01.06.2014 Views

Why PLM Projects Fail - ProSTEP iViP

Why PLM Projects Fail - ProSTEP iViP

Why PLM Projects Fail - ProSTEP iViP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Product Lifecycle Management<br />

General comments (1): Profit Outlook and Result<br />

Complexity of Products and Processes Integrated Holistic Concept Conclusion<br />

Institute for Virtual Product Engineering<br />

<br />

What is the optimal relationship between effort and result?<br />

Result<br />

100%<br />

With 20% effort<br />

80% results<br />

Optimal <strong>PLM</strong> Point<br />

Effort<br />

Prof. Dr.-Ing. Martin Eigner <strong>ProSTEP</strong> <strong>iViP</strong> Symposium 2009 Slide: 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!