ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED<br />

(A <strong>Govt</strong>. <strong>of</strong> <strong>Orissa</strong> Undertaking)<br />

Panthanivas (Old Block): Lewis Road: Bhubaneswar-14<br />

(BUILDING PROJECT DIVISION)-II<br />

DETAILED TENDER CALL NOTICE<br />

Name <strong>of</strong> Work:<strong>Development</strong> <strong>of</strong> Brahmapura under Bramhapura-Nuagarh-<br />

Kuadoli-Nandinia-Jhanjibandha as a Tourist Destination In<br />

<strong>Orissa</strong>.<br />

This will be a percentage rate tender (Clause-6)<br />

“Quality is never an accident, it is always the result <strong>of</strong> high<br />

intention, sincere effort, intelligent direction and skillful execution“.<br />

Let us achieve it……….<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


2<br />

ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED<br />

(A <strong>Govt</strong>. <strong>of</strong> <strong>Orissa</strong> Undertaking)<br />

Panthanivas, (Old Block), Lewis Road, Bhubaneswar-14<br />

No. BP- 12/11 Date: 15.01.2010<br />

DETAILED TENDER CALL NOTICE<br />

Sealed tenders in conformity with DTCN eventually to be drawn in P. W.D.<br />

F-2 form are invited from the registered contractors <strong>of</strong> state PWD/<br />

Irrigation/ CPWD/MES/Railway and other Government organization for the<br />

following works.<br />

Name <strong>of</strong> the work<br />

<strong>Development</strong> <strong>of</strong><br />

Bramhapura under<br />

Brahamapura-<br />

Nuagarh-Kuadoli-<br />

Nandinia-<br />

Jhanjibandha as a<br />

Tourist Destination<br />

In <strong>Orissa</strong>.<br />

Value <strong>of</strong> work<br />

46,72,500.00<br />

Cost <strong>of</strong> tender<br />

documents<br />

(Non<br />

refundable)<br />

Rs.6,000.00<br />

+ VAT 4%<br />

E.M.D1%<br />

Rs.47,000/-<br />

Class <strong>of</strong><br />

Contractor<br />

‘B” & “A”<br />

Period <strong>of</strong><br />

completion<br />

9 (Nine)<br />

calendar<br />

months<br />

The details <strong>of</strong> tender documents can be had from our Web site:<br />

www.panthanivas.com / www.otdc.in . The Tender paper will be received up to 3<br />

P.M <strong>of</strong> 2.02.2011 at O.T.D.C. Head <strong>of</strong>fice by speed post/registered post and will<br />

be opened on the same day at 4.00 P. M. O.T.D.C. <strong>Ltd</strong>. will not be held<br />

responsible for postal delay.<br />

The Authority reserves the right to reject any or all the tenders without<br />

assigning any reason there <strong>of</strong>.<br />

The sealed covers should be superscribed “Tender for……………………………”.<br />

The Tenders shall be addressed to the Sr. Divisional Manager (Building Project)-II,<br />

<strong>Orissa</strong> <strong>Tourism</strong> <strong>Development</strong> <strong>Corporation</strong> <strong>Ltd</strong>., Panthanivas (Old Block), Lewis Road,<br />

Bhubaneswar – 751 014. Tenders will be received through Speed Post / Regd. Post<br />

only. OTDC will not be responsible for any postal delay. Hand delivery will not be<br />

accepted.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


3<br />

TERMS & CONDITIONS<br />

1. The following requirements must be met with along with the tender document failing<br />

which tender shall be liable for rejection.<br />

a) Cost <strong>of</strong> tender paper + 4% VAT in shape <strong>of</strong> Bank Draft in favour <strong>of</strong> Managing<br />

Director, OTDC <strong>Ltd</strong> .<br />

b) 1% EMD in shape <strong>of</strong> Bank Draft in favour <strong>of</strong> the Managing Director, O.T.D.C.<br />

<strong>Ltd</strong>. payable at any Nationalized bank, Bhubaneswar.<br />

c) VAT Clearance Certficate / TIN No.<br />

d) Upto date PAN CARD<br />

e) Valid E.P.F. Registration<br />

f) Valid contractor’s registration<br />

2. QUALITY CONTROL REQUIREMENTS:<br />

a) All bills should be supported with photographs <strong>of</strong> progress made.<br />

The normal period <strong>of</strong> rectification beyond the completion period<br />

shall be 2 years from the date <strong>of</strong> completion <strong>of</strong> the project. 5%<br />

security will be kept with-held in shape <strong>of</strong> bank guarantee or NSC<br />

after the normal expiry period <strong>of</strong> 6months till 2years from the date <strong>of</strong><br />

completion ; during this period the contractor is supposed to rectify<br />

all the defects noticed , failing which the same shall be taken up by<br />

the department and will be recovered from the security so withheld.<br />

3. (a) The Plan and Specification for the work can be seen at the Office <strong>of</strong><br />

the Sr. Divisional Manager (BP)-II, O.T.D.C.<strong>Ltd</strong>, during working hours and<br />

days. Complaints at a future date that the plan and specification have<br />

not been seen will not be entertained.<br />

(b) All other information can be had from <strong>of</strong>fice <strong>of</strong> the Sr. Divisional<br />

Manager, (BP)-II, O.T.D.C. LTD. Contact Person: Sri S Mahala, A.E , Mob:<br />

9437306326<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


4<br />

4. EARNEST MONEY DEPOSIT AND INITIAL SECURITY DEPOSIT<br />

The tenderers whose tender is selected for acceptance shall within a<br />

period <strong>of</strong> seven days upon written intimation being given to him <strong>of</strong><br />

acceptance <strong>of</strong> his tender make an initial security deposit <strong>of</strong> 1% (one percent)<br />

<strong>of</strong> the tendered amount so that the earnest money and initial security<br />

deposit will be 2% <strong>of</strong> the tendered amount and sign the agreement in the<br />

Office <strong>of</strong> O.T.D.C. <strong>Ltd</strong>, failing which, the tender will be rejected with<br />

forfeiture <strong>of</strong> E.M.D.<br />

This security deposit, together with the earnest money and the<br />

amount withheld if any shall be retained as security deposit for the due<br />

fulfillment <strong>of</strong> this contract. Failure to enter into the required agreement<br />

and to make the security deposit, as above shall entail forfeiture <strong>of</strong> the<br />

Earnest Money. No tender shall be finally accepted until the required<br />

amount <strong>of</strong> security deposit (money) is deposited. The written agreement to<br />

be entered into between the contractor and the <strong>Corporation</strong> shall be the<br />

foundation <strong>of</strong> the right <strong>of</strong> both the parties and the contract shall deem to<br />

be incomplete until the agreement has first been signed by the contractor<br />

and then by the Sr. Divisional Manager (BP)-II, O.T.D.C. <strong>Ltd</strong>.<br />

5. Additional performance security shall be deposited by the bidders when the<br />

bid amount is seriously unbalanced i.e less than the estimated cost by more<br />

than 10%. In such an event the bidder will deposit the additional<br />

performance security to the extent <strong>of</strong> the differential cost <strong>of</strong> the bid<br />

amount and 90% <strong>of</strong> the estimated cost in shape <strong>of</strong> Post Office Savings Bank<br />

Account/National Savings Certificate/Post Office Time Deposit<br />

account/Kissan Vikash Patra/Deposit receipt <strong>of</strong> schedule Bank at the time <strong>of</strong><br />

sanction <strong>of</strong> tender without which the tender will be liable for rejection.<br />

6. PERCENTAGE RATE TENDER :<br />

The tender will be on percentage rate over the estimated cost and not on<br />

item rate basis as per Works Department letter no Codes-5/07-17190 dt.<br />

9.10.07. The percentage rate over the estimated cost should be quoted both<br />

in words and figures. In case <strong>of</strong> discrepancy between words and figures,<br />

the words shall prevail.<br />

7. The contractors will be responsible for payment <strong>of</strong> all royalties or other<br />

charges for quarrying materials. All local taxes inclusive <strong>of</strong> State Sales Tax<br />

and Income Tax, Octroi charges, Ferry and Tollage charges are to be paid by<br />

the Contractor.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


5<br />

8. I.T.C.C/PAN and S.T.C.C./VAT C.C :<br />

The tender may not, at the discretion <strong>of</strong> the competent authority, be<br />

considered unless accompanied with attested true copy <strong>of</strong> the PAN card and<br />

VAT clearance certificate as the case may be and the original certificate to<br />

be produced at the time <strong>of</strong> opening <strong>of</strong> tenders.<br />

9. If the contractor removes any materials or stock so supplied to him from<br />

the site <strong>of</strong> work with a view to disposing <strong>of</strong>f the same dishonestly, he should<br />

in addition to any other liabilities Civil or Criminal arising out <strong>of</strong> the contract<br />

be liable to pay a penalty equivalent to five times the price <strong>of</strong> the materials<br />

on stock according to the stipulated rates and the penalty so imposed shall<br />

be recovered from any sum that may then or at any time thereafter become<br />

due to the contractor or from his security.<br />

10. The contractor should be fully liable to indemnify the <strong>Corporation</strong> for<br />

payment <strong>of</strong> any compensation under Workmen's Compensation Act-V-III <strong>of</strong><br />

1923 on account <strong>of</strong> the workmen being employed by him and the full amount<br />

<strong>of</strong> compensation paid will be recovered from the contractor.<br />

11. Every tenderer must examine the detailed specification <strong>of</strong> <strong>Orissa</strong> before<br />

submitting his tender. The right is reserved without impairing the contract<br />

to make such increase or decrease in the quantities or items <strong>of</strong> work<br />

mentioned in the schedule attached to the tender notice as may be<br />

considered necessary to complete the work fully and satisfactorily. Such<br />

increase shall in no case invalidate the contract rates. It shall be definitely<br />

understood that the <strong>Corporation</strong> does not accept any responsibility for the<br />

correctness or completeness <strong>of</strong> the quantities shown in the schedule. The<br />

schedule is liable to alteration by omissions or additions or deductions and<br />

such omissions/ deductions shall in no case invalidate the contract and no<br />

extra monetary compensation will be entertained.<br />

12. The agency should produce valid labour license for the said work before<br />

signing the agreement.<br />

13. The agency should use all building materials such as reinforcement, sand etc.<br />

free from corrosion/corrosive materials etc. No extra payment will be made<br />

for such purpose by O.T.D.C. <strong>Ltd</strong>.<br />

14. <strong>Orissa</strong> Detailed Standard Specification will be followed during execution <strong>of</strong><br />

work.<br />

15. All materials including those issued direct to the work will be received by the<br />

contractor from the respective Store <strong>of</strong> the <strong>Corporation</strong> in the sizes as per<br />

availability <strong>of</strong> stock. After issue, it will be the contractor's responsibility<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


6<br />

for transportation, storage, handling, safe custody and proper upkeepment<br />

<strong>of</strong> materials. The rate <strong>of</strong> the contractor should include the entire incidental<br />

charges required after the issue <strong>of</strong> material from <strong>Corporation</strong> store till its<br />

utilisation in the work and return <strong>of</strong> surplus and good materials at the issuing<br />

store.<br />

16. The contractor will have to bear the cost <strong>of</strong> straightening, cutting,<br />

jointing, welding etc. <strong>of</strong> all steel reinforcement and structural and no cut<br />

pieces less than 1(one) meter length will be accepted. After completion <strong>of</strong><br />

the work the contractor has to return all surplus and good materials at the<br />

issuing store at his own cost failing which the cost <strong>of</strong> the unutilized balance<br />

<strong>Corporation</strong> materials and such other damaged materials not receptacle to<br />

the <strong>Corporation</strong> would be recovered from him at 5 (five) times the stock<br />

issue rates.<br />

17. All reinforced cement concrete work should conform to <strong>Orissa</strong> Detailed<br />

Standard Specification and should be <strong>of</strong> grade M-150/200 with 12mm. Size<br />

black hard crusher broken granite stone chips (20mm. Size not to exceed<br />

25%) having a minimum compressive strength (in work test)<br />

150kg/200kg/cm 2 in 15 cm. cubes at 28 days after mixing and tests<br />

conducted in accordance with IS 456 and IS 516.<br />

18. Shuttering and centering shall be with seasoned Sal wood planks the inside<br />

<strong>of</strong> which shall be lined with suitable sheeting and made leak-pro<strong>of</strong> and water<br />

tight or alternatively steel shuttering and centering may be used.<br />

19. The selected contractor may take delivery <strong>of</strong> supply <strong>of</strong> materials according<br />

to his need for the work issued by the Engineer-in-charge <strong>of</strong> the work. The<br />

contractor shall make all arrangements for proper storage <strong>of</strong> materials. But<br />

no cost for raising shed for the storage <strong>of</strong> materials and pay <strong>of</strong> watchmen<br />

etc. will be borne by the <strong>Corporation</strong>. These are all to be borne by the<br />

Contractor. The <strong>Corporation</strong> is not responsible for considering the theft <strong>of</strong><br />

materials at site. It is contractor's risk. Under any such plea if the<br />

contractor stops the work he shall have to pay the penalty as per the clauses<br />

<strong>of</strong> the contract.<br />

20. For the purpose <strong>of</strong> jurisdiction in the event <strong>of</strong> dispute if any contract should<br />

be deemed to have entered into within the State <strong>of</strong> <strong>Orissa</strong> and it is agreed<br />

that, neither party to the contract nor the agreement will be competent to<br />

bring a suit in regard to the matters covered by this contract at any place<br />

outside the State <strong>of</strong> <strong>Orissa</strong>.<br />

21. After the work is finished, all surplus materials and debris are to be<br />

removed by the contractor and preliminary works such as vats, mixing<br />

platforms, etc. are to be dismantled and all the materials are to be removed<br />

from the site. No extra payment will be made to the contractor on this<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


7<br />

account. The rate quoted should be inclusive <strong>of</strong> all these items. The ground<br />

upto 15 meter shall be cleared and rough dressed.<br />

22. The contractor shall not interfere with the execution <strong>of</strong> water supply or<br />

electrical fittings arrangements and any other works entrusted to any other<br />

agency by the <strong>Corporation</strong> at any time during the progress <strong>of</strong> work.<br />

23. The <strong>Corporation</strong> will have the right to inspect the scaffolding and centering<br />

made for the work and can reject partly or fully such structures if found<br />

defective in their opinion.<br />

24. The Contractor will have to arrange for water supply for all works and made<br />

sanitary arrangements at his own cost for his Labour camps. The contractor<br />

has to arrange adequate lighting arrangements for night works whenever<br />

necessary at his own cost.<br />

25. Bailing out water from the foundation either rain water or sub-soil water if<br />

necessary should be borne by the contractor. No payment will be made for<br />

benchmarks, level pillars pr<strong>of</strong>iles and benching and leveling ground where<br />

required. The rates quoted should be for finished items <strong>of</strong> work inclusive <strong>of</strong><br />

these incidental items <strong>of</strong> work.<br />

26. Cement concrete in ro<strong>of</strong> slabs, beams and wherever prescribed by the<br />

Engineer-in-charge shall be machine mixed and vibrated, and the contractor<br />

should arrange his own concrete mixers, vibrators, and pumps etc. for the<br />

purpose.<br />

27. It should be understood clearly that no claims whatsoever will be<br />

entertained.<br />

28. The tenderer shall have to abide by the C.P.W. Safety Code introduced by<br />

the <strong>Govt</strong>. <strong>of</strong> India, Ministry <strong>of</strong> Works, Housing and Supply in their standing<br />

orders No.44250 dt.25.11.57.<br />

29. The contractor will abide by the Fair Wages clause as introduced by the<br />

Government.<br />

30. The <strong>Corporation</strong> have the right to supply at any time in the interest <strong>of</strong> work<br />

any <strong>Corporation</strong> materials to be used in the work in addition to those<br />

mentioned in the clause 13 and the contractor shall use such materials<br />

without any controversy or dispute on that account. The rates <strong>of</strong> the<br />

materials will be at the stock issue rates fixed by the <strong>Corporation</strong> or market<br />

rates whichever is higher.<br />

31. The contractor will be responsible for the loss or damage if any <strong>of</strong><br />

<strong>Corporation</strong> materials supplied to him under clauses 13 and 30 during<br />

execution <strong>of</strong> the work due to reasons whatsoever and the cost <strong>of</strong> such<br />

materials will be recovered from him at the prevailing stock issue rates or<br />

market rates whichever is higher.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


