Information Doc RFPWTE - Petroleum Corporation Of Jamaica
Information Doc RFPWTE - Petroleum Corporation Of Jamaica
Information Doc RFPWTE - Petroleum Corporation Of Jamaica
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NEPM Region – Hadden, Tobolski and <strong>Doc</strong>tors Wood<br />
Table 7.0 DESCRIPTION of North Eastern Waste Shed<br />
NEPM Tobalski Hadden <strong>Doc</strong>tors wood<br />
Service Area St. Ann St. Ann Portland & St. Mary<br />
Location<br />
Tobalski<br />
occupies a mined<br />
out bauxite pit on<br />
karstic limestone<br />
in the Rio Bueno<br />
Limestone<br />
Haddon occupies a mined<br />
out bauxite pit within a<br />
closed karstic limestone<br />
depression on the White<br />
River Limestone Aquifer<br />
of the Dry Harbour<br />
<strong>Doc</strong>tors Wood is<br />
locate in a coastal<br />
freshwater swamp<br />
within the Buff Bay<br />
River Limestone<br />
Aquifer.<br />
Aquifer. Mountain Basin.<br />
Size 4.9 Hectares 3.9 Hectares Unknown<br />
Surrounding<br />
Land use<br />
Communities<br />
Accessibility<br />
to Water &<br />
Electricity<br />
Residential Residential Residential<br />
Lincoln, Benny Hadden Community, Buff Bay and Hart<br />
and Goshen Walkerswood, Moneague, Hill<br />
and Clapham<br />
No potable Tanks but no piped water No potable water, no<br />
water, no supply. Water is<br />
electricity.<br />
electricity. transported by vehicle. No<br />
electricity.<br />
Table 7,1<br />
WASTE INTAKE at North eastern Waste shed<br />
Average Tons Per Day<br />
Disposal Site 2007 2008<br />
(Jan – June)<br />
Tobalski 36.9 70.1<br />
Hadden 100.3 101.4<br />
<strong>Doc</strong>torswood 31.9 43.55<br />
<strong>Information</strong> for WTE RFP<br />
PCJ’s Centre of Excellence for Renewable Energy Page 22 of 56