3. <strong>Schemes</strong> under Section 16 of the <strong>Highways</strong> <strong>Act</strong><br />
Extent of Plans<br />
Requirement of Regulations<br />
3.1 The Regulations require that the detail must be shown for at least 67 metres<br />
to either side of the centre line of a new road shown in the Scheme plan. This<br />
includes 67 metres from any new connecting roads. The plan must be an up-todate<br />
Ordnance Survey base.<br />
Scale<br />
Requirement of Regulations<br />
3.2 The Regulations require any Scheme plan for a new special road to be at a scale<br />
of not less than 1:10,000.<br />
3.3 For a large scheme, 1:10,000 will normally be appropriate. For small schemes, a<br />
larger scale should be considered.<br />
Markings<br />
Requirement of Regulations<br />
3.4 That the new centre line of any new route included in the Scheme plan is shown<br />
by a solid black line not more than 1.5 mm wide.<br />
St<strong>and</strong>ard Key<br />
3.5 The following key conventions are used<br />
Line of new special road <strong>and</strong> slip roads<br />
Routes of other new highways<br />
(see scheme details below)<br />
Notes within Key<br />
3.6 The following note should be included in the key where new construction is being<br />
carried out.<br />
“This plan shows the centre line of the new special road(s) but does not show<br />
width or construction details”.<br />
13