8<br />

31. CONTRACTOR'S TOOLS & PLANT AND SUPPLY OF<br />

DEPARTMENTAL TOOLS & PLAT TO CONTRACTORS.<br />

The contractor should arrange at his own cost necessary tools and plant such<br />

as Pumps, Vibrator, Concrete mixer etc. required for the efficient execution<br />

<strong>of</strong> the work and rates quoted should be inclusive <strong>of</strong> the running charges <strong>of</strong><br />

such plant and cost <strong>of</strong> consumables.<br />

32. The contractor will have to submit to the Sr. Divisional Manager (BP)-II,<br />

O.T.D.C. <strong>Ltd</strong>. monthly return <strong>of</strong> labour both skilled & un-skilled employed by<br />

him on the work.<br />

33. The tenderers are required to go through each clause <strong>of</strong> <strong>Corporation</strong><br />

contract form carefully in addition to clauses mentioned herewith before<br />

tendering.<br />

34. No part <strong>of</strong> the contract shall be sublet without written permission <strong>of</strong> the Sr.<br />

Divisional Manager (BP)-II, O.T.D.C. <strong>Ltd</strong>., Bhubaneswar or transfer be made<br />

by power <strong>of</strong> attorney authorising others to receive payment on the<br />

contractor's behalf.<br />

35. If any further necessary information is required, Sr. Divisional Manager<br />

(BP)-II, O.T.D.C. <strong>Ltd</strong>., Bhubaneswar will furnish such but it must be clearly<br />

understood that tenders must be received in order and according to the<br />

instructions.<br />

36. No contractor will be permitted to furnish their tender in their own<br />

manuscript papers.<br />

37. SAMPLE OF MATERIALS:<br />

Every tenderer is expected before quoting his rates to inspect the site <strong>of</strong><br />

proposed work. He should also inspect the quarries and satisfy himself about<br />

the quality, availability <strong>of</strong> materials, medical aids, labour and foodstuffs etc.<br />

and the rates may be inclusive <strong>of</strong> all these items <strong>of</strong> work. In every case the<br />

materials must comply with the relevant specification.<br />

38. O.T.D.C. <strong>Ltd</strong>. Will not however, after acceptance <strong>of</strong> contract rate, pay any<br />

extra charges for lead or for any other reason in case the contractor is<br />

found later on to have mis-judged the materials available.<br />

39. EXTRANEOUS CONDITION:<br />

The tenders containing extraneous conditions not covered by the tender call<br />

notice are liable for rejection.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


9<br />

40. VALIDITY<br />

All tenders received will remain valid for a period <strong>of</strong> ninety days from the<br />

date <strong>of</strong> receipt <strong>of</strong> tenders and validity <strong>of</strong> tender can also be extended if<br />

agreed to by the contractor and the <strong>Corporation</strong>.<br />

41. Quality control tests are to be carried out as per standard norms by the<br />

contractor through a <strong>Govt</strong>. laboratory or any authorized <strong>Govt</strong>. laboratory. No<br />

extra payment will be made for these tests. The department may conduct<br />

separate tests as when felt necessary, the cost <strong>of</strong> which will be borne by the<br />

department.<br />

42. LIST OF WORKS IN HAND, T & P & WORK EXECUTED:<br />

Tenderers are required to submit, (i) list <strong>of</strong> works in the hand in the following<br />

prescribed pr<strong>of</strong>orma 'A', (ii) list <strong>of</strong> works executed in the prescribed<br />

pr<strong>of</strong>orma 'B' and (iii) the list <strong>of</strong> T & P in the prescribed pr<strong>of</strong>orma 'C' along<br />

with the tenders.<br />

43. All reinforced cement concrete works should be finished smooth, Extra<br />

charges for plastering if required to any R.C.C. structures like columns,<br />

beams, chajjas etc. shall not be paid.<br />

44. Income tax, Sales tax and workers welfare cess will be deducted as per<br />

prevailing <strong>Govt</strong>. orders from time to time.<br />

45. The tenderer shall bear cost <strong>of</strong> various incidental sundries and contingencies<br />

necessitated by the works falling within the following or similar category.<br />

(a)<br />

(b)<br />

Rent, royalties and other charges <strong>of</strong> materials, Octroi duty, all other taxes<br />

including sales tax, ferry tolls, conveyance charges and other costs on<br />

account <strong>of</strong> land and buildings including temporary buildings required by the<br />

tenderer for collection <strong>of</strong> materials, storage, housing <strong>of</strong> staff or other<br />

purpose <strong>of</strong> the work. No rent however be payable to <strong>Corporation</strong> for<br />

temporary occupation <strong>of</strong> land owned by the <strong>Corporation</strong> at the site <strong>of</strong> the<br />

work.<br />

Labour camps and huts necessary to a suitable scale including conservancy<br />

and sanitary arrangements thereon to the satisfaction <strong>of</strong> the local health<br />

authorities.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


10<br />

(c)<br />

Suitable water supply including pipe water supply wherever available for the<br />

staff and labourers for the works.<br />

(d)<br />

Fees and dues hired by Municipal, Canal and water supply authorities.<br />

(e)<br />

Suitable equipments and wearing apparatus for the labourers engaged in<br />

risky operation.<br />

(f)<br />

Suitable fencing barriers, signal including paraffin and electrical signal<br />

where necessary at works and approaches in order to protect the public and<br />

employees from accidents.<br />

(g)<br />

Compensation including cost <strong>of</strong> any suit for injury to person or property due<br />

to neglect <strong>of</strong> any major precautions also sums which may become payable due<br />

to operation <strong>of</strong> workmen's Compensation Act.<br />

(h)<br />

The contractor has to arrange adequate lighting arrangement for night<br />

works wherever necessary at his own cost.<br />

(i)<br />

The contractor has to arrange all the building materials including the<br />

equipments required for under reamed pile foundation for starting the work.<br />

46. INTEREST:<br />

Under no circumstances interest is chargeable for the dues or additional<br />

dues if any payable for the work.<br />

a) Special class contractor shall employ under him one Graduate Engineer and<br />

two Diploma Holders belonging to the State <strong>of</strong> <strong>Orissa</strong>, like wise 'A' class<br />

contractor shall employ under him one Graduate Engineer or two Diploma<br />

Holder belonging to the State <strong>of</strong> <strong>Orissa</strong>. The employment <strong>of</strong> such Graduate<br />

Engineer and Diploma Holders under the contractor shall be full-time and<br />

continuous and they shall not be superannuated, retired, dismissed or<br />

removed personnel from any state <strong>Govt</strong>. or Central <strong>Govt</strong>. service/Public<br />

Sector undertaking/Private companies and firms or be ineligible for<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


11<br />

appointment to <strong>Govt</strong>. service. The contractor shall pay them monthly<br />

emoluments, which shall not be less than the emoluments <strong>of</strong> the personnel <strong>of</strong><br />

equivalent qualification employed under the State <strong>Govt</strong>. <strong>of</strong> <strong>Orissa</strong>. The Sr.<br />

Divisional Manager, Building Project-II may however assist the contractor<br />

with names <strong>of</strong> such un-employed Graduate Engineers and Diploma Holders if<br />

such help is sought for by the Contractor. The name <strong>of</strong> such Engineer<br />

personnel appointed by the Contractor should be intimated to the tender<br />

receiving authority along with each tender, as to who would be supervising<br />

the work. Each bill <strong>of</strong> the Special Class or 'A' class contractor shall be<br />

accompanied by an Employment Roll <strong>of</strong> the Engineering personnel together<br />

with a certificate <strong>of</strong> the Graduate Engineer or Diploma Holder so employed<br />

by the contractor to the effect that the work executed as per the bill has<br />

been supervised by him. A prescribed pr<strong>of</strong>orma is enclosed herewith for<br />

furnishing the required certificate there in under this clause.<br />

47. The sealed cover should be super-scribed with the material <strong>of</strong> contents.<br />

48. The quantity/volume <strong>of</strong> item may alter during construction as per field<br />

condition.<br />

49. Wherever there is ambiguity or missing data, the work shall be done as per<br />

the direction <strong>of</strong> the Engineer-in-charge.<br />

50. The interested bidders may visit the site and should be acquainted<br />

themselves with the field activities to be experienced during construction.<br />

51. The delay if any due to other departments such as digging on road etc. shall<br />

be the responsibility <strong>of</strong> the successful bidder.<br />

52. The bidder shall possess electrical license from ELBO, <strong>Orissa</strong>.<br />

53. Statutory clearance if any from electrical inspector shall be the<br />

responsibility <strong>of</strong> the successful bidder.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


12<br />

QUALITY CONTROL REQUIREMENTS<br />

1.0 Earth work<br />

1.1. Density requirements for embankments and sub-grade materials. MoRTH Specification (4 th<br />

Revision).<br />

Sl.<br />

No.<br />

Type <strong>of</strong> work<br />

Maximum dry density at OMC<br />

(IS:2720 Part-8)<br />

1. Embankment upto 3m height not subjected to extensive flooding Minimum 15.2kN/m 3<br />

2. Embankment exceeding 3m height or embankment subjected or<br />

embankment subjected to long periods <strong>of</strong> inundation.<br />

Minimum 16kN/m 3<br />

3. Subgrade and earthen shoulder and back fill. Minimum 17.5kN/m 3<br />

1.2. Compaction requirement for embankment and sub-grade.<br />

Sl.<br />

No.<br />

Type <strong>of</strong> work<br />

Percentage <strong>of</strong> Compaction at<br />

OMC<br />

1. Sub-grade and shoulder Minimum 97%<br />

2. Embankment Minimum 95%<br />

3. Expansive clay<br />

a. Sub-grade Not allowed<br />

b. Remaining portion Minimum 90%<br />

1.3. Criteria for small embankment (dams) (IS : 12169)<br />

The general guidelines for embankment sections are furnished in Table No.-1.<br />

TABLE-4<br />

(GENERAL GUIDELINES FOR EMBANKMENT SECTIONS)<br />

SL.<br />

NO.<br />

DESCRIPTION HEIGHT UPTO 5m HT. ABOVE 5M AND<br />

UPTO 10m<br />

1. Type <strong>of</strong> section Homogeneous<br />

Modified<br />

homogeneous section<br />

Ii Slopes U/S U/S<br />

a. Coarse grained soil (GW,<br />

GP, SW, SP)<br />

b. Coarse grained soil<br />

(GW,GP, SW, SP)<br />

c. Fine grained soil (Cl, ML,<br />

Cl, Ml)<br />

(H:V)<br />

(H:V)<br />

Zoned section/<br />

Modified homogeneous<br />

section/ homogeneous<br />

section<br />

U/S<br />

(H:V)<br />

D/S<br />

(H:V)<br />

HT. ABOVE 10M AND UPTO<br />

15m<br />

Zoned section/ modified<br />

homogeneous section/<br />

homogenous section<br />

U/S<br />

D/S<br />

Not suitable Not suitable Not suitable for core. Suitable<br />

for casing zone.<br />

2:1 2:1 2:1 2:1 Section to be decided based<br />

upon the stability analysis in<br />

accordance with IS: 7894-<br />

1975.<br />

2:1 2:1 25:1 2251:1 -do-<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


13<br />

d. Fine grained Soil (CH,<br />

MH)<br />

2:1 2:1 3.75:1 25:1 may be<br />

provided<br />

a. Top width -- 3m 3m<br />

Necessary<br />

b. Top level -- 0.5m above MWL 0.5m above MWL<br />

Iv Rock toe height Not necessary upto<br />

3m above 3m ht, 1m,<br />

ht <strong>of</strong> rock toe may be<br />

provided<br />

Necessary H/5, where<br />

H is the height <strong>of</strong> the<br />

embankment.<br />

Necessary H/5, where H is the<br />

height <strong>of</strong> the embkt.<br />

v. Berms Not necessary Not necessary The berm may be provided as<br />

per design. The min. berm<br />

width shall be 3m. The berm<br />

may be provided also on the<br />

D/S slope for facilities during<br />

maintenance.<br />

1.4. Criteria for small embankments (dams) : (IS : 12169)<br />

The general guidelines regarding suitability <strong>of</strong> soil for construction <strong>of</strong> dams are furnished in table No. 2.<br />

Table – 2<br />

Suitability <strong>of</strong> soil for construction <strong>of</strong> dams.<br />

Relative<br />

suitability<br />

Homogeneous<br />

Dykes<br />

Zone dam<br />

Impervious cure<br />

Pervisou casing<br />

Very GC GC SW,GW GC<br />

Suitable<br />

Suitable CL, Cl Cl, Cl GM CL,Cl<br />

Impervious blanket<br />

Fairly suitable SP, SM, CH GM, GC, SM, SC, CH SP, GP CH, SM, SC, GC<br />

Poor<br />

Not suitable<br />

Ml, Ml, MH<br />

OLOl, OH, Pt<br />

1.5. Frequency <strong>of</strong> test<br />

Table-3<br />

Sl.<br />

No.<br />

Test Designation<br />

Frequency <strong>of</strong> test as per<br />

MoRTH<br />

1. Mechanical analysis <strong>of</strong> soil 2 tests/3000m 3<br />

2. Plastic <strong>of</strong> soil 2 tests/3000m 3<br />

3. Density test <strong>of</strong> soil 2 tests/3000m 3<br />

4. Deleterious content As & when required<br />

Frequency <strong>of</strong> test <strong>of</strong> ODR & VR as<br />

recommended by IRC-SP-20<br />

5. Moisture content <strong>of</strong> soil 1 tests/250m 3 2-3 tests per 250m 3 <strong>of</strong> loose soil<br />

6. CBR test <strong>of</strong> soil 1 tests/3000m 3 or more<br />

7. Compaction test <strong>of</strong> soil for<br />

each layer<br />

Note : CBR <strong>of</strong> sub-grade should not be less than 2%<br />

MoRTH- Ministry <strong>of</strong> road transport and highways<br />

5-10 tests/1000m 3 5-10 tests per 1000m 3<br />

Table-7<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


14<br />

E.W. COMPACTION : The information given should be taken only as an approximate guide<br />

