New grade-separated junctions<br />

2.15 The plan should show the full extent of the new trunk road line <strong>and</strong> slip roads as<br />

solid black lines, <strong>and</strong> to show the existing roundabout <strong>and</strong> connecting roads as<br />

new highways with black <strong>and</strong> white dashes.<br />

Numbering <strong>and</strong> lettering<br />

Line Order<br />

2.16 The start <strong>and</strong> end points of the new trunk road should be lettered A <strong>and</strong> B (<strong>and</strong><br />

the route <strong>and</strong> distance will be described in the line Order Schedule). Where<br />

there are a number of sections, the lettering will continue C - D, E - F etc, working<br />

across the plan from left to right. Slip roads will be numbered 1, 2 etc (<strong>and</strong> also<br />

described in the Line Order Schedule).<br />

Detrunking Order<br />

2.17 The route to be detrunked should be marked with broad black dashes <strong>and</strong><br />

lettered at either end of each section of detrunking (<strong>and</strong> the route <strong>and</strong> distance<br />

will be described in the detrunking Order Schedule). Care should be taken to<br />

identify the precise extent of the route to be detrunked to ensure that the whole<br />

route is included.<br />

2.18 Where a section of trunk road is to be stopped up there is no requirement to<br />

include it in the detrunking Order. On occasion, it may be appropriate to close a<br />

part width of a trunk road whilst detrunking the remainder, for example where one<br />

carriageway of an existing trunk road will be retained as a local road but the other<br />

is being stopped up.<br />

2.19 On the detrunking Order plan, the treatment is to show the existing roundabout to<br />

the point where it links to the local road network as ‘road ceasing to be trunk road’.<br />

Trunking Order<br />

2.20 Trunking is h<strong>and</strong>led in a similar way to detrunking. It is shown by an open ladder<br />

marking <strong>and</strong> lettered at each end of the section to be trunked.<br />

11