />
with 40mm size hard stone metal all complete<br />
with providing & fixing <strong>of</strong> 450mm X 450mm precast<br />
RCC cover with frame as per approved design<br />
and specification and as per the instruction <strong>of</strong> the<br />
Engineer-in-charge including cost, conveyance<br />
taxes <strong>of</strong> all materials to site complete as directed<br />
by Engineer-in-charge. Each 2.00 341.35 682.70<br />
78 Supplying all materials, labour, T&P and<br />
construction <strong>of</strong> inspection chamber <strong>of</strong> the<br />
following sizes with cement concrete ( 1:3:6 ) using<br />
40mm size h.g.metal on the bed , 1st class K.B.<br />
brick work in cm ( 1:6 ) moulding & shaping the<br />
channel inside and benching with cement concrete<br />
( 1:2:4) using 12mm size h.g. chips, 12mm thick<br />
cement plaster in cm (1:3) with punning inside ,<br />
flash pointing to out side in cm ( 1:3 ) R.C.C cover<br />
slab In CC ( 1:2:4 )using 12mm size h.g. chips ,<br />
earth work in excavation in all kind <strong>of</strong> soil around<br />
the chamber including watering, curing, conveyance<br />
<strong>of</strong> all materials to the work site royalty, taxes etc.<br />
complete all respect as per P.H. specification and<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
direction <strong>of</strong> E-I-C .<br />
a) 760mm x 760mm x 460mm Each 1.00 4189.07 4189.07<br />
EXTERNAL SEWERAGE DISPOSSAL:-<br />
79 Construction <strong>of</strong> brick masonary Soak pit <strong>of</strong> size<br />
49<br />
1.1mt.dia and 3mt. depth with R.C.C cover slab<br />
as<br />
per approved drawing & design &<br />
complete as per<br />
P.H. specification and directions <strong>of</strong> the Engineerin-charge.<br />
a) Inside dia. 1.10 mtr. Each 1.00 10563.30 10563.30<br />
EXTERNAL WATER SUPPLY<br />
80 Supplying all labour ,T&P and laying <strong>of</strong> GI pipe/ PVC<br />
pipes fittings and specials <strong>of</strong> approved make and<br />
testing etc complete including all costs <strong>of</strong> labour<br />
and materials T & P required for the work etc<br />
complete and as per direction <strong>of</strong> Engineer-incharge.<br />
a) 50mm dia G.I pipe (heavy) Mtr 300.00 320.00 96000.00<br />
b) 25mm PVC pipe (10kg/cm2) Mtr 290.00 120.00 34800.00<br />
c) 63mm PVC pipe (6kg/cm2) Mtr 500.00 110.00 55000.00<br />
81 Supplying all labour ,T&P and fitting and fixing <strong>of</strong><br />
full way valve /sluice valve <strong>of</strong> approved make with<br />
supplying <strong>of</strong> all jointing materials ,T&P etc all<br />
complete including cost<br />
<strong>of</strong> f.w.v labour and<br />
materials T & P required for the work etc complete<br />
and as per direction <strong>of</strong> Engineer-in-charge.<br />
a) 50mm dia F.W.V Nos 4.00 1050.00 4200.00<br />
b) 25mm dia F.WV Nos 3.00 620.00 1860.00<br />
82 Supplying all materials, labour ,T&P and<br />
construction <strong>of</strong> F.W.V chamber as per approved<br />
drawing and design with all fittings and fixing ,T&P<br />
etc all complecte including cost <strong>of</strong> f.w.v labour and<br />
materials T & P required for the work etc complete<br />
and as per direction <strong>of</strong> Engineer-in-charge.<br />
a) F.W.V Chambers Nos 7.00 2000.00 14000.00<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II
50<br />
83 Supplying all materials, labour ,T&P and<br />
construction <strong>of</strong> single mouth stand post<br />
as per<br />
approved drawing and design with all fittings and<br />
fixing ,T&P etc all complete including cost <strong>of</strong><br />
F.W.V labour and materials T & P required for the<br />
work etc complete and as per direction <strong>of</strong><br />
Engineer-in-charge.<br />
a) Stand Post Nos 1.00 3000.00 3000.00<br />
TOTAL 83(Eighty-three) only.<br />
D Total= 276423.42<br />
TOTAL AMOUNT=(A+B+C+D)= 4672465.35<br />
SAY= 4672500.00<br />
N.B: The tenderer is required to quote only the percentage excess or less over the<br />
estimated cost here-below both in words and figures :<br />
___________________ ( _______________________________________ )<br />
(in figures)<br />
(in words)<br />
No. <strong>of</strong> Correction ……………………………….<br />
No. <strong>of</strong> Overwriting……………………………….<br />
No. <strong>of</strong> Interpolation……………………………….<br />
CONTRACTOR<br />
SR. DIVISIONAL MANAGER (BP)-II