Material Major Division Sub-groups Suitable<br />

type <strong>of</strong><br />

compacting<br />

equipment<br />

No. <strong>of</strong><br />

passes for<br />

satisfactory<br />

compaction<br />

(Min.)<br />

Thickness<br />

<strong>of</strong> loose<br />

layer<br />

(Actual<br />

thickness<br />

depends on<br />

plant<br />

used),<br />

Max cm.<br />

1 2 3 4 5 6 7<br />

Coarse<br />

grained<br />

soil and<br />

other<br />

materials<br />

Fine<br />

grained<br />

soils<br />

Gravel and<br />

gravelly soils<br />

Soils having low<br />

compressibility<br />

Well-graded<br />

gravel, gravels and<br />

mixtures, little or<br />

no fines<br />

Well-graded<br />

gravel sand<br />

mixtures with<br />

excellent clay<br />

blinder uniform<br />

gravel with little<br />

or no fines poorly<br />

graded gravel and<br />

gravel sand<br />

mixtures little or<br />

no fines<br />

Gravel with fines.<br />

Silty gravel,<br />

clayey gravel,<br />

poorly-graded<br />

gravel-sand-clay<br />

mixtures<br />

Well grained sands<br />

and gravelly sands,<br />

little or no fines<br />

Well-graded sand<br />

with excellent<br />

clay-binder<br />

Uniform sands<br />

with little or no<br />

fines silts<br />

(inorganic) and<br />

very fine sands,<br />

rock flour, silty or<br />

clayey fine sands,<br />

with slight<br />

plasticity. Silty<br />

and sandy clays<br />

(inorganic or<br />

medium plasticity.<br />

Smoothwheel<br />

roller<br />

pneumatictyred<br />

roller<br />

vibrating<br />

smooth wheel<br />

roller heavy<br />

bivrating<br />

plate frogrammer<br />

powerrammer<br />

Smooth<br />

wheel roller<br />

pneumatic<br />

tyred roller<br />

track laying<br />

tractor sheep<br />

foot roller<br />

frog rammer<br />

power<br />

rammer.<br />

6<br />

6<br />

6<br />

2*<br />

3**<br />

4<br />

--<br />

10<br />

30<br />

2*<br />

2*<br />

20<br />

20<br />

20<br />

37.5<br />

37.5<br />

20<br />

20<br />

--<br />

15<br />

15<br />

37.5<br />

20<br />

Remarks<br />

Vibrating rollers or<br />

vibrators will be very<br />

satisfactory if the<br />

moisture conent <strong>of</strong><br />

the soil is low, but<br />

may be uneconomical<br />

close moisture<br />

content control is<br />

essential when the<br />

moisture content is<br />

relatively high it is<br />

preferably to use a<br />

pneumatic tyred<br />

roller<br />

--<br />

--<br />

These soils are<br />

considered very<br />

undesirable for use in<br />

earthwork and should<br />

not be employed if<br />

they are highly<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


15<br />

Soils having<br />

high<br />

compressibility<br />

Fibrous organic<br />

soils with very<br />

high<br />

compressibility<br />

Clays (inorganic)<br />

or medium<br />

plasticity.<br />

Micaceous or<br />

distomaccous fine<br />

sandy and silty<br />

soils, elastic silts<br />

Clays (inorganic)<br />

or high plasticity,<br />

fat clays<br />

Organic clays <strong>of</strong><br />

high plasticity<br />

pest and other<br />

highly organic<br />

swamp soils.<br />

compressible it is<br />

advisable to compact<br />

these soils at the<br />

moisture content at<br />

which no change will<br />

occur subsequently<br />

As for micaceious or<br />

distomaceous fine<br />

sandy and silty soils<br />

these soils are<br />

entirely unsuitable<br />

for earthwork<br />

construction.<br />

5. Materials for cement concrete :<br />

This includes the I.S. specification <strong>of</strong> the materials such as cement, coarse and fine aggregate,<br />

water, and reinforcement. For details respective I.S. specification may be referred to.<br />

5.1. Fine aggregate : IS 383<br />

5.1.1. Zoning: The fine aggregates suitable for concrete shall be in zone-I, II or III. Fine aggregate in<br />

zone-IV are not suitable for concrete. The zone can be decided by grain size analysis by<br />

sieving as follows.<br />

Table-21 (IS-383-Table No.-4)<br />

IS Sieve<br />

Designation<br />

Percentage passing for<br />

Grading Zone-I Grading Zone-II Grading Zone-III Grading Zone-IV<br />

10m. 100 100 100 100<br />

4.75mm 90-100 90-100 90-100 95-100<br />

2.36mm 60-95 75-100 85-100 95-100<br />

1.18mm 30-70 55-90 75-100 90-100<br />

600 micron 15-34 35-59 60-79 80-100<br />

300 micron 5-20 8-30 12-40 15-50<br />

150 micron 0-10 0-10 0-10 0-15<br />

5.1.2. Bulkage :- Maximum buklage shall be limited to 20%<br />

5.2. Quality <strong>of</strong> coarse aggregates:<br />

5.2.1. Crushing value Permissible Value Method <strong>of</strong> test<br />

a. All concrete woks except<br />

wearing surface.<br />

Maximum 45% IS 2386-1963 part –IV<br />

b For wearing surface -do- 30% -do-<br />

5.2.2. Impact value Permissible Limit Method <strong>of</strong> test<br />

a. All concrete woks except<br />

wearing surface.<br />

Maximum 45% IS 2386-1963 part –IV<br />

b For wearing surface -do- 30% -do-<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


16<br />

5.2.3. Abrasion value<br />

a. All concrete woks except<br />

wearing surface.<br />

Maximum 50% -do-<br />

b For wearing surface -do- 30% -do-<br />

5.2.4. Deleterious materials : Maximum percentage shall be 5%.<br />

5.2.5. Alkali aggregate reaction:- It is harmful for concrete. The test shall be conducted and use <strong>of</strong><br />

pozzolanic cement or pozzolanic admixture shall be studied.<br />

5.2.6. Gradation <strong>of</strong> coarse aggregate <strong>of</strong> nominal size:<br />

Table-22<br />

IS Sieve (mm)<br />

Percentage passing for graded aggregates <strong>of</strong> nominal size<br />

40 20 15 12.5<br />

80 100 -- -- --<br />

40 95-100 100 -- --<br />

20 30-70 95-100 100 100<br />

16 -- -- 90-100 --<br />

12.5 -- -- -- 90-100<br />

10 10.35 25.55 30.70 40-85<br />

4.75 0-5 0-10 0-10 0-10<br />

2.36 -- -- -- --<br />

5.3. Cement : The normal type <strong>of</strong> cement used are :<br />

1. Ordinary Portland cement 33 grade, 43 grade, 53 grade conforming to IS: 269, IS:8112 &<br />

IS:12269 respectively.<br />

2. Port land slag cement IS: 544<br />

3. Port land pozzolana cement I.S : 1489<br />

5.3.1. Standard <strong>of</strong> physical test <strong>of</strong> cement<br />

a. Initial setting time - minimum 30 minutes<br />

b. Final setting time - Maximum 10 hrs.<br />

c. Fineness - (i) 225 (m 2 /kg) for OPC & PSC<br />

(ii) 300 (m 2 /kg) for PPC<br />

d. Soundness - a. 10mm maximum (Lechat expansion)<br />

b. Maximum 0.8% in Autoclave<br />

e. Compressive Strength :<br />

Time<br />

33 grade OPC, PSC,<br />

PPC<br />

43 grade OPC 53 grade OPC<br />

a. 72 hrs. 16MP 2 23MP 2 27MP 2<br />

b. 7 days 22MP 2 33MP 2 37MP 2<br />

c. 28 days 33MP 2 43MP 2 53MP 2<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


17<br />

5.3.2. Standards for chemical test :<br />

Table – 23<br />

Types <strong>of</strong> cement<br />

Percentage by mass (Max.)<br />

OPC<br />

PPC PSC Remarks<br />

33 43 53<br />

1. Magnesia 6 6 6 6 8<br />

2. Insoluble residue 4 2 2 x+4(100-x)<br />

100<br />

4 Where x=% <strong>of</strong> pozollana in<br />

cement<br />

3. Sulphur trioxide 2.5d 2.5d 2.5d 3 3 Where d-3% when C,A>5%<br />

4. Sulphur as sulphide -- -- -- -- 1.5<br />

5. Loss on ignition 5 5 4 5 5<br />

6. Chloride 0.5 0.05 0.05 -- -- Maximum for pre-stressed<br />

and long span structures<br />

5.4. Water :<br />

Normal potable water shall be used for concrete. The pH value shall be not less than 6. Permissible<br />

limits <strong>of</strong> solids – I.S. :3025.<br />

Organic - 2000mg/litre<br />

Chloride - 2000mg/litre<br />

Inorganic - 3000mg/litre<br />

Sulphate - 400 mg/litre<br />

Suspended matter -<br />

2000mg/litre<br />

5.5. Reinforcement steel :<br />

The normal reinforcement steel bars may be mild and medium tensile steel bars or high strength<br />

deformed steel bars conforming to I.S.-432 and IS:1786 respectively. The limits <strong>of</strong> physical and<br />

chemicals properties <strong>of</strong> deformed bar.<br />

a. Mechanical properties<br />

Sl.<br />

No.<br />

Table – 24 (IS : 1786, Table No.-3)<br />

Property F 3 415 Grade F c 500 F e 550<br />

1 2 3 4 5<br />

1 0.2% pro<strong>of</strong> stress/yield stress, Min,<br />

N.mm 2 415.0 500.0 550.0<br />

2. Elongation, percent, Min, on gauge<br />

length 5.56 v(A), where A is the<br />

cross sectional area <strong>of</strong> the test piece.<br />

3. Tensile strength, Min 10%more than the actual<br />

0.2% pro<strong>of</strong> stress but not<br />

less than 485.0 N/mm 2<br />

14.5 12.0 8.0<br />

8% more than the actual<br />

0.2% pro<strong>of</strong> stress but not<br />

less than 545.0 N/mm 2<br />

6% more than the actual<br />

0.2% pro<strong>of</strong> stress but not<br />

less than 585.0 N/mm 2<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


18<br />

b. Chemical properties :<br />

Table – 24 (IS : 1786)<br />

Constituent<br />

Percent, maximum<br />

F e 415 F e 500 F e 550<br />

Carbon 0.30 0.30 0.30<br />

Sulphur 0.060 0.055 0.055<br />

Phosphorous 0.060 0.055 0.050<br />

Sulphur and phosphorous 0.11 0.105 0.10<br />

c. Frequency <strong>of</strong> test (IS : 1786)<br />

One test <strong>of</strong> each type <strong>of</strong> MS rod to be used in each structure.<br />

d. Pull out test : As per IS:2770<br />

e. Bend and rebend test : IS : 1786.<br />

f. Mass and cross sectional area (IS : 1786).<br />

Nominal size (mm) Sectional area (mm 2 ) Mass per meter (kg)<br />

6 28.3 0.222<br />

8 50.3 0.395<br />

10 78.6 0.617<br />

12 113.1 0.888<br />

16 201.2 1.580<br />

20 314.3 2.47<br />

25 491.1 3.85<br />

28 616.0 4.83<br />

32 804.6 6.31<br />

5.6. Construction joints :<br />

The concreting shall be done up to construction joints, but while commencing the work on the<br />

cold joints, the aggregates shall be exposed with high pressure water jet or any other method. It is<br />

preferable to expose the aggregates previously i.e. just after the closer <strong>of</strong> the work by wire<br />

brushing and cleaning. Cleaning may be done be by air water jetting or any other method.<br />

6. Concrete works.<br />

6.1. Grade <strong>of</strong> concrete<br />

The grade designation shall be as follows.<br />

a. Ordinary concrete M10, M15 & M20<br />

b. Standard concrete M25, M30, M35, M40, M45, M50 & M55<br />

c. High strength concrete M60, M65, M70, M75 & M80<br />

d. Concrete exposed to seawater shall be at least M20 & M30 for P.C.C. & R.C.C. respectively.<br />

The use <strong>of</strong> slag or pozzolana cement is advantageous under such conditions.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


19<br />

6.2. Workability <strong>of</strong> concrete<br />

Table –26<br />

Placing conditions<br />

Binding concrete; shallow sections; pavements using<br />

lavers;<br />

Mass concrete; lightly reinforced sections in slabs,<br />

beams, walls, columns; floors; hand placed pavements;<br />

canal lining; strip footings.<br />

Heavily reinforced sections in slabs, beams, walls,<br />

columns; slipfonn work; pumped concrete<br />

Trench fill;<br />

In-situ pilling<br />

Degree <strong>of</strong><br />

workability<br />

Slump (mm)<br />

1 2 3<br />

Very low Compacting factor from 0.75<br />

to 0.8 is suggested<br />

Low 25-75<br />

Medium 50-100<br />

75-10<br />

High 100-150<br />

Tremie concrete; Very high Refer IS :9103<br />

Note : For most <strong>of</strong> the placing conditions, internal vibrators (neddle vibrators) are suitable. The<br />

diameter <strong>of</strong> the needle shall be determined based on the density and spacing <strong>of</strong> reinforcement bars and<br />

thickness <strong>of</strong> sections. For tremie concrete, vibrators are not required to be used.<br />

6.3. Mild : Concrete surfaces protected against weather or aggressive conditions except those<br />

situated in coastal area.<br />

6.3.2. Moderate : Concrete surfaces sheltered from severe rain or freezing whilst wet.<br />

Concrete exposed to condensation and rain.<br />

Concrete continuously under water.<br />

Concrete in contact <strong>of</strong> buried under non-aggressive soils/ ground water.<br />

Concrete surfaces sheltered from saturated salt air in coastal area.<br />

6.3.3. Severe : Concrete surfaces exposed to severe rain, alternate wetting and drying or occasional<br />

freezing whilst wet or severe condensation. Concrete complitely immersed in sea water concrete<br />

expose to coastal environment.<br />

6.3.4. Very severe : Concrete surfaces exposed to sea water spray, corrosive fumes or severe freezing<br />

conditions whiles wet.<br />

Concrete incontact with or buried under aggressive sub-soil/ ground water.<br />

6.3.5. Extreme : Surface <strong>of</strong> members in tidal zone.<br />

Members indirect contact with liquid / solid aggressive chemicals.<br />

Exposure a.PCC<br />

Minimum W/C grade<br />

Cement ratio<br />

Content maximum<br />

Kg/(m 3 )<br />

Mild 220 0.6 --<br />

Moderate 240 0.6 M15<br />

Severe 250 0.50 M20<br />

Very severe 260 0.45 M20<br />

Extreme 280 0.40 M25<br />

b.PCC<br />

Mild 300 0.55 M20<br />

Moderate 300 0.50 M25<br />

Severe 320 0.45 M30<br />

Very severe 340 0.45 M35<br />

Extreme 360 0.40 M40<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


20<br />

6.4. Nominal mix concrete<br />

Table – 27<br />

The nominal mix concrete may be used for concrete <strong>of</strong> M20 grade and lower as per the table below:<br />

Grade <strong>of</strong> concrete<br />

Total qty. <strong>of</strong> dry<br />

aggregate for 50kg <strong>of</strong><br />

cement in kg<br />

Proportion <strong>of</strong> fine to<br />

coarse aggregate by<br />

mass<br />

Max. qty. <strong>of</strong> water<br />

per 50kg <strong>of</strong> cement in<br />

litre<br />

M5 800 Generally 60<br />

M 7.5 625 1:2 45<br />

M10 480 -- 34<br />

M15 330 -- 32<br />

M20 250 -- 30<br />

6.5. Design Mix : Ref. IS : 10262<br />

6.6. Placing : The concrete shall be placed and compacted before initial setting time <strong>of</strong> cement.<br />

6.7. Curing : The period for moisture curing shall be minimum 10 days. It may be extended upto 28<br />

days.<br />

6.8. Stripping time : Following stripping time may followed.<br />

Type <strong>of</strong> form work<br />

Minimum period before striking form work.<br />

a. Vertical 16-25 h<br />

b. S<strong>of</strong>fit form work to slab 3 days<br />

c. S<strong>of</strong>fit form work to beam 7 days<br />

d. Props to slab<br />

(i) Spanning upto 4.5m<br />

7 days<br />

(ii) Spanning over 4.5m<br />

14 days<br />

6.9 Nominal cover:<br />

Cover to be provided depending on exposure condition.<br />

Exposure<br />

Cover in mm<br />

Mild 20<br />

Moderate 30<br />

Sever 45<br />

6.9. Frequency <strong>of</strong> sampling : Depending on quantity <strong>of</strong> work, number <strong>of</strong> samples are to be taken.<br />

