Highways Act Orders and Schemes
Highways Act Orders and Schemes
Highways Act Orders and Schemes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
St<strong>and</strong>ard Key<br />
2.7 The following key conventions are used.<br />
Line Order<br />
Routes of new trunk road <strong>and</strong> slip roads<br />
Routes of other new highways<br />
(see scheme detail below)<br />
Route of new main trunk road on slip road Order<br />
Detrunking Order<br />
Road ceasing to be trunk road<br />
Trunking Order<br />
Road becoming trunk road<br />
Notes within the key<br />
2.8 The following note should be included on the plan folio cover with the key where<br />
new construction is being carried out,<br />
“This plan shows the centre line of the new Trunk Road(s) but not the width or<br />
construction detail.”<br />
Scheme detail<br />
2.9 For an Order showing a new road, little scheme detail should be added to the<br />
Ordnance base. Where a link road (new highway) is included in the Side Roads<br />
Order that will connect the scheme to the existing local network, this can also be<br />
shown diagrammatically by black <strong>and</strong> white dashes on the plan for a Section 10<br />
Order to make the Order easier to underst<strong>and</strong>. Where separate <strong>Orders</strong> are being<br />
prepared for the main line <strong>and</strong> the slip roads the slip roads should be marked by<br />
black <strong>and</strong> white dashes on the line Order plan. On the plan for the slip road Order<br />
the main line should be shown by two solid lines. The marking should be included<br />
in the key (see St<strong>and</strong>ard Key above).