Qty. in m 3 No. <strong>of</strong> samples<br />

1-5 1 Set<br />

6-15 2 Set<br />

16-30 3 Set<br />

31-50 4 Set<br />

51 to above 4 plus one additional<br />

set for each 50m 3 or part.<br />

(one set= 6 Nos. <strong>of</strong> samples)<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


21<br />

6.10. Concrete works :<br />

Table – 28<br />

Sl.<br />

No.<br />

Test<br />

Frequency as per MoRTH<br />

A. Coarse aggregate<br />

1. Sieve analysis flakiness and elongation index One test for every 150m 3 or less<br />

2. Specific gravity, bulk density, moisture content and<br />

absorption.<br />

-do-<br />

3. Soundness -do-<br />

4. Abrasion, impact, aggregate crushing value -do-<br />

5. Organic impurities value<br />

6. Alkali-aggregate reactivity Twice in one season<br />

7. Petro-graphic test -do-<br />

B. Fine Aggregates<br />

1. Sieve analysis One test for every 1.50m 3 <strong>of</strong> sand<br />

2. Organic impurities -do-<br />

3. Soundness -do-<br />

4. Sp. Gravity, moisture contents and absorption -do-<br />

C. Cement<br />

1. Fineness One test for each brand and batch <strong>of</strong> cement<br />

2. Setting time -do-<br />

3. Compressive strength<br />

D. Finished concrete<br />

1. Slump test One test for each shift both at mixer and at placement<br />

site. As frequently as possible.<br />

2. Compressive strength -do-<br />

3. Cement content One test every 3 months<br />

6.12 Aceptance criteria for concrete (IS : 456-2000, clause-16):<br />

The concrete shall be deemed to comply with the strength requirements when both the following<br />

conditions are met.<br />

a. The mean strength determined from any group <strong>of</strong> four consecutive tests results shall<br />

satisfy the following conditions.<br />

(i) Mean strength :<br />

a. For M 13 grade : f a + 0.825 x established standard deviation<br />

(rounded to 0.5) N/mm 2<br />

OR<br />

Fa + 3N/mm 2 (which ever is greater).<br />

b. For M 20 grade : Mean strengthf a + 0.825 standard<br />

or above deviation (rounded to nearest 0.5) N/mm 2<br />

OR<br />

F a + 4N/mm 2 (which ever is greater).<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


22<br />

In absence <strong>of</strong> data for SD, the SD may be taken 3.5 for M 10 and M 15 grade, 4 for M 20 and M 25 grade and 5<br />

for M 30 to M 50 grade.<br />

b. Individual test results :<br />

For M 13 grade<br />

Strength f ck – 3N/mm 2<br />

For M 20 grade or above<br />

Strength f ck – 4N/mm 2<br />

(Where f ck is the characteristic strength <strong>of</strong> concrete)<br />

7. Common Burnt clay bricks :<br />

7.1. Brick classification : (IS : 1077 & IS : 2180)<br />

Class<br />

Average compressive strength<br />

(M/mm 2 )<br />

100 100<br />

75 75<br />

35 35<br />

30 30<br />

25 25<br />

20 20<br />

17.5 17.5<br />

15 15<br />

12.5 12.5<br />

10 10<br />

7.5 7.5<br />

5 5<br />

3.5<br />

7.2. Dimension : (IS : 1077)<br />

a. Modular<br />

Length (mm) Width (mm) Height (mm)<br />

190 90 90<br />

190 90 90<br />

b. Non-modular<br />

Length (mm) Width (mm) Height (mm)<br />

230 110 70<br />

230 110 30<br />

N. B. : Tolerance for 20 bricks <strong>of</strong> modular and non-modular are 80 mm &<br />

40mm for different heights.<br />

7.3. Water absorption : (IS : 3495).<br />

After immersion in cold water for 24 hours<br />

a. Upto class 12.5 : Maximum 20%<br />

b. Higher pressure : Maximum 15%<br />

7.4. Frequency <strong>of</strong> tests :<br />

20 bricks shall be tested out <strong>of</strong> 50,000 & 1,00,000 bricks in class 100 & 75.<br />

7.5. Grading <strong>of</strong> sand for plaster (IS : 1542).<br />

IS sieve designation (mm)<br />

Percentage passing by weight<br />

10 100<br />

4.75 95.100<br />

2.236 95-100<br />

1.18 90-100<br />

600 micron 80-100<br />

300 micron 20-65<br />

150 micron 0-50<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


23<br />

8. Pipes, pipe fitting valves and specials:<br />

WATER SUPPLY<br />

Pipes <strong>of</strong> different types and classes, pipe fittings, valves and specials used for pipe laying work should be manufacturer and<br />

factory tested hy7drostatically as per the relevant I.S. specifications as given below. The CI and DI pipes on DGS&D contract are to be<br />

tested by the agency authorized by DGS&D/EPM and PVC pipes and fittings are to be tested by CIPET (Central Institute <strong>of</strong> Plastic<br />

Engineering and technology).<br />

8.1. Pipe<br />

8.11. Reference to I.S. code :<br />

IS : 1536<br />

IS : 8329<br />

IS : 3589<br />

IS : 4985<br />

Specification for centrifugally cast spun iron pressure pipe for water, gas & sewege.<br />

Specification for centrifugally cast (spun) ductile iron pressure pipe for water, gas & sewege.<br />

Specification for electrically welded steel pipe (first revision)<br />

Specification for electrically welded steel pipes (first revision)<br />

IS : 4958<br />

IS : 10221<br />

IS : 11906<br />

Un plasticised PVC pipes for potable water supplies.<br />

Code <strong>of</strong> practice for coating and wrapping under ground steel pipes.<br />

Recommendation for cement master lining <strong>of</strong> cast iron milk steel and ductile Iron pipes and fitting for transport <strong>of</strong><br />

water.<br />

8.2. Pipe fittings and jointing materials.<br />

8.2.1. Reference to code :<br />

IS : 1538 Specification for cast iron fitting for pressure pipe (para 1 to 24) for water, gas & sewge<br />

IS : 10124 Febricated PVC fitting for potable water samples(para 1 to 13)<br />

IS : 782<br />

IS : 5383<br />

8.3. Valves and specials<br />

IS : 780<br />

IS : 2906<br />

IS : 2685<br />

IS : 5312<br />

Specification for caulking lead<br />

Rubber gaskets for double iron pipes.<br />

Specification for sluice valves for water works purpose (50mm to 300mm)<br />

Specification for sluice valves for water works purpose (350mm to 1200mm)<br />

Code <strong>of</strong> practice for selection installation and maintenance <strong>of</strong> sluice values.<br />

Specification for swing check type reflux (Non-return valves) for water works purpose.<br />

8.3. Inspection <strong>of</strong> pipes before final acceptance.<br />

Each pipe shall have cast, stamped or indelibly painted the trade mark <strong>of</strong> manufacturer, the nominal dia, class weight, batch<br />

number, last two digits <strong>of</strong> the year <strong>of</strong> manufacturer and also with ISI certificate mark. The pipes should bear the stamping <strong>of</strong> testing agency<br />

like DGS & D in case <strong>of</strong> CI & DI pipes CIPET in case <strong>of</strong> PVC pipes etc.<br />

8.3.1. Pipe laying<br />

8.3.2. Laying <strong>of</strong> cast iron pipes :<br />

Inspection <strong>of</strong> pipes before laying :<br />

Before laying the pipes and fittings shall be inspected for defects and be rung with a light hammer, preferably while suspended,<br />

to detect cracks. Smearing the outside with chalk dust helps in the location <strong>of</strong> cracks. If doubt persists further confirmation may be obtained<br />

by pouring a little kerosene on the inside <strong>of</strong> the pipe at the suspected spot. If crack is present, the kerosene seeps thorough and shows on the<br />

outer surface. Any pipe found unsuitable after inspection before laying shall be rejected.<br />

Laying should be done as per IS code <strong>of</strong> practice 3114 (Third Revision).<br />

a) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be less than 900mm measured from the top <strong>of</strong> pipe to the surface <strong>of</strong><br />

ground and not less than 750mm else where.<br />

b) Width <strong>of</strong> Trench : The width <strong>of</strong> trench should be 200 mm more on either side <strong>of</strong> the external dia <strong>of</strong> pipe (i.e. External<br />

dia <strong>of</strong> pipe + 2 x 200mm). Additional width shall be provided at position <strong>of</strong> sockets and flanges for jointing.<br />

c) Cover over the pipe- Minimum cover <strong>of</strong> 1M in recommended under road way and may be modified to meet the local<br />

condition.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


24<br />

8.3.3. Laying and jointing <strong>of</strong> ductile iron pipes :<br />

The pipes should be laid as per the specification laid down in IS : 12288.<br />

a) Width <strong>of</strong> Trench :- The width <strong>of</strong> trench at bottom shall provide not less than 200mm clearance on both sides <strong>of</strong> pipe (i.e.<br />

external dia <strong>of</strong> pipe + 2x 200mm)<br />

b) Cover over the pipe – In agricultural land the depth should be sufficient to provide cover not less than 900mm and under a<br />

roadway the cover should be minimum 1.0M.<br />

8.3.4. Laying <strong>of</strong> welded steel pipes :<br />

The laying should be done as per IS – 5822 (First revision).<br />

a) Width <strong>of</strong> Trench – The width at the bottom below in the faces should not be less than 200 mm clearance on either side <strong>of</strong><br />

the pipes.<br />

b) Cover over the pipe – When the pipeline is under a roadway, a minimum cover <strong>of</strong> 1.0 Meter should be provided and can be<br />

modified to suit the local condition by taking necessary precaution.<br />

c) Pipe welding :- In case <strong>of</strong> welding the pipe in the trench, additional excavation <strong>of</strong> not more than 600 mm in depth 900mm<br />

in length should be provided all round the pipe at the position <strong>of</strong> the joints for facility <strong>of</strong> welding.<br />

d) Coating and wrapping <strong>of</strong> pipes :- Against internal corrosion, steel pipes are given epoxy lining or hot applied coal<br />

tar/asphalt lining or rich cement mortar lining at works or the field by centrifugal process. The outer coating for under<br />

ground pipeline may be in cement sand gunniting or hot applied coal tar asphalt enamel reinforced with fiber glass fabric<br />

yarn. Coating and wrapping should be done as per IS 10221.<br />

8.3.5. Laying <strong>of</strong> PVC pipes :<br />

Laying and joining <strong>of</strong> PVC pipes should be done as per IS: 7634 (part – III).<br />

a) Width <strong>of</strong> trench :- The trench should be as narrow as practicable. As a normal practice this may be kept from 0.30M over the<br />

outside dia or pipe (i..e external dia <strong>of</strong> pipe + 30 cum.).<br />

b) Depth <strong>of</strong> Trench – The depth <strong>of</strong> trench should be 1.00M from the ground level.<br />

c) The trench bottom where it is rocky and un-even a layer <strong>of</strong> sand or alluvial earth <strong>of</strong> 100mm depth should be provided under the<br />

pipe.<br />

d) Jointing <strong>of</strong> pipes : Solvent welding technique <strong>of</strong>fers as easy and ample type <strong>of</strong> joint in PVC pipe used spigot and socket type<br />

joints. The cement solvent to be used for jointing should be as per the recommendations <strong>of</strong> the pipe manufacturer.<br />

8.4. Testing <strong>of</strong> pipe line after laying (field test pressure).<br />

After laying and jointing, the mains shall be slowly and carefully charged with water, so that all air is expelled from the main by<br />

providing a25mm inlet with a stop cock, allowed to stand full <strong>of</strong> water for a few days if time permits, and then tested with pressure.<br />

The field test pressure to be imposed should be not less than the maximum <strong>of</strong> the following.<br />

a) 1.5times the maximum sustained operating pressure.<br />

b) 1.5 times the maximum pipeline static pressure.<br />

c) Sum <strong>of</strong> the maximum sustained operating pressure and the maximum surge pressure.<br />

d) Sum <strong>of</strong> the maximum pipe line static pressure and the maximum equal to the work test pressure for any pipe fitting in corporate.<br />

9.0. Production wells (large dia tube wells):<br />

9.1. Materials for constructions :<br />

1. Casting pipes should be mild steel or UPVC pipes. Mild steel pipes should conform to IS :4270 and ASTM-DN-1785.<br />

The UPVC pipes should be <strong>of</strong> ASTM quality (Sch-40, Sch-80 or Sch-120 depending on site condition) and should<br />

also confirm to IS:2818.<br />

2. Well screens and slotted pipes should conform to IS : 8110. The well screens may be monometal, bimetal, stainless<br />

steel or PVC.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


25<br />

Sufficient opening should be provided for screens and slotted pipes so that 70% or more <strong>of</strong> sand grains in the natural aquifer<br />

where uniformity co-efficient should range between 2.0 to 2.50. For soils with uniformly coefficient less than 1.5, pea gravel pack should be<br />

used.<br />

The total area <strong>of</strong> opening should be such s to maintain on entrance velocity less than necessary to carry the finest particle <strong>of</strong> sand<br />

that is to be excluded by the screen. In general, it should be 4 to 6 cm/sec. With the gravel shrouding.<br />

The opening should preferably be ‘V’ shaped.<br />

3. Gravel to be used for shrouding (packing around the casing pipe) should confirm to IS : 4099. The gravel wall provided may vary<br />

in thickness to suit the size and depth <strong>of</strong> boring and may vary from 10cm to 25cm but usually 10cm.<br />

9.2. Construction <strong>of</strong> tube well :<br />

The drilling operation should be taken up with rotary drilling rig. Down the whole Hammer Rig or Combination Rig depending<br />

on type <strong>of</strong> strata and conforming to IS :2800 (Part-I).<br />

For drilling with rotary drilling rig in s<strong>of</strong>t formations, bentonite powder should be used in place <strong>of</strong> local mud as sealing<br />

compound to facilitate drilling operation. The casing pipe and well strainer should be lowered perfectly vertically and well screen should be<br />

properly placed against the aquifers. The casing pipe should be extended to at least 60 cm above the ground level.<br />

The annular space between the bore and the housing pipe (casing pipe) should be cement grouted upto at least 5m below ground<br />

level to provide a sanitary sealing.<br />

9.3. Testing and development <strong>of</strong> tube well :<br />

9.3.1. The testing <strong>of</strong> tube well should be conducted as per IS : 2800 (part-II).<br />

Tube wells are to be tested for plumbness and alignment normally after completion <strong>of</strong> drilling but immediately after the housing<br />

pipes are installed and prior to commencement <strong>of</strong> gravel fitting in the case <strong>of</strong> gravel shrouded tube well. For wells encased with pipes less<br />

than 350mm dia meter, the verticality <strong>of</strong> tube well shall have a deviation not exceeding 10cm per 30 m depth <strong>of</strong> the tube well and the<br />

deviation shall be in one direction and in one place only.<br />

In the case gravel shrouded tube well, if the pipe assembly is found included in a start position. It should be pulled in a desired<br />

directions to rectify the stantness and bringing the pipe assembly into permissible limit <strong>of</strong> verticality.<br />

9.3.2. <strong>Development</strong> <strong>of</strong> tubewell :<br />

The object <strong>of</strong> well development is the removal <strong>of</strong> silt, fine sand and other such materials form a zone immediately around the<br />

well, screen, there by creating larger passage in the formation through which water can flow more freely towards the wells.<br />

Well development includes the operation <strong>of</strong> flushing, testing and equipping the wells before they are put into service.<br />

The development should be carried on with an air compressor <strong>of</strong> suitable capacity (to develop 7kg to 10kg/Cm 2 and airflow <strong>of</strong><br />

2m 3 /min) In accordance with IS : 11189, and the process should be continued until the stabilization <strong>of</strong> sand gravel pack and<br />

discharge <strong>of</strong> clear water is fully assured.<br />

10. Pumping sets :<br />

10.1. Reference & code<br />

IS 1520<br />

IS 6595<br />

IS 9684<br />

IS 1710<br />

IS 8034<br />

IS 10825<br />

IS 325/19758<br />

IS 7538<br />

The pumping sets and accessories should conform to following IS specification:<br />

Horizontal centrifugal pumps for clear cold fresh water (2 nd revision)<br />

Horizontal centrifugal pumps for clear cold fresh water for Agricultural purpose (first revision).<br />

Selection, installation, operation and maintenance <strong>of</strong> Horizontal centrifugal pumps for agricultural purpose.<br />

Vertical turbine pumps for clear. Cold fresh water (1 st revision).<br />

Submersible pump sets for clear, cold, fresh water.<br />

Foot valve, Reflex value or non return valve and bore valves to be used in suction line <strong>of</strong> agriculture pumping sets.<br />

(first revision).<br />

Three phase induction motors.<br />

Motors for submersible pumps<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


26<br />

10.2. Inspection <strong>of</strong> pumps before final acceptance.<br />

1. The name plates <strong>of</strong> the pump and motor with details like Sl. No.- Head, Discharge, rpm, HP/KW <strong>of</strong> motor etc<br />

engraved on the name plate should be clearly verified to confirm within the pumping set is as per the supply order.<br />

2. Manufacturer’s test report along with laboratory hydrostatic test reports <strong>of</strong> the pumps should be verified to know the<br />

duty <strong>of</strong> pump.<br />

3. The supplier should give at lest one copy <strong>of</strong> specific installation and operation manual <strong>of</strong> the pumping sets supplied<br />

by them.<br />

4. The field test for pumps should be conducted to confirm the duty <strong>of</strong> pumps after ins installation.<br />

10.3. Pump installation<br />

The installation <strong>of</strong> centrifugal pumps should proceed through five stages in the following order.<br />

1. Preparing the foundation and locate the foundation bolts.<br />

2. Locating the pump on the foundation bolts, however resting on leveling wedges, which permit not only easy leveling but also<br />

space for fitting the grunt later on.<br />

3. Levelling<br />

4. Grouting<br />

5. Alignment<br />

The foundation should be sufficiently substantial to absorb vibrating and to form a permanent, rigid support for the base plate.<br />

Alignment <strong>of</strong> the pump sets should be checked even if they are received aligned by the<br />

manufacturer. The alignment should be proper both for parallelism (by filler gauge) and for coasiablity (by<br />

straight edge or by dial gauge).<br />

During all alignment- checks both the shafts should be pressed hard, over to one side while talking<br />

the readings alignment should also be checked after fastening the piping and there after periodically<br />

during operation.<br />

Submersible pumps with wet type motors should be fitted with water and the opening should be<br />

properly plugged after filling water.<br />

Pumps kept in storage for a long time should be thoroughly cleaned before installation.<br />

10.4. Testing <strong>of</strong> pumps :<br />

There are two types <strong>of</strong> pumps testing.<br />

1. Testing in the shop or laboratory at the manufacturer works.<br />

2. Testing in the field after installation<br />

(i)<br />

(ii)<br />

(iii)<br />

Every pump must be tested before it is finally accepted. It is necessary for comparision <strong>of</strong><br />

specified, predicated and actual performance after installation, relating to head, discharge power,<br />

efficiency and suction requirements centrifugal pumps should be listed as per IS-9137 (Class ‘C’<br />

code <strong>of</strong> testing) and IS-11346.<br />

The scheme <strong>of</strong> testing includes taking readings, doing calculation and plotting <strong>of</strong><br />

The H-Q characteristics<br />

The P-Q characteristics.<br />

The efficiency versus Q characteristics<br />

11. Water Quality<br />

11.1. Recommended guidelines for physical and chemical parameter:<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


27<br />

Sl.<br />

No.<br />

Characteristics *Acceptable **Cause for<br />

1. Turbidity (NTU) 1 10<br />

2. Colour (Units on Platinum Cobalt scale) 5 25<br />

3. Teste and Odour Unobjectionable Objectionable<br />

4. PH 7.0 to 8.5 9.0<br />

5. Total dissolved solids (mg/I) 500 2000<br />

6. Chlorides (as CI) (mg/I) 20 600<br />

7. Chlorides (as CI) (mg/I) 200 1000<br />

8. Sulphates (as SO 4 (mg/I) 200 400<br />

9. Fluorides (as F) (mg/I) 1.0 1.5<br />

10. Nitrates (as NO 3 (mg/I) 45 45<br />

11. Calcium (as Ca) (mg/I) 75 200<br />

12. Magnesium (as Mg) (mg/I) 30 150<br />

If there are 250 mg/I <strong>of</strong> sulphates, Mg content can be increased to a amximum <strong>of</strong> 125mg/I<br />

with the reduction <strong>of</strong> sulphates at the rate <strong>of</strong> I unit per every 2.5 units <strong>of</strong> sulphates.<br />

Sl.<br />

No.<br />

Characteristics *Acceptable **Cause for<br />

13. Iron (as Fe) mg/I 0.1 1.0<br />

14. Manganese (as Mn) mg/I 0.05 0.5<br />

15. Copper (as Cu) (mg/I) 0.05 1.5<br />

16. Aluminium (as AI) (mg/I) 0.03 0.2<br />

17. Residual Chloride (mg/I) 0.2 >1.0<br />

18. Zinc (as Zn) (mg/I) 5.0 15.0<br />

19. Phenolic compounds (as Phenol) (mg/I) 0.001 0.002<br />

20. Anionic detergents (mg/I) (as MBAS) 0.2 1.0<br />

21. Mineral Oil (mg/I) 0.01 0.03<br />

TOXIC MATERIALS<br />

22. Arsenic (as As) (mg/I) 0.01 0.05<br />

23. Cadmium (as CD) (mg/I) 0.01 0.01<br />

24. Chromium<br />

(as hexavalent Cr) (mg/I) 0.05 0.05<br />

25. Cyanides (as CN) (mg/I) 0.05 0.05<br />

26. Lead (as Pb) (mg/I) 0.05 0.05<br />

27. Selenium (as SC) (mg/I) 0.01 0.01<br />

28. Mercury (total as Hg)<br />

(mg/I) 0.001 0.001<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


28<br />

29. Polynuclear aromatic 0.2 0.2<br />

Hydrocarbons (PAH) (ug/I)<br />

Pesticides (total, mg/I) Absent Refer to WHO<br />

guidelines for drinking<br />

water quality Vol.-I-<br />

1993<br />

RADIO ACTIVITY<br />

30. Gross Alpha activity (Bq/I) 0.1 0.1<br />

31. Gross Beta activity (Bq/I) 0.1 1.0<br />

The figures indicated under the column ‘Acceptable’ are the limits upto which water is generally<br />

acceptable to the consumers.<br />

Figures in excess <strong>of</strong> those mentioned under ‘Acceptable’ render the water not acceptable,<br />

but still may be tolerated in the absence <strong>of</strong> an alternative and better source but upto the limits<br />

indicated under column “Cause for Rejection” above which the sources will have to be rejected.<br />

It is possible that some mine and spring waters may exceed these radio activity limits and in such<br />

cases it is necessary to analyses the individual radio-nuclide order to assess the acceptability or otherwise<br />

for public consumption.<br />

<br />

Sr. Divisional Manager<br />

(Building Project)-II<br />

O.T.D.C. <strong>Ltd</strong>.<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


29<br />

PROFORMA-'A'<br />

CERTIFICATE OF LIST OF WORKS IN HAND (Clause No.49 (i) <strong>of</strong> DTCN)<br />

I/We do hereby certify that the following works have been executed by me/us in<br />

the past.<br />

Sl.<br />

No.<br />

Particulars <strong>of</strong><br />

works now in<br />

hand<br />

Amount <strong>of</strong><br />

each work<br />

Period which the work<br />

is stipulated to be<br />

completed<br />

(in month)<br />

Approximate value<br />

<strong>of</strong> work done<br />

against each work<br />

on the date <strong>of</strong><br />

submission <strong>of</strong><br />

Tender<br />

Deptt. Under which<br />

the work is being<br />

taken up.<br />

1 2 3 4 5 6 7<br />

Remarks<br />

I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date________________<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


CERTIFICATE OF EMPLOYMENT OF UN-EMPLOYED GRADUATE ENGINEERS/DIPLOMA HOLDERS<br />

(For Special Class and 'A' Class Contractors only)<br />

I/We do hereby certify that at present the following Engineering personnel are working with<br />

me/in our firm/company and their bio-data are furnished below:<br />

Sl.<br />

No.<br />

Name <strong>of</strong><br />

Engineering<br />

personnel<br />

appointed for<br />

supervising<br />

contractor's<br />

works with<br />

address<br />

Qualification<br />

Date <strong>of</strong><br />

appointment<br />

Monthly<br />

emolument<br />

Whether<br />

full time<br />

engagement<br />

and<br />

continuous<br />

30<br />

If they are<br />

Superannuated/<br />

Retired/ dismissed or<br />

removed personnel from<br />

State <strong>Govt</strong>./ Central<br />

<strong>Govt</strong>./ Public sector<br />

undertakings/ Private<br />

companies and firms or<br />

any one ineligible for<br />

<strong>Govt</strong>. service.<br />

1 2 3 4 5 6 7<br />

I/We also note that non-submission <strong>of</strong> this certificate will render my/our tenders liable for<br />

rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date________________<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


31<br />

PROFORMA-'B'<br />

CERTIFICATE OF LIST OF WORKS EXECUTED (Clause<br />

No.49(ii) <strong>of</strong> DTCN)<br />

I/We do hereby certify that the following works have<br />

been executed by me/us in the past.<br />

Sl.<br />

No.<br />

Particulars <strong>of</strong><br />

works already<br />

executed<br />

Approxim<br />

ate<br />

amount<br />

<strong>of</strong> each<br />

work<br />

Name <strong>of</strong><br />

Deptt.<br />

under which<br />

the works<br />

were<br />

executed<br />

Period <strong>of</strong><br />

commencem<br />

ent and<br />

period <strong>of</strong><br />

completion<br />

Whether the<br />

works were<br />

completed in<br />

stipulated<br />

period<br />

1 2 3 4 5 6 7<br />

Remarks<br />

I/We also note that, non-submission <strong>of</strong> this certificate will render my/our tender liable for<br />

rejection.<br />

Signature <strong>of</strong> the tenderer<br />

Date________________<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


WORK PROGRAMME<br />

32<br />

Name <strong>of</strong> the Work:“<strong>Development</strong> <strong>of</strong> Brahmapura under Brahamapura-Nuagarh-Kuadoli-<br />

Nandinia-Jhanjibandha as a Tourist Destination In <strong>Orissa</strong>.”.<br />

Time<br />

Description <strong>of</strong> work<br />

1 st Month ………………………………………………………………………………………………………………………..<br />

2 nd Month ………………………..………………………………………………………………………………………………<br />

3 rd Month ……………………………………………………………………………………………………………………….<br />

4 th Month …………………………………………………………………………………………………………………………<br />

5 th Month ………………………………………………………………………………………………………………………..<br />

6 th Month ………………………………………………………………………………………………………………………..<br />

7 th Month …………………………………………………………………………………………………………….<br />

8 th Month …………………………………………………………………………………………………………….<br />

9 th Month …………………………………………………………………………………………………………….<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


33<br />

TENDER SCHEDULE FOR DEVELOPMENT OF BRAHAMAPURA UNDER<br />

BARHAMAPURA-HINDOL-NUAGARH-KUADOLI-NANDINIA-JHANJIBANDHA<br />

AS A TOURIST DESTINATION IN ORISSA<br />

Estimated cost: - Rs.46.72lakhs<br />

E.M.D:- 1 % <strong>of</strong> Estimated amount<br />

Sl.<br />

CIVIL WORK<br />

No.<br />

Unit Qnty Rate Amount<br />

Civil work<br />

1 Earth work excavation<br />

Earth work in excavation <strong>of</strong> foundation trenches and<br />

column foundation and pits in Hard soil/ Gravelly soil<br />

and depositing materials within 50m initial lead and<br />

1.5m initial lift including rough dressing as per<br />

direction and specification <strong>of</strong> the department<br />

including stacking the useful materials separately as<br />

ordered as per direction <strong>of</strong> Engineer-in-charge<br />

including cost <strong>of</strong> all labour, sundries, Tools & plants<br />

etc. complete. Cum 438.05 52.00 22778.60<br />

2. Earthwork (open well)<br />

Earth work excavation in hard rock(other than<br />

granite and disintigration) removed by chiselling<br />

dressing and levelling the bed not exceeding 1.5 mt<br />

depth depositing the soil within initial lead <strong>of</strong> 50mt<br />

and as per specification for 1st depth <strong>of</strong> 1.5m (up to<br />

5') cum 75.09 377.00 28308.93<br />

2nd depth <strong>of</strong> 1.5m (up to 10') cum 44.43 571.70 25400.63<br />

3rd depth <strong>of</strong> 1.5m (up to 15') cum 44.43 764.33 33959.18<br />

4th depth <strong>of</strong> 1.5m (up to 20') cum 44.43 956.96 42517.73<br />

5th depth <strong>of</strong> 1.5m (up to 25') cum 44.43 1149.60 51076.73<br />

3 Back filling<br />

Filling foundation trenches and plinth with<br />

excavated materials in layers not exceeding 0.3mtr.<br />

in depth including watering, ramming and dressing<br />

and levelling the top to proper level or gadient,<br />

including cost <strong>of</strong> all labour,sundries, T&P etc.,<br />

complete as per direction <strong>of</strong> the Engineer-in-charge. Cum 88.52 34.67 3068.99<br />

4 Sand filling<br />

Filling foundation trenches and plinth with sweet<br />

river sand, well watered and compacted in layers <strong>of</strong><br />

0.225 mtr, top surface dressed and levelled to<br />

proper gradient including cost <strong>of</strong> all materials,<br />

conveyance, all taxes and royalties, loading and<br />

unloading, including cost <strong>of</strong> all labour, T&P, sundries<br />

etc. complete in all respect as per direction <strong>of</strong> the<br />

Engineer-in-charge. Cum 159.79 305.20 48767.91<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


5 P.C.C - (1:4:8)<br />

Providing and laying plain cement concrete (1:4:8) in<br />

foundation and bottom layers <strong>of</strong> flooring etc. using<br />

40mm size black hard crusher broken granite metal<br />

<strong>of</strong> approved quality from approved quarry including<br />

mixing, lowering laying and compacting to proper<br />

thickness, watering and curing for the required<br />

period as per direction <strong>of</strong> the Engineer-in-charge,<br />

including cost <strong>of</strong> all materials with all taxes and<br />

royalities, loading and unloading conveyance, all<br />

labour, all sundries and T&P etc. complete. Cum 77.92 2525.00 196750.53<br />

6 C.C(1:2:4)<br />

Cement Concrete (1:2:4) using 12mm size broken<br />

granite chips <strong>of</strong> approved quality from approved<br />

quarry including mixing, lowering laying and<br />

compacting to proper thickness, watering and curing<br />

for the required period as per direction <strong>of</strong> the<br />

Engineer-in-charge, including cost <strong>of</strong> all materials<br />

with all taxes and royalities, loading and unloading<br />

conveyance, all labour, all sundries and T&P etc.<br />

complete. etc. complete. Cum 22.27 3823.20 85142.66<br />

7 Laterite (1:6 F & P )<br />

Laterite masonry in cement mortar (1:6) after<br />

spraying water over the Laterite to clean it from<br />

the dust/ mud particles before use in foundation<br />

& plinth as per drawings. including cost,<br />

conveyance, all taxes, royalties, loading and<br />

unloading <strong>of</strong> all materials, including cost <strong>of</strong> all<br />

labour, scaffolding, watering and curing, sundries,<br />

T&P etc. complete as per the direction <strong>of</strong> the<br />

Engineer-in-charge. Cum 92.81 1902.90 176608.15<br />

8 Laterite (1:6 F & P )(open well)<br />

Laterite stone masonary in cement mortar (1:6) in<br />

Foundation and Plinth including watering and curing<br />

for seven days with cost, conveyance, royality,<br />

taxes <strong>of</strong> all materials, labour and T&P required for<br />

the work etc complete and as per direction <strong>of</strong><br />

Engineer-in-charge. cum 49.05 1974.60 96854.13<br />

9 Laterite (1:6 Superstructure )<br />

Laterite masonry in cement mortar (1:6) after<br />

spraying water over the Laterite to clean it from<br />

the dust/ mud particles before use Superstructure<br />

as per drawings. including cost, conveyance, all<br />

taxes, royalties, loading and unloading <strong>of</strong> all<br />

materials, including cost <strong>of</strong> all labour, scaffolding,<br />

watering and curing, sundries, T&P etc. complete Cum 162.68 1944.84 316386.57<br />

34<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


as per the direction <strong>of</strong> the Engineer-in-charge.<br />

10 C.B Bricks (1:6 F & P)<br />

Providing 1st class clamp burnt bricks masonry work<br />

using C.B.bricks having crushing strength not<br />

less than 35Kg/Sqcm in cement mortar (1:6) after<br />

immersing the bricks for minimum 6 hours in<br />

water before use in Foundation Plinth as per<br />

drawings. including cost, conveyance, all taxes,<br />

royalties, loading and unloading <strong>of</strong> all materials,<br />

including cost <strong>of</strong> all labour, scaffolding, watering<br />

and curing, sundries, T&P etc. complete as per the<br />

direction <strong>of</strong> the Engineer-in-charge. Cum 20.61 2159.30 44492.38<br />

11 C.B Bricks (1:6 Superstructure)<br />

Providing 1st class clamp burnt bricks masonry work<br />

using C.B.bricks having crushing strength not<br />

less than 35Kg/Sqcm in cement mortar (1:6) after<br />

immersing the bricks for minimum 6 hours in<br />

water before use in Superstructure as per<br />

drawings. including cost, conveyance, all taxes,<br />

royalties, loading and unloading <strong>of</strong> all materials,<br />

including cost <strong>of</strong> all labour, scaffolding, watering<br />

and curing, sundries, T&P etc. complete as per the<br />

direction <strong>of</strong> the Engineer-in-charge. Cum 14.39 2192.30 31547.20<br />

12 C.B Bricks (1:4 Superstructure)<br />

Providing 1st class clamp burnt bricks masonry work<br />

using C.B.bricks having crushing strength not<br />

less than 35Kg/Sqcm in cement mortar (1:4) after<br />

immersing the bricks for minimum 6 hours in<br />

water before use in Superstructure and using<br />

cost <strong>of</strong> 6mm dia. Rod as per drawings. including cost,<br />

conveyance, all taxes, royalties, loading and<br />

unloading <strong>of</strong> all materials, including cost <strong>of</strong> all<br />

labour, scaffolding, watering and curing, sundries,<br />

T&P etc. complete as per the direction <strong>of</strong> the<br />

Engineer-in-charge. Cum 6.69 2959.60 19799.72<br />

13 R.C.C- M20<br />

Providing, lifting, hoisting and laying Reinforced<br />

cement concrete <strong>of</strong> M-20 Grade in footing, Lintels,<br />

Chajja,Ro<strong>of</strong> slabs, Column, Beam etc. with 12mm to<br />

20mm size black hard crusher broken granite chips<br />

<strong>of</strong> approved quality from approved quarry including<br />

mixing and compacting to proper shape and size,<br />

level and plumbs and finishing the exposed surfaces<br />

smooth including cost <strong>of</strong> scaffolding, watering and<br />

curing for the required period including cost <strong>of</strong> all<br />

materials with taxes, royalties transportation, Cum 87.02 3750.80 326394.62<br />

35<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


loading and unloading, all labour, sundries, T&P<br />

including hire & running charges <strong>of</strong> concrete mixer<br />

and vibrator etc completed as per the direction <strong>of</strong><br />

the Engineer-in-charge but excluding the cost <strong>of</strong><br />

materials and labour for reinforcement bars ,<br />

centering and shuttering for the work.<br />

14 Centering and shuttering<br />

Providing strong, rigid, leveled and plumbed<br />

centering and shuttering to required shape and size<br />

for all kinds <strong>of</strong> R.C.C. works in the items mentioned<br />

below with wooden or steel centering materials with<br />

all necessary bracing, ties and supports with level<br />

centering covered with bituminous paper including<br />

provision <strong>of</strong> necessary holes and pockets, electrical<br />

conduit pipe, P.H. pipes, fan hooks or boxes, switch<br />

and board insert plates, clamps and extension bars<br />

etc. as per the direction <strong>of</strong> the Engineer-in-charge<br />

and dismantling and removing the shuttering after<br />

the required interval from the date <strong>of</strong> casting,<br />

including cost <strong>of</strong> all materials with transportation,<br />

taxes, loading and unloading etc. and all labour,<br />

sundries, T&P scaffolding etc. complete.<br />

a) Foundation & plinth beam Sqm 27.93 67.20 1876.90<br />

b) Column foundation Sqm 53.34 67.20 3584.45<br />

c) Lintel Sqm 20.86 155.10 3235.39<br />

d) Ro<strong>of</strong> slab(flat) Sqm 178.40 225.10 40157.84<br />

e) Slab(slope) Sqm 88.10 262.00 23082.20<br />

f) Chajja Sqm 7.70 225.10 1733.27<br />

g) Beam & Column Sqm 276.60 305.70 84556.62<br />

h) fin & concrete wall Sqm 33.60 259.40 8715.84<br />

15 Reinforcement (TOR Fe-415)<br />

Providing & fixing TOR Fe-415 reinforcement bars<br />

for RCC work <strong>of</strong> required diameter <strong>of</strong> approved<br />

quality with straightening, cutting, bending, binding<br />

welding and joining (if necessary) and tying the grills<br />

and placing in position as required for R.C.C. work<br />

and providing fan hooks, hoisting, lowering and laying<br />

including cost, conveyance and taxes <strong>of</strong> M.S. Rods or<br />

tor steel and binding wires <strong>of</strong> 18 to 20 gauge and<br />

labour required for the work for bending, binding<br />

and tying the grills in all heights as per the<br />

specification & direction <strong>of</strong> E-I-C. (Linear<br />

measurements will be taken & quantity will be<br />

calculated on standard weight. Weight <strong>of</strong> binding<br />

wire will not be considered for measurement.) Qtl. 85.45 4932.00 421439.40<br />

16 16mm thick Plaster<br />

36<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


Providing 16mm thick cement plaster to the inside<br />

surface <strong>of</strong> C.B Brick masonary wall with cement<br />

mortar (1:6) including racking out joints, scraping<br />

and cleaning the surface and finishing the plaster<br />

surface smooth using wooden floats only to proper<br />

plumbs and level as per drawings including cost <strong>of</strong> all<br />

materials, conveyance, loading and unloading, all<br />

taxes and royalties, all labour, scaffolding, watering<br />

and curing, sundries and T&P etc. complete as per<br />

direction <strong>of</strong> the Engineer-in-charge Sqm 170.50 76.40 13026.20<br />

17 12mm thick Plaster<br />

Providing 12mm thick cement plaster to the outside<br />

surface <strong>of</strong> C.B Brick Masonary wall with cement<br />

mortar (1:6) including racking out joints, scraping<br />

and cleaning the surface and finishing the plaster<br />

surface smooth using wooden floats only to proper<br />

plumbs and level as per drawings including cost <strong>of</strong> all<br />

materials, conveyance, loading and unloading, all<br />

taxes and royalties, all labour, scaffolding, watering<br />

and curing, sundries and T&P etc. complete as per<br />

direction <strong>of</strong> the Engineer-in-charge Sqm 98.76 56.60 5589.82<br />

18 6 mm thick Plaster<br />

Providing 6mm thick ceiling plaster (1:4) in all floors<br />

finished smooth to inside rough surface <strong>of</strong> ceiling<br />

after chiping & ceiling properly including watering<br />

and curing with cost, conveyance, royalties and<br />

taxes <strong>of</strong> all materials and cost <strong>of</strong> all labour with T &<br />

P required for the work etc. complete.as per<br />

direction <strong>of</strong> Engineer-in-charge. Sqm 444.47 60.20 26757.09<br />

19 Flush Pointing (1:3)<br />

Cement Flush pointing to the stone masonry in<br />

cement mortar(1:3) after raking out the joints<br />

watering, curing etc. complete including cost <strong>of</strong><br />

conveyance , royalities, taxes and cost <strong>of</strong> all<br />

materials, T&P etc. complete in all respect. Sqm 1157.97 60.30 69825.591<br />

20 Providing 12mm thick cement plaster with cement<br />

mortar <strong>of</strong> (1:4) including neat cement punning,<br />

finished smooth to proper level with bitumen<br />

painting over top <strong>of</strong> walls as bearing plaster<br />

including cost <strong>of</strong> all materials, conveyance, loading<br />

and unloading, all taxes and royalties, all labour,<br />

scaffolding, watering and curing , sundries and T&P<br />

etc. complete as per direction <strong>of</strong> the Engineer-incharge.<br />

Sqm 10.90 68.20 743.38<br />

21 Decorative cement plaster<br />

20mm thick Decorative cement plaster including<br />

37<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


colour mixing if required as per the drawing., Data<br />

per sqm complete with all cost, convelance, royality,<br />

taxes <strong>of</strong> all materials, labour, T & P required for<br />

the work etc complete and as per direction <strong>of</strong><br />

Engineer-in-charge.<br />

PCC sqm 22.07 1345.50 29695.19<br />

22 Grading Concrete<br />

Providing 25mm Avg. thick grading concrete ( 1:2:2)<br />

over 2 coats <strong>of</strong> waterpro<strong>of</strong>ing treatment on ro<strong>of</strong><br />

slabs using 6 mm thick & down graded-chips after<br />

chipping, chiselling and cleaning the surface by wire<br />

brushing, watering and curing etc. complete<br />

including cost, conveyance, royalties and taxes <strong>of</strong> all<br />

materials and labour , T & P required for the work<br />

etc. complete in all floor as per direction <strong>of</strong><br />

Engineer-in-charge. Sqm 189.60 147.90 28383.12<br />

23(a)<br />

Flooring (Ceramic tiles)<br />

Providing & fixing premium quality( 300 x300 x<br />

7mm) thick ceramic tiles flooring <strong>of</strong> approved<br />

colour over 20mm thick bed in C.M. (1:1) and make<br />

(Johnson / Bell / KAJARIA or equivalent)<br />

confirming to IS specification in floors filling joints<br />

with epoxy grout <strong>of</strong> approved quality etc. complete<br />

in all respects as per direction <strong>of</strong> the Engineer-incharge.<br />

sqm 24.85 704.80 17514.28<br />

38<br />

(b) Fixing ceramic tile in dadoes skirting on 12mm thick<br />

cement plaster (1:3) jointed with neat cement slurry<br />

and ceramic tile <strong>of</strong> make (Johnson / Bell /<br />

KAJARIA or equivalent) confirming to IS<br />

specification in dadoos and skarting filling joints<br />

with epoxy grout <strong>of</strong> approved quality etc complete in<br />

all respects as per direction <strong>of</strong> the Engineer-incharge.<br />

Sqm 125.79 660.40 83071.72<br />

24 Kota Stone(1:1)<br />

Providing & fixing Kota stone <strong>of</strong> minimum 16mm<br />

thick (area above 0.10sqm) in floor using 25mm thick<br />

cement mortar (1:1) <strong>of</strong> approved quality, colour and<br />

filling joints with epoxy grout <strong>of</strong> approved quality<br />

etc. complete in all respects as per direction <strong>of</strong> the<br />

Engineer-in-charge.<br />

<strong>Development</strong> <strong>of</strong> park(stepped pathway) sqm 238.47 756.80 180474.10<br />

25 Flooring(Marble tiles)<br />

Providing & fixing marble tile minimum 16mm thick<br />

flooring (area above 0.10sqm to 0.40sqm) flooring<br />

over 25mm thick bed in C.M. (1:1) and confirming to Sqm 114.73 908.30 104209.26<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


IS specification in floors filling joints with epoxy<br />

grout <strong>of</strong> approved quality etc. complete in all<br />

respects as per direction <strong>of</strong> the Engineer-in-charge<br />

26 Artificial stone flooring<br />

25mm thick artificial stone flooring with cement<br />

concrete( 1:2:4) laid to a proper slope in two layers<br />

bottom layer being 20mm with min. 12mm size down<br />

graded hard granite stone chips and the top layer<br />

gmm thick down graded with 6mm chips <strong>of</strong> approved<br />

quality <strong>of</strong> stone from an approved quarry including<br />

rounding the corners, watering, curing, with all cost,<br />

conveyance, royalities, T&P etc. complete as per the<br />

directions <strong>of</strong> the EIC. Sqm 5.95 140.10 833.60<br />

27 Teracota tiles in ro<strong>of</strong> slab<br />

Fixing teracota tiles on ro<strong>of</strong> on 12 mm thick cement<br />

plaster (1:3) jointed with neat cement slurry mixed<br />

with pigments to match the shade <strong>of</strong> the tiles<br />

including rubbing and polishing complete. Sqm 38.55 522.73 20151.24<br />

28 Texture paint<br />

Providing texture paint to exterior surfaces<br />

including cost <strong>of</strong> all materials, labour, conveyance,<br />

taxes, royalities, scaffolding, watering, curing,<br />

sundries, tools and plants etc., as per the direction<br />

<strong>of</strong> the Engineer-in-charge. Sqm 1376.91 300.00 413073.00<br />

29 Plastic paint<br />

Providing and applying 2 coats <strong>of</strong> plastic paint<br />

approved quality over a coat <strong>of</strong> POP and shade, over<br />

a coat <strong>of</strong> cement primer <strong>of</strong> approved quality over<br />

the surface (interior) including preparation <strong>of</strong><br />

surface, B278 sand papering the intermediate coats,<br />

providing necessary putty work including cost <strong>of</strong> all<br />

materials, labour, conveyance, taxes, royalities,<br />

scaffolding, watering, curing, sundries, tools and<br />

plants etc., as per the direction <strong>of</strong> the Engineer-incharge.<br />

Sqm 474.85 69.90 33192.02<br />

30 Enamel Paints<br />

Painting two coats with synthetic enamel paint <strong>of</strong><br />

approved quality and approved shade confirming to<br />

ISI on steel/wood work to give an even shade over a<br />

coat <strong>of</strong> primer <strong>of</strong> approved quality and shade<br />

including sand papering and making the surface<br />

smooth in all floors at all heights including cost,<br />

conveyance, loading, unloading, taxes <strong>of</strong> all<br />

materials, labour, sundries, T& P scaffolding<br />

required for the work and complete in all respect as<br />

per specifications and directions <strong>of</strong> Engineer-in- Sqm 43.72 70.90 3099.75<br />

39<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


charge.<br />

31 Glazed Ventilator<br />

Glazed Ventilator <strong>of</strong> size 600mm x 600mm with<br />

teak wood frame <strong>of</strong> size 75mm x 37.5mm in crosssection.<br />

including all fitting including cost <strong>of</strong><br />

materials all taxes labour, T&P etc complete as per<br />

direction <strong>of</strong> engineer-in-charge. Sqm 3.62 3020.30 10933.49<br />

32 Sliding window<br />

Supplying fitting, fixing up window (sliding type)<br />

made up aluminum section 151-154, 151-155 as<br />

window frame section no 151-155,151-153 and 151-<br />

167 as shutter frame with 5mm thick black glass as<br />

panel fitted with rubber beading including locking<br />

arrangement including all fitting including cost <strong>of</strong><br />

materials all taxes labour, T&P etc complete as per<br />

direction <strong>of</strong> engineer-in-charge. Sqm 2.92 3133.30 9149.24<br />

33 Sal wood Choukaths<br />

Supplying, fitting and fixing in position well dressed,<br />

well seasoned sal wood work in choukaths size (75<br />

mm x125mm ) which should be free from serious<br />

defects such as dead knots, flows etc. in all floors<br />

including two coats <strong>of</strong> coaltarring to wall side faces,<br />

6 nos. <strong>of</strong> W.I. Clamps and required screws with<br />

approved quality including cost, conveyance,<br />

royalties and taxes <strong>of</strong> all materials and cost <strong>of</strong> all<br />

labour with T & P required for the work and<br />

complete as per the direction <strong>of</strong> Engineer-incharge.<br />

Cum 0.09 34213.40 3079.21<br />

34 Providing fitting and fixing 25mm thick Piasal wood<br />

or local teak wood pannel shutter complete including<br />

mending and cutting sizes <strong>of</strong> grooves in chowkaths<br />

and for over lapping portion <strong>of</strong> the shutters where<br />

necessary supplying, fitting fixing wooden hinged<br />

cleats, sand blocks and fixing oxidised iron or<br />

chromium plated, iron/ steel aldrops, tower bolts,<br />

handles, iron hinges screws etc. complete as per<br />

requirement and any additional fittings as directed<br />

by the Engineer-in-charge in all floors . Sqm 3.13 3031.60 9488.91<br />

35 PVC Door<br />

Providing and fixing 30mm thick factory made PVC<br />

rigid foam paneled door shutters manufactured by<br />

M/s Rajshri or equivalent made from M.S. tube <strong>of</strong><br />

19 gauge thickness, size 19x19mm for styles and<br />

15x15mm for top and bottom rails, covered with<br />

heat moulded PVC “C” channel <strong>of</strong> 5mm thick sheet<br />

and 30x50mm wide to form styles and 5mm thick Sqm 8.45 2700.00 22815.00<br />

40<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


and 75mm wide PVC sheets for top rail, lock rail and<br />

bottom rail on other side and 5mm thick, 20mm wide<br />

cross PVC sheet as gap insert for top rail and<br />

bottom rail, paneling <strong>of</strong> 5mm thick PVC sheet fitted<br />

in the M.S. frame welded/sealed to the styles and<br />

rails with 5x30mm PVC sheet beading on either side<br />

and joined together with solvent cement adhesive<br />

etc., complete as per manufacturers specification<br />

including fixing frames with 4 Nos. M.S. powder<br />

coated butt hinges complete including one 10inch<br />

aluminium aldrop & two aluminium tower bolts <strong>of</strong><br />

10inch and 6inch and two aluminium handles cost <strong>of</strong><br />

all materials, conveyance, loading, unloading, and<br />

taxes <strong>of</strong> all materials, cost <strong>of</strong> all labour, sundries,<br />

T&P required for the work as per direction <strong>of</strong> E-I-C<br />

36 Plinth protection<br />

Providing plinth protection 600mm wide having inner<br />

wall <strong>of</strong> 125x450mm in C.B. Bricks masonry in CM<br />

(1:6)over 100mm thick base PCC (1:4:8)100mm thick<br />

inside sand filling, 75mm thick flooring base in<br />

CC(1:4:8 ) 12mm thick C.P in C.M.1:4 complete with<br />

necessary slopes, dressing and leveling the earth all<br />

round the building including the cost <strong>of</strong> all<br />

materials, labour, all taxes, royalties,<br />

transportation, loading and unloading, watering and<br />

curing, sundries T&P etc.complete as directed by<br />

the <strong>of</strong> E-I-C. Sqm 25.41 240.86 6120.25<br />

37 Granite flooring<br />

Providing & fixing <strong>of</strong> granite slab20mm thick and<br />

above 0.4 sq.m in floor over 25mm thick cement<br />

mortar (1:1) to proper slope, line and level including<br />

cutting to required size and shape, fixing at corners<br />

and splays etc. including filling the joints with white<br />

cement and color pigment to match the color and<br />

shade <strong>of</strong> tiles and cleaning the surface complete as<br />

per the design & drawing with cost <strong>of</strong> all materials,<br />

labour, conveyance, taxes , T&P etc. complete as per<br />

the direction <strong>of</strong> Engineering-in-charge Sqm 84.23 1930.00 162563.90<br />

38 Stainless steel<br />

Supplying, fitting and fixing <strong>of</strong> stainless steel <strong>of</strong><br />

304 grade in hand railing using 50mm dia <strong>of</strong> 2mm<br />

thick circular pipe with Balustrade <strong>of</strong> size<br />

32mmx32mmx 2mm @ 0.90mtr c/c as per approved<br />

design and specification ,buffing,polishing etc with<br />

cost, conveyance, royality, taxes <strong>of</strong> all materials,<br />

labour and T&P required for the work etc complete Rmt 9.41 3137.70 29525.76<br />

41<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


and as per direction <strong>of</strong> Engineer-in-charge.<br />

39 RCC railing(M-20)<br />

Providing & fixing <strong>of</strong> decorative R.C.C railing (M-20),<br />

750mm height prefabricated with balustrade<br />

complete as per approved architectural drawings &<br />

including colouring cost, conveyance, royalties and<br />

taxes <strong>of</strong> all materials, labour, T&P, sundries etc.<br />

required for the work complete as per direction <strong>of</strong><br />

the E-I-C.<br />

<strong>Development</strong> <strong>of</strong> park (stepped pathway) RMT 187.15 1030.90 192932.94<br />

40 M. S Fan Hooks<br />

Providing fitting, fixing fan hook M.S. round rod <strong>of</strong><br />

16mm dia ( SAIL Steel) with all cost <strong>of</strong> material,<br />

labour, conveyance, T&P and complete as per the<br />

direction <strong>of</strong> Engineer-in-charge. Nos. 6.00 45.00 270.00<br />

41 M.S. grill<br />

Supplying, fitting and fixing <strong>of</strong> powder coated M.S.<br />

grill and gate made out <strong>of</strong> M.S. square bar / M.S.<br />

flats / M.S. angles as per approved drawing and<br />

design, cutting to required size and welding<br />

properly, finished smooth and sand papering,<br />

including cost, conveyance, taxes <strong>of</strong> all materials,<br />

required screws, cost <strong>of</strong> all labour, T&P etc. as<br />

required for the work complete as per direction <strong>of</strong><br />

the Engineer-in-charge in all floors. Kg 654.19 60.00 39251.40<br />

42 <strong>Development</strong> <strong>of</strong> site fencing and approach road to<br />

pump house site and including all cost <strong>of</strong> all material,<br />

labour, all taxes, royalties, transportation, loading<br />

and unloading, watering and curing, sundries T&P<br />

etc.complete as directed by the <strong>of</strong> E-I-C. Cum 11.32 367.20 4156.70<br />

43 Supplying, fitting and fixing <strong>of</strong> R,C.C POST with<br />

barbed wire using 3ply barbed wire in 6" c/c <strong>of</strong><br />

approved quality for fencing, fixing by means <strong>of</strong><br />

staples and straining hook tying with G:I wire<br />

including cos <strong>of</strong> barbed wire staples hooks and tying<br />

wire and cost <strong>of</strong> all material , labour, all taxes,<br />

royalties, transportation, loading and unloading,<br />

watering and curing, sundries T&P etc.complete as<br />

directed by the <strong>of</strong> E-I-C. Rft 120.00 250.51 30061.20<br />

INTERNAL ELECTRIFICATION<br />

44 Recessed wiring to light point and exhaust fan point<br />

in 20mm dia non-metallic fexible conduit pipe with<br />

1.5 sqmm single core copper wire & earth continuity<br />

in 1sqmm PVC insulated copper wire and modular<br />

type 6Amp. 1way plate type Modular switch,<br />

A CIVIL WORK TOTAL 3666942.93<br />

42<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


(Polycarbonate) and G.I box <strong>of</strong> adequate size<br />

including PVC bend, saddle, elbow, etc including cost<br />

<strong>of</strong> all materials, labours, transportation, T & P etc.<br />

complete as per direction <strong>of</strong> the Engineer-in-charge<br />

a) Short point Nos. 16.00 470.00 7520.00<br />

b) Medium point Nos. 18.00 701.00 12618.00<br />

c) Long point Nos. 6.00 1011.00 6066.00<br />

45 Recessed wiring to ceiling fan point in 20mm dia nonmetallic<br />

fexible conduit pipe with 1.5sqmm single<br />

core copper wire & earth continuity in 1sqmm PVC<br />

insulated copper wire and modular type box cover,<br />

step type regulator and switch etc. complete<br />

including cost <strong>of</strong> all materials, labours,<br />

transportation, T & P etc. complete as per direction<br />

<strong>of</strong> the Engineer-in-charge. Nos. 4.00 927.00 3708.00<br />

46 Recessed wiring to 6A plug point in 20mm dia nonmetallic<br />

flexible conduit pipe with 1.5sqmm single<br />

core copper wire & earth continuity in 1sqmm PVC<br />

insulated copper wire and modular type box cover,<br />

switch and socket etc. complete including cost <strong>of</strong> all<br />

materials, labours, transportation, T & P etc.<br />

complete as per direction <strong>of</strong> the Engineer-in-charge. Nos. 6.00 576.00 3456.00<br />

47 Supplying and fixing <strong>of</strong> 6A plug in modular type<br />

box cover, switch and socket G.I box <strong>of</strong> adequate<br />

size including PVC bend, saddle, elbow, etc and other<br />

necessary materials & labour etc. complete including<br />

cost <strong>of</strong> all materials, labours, transportation, T & P<br />

etc. complete as per direction <strong>of</strong> the Engineer-incharge.<br />

Nos. 4.00 355.00 1420.00<br />

48 Supplying, fixing <strong>of</strong> 20A plug in modular type box<br />

cover, switch and socket etc. complete G.I box <strong>of</strong><br />

adequate size including PVC bend, saddle, elbow,<br />

including cost <strong>of</strong> all materials, labours,<br />

transportation, T & P etc. complete as per direction<br />

<strong>of</strong> the Engineer-in-charge . Nos. 6.00 648.00 3888.00<br />

49 Recessed wiring to sub main with 2 x 2.5 + 1 x 1sqmm<br />

single core PVC insulated copper wire run inside<br />

20mm dia heavy duty polythene conduit with PVC<br />

bend, saddle, screw etc along with other necessary<br />

materials including cost <strong>of</strong> all materials, labours,<br />

transportation, T & P etc. complete as per direction<br />

<strong>of</strong> the Engineer-in-charge and labour. Mtr 216.00 106.00 22896.00<br />

50 Recessed wiring to sub main with 2 x 4 + 1 x 1.5sqmm<br />

single core PVC insulated copper wire run inside<br />

20mm dia heavy duty polythene conduit with PVC<br />

bend, saddle, screw etc along with other necessary Mtr 95.00 144.00 13680.00<br />

43<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


materials including cost <strong>of</strong> all materials, labours,<br />

transportation, T & P etc. complete as per direction<br />

<strong>of</strong> the Engineer-in-charge<br />

51 Supplying, fitting & fixing <strong>of</strong> 900mm ceiling fan<br />

(Bajaj-model elegance/ Havells –Fusion Metalic) or<br />

equivalent make including cost <strong>of</strong> GI pipe including<br />

cost <strong>of</strong> all materials, labours, transportation, T & P<br />

etc. complete as per direction <strong>of</strong> the Engineer-incharge<br />

Nos. 4.00 1933.00 7732.00<br />

52 Supply, fitting & fixing <strong>of</strong> exhaust fan (make<br />

Bajaj/Crompton greaves)including nut bolt & wire<br />

including cost <strong>of</strong> all materials, labours,<br />

transportation, T & P etc. complete as per direction<br />

<strong>of</strong> the Engineer-in-charge No. 6.00 1500.00 9000.00<br />

53 Supplying, fitting & fixing <strong>of</strong> 5 watt LED Bulb<br />

(Fortune Art/ Equivalent )Make including cost <strong>of</strong> all<br />

materials, labours, transportation, T & P etc.<br />

complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 15.00 3800.00 57000.00<br />

54 Supplying, fitting & fixing <strong>of</strong> 16 watt LED tube light<br />

(Fortune Art/ Equivalent)Make including cost <strong>of</strong> all<br />

materials, labours, transportation, T & P etc.<br />

complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 2.00 6552.00 13104.00<br />

55 Supplying, fitting & fixing <strong>of</strong> 10 watt LED street<br />

light (Fortune Art/ Equivalent )Make including cost<br />

<strong>of</strong> all materials, labours, transportation, T & P etc.<br />

complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 2.00 9801.00 19602.00<br />

56 Supplying, fitting & fixing <strong>of</strong> 8 way Double door<br />

distribution box with I/C -40 A DP MCB -1No , O/G<br />

- 6/10A sp MCB -6No including cost <strong>of</strong> all materials,<br />

labour, T &P etc. complete as per direction <strong>of</strong><br />

Engineer-in-charge Nos. 2.00 3200.00 6400.00<br />

57 Supplying, fitting & fixing <strong>of</strong> 12 watt LED par light<br />

(Fortune Art/ Equivalent )Make including cost <strong>of</strong> all<br />

materials, labours, transportation, T & P etc.<br />

complete as per direction <strong>of</strong> the Engineer-in-charge Nos. 6.00 5784.00 34704.00<br />

58 Supplying <strong>of</strong> 3 phase 50 HZ submersible pump set<br />

suitable for with head <strong>of</strong> 55mt. & discharge <strong>of</strong> 4.5<br />

LPS (7.5H.P) complete ( Make -KSB/ TEXMO). Set 1.00 35900.00 35900.00<br />

59 Supplying ,fitting and fixing <strong>of</strong> 4sqmm 3core flat<br />

copper cable suitable for above pump set confirming<br />

to relevant IS specification with ISI mark.(Make-<br />

Finolex/BCH/Polycab) Mtr 160.00 130.00 20800.00<br />

60 Supplying ,fitting and fixing <strong>of</strong> 3phase star delta<br />

fully automatic control panel with Ampere meter<br />

,voltmeter, single phasing over load relay and<br />

indicator lamp etc Nos 1.00 9500.00 9500.00<br />

44<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


B Total 288994.00<br />

C.ILLUMINATION<br />

61 Supplying, installation, testing and commissioning <strong>of</strong><br />

stone lantern <strong>of</strong> Khandalite stone <strong>of</strong> height 3'<br />

having minimum 3'8" above ground level with<br />

required foundation etc. complete suitable for use<br />

with 5W LED Bulb (Fortune Art/ Equivalent Make)<br />

as per specification and direction <strong>of</strong> the Engineer in<br />

charge. Nos 20.00 13300.00 266000.00<br />

62 Supply <strong>of</strong> all required material and laying, testing,<br />

commissioning <strong>of</strong> following sizes1.1KV grade PVC<br />

insulated armored aluminium/copper power cable<br />

excavation <strong>of</strong> cable trench <strong>of</strong> 750 mm deep in all<br />

kinds <strong>of</strong> soil, 150 mm thick and filling, brick<br />

covering,<br />

a) 4 core x 16sqmm armored. AL cable. Mtrs 70.00 293.00 20510.00<br />

b) 2 core x 6sqmm Ar. Cu. cable. Mtrs 165.00 323.00 53295.00<br />

c) 2 core x 2.5sqmm Ar Cu. cable. Mtrs 250.00 218.00 54500.00<br />

63 Supply, delivery, installation, testing and<br />

commissioning <strong>of</strong> L.T. outdoor floor mounted ,Double<br />

door type main distribution boards made out <strong>of</strong> 2<br />

mm thick CR sheet metal duly acid treated with<br />

powder coated body as per specification and<br />

direction <strong>of</strong> the Engineer in charge.<br />

(a) Main panel :<br />

Incoming<br />

100 Amp 35 kA 415 V FP MCCB - 1 No.<br />

1 set <strong>of</strong> 3 phase150 Amp copper busbar<br />

0-500 V voltmeter - 1 No. with selector switch<br />

0-100 Amp Ampere Metre - 1 No. with selector<br />

switch<br />

PH indicater -6 nos.<br />

(b) 100/5 Amp CT coil - 3 nos.<br />

Out going :<br />

40 A F.P C/O - 1 Nos.<br />

40 Amp DP MCB - 4 Nos.<br />

25 Amp SP MCB - 4 Nos. Set 1.00 38000.00 38000.00<br />

64 EARTHING<br />

(i) Supply and installation including all connections <strong>of</strong><br />

earth electrode stations comprising <strong>of</strong> :<br />

40 mm dia class - 'B' G.I. Pipe 2.5 mt. long.<br />

(a) Digging <strong>of</strong> earth pit, placing <strong>of</strong> G.I. Pipe in the pit<br />

and filling up <strong>of</strong> the same with a mixture <strong>of</strong> 150 kg.<br />

Salt 50 kg. <strong>of</strong> charcoal and rest with good clay<br />

earth all firmly compact into the pit. Nos. 2.00 1500.00 3000.00<br />

(b) 30 cm. at the top portion at the pipe having a G.I. Mtr. 30.00 90.00 2700.00<br />

45<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


Hinges shall be enclosed in a brick work chamber<br />

built up to 10 cm below G.I. and upto 30 cm above<br />

G.I. Chamber which shall have 450 mm x 450 mm<br />

inside dimension will have a G.I. Hinge cover<br />

(c) Providing and fixing <strong>of</strong> No. 8 SWG copper wire on<br />

surface or recessed as required for connection etc.<br />

as per the direction <strong>of</strong> Engineer-in-charge/<br />

Consultant. Mtr. 30.00 70.00 2100.00<br />

C Total= 440105.00<br />

D. P.H & SANITARY<br />

P.H. (Internal )<br />

65 Supplying all materials, labour, T&P and providing<br />

and fixing to wall or ceiling and floor PVC pipes<br />

conforming to ASTM-D- 1785/89( Sch-8) & pipe<br />

fitting <strong>of</strong> the following nominal bore with clamps<br />

including making good the wall or ceiling etc. and<br />

complete as per the direction <strong>of</strong> E-I-C.<br />

a) 15mm dia Mtr. 10.00 87.36 873.60<br />

b) 20mm dia Mtr. 10.00 113.86 1138.60<br />

66 Supplying all material, labour , T&P & fitting ,fixing<br />

the following different water supply fittings <strong>of</strong><br />

brand AJAYA & ASTRA approved make with<br />

including supply <strong>of</strong> all necessary jointing materials<br />

etc. all complete as directed by the Engineer-incharge.<br />

CPVC ball valve.<br />

a) 20mm dia brass ball valve Each 6.00 217.83 1306.98<br />

67 Supplying all materials, labour, T&P and cutting the<br />

holes through the existing brick work including<br />

making good the damages in CM ( 1:4 ) for taking<br />

G.I/PVC/CPVC pipe and fitting etc. and complete as<br />

per the P.H. specification & direction <strong>of</strong> E-I-C.<br />

a) 250mm thick wall Each 4.00 16.56 66.24<br />

b) 375mm thick wall Each 2.00 24.84 49.68<br />

68 Supplying all materials, labour, T&P and providing<br />

and fixing brass / CP fittings <strong>of</strong> the following<br />

nominal bore with supply <strong>of</strong> all jointing materials<br />

complete as per the specification and direction <strong>of</strong><br />

E-I-C<br />

a) 15mm dia brass Bib Cock (JAQUAR , Cat, No - 037) Each 4.00 513.80 2055.20<br />

c) 15mm dia CP Pillar cock(JAQUAR.Cat. No.-011) Each 4.00 523.80 2095.20<br />

d) 15mm dia CP angular stop cock(JAQUAR, Cat. No.-<br />

051) Each 4.00 503.80 2015.20<br />

e) Soap Dish(Cat.no- 7731)(JAQUAR ,Continental,<br />

Cat.No-1133 ) Each 6.00 637.13 3822.78<br />

f) CP Grating (125mm) Each 6.00 50.00 300.00<br />

46<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


g) Connecting Pipe Each 6.00 90.00 540.00<br />

h) Towel ring (JAQUAR continental CAT.NO -1121 ) Each 6.00 680.73 4084.38<br />

i) Basin ( Parry wareCat. No-C0491) Each 3.00 1292.50 3877.50<br />

69 Supplying all materials, labour, T&P and fixing<br />

Mirror for superior glass mounted on 6mm thick<br />

A.C. sheet or ply wood sheet and fixed to wooden<br />

plugs with CP screws and washers , complete as per<br />

the P.H specification and direction <strong>of</strong> E-I-C.<br />

a) 600 x 450 mm ( Bevelled type) Each 3.00 561.9 1685.7<br />

70 Supplying all materials , labour & T&P and fixing<br />

Urinal Squatting 45 x 35 to the floor in cement<br />

mortar (1:1) etc., all complete as per specification<br />

and direction <strong>of</strong> the Engineer-in-charge. (Hindustan<br />

,Cat. No-60003) Each 3.00 1009.15 3027.45<br />

71 Supplying all materials , labour, T&P and fixing water<br />

closet, squatting pan(Indian type W.C pan/<strong>Orissa</strong><br />

pattern squatting pan) duly embedded in Cement<br />

concrete (1:3:6) using 12 mm size hard granite metal<br />

all complete as per specification and direction <strong>of</strong><br />

the Engineer-in-charge.(Hindustan Sanitary),Cat.<br />

No-20004 Each 2.00 1593.90 3187.80<br />

72 Supplying all materials , labour, T&P and fixing<br />

Cystern all complete as per specification and<br />

direction <strong>of</strong> the Engineer-in- charge.<br />

Cystern(Parryware:C8136) Each 1.00 6689.29 6689.29<br />

73 Supplying all materials , labour & T&P and fixing<br />

wash down water closet(European type W.C pan)<br />

with integral "S" or "P" trap to the floor with<br />

wooden plug and chromium plated screw including<br />

jointing the trap with soil pipe in cement mortar<br />

(1:1) etc., all complete as per specification and<br />

direction <strong>of</strong> the Engineer-in-charge.(Hindustan ,Cat.<br />

No-20061) Each 1.00 3515.65 3515.65<br />

INTERNAL SEWERAGE DISPOSSAL & SANITARY INSTALLATION<br />

74 Supplying all materials, labour, T&P and providing<br />

and fixing SWR PVC soil waste pipe and fittings<br />

<strong>of</strong> the following outside diameter confirming to<br />

the IS- 13592/1992 to walls with nails , bobbins<br />

and wooden pegs cemented by non heat application<br />

method as per manufacturer's specification<br />

testing, earth work in excavation in all kind <strong>of</strong> soil<br />

and refilling <strong>of</strong> trenches as per the specification<br />

and direction <strong>of</strong> E-I-C.<br />

a) 110mm dia ( ISI Marked ) Mtr. 15.00 226.92 3403.80<br />

b) 150mm dia ( ISI Marked) Mtr. 11.00 453.96 4993.56<br />

47<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


75 Supplying all materials, labour T&P for jointing <strong>of</strong><br />

48<br />

the UPVC SWR SEWER pipe fittings <strong>of</strong> standard<br />

make duly approved by the Engineer-in-charge with<br />

joining material etc. suitably required for fixing on<br />

100mm dia soil waste pipe complete with requisite<br />

testing as directed by Engineer-in-charge.<br />

a) "P" Trap Each 4.00 406.02 1624.08<br />

b) 110mm dia Bend Plain Each 4.00 115.75 463.00<br />

c) 110mm Door Bend Each 4.00 142.58 570.32<br />

d) 110mm dia. Floor trap Each 4.00 172.95 691.80<br />

76 Fixing <strong>of</strong> UPVC vent pipes Including labour & T&P<br />

all complete as directed by the Engineer-in-charge.<br />

b) 110mm Vent Cowl Nos 2.00 25.27 50.54<br />

77 Supplying all materials, labour, T&P for<br />

construction <strong>of</strong> 350mm x 350mm size Gulley trap<br />

chamber by K.B.Bricks masonry having crushing<br />

strength 75 to 99 Kg/sqcm with 250mm x 250mm<br />

CI grating including labour & material for fitting<br />

and fixing 100mm X 100mm sqare mouth SW gulley<br />

trap with supply <strong>of</strong> all jointing materials and<br />

encasing the gully trap with a block <strong>of</strong> C.C. 1:4:8<br />

with 40mm size hard stone metal all complete<br />

with providing & fixing <strong>of</strong> 450mm X 450mm precast<br />

RCC cover with frame as per approved design<br />

and specification and as per the instruction <strong>of</strong> the<br />

Engineer-in-charge including cost, conveyance<br />

taxes <strong>of</strong> all materials to site complete as directed<br />

by Engineer-in-charge. Each 2.00 341.35 682.70<br />

78 Supplying all materials, labour, T&P and<br />

construction <strong>of</strong> inspection chamber <strong>of</strong> the<br />

following sizes with cement concrete ( 1:3:6 ) using<br />

40mm size h.g.metal on the bed , 1st class K.B.<br />

brick work in cm ( 1:6 ) moulding & shaping the<br />

channel inside and benching with cement concrete<br />

( 1:2:4) using 12mm size h.g. chips, 12mm thick<br />

cement plaster in cm (1:3) with punning inside ,<br />

flash pointing to out side in cm ( 1:3 ) R.C.C cover<br />

slab In CC ( 1:2:4 )using 12mm size h.g. chips ,<br />

earth work in excavation in all kind <strong>of</strong> soil around<br />

the chamber including watering, curing, conveyance<br />

<strong>of</strong> all materials to the work site royalty, taxes etc.<br />

complete all respect as per P.H. specification and<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


direction <strong>of</strong> E-I-C .<br />

a) 760mm x 760mm x 460mm Each 1.00 4189.07 4189.07<br />

EXTERNAL SEWERAGE DISPOSSAL:-<br />

79 Construction <strong>of</strong> brick masonary Soak pit <strong>of</strong> size<br />

49<br />

1.1mt.dia and 3mt. depth with R.C.C cover slab<br />

as<br />

per approved drawing & design &<br />

complete as per<br />

P.H. specification and directions <strong>of</strong> the Engineerin-charge.<br />

a) Inside dia. 1.10 mtr. Each 1.00 10563.30 10563.30<br />

EXTERNAL WATER SUPPLY<br />

80 Supplying all labour ,T&P and laying <strong>of</strong> GI pipe/ PVC<br />

pipes fittings and specials <strong>of</strong> approved make and<br />

testing etc complete including all costs <strong>of</strong> labour<br />

and materials T & P required for the work etc<br />

complete and as per direction <strong>of</strong> Engineer-incharge.<br />

a) 50mm dia G.I pipe (heavy) Mtr 300.00 320.00 96000.00<br />

b) 25mm PVC pipe (10kg/cm2) Mtr 290.00 120.00 34800.00<br />

c) 63mm PVC pipe (6kg/cm2) Mtr 500.00 110.00 55000.00<br />

81 Supplying all labour ,T&P and fitting and fixing <strong>of</strong><br />

full way valve /sluice valve <strong>of</strong> approved make with<br />

supplying <strong>of</strong> all jointing materials ,T&P etc all<br />

complete including cost<br />

<strong>of</strong> f.w.v labour and<br />

materials T & P required for the work etc complete<br />

and as per direction <strong>of</strong> Engineer-in-charge.<br />

a) 50mm dia F.W.V Nos 4.00 1050.00 4200.00<br />

b) 25mm dia F.WV Nos 3.00 620.00 1860.00<br />

82 Supplying all materials, labour ,T&P and<br />

construction <strong>of</strong> F.W.V chamber as per approved<br />

drawing and design with all fittings and fixing ,T&P<br />

etc all complecte including cost <strong>of</strong> f.w.v labour and<br />

materials T & P required for the work etc complete<br />

and as per direction <strong>of</strong> Engineer-in-charge.<br />

a) F.W.V Chambers Nos 7.00 2000.00 14000.00<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II


50<br />

83 Supplying all materials, labour ,T&P and<br />

construction <strong>of</strong> single mouth stand post<br />

as per<br />

approved drawing and design with all fittings and<br />

fixing ,T&P etc all complete including cost <strong>of</strong><br />

F.W.V labour and materials T & P required for the<br />

work etc complete and as per direction <strong>of</strong><br />

Engineer-in-charge.<br />

a) Stand Post Nos 1.00 3000.00 3000.00<br />

TOTAL 83(Eighty-three) only.<br />

D Total= 276423.42<br />

TOTAL AMOUNT=(A+B+C+D)= 4672465.35<br />

SAY= 4672500.00<br />

N.B: The tenderer is required to quote only the percentage excess or less over the<br />

estimated cost here-below both in words and figures :<br />

___________________ ( _______________________________________ )<br />

(in figures)<br />

(in words)<br />

No. <strong>of</strong> Correction ……………………………….<br />

No. <strong>of</strong> Overwriting……………………………….<br />

No. <strong>of</strong> Interpolation……………………………….<br />

CONTRACTOR<br />

SR. DIVISIONAL MANAGER (BP